-
2
-
-
0032736579
-
Resource-Constrained Project Scheduling: Notation, Classification, Models, and Methods
-
Brucker, P., A. Drexel, R. Möhring, K. Neumann, and E. Pesch. (1999). "Resource-Constrained Project Scheduling: Notation, Classification, Models, and Methods." European Journal of Operational Research 112, 3-41.
-
(1999)
European Journal of Operational Research
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexel, A.2
Möhring, R.3
Neumann, K.4
Pesch, E.5
-
3
-
-
0017559241
-
Planning and Dynamic Control of Projects under Uncertainty
-
Burt, J.M. (1977). "Planning and Dynamic Control of Projects under Uncertainty." Management Science 24, 249-258.
-
(1977)
Management Science
, vol.24
, pp. 249-258
-
-
Burt, J.M.1
-
4
-
-
0011717163
-
Towards the Development of a Complete Multi-Project Scheduling System
-
Fendley, L.G. (1968). "Towards the Development of a Complete Multi-Project Scheduling System." Journal of Industrial Engineering 19, 505-515.
-
(1968)
Journal of Industrial Engineering
, vol.19
, pp. 505-515
-
-
Fendley, L.G.1
-
5
-
-
0033906536
-
On the Allocation of Uncertainty-Reduction Effort to Minimize Total Variability
-
Gerchak, Y. (2000). "On the Allocation of Uncertainty-Reduction Effort to Minimize Total Variability." IIE Transactions 32, 403-407.
-
(2000)
IIE Transactions
, vol.32
, pp. 403-407
-
-
Gerchak, Y.1
-
7
-
-
0347110998
-
A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management
-
Gutjahr, W.J., C. Strauss, and E. Wagner. (2000). "A Stochastic Branch-and-Bound Approach to Activity Crashing in Project Management." INFORMS Journal on Computing 12, 125-135.
-
(2000)
INFORMS Journal on Computing
, vol.12
, pp. 125-135
-
-
Gutjahr, W.J.1
Strauss, C.2
Wagner, E.3
-
9
-
-
0020087944
-
Multi-Project Scheduling: Categorization of Heuristic Rules Performance
-
Kurtulus, I.S. and E.W. Davis. (1982). "Multi-Project Scheduling: Categorization of Heuristic Rules Performance." Management Science 28, 161-172.
-
(1982)
Management Science
, vol.28
, pp. 161-172
-
-
Kurtulus, I.S.1
Davis, E.W.2
-
10
-
-
0022025928
-
Multi-Project Scheