-
1
-
-
0019342681
-
Scheduling subject to resource constraints: Classification and complexity
-
Blazewicz, J., Lenstra, J. K., and Rinnooy Kan, A. H. G. (1983). " Scheduling subject to resource constraints: Classification and complexity.. " Discrete Appl. Math., 5, 11-24.
-
(1983)
Discrete Appl. Math.
, vol.5
, pp. 11-24
-
-
Blazewicz, J.1
Lenstra, J.K.2
Rinnooy Kan, A.H.G.3
-
2
-
-
0037508562
-
A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple-mode version
-
Bouleimen, K., and Lecocq, H. (2003). " A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple-mode version.. " Eur. J. Oper. Res., 149, 268-281.
-
(2003)
Eur. J. Oper. Res.
, vol.149
, pp. 268-281
-
-
Bouleimen, K.1
Lecocq, H.2
-
3
-
-
0032736579
-
Resource-constrained project scheduling: Notation, classification, models and methods
-
Brucker, P., Drexel, A., Möhring, R., Neumann, K., and Pesch, E. (1999). " Resource-constrained project scheduling: Notation, classification, models and methods.. " Eur. J. Oper. Res., 112, 3-41.
-
(1999)
Eur. J. Oper. Res.
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexel, A.2
Möhring, R.3
Neumann, K.4
Pesch, E.5
-
4
-
-
33947362561
-
-
2nd Ed., R. S. Means, Hauppauge, N.Y.
-
Building cost data. (2001). 2nd Ed., R. S. Means, Hauppauge, N.Y.
-
(2001)
Building Cost Data
-
-
-
5
-
-
0017559241
-
Planning and dynamic control of projects under uncertainty
-
Burt, J. M. (1977). " Planning and dynamic control of projects under uncertainty.. " Manage. Sci., 24, 249-258.
-
(1977)
Manage. Sci.
, vol.24
, pp. 249-258
-
-
Burt, J.M.1
-
6
-
-
12744265205
-
Graphical approach for manpower planning in infrastructure networks
-
Elhakeem, A., and Hejazy, T. (2005). " Graphical approach for manpower planning in infrastructure networks.. " J. Constr. Eng. Manage., 131 (2), 168-175.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.2
, pp. 168-175
-
-
Elhakeem, A.1
Hejazy, T.2
-
7
-
-
0033906536
-
On the allocation of uncertainty-reduction effort to minimize total variability
-
Gerchak, Y. (2000). " On the allocation of uncertainty-reduction effort to minimize total variability.. " IIE Trans., 32, 403-407.
-
(2000)
IIE Trans.
, vol.32
, pp. 403-407
-
-
Gerchak, Y.1
-
8
-
-
0032120296
-
A heuristic for network project scheduling with random activity durations depending on the resource allocation
-
Golenko-Ginzburg, D., and Gonik, A. (1998). " A heuristic for network project scheduling with random activity durations depending on the resource allocation.. " Int. J. Prod. Econ., 55, 149-162.
-
(1998)
Int. J. Prod. Econ.
, vol.55
, pp. 149-162
-
-
Golenko-Ginzburg, D.1
Gonik, A.2
-
9
-
-
0032188522
-
A competitive genetic algorithm for the resource-constrained project scheduling
-
Hartmann, S. (1998). " A competitive genetic algorithm for the resource-constrained project scheduling.. " Naval Res. Logistics Quart., 456, 733-750.
-
(1998)
Naval Res. Logistics Quart.
, vol.456
, pp. 733-750
-
-
Hartmann, S.1
-
10
-
-
0347077154
-
-
Springer, Berlin.
-
Hartmann, S. (1999). Project scheduling under limited resources, models, methods, and applications, Springer, Berlin.
-
(1999)
Project Scheduling under Limited Resources, Models, Methods, and Applications
-
-
Hartmann, S.1
-
11
-
-
33845270624
-
Experimental investigation of heuristics of resource-constrained project scheduling: An update
-
Hartmann, S., and Kolisch, R. (2000). " Experimental investigation of heuristics of resource-constrained project scheduling: An update.. " Eur. J. Oper. Res., 174 (1), 23-27.
-
(2000)
Eur. J. Oper. Res.
, vol.174
, Issue.1
, pp. 23-27
-
-
Hartmann, S.1
Kolisch, R.2
-
12
-
-
0032042933
-
Resource-constrained project scheduling: A survey of recent developments
-
Herroelen, W., De Reyck, B., and Demeulemeester, E. (1998). " Resource-constrained project scheduling: A survey of recent developments.. " Comput. Oper. Res., 25 (4), 279-302.
