메뉴 건너뛰기




Volumn 132, Issue 1-4, 2004, Pages 243-256

Managing portfolios of projects under uncertainty

Author keywords

optimization; project scheduling; uncertainty

Indexed keywords


EID: 6344260154     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1023/B:ANOR.0000045285.12058.03     Document Type: Conference Paper
Times cited : (15)

References (21)
  • 1
    • 0031272681 scopus 로고    scopus 로고
    • Rollout Algorithms for Combinatorial Optimization
    • Bertsekas, D., J.N. Tsitsiklis, and C. Wu. (1998). "Rollout Algorithms for Combinatorial Optimization." Journal of Heuristics 3, 245-262.
    • (1998) Journal of Heuristics , vol.3 , pp. 245-262
    • Bertsekas, D.1    Tsitsiklis, J.N.2    Wu, C.3
  • 3
    • 0017559241 scopus 로고
    • Planning and Dynamic Control of Projects under Uncertainty
    • Burt, J.M. (1977). "Planning and Dynamic Control of Projects under Uncertainty." Management Science 24, 249-258.
    • (1977) Management Science , vol.24 , pp. 249-258
    • Burt, J.M.1
  • 4
    • 0011717163 scopus 로고
    • Towards the Development of a Complete Multi-Project Scheduling System
    • Fendley, L.G. (1968). "Towards the Development of a Complete Multi-Project Scheduling System." Journal of Industrial Engineering 19, 505-515.
    • (1968) Journal of Industrial Engineering , vol.19 , pp. 505-515
    • Fendley, L.G.1
  • 5
    • 0033906536 scopus 로고    scopus 로고
    • On the Allocation of Uncertainty-Reduction Effort to Minimize Total Variability
    • Gerchak, Y. (2000). "On the Allocation of Uncertainty-Reduction Effort to Minimize Total Variability." IIE Transactions 32, 403-407.
    • (2000) IIE Transactions , vol.32 , pp. 403-407
    • Gerchak, Y.1
  • 7
    • 0347110998 scopus 로고    scopus 로고
    • A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management
    • Gutjahr, W.J., C. Strauss, and E. Wagner. (2000). "A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management." INFORMS Journal on Computing 12, 125-135.
    • (2000) INFORMS Journal on Computing , vol.12 , pp. 125-135
    • Gutjahr, W.J.1    Strauss, C.2    Wagner, E.3
  • 9
    • 0020087944 scopus 로고
    • Multi-Project Scheduling: Categorization of Heuristic Rules Performance
    • Kurtulus, I.S. and E.W. Davis. (1982). "Multi-Project Scheduling: Categorization of Heuristic Rules Performance." Management Science 28, 161-172.
    • (1982) Management Science , vol.28 , pp. 161-172
    • Kurtulus, I.S.1    Davis, E.W.2
  • 10
    • 0022025928 scopus 로고
    • Multi-Project Scheduling: Analysis of Project Performance
    • Kurtulus, I.S. and S.C. Narula. (1985). "Multi-Project Scheduling: Analysis of Project Performance." IIE Transactions 17, 58-66.
    • (1985) IIE Transactions , vol.17 , pp. 58-66
    • Kurtulus, I.S.1    Narula, S.C.2
  • 12
    • 0034559445 scopus 로고    scopus 로고
    • A Multicriteria Heuristic Method to Improve Resource Allocation in Multiproject Scheduling
    • Lova, A., C. Maroto, and P. Tormos. (2000). "A Multicriteria Heuristic Method to Improve Resource Allocation in Multiproject Scheduling." European Journal of Operational Research 127, 408-424.
    • (2000) European Journal of Operational Research , vol.127 , pp. 408-424
    • Lova, A.1    Maroto, C.2    Tormos, P.3
  • 16
    • 0035599178 scopus 로고    scopus 로고
    • Uncertainty Modelling in Software Development Projects (with Case Study)
    • Özdamar, L. and E. Alanya. (2001). "Uncertainty Modelling in Software Development Projects (with Case Study)." Annals of Operations Research 102, 157-178.
    • (2001) Annals of Operations Research , vol.102 , pp. 157-178
    • Özdamar, L.1    Alanya, E.2
  • 17
    • 0029393209 scopus 로고
    • A Survey on the Resource Constrained Project Scheduling Problem
    • Özdamar, L. and G. Ulusoy. (1995). "A Survey on the Resource Constrained Project Scheduling Problem." IIE Transactions 27, 574-586.
    • (1995) IIE Transactions , vol.27 , pp. 574-586
    • Özdamar, L.1    Ulusoy, G.2
  • 19
    • 0032210453 scopus 로고    scopus 로고
    • Using Tabu Search to Schedule Activities of Stochastic ResourceConstrained Projects
    • Tsai, Y. and D. Gemmill. (1998). "Using Tabu Search to Schedule Activities of Stochastic ResourceConstrained Projects." European Journal of Operational Research 111, 129-141.
    • (1998) European Journal of Operational Research , vol.111 , pp. 129-141
    • Tsai, Y.1    Gemmill, D.2
  • 20
    • 0033524327 scopus 로고    scopus 로고
    • Statistical Dependence in Risk Analysis for Project Networks Using Monte Carlo Methods
    • van Dorp, J.R. and M.R. Duffey. (1999). "Statistical Dependence in Risk Analysis for Project Networks Using Monte Carlo Methods." International Journal of Production Economics 58, 17-29.
    • (1999) International Journal of Production Economics , vol.58 , pp. 17-29
    • Dorp, J.R.1    Duffey, M.R.2
  • 21
    • 0035454491 scopus 로고    scopus 로고
    • Comparision of Linear Scheduling Model (LSM) and Critical Path Method (CPM)
    • Yamín, R. and D. Harmelink. (2001). "Comparision of Linear Scheduling Model (LSM) and Critical Path Method (CPM)." Journal of Construction Engineering and Management 127, 374-381.
    • (2001) Journal of Construction Engineering and Management , vol.127 , pp. 374-381
    • Yamín, R.1    Harmelink, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.