Volumn 133, Issue 4, 2007, Pages 268-276

Project planning for construction under uncertainty with limited resources

Author keywords

Construction industry; Project management; Resource management; Uncertainty principles

Indexed keywords

CONTROL POLICIES; RESOURCE MANAGEMENT; UNCERTAINTY PRINCIPLES;

EID: 33947389629     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2007)133:4(268)     Document Type: Article
Times cited : (19)

References (23)
  • 1
    • 0019342681 scopus 로고
    • Scheduling subject to resource constraints: Classification and complexity
    • Blazewicz, J., Lenstra, J. K., and Rinnooy Kan, A. H. G. (1983). " Scheduling subject to resource constraints: Classification and complexity.. " Discrete Appl. Math., 5, 11-24.
    • (1983) Discrete Appl. Math. , vol.5 , pp. 11-24
    • Blazewicz, J.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3
  • 2
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple-mode version
    • Bouleimen, K., and Lecocq, H. (2003). " A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple-mode version.. " Eur. J. Oper. Res., 149, 268-281.
    • (2003) Eur. J. Oper. Res. , vol.149 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 3
    • 0032736579 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: Notation, classification, models and methods
    • Brucker, P., Drexel, A., Möhring, R., Neumann, K., and Pesch, E. (1999). " Resource-constrained project scheduling: Notation, classification, models and methods.. " Eur. J. Oper. Res., 112, 3-41.
    • (1999) Eur. J. Oper. Res. , vol.112 , pp. 3-41
    • Brucker, P.1    Drexel, A.2    Möhring, R.3    Neumann, K.4    Pesch, E.5
  • 4
    • 33947362561 scopus 로고    scopus 로고
    • 2nd Ed., R. S. Means, Hauppauge, N.Y.
    • Building cost data. (2001). 2nd Ed., R. S. Means, Hauppauge, N.Y.
    • (2001) Building Cost Data
  • 5
    • 0017559241 scopus 로고
    • Planning and dynamic control of projects under uncertainty
    • Burt, J. M. (1977). " Planning and dynamic control of projects under uncertainty.. " Manage. Sci., 24, 249-258.
    • (1977) Manage. Sci. , vol.24 , pp. 249-258
    • Burt, J.M.1
  • 6
    • 12744265205 scopus 로고    scopus 로고
    • Graphical approach for manpower planning in infrastructure networks
    • Elhakeem, A., and Hejazy, T. (2005). " Graphical approach for manpower planning in infrastructure networks.. " J. Constr. Eng. Manage., 131 (2), 168-175.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.2 , pp. 168-175
    • Elhakeem, A.1    Hejazy, T.2
  • 7
    • 0033906536 scopus 로고    scopus 로고
    • On the allocation of uncertainty-reduction effort to minimize total variability
    • Gerchak, Y. (2000). " On the allocation of uncertainty-reduction effort to minimize total variability.. " IIE Trans., 32, 403-407.
    • (2000) IIE Trans. , vol.32 , pp. 403-407
    • Gerchak, Y.1
  • 8
    • 0032120296 scopus 로고    scopus 로고
    • A heuristic for network project scheduling with random activity durations depending on the resource allocation
    • Golenko-Ginzburg, D., and Gonik, A. (1998). " A heuristic for network project scheduling with random activity durations depending on the resource allocation.. " Int. J. Prod. Econ., 55, 149-162.
    • (1998) Int. J. Prod. Econ. , vol.55 , pp. 149-162
    • Golenko-Ginzburg, D.1    Gonik, A.2
  • 9
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for the resource-constrained project scheduling
    • Hartmann, S. (1998). " A competitive genetic algorithm for the resource-constrained project scheduling.. " Naval Res. Logistics Quart., 456, 733-750.
    • (1998) Naval Res. Logistics Quart. , vol.456 , pp. 733-750
    • Hartmann, S.1
  • 11