-
(1998)
Comput. Oper. Res.
, vol.25
, Issue.4
, pp. 279-302
-
-
Herroelen, W.1
De Reyck, B.2
Demeulemeester, E.3
-
13
-
-
0030231487
-
Efficient priority rules for the resource-constrained project scheduling problem
-
Kolisch, R. (1996). " Efficient priority rules for the resource-constrained project scheduling problem.. " J. Operations Manage., 14, 179-192.
-
(1996)
J. Operations Manage.
, vol.14
, pp. 179-192
-
-
Kolisch, R.1
-
14
-
-
33745797772
-
Experimental investigation of heuristics for resource-constrained project scheduling: An update
-
Kolisch, R., and Hartmann, S. (2005). " Experimental investigation of heuristics for resource-constrained project scheduling: An update.. " Eur. J. Oper. Res.
-
(2005)
Eur. J. Oper. Res.
-
-
Kolisch, R.1
Hartmann, S.2
-
15
-
-
0004312378
-
-
3rd Ed., McGraw-Hill, New York.
-
Law, A. M., and Kelton, W. D. (1999). Simulation modeling and analysis, 3rd Ed., McGraw-Hill, New York.
-
(1999)
Simulation Modeling and Analysis
-
-
Law, A.M.1
Kelton, W.D.2
-
16
-
-
0033312040
-
GA-based multicriteria optimal model for construction scheduling
-
Leu, S., and Yang, C. (1999). " GA-based multicriteria optimal model for construction scheduling.. " J. Constr. Eng. Manage., 125 (6), 420-427.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.6
, pp. 420-427
-
-
Leu, S.1
Yang, C.2
-
17
-
-
0004379605
-
-
2nd Ed., ASCE, Reston, Va.
-
Levin, P. (1998). Construction contract claims, changes, and dispute resolution, 2nd Ed., ASCE, Reston, Va.
-
(1998)
Construction Contract Claims, Changes, and Dispute Resolution
-
-
Levin, P.1
-
18
-
-
0026822242
-
An iterative scheduling technique for resource-constrained project scheduling
-
Li, K. Y., and Willis, R. J. (1992). " An iterative scheduling technique for resource-constrained project scheduling.. " Eur. J. Oper. Res., 56, 370-379.
-
(1992)
Eur. J. Oper. Res.
, vol.56
, pp. 370-379
-
-
Li, K.Y.1
Willis, R.J.2
-
19
-
-
13944280651
-
Resource-activity critical-path method for construction planning
-
Lu, M., and Li, H. (2003). " Resource-activity critical-path method for construction planning.. " J. Constr. Eng. Manage., 129 (4), 412-420.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.4
, pp. 412-420
-
-
Lu, M.1
Li, H.2
-
20
-
-
6344260154
-
Managing portfolios of projects under uncertainty
-
Nozick, L. K., Turnquist, M. A., and Xu, N. (2004). " Managing portfolios of projects under uncertainty.. " Ann. Operat. Res., 132, 243-256.
-
(2004)
Ann. Operat. Res.
, vol.132
, pp. 243-256
-
-
Nozick, L.K.1
Turnquist, M.A.2
Xu, N.3
-
21
-
-
0035138778
-
Resource scheduling using neural dynamics model of Adeli and Park
-
Senouci, A. B., and Adeli, H. (2001). " Resource scheduling using neural dynamics model of Adeli and Park.. " J. Constr. Eng. Manage., 127 (1), 28-34.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.1
, pp. 28-34
-
-
Senouci, A.B.1
Adeli, H.2
-
22
-
-
33846688754
-
-
Vaziri, K., Nozick, L. K., and Turnquist, M. A. (2005). " Resource allocation and planning for program management.. " Winter Simulation Conf., 2127-2135.
-
(2005)
Resource Allocation and Planning for Program Management
, pp. 2127-2135
-
-
Vaziri, K.1
Nozick, L.K.2
Turnquist, M.A.3
-
23
-
-
0035454491
-
Comparison of linear scheduling model (LSM) and critical path method (CPM)
-
Yamin, R. A., and Harmelink, D. J. (2001). " Comparison of linear scheduling model (LSM) and critical path method (CPM).. " J. Constr. Eng. Manage., 127 (5), 374-381.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.5
, pp. 374-381
-
-
Yamin, R.A.1
Harmelink, D.J.2
|