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics of resource-constrained project scheduling: An update
    • Hartmann, S., and Kolisch, R. (2000). " Experimental investigation of heuristics of resource-constrained project scheduling: An update.. " Eur. J. Oper. Res., 174 (1), 23-27.
    • (2000) Eur. J. Oper. Res. , vol.174 , Issue.1 , pp. 23-27
    • Hartmann, S.1    Kolisch, R.2
  • 12
    • 0032042933 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: A survey of recent developments
    • Herroelen, W., De Reyck, B., and Demeulemeester, E. (1998). " Resource-constrained project scheduling: A survey of recent developments.. " Comput. Oper. Res., 25 (4), 279-302.
    • (1998) Comput. Oper. Res. , vol.25 , Issue.4 , pp. 279-302
    • Herroelen, W.1    De Reyck, B.2    Demeulemeester, E.3
  • 13
    • 0030231487 scopus 로고    scopus 로고
    • Efficient priority rules for the resource-constrained project scheduling problem
    • Kolisch, R. (1996). " Efficient priority rules for the resource-constrained project scheduling problem.. " J. Operations Manage., 14, 179-192.
    • (1996) J. Operations Manage. , vol.14 , pp. 179-192
    • Kolisch, R.1
  • 14
    • 33745797772 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling: An update
    • Kolisch, R., and Hartmann, S. (2005). " Experimental investigation of heuristics for resource-constrained project scheduling: An update.. " Eur. J. Oper. Res.
    • (2005) Eur. J. Oper. Res.
    • Kolisch, R.1    Hartmann, S.2
  • 16
    • 0033312040 scopus 로고    scopus 로고
    • GA-based multicriteria optimal model for construction scheduling
    • Leu, S., and Yang, C. (1999). " GA-based multicriteria optimal model for construction scheduling.. " J. Constr. Eng. Manage., 125 (6), 420-427.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.6 , pp. 420-427
    • Leu, S.1    Yang, C.2
  • 18
    • 0026822242 scopus 로고
    • An iterative scheduling technique for resource-constrained project scheduling
    • Li, K. Y., and Willis, R. J. (1992). " An iterative scheduling technique for resource-constrained project scheduling.. " Eur. J. Oper. Res., 56, 370-379.
    • (1992) Eur. J. Oper. Res. , vol.56 , pp. 370-379
    • Li, K.Y.1    Willis, R.J.2
  • 19
    • 13944280651 scopus 로고    scopus 로고
    • Resource-activity critical-path method for construction planning
    • Lu, M., and Li, H. (2003). " Resource-activity critical-path method for construction planning.. " J. Constr. Eng. Manage., 129 (4), 412-420.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.4 , pp. 412-420
    • Lu, M.1    Li, H.2
  • 20
    • 6344260154 scopus 로고    scopus 로고
    • Managing portfolios of projects under uncertainty
    • Nozick, L. K., Turnquist, M. A., and Xu, N. (2004). " Managing portfolios of projects under uncertainty.. " Ann. Operat. Res., 132, 243-256.
    • (2004) Ann. Operat. Res. , vol.132 , pp. 243-256
    • Nozick, L.K.1    Turnquist, M.A.2    Xu, N.3
  • 21
    • 0035138778 scopus 로고    scopus 로고
    • Resource scheduling using neural dynamics model of Adeli and Park
    • Senouci, A. B., and Adeli, H. (2001). " Resource scheduling using neural dynamics model of Adeli and Park.. " J. Constr. Eng. Manage., 127 (1), 28-34.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.1 , pp. 28-34
    • Senouci, A.B.1    Adeli, H.2
  • 23
    • 0035454491 scopus 로고    scopus 로고
    • Comparison of linear scheduling model (LSM) and critical path method (CPM)
    • Yamin, R. A., and Harmelink, D. J. (2001). " Comparison of linear scheduling model (LSM) and critical path method (CPM).. " J. Constr. Eng. Manage., 127 (5), 374-381.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.5 , pp. 374-381
    • Yamin, R.A.1    Harmelink, D.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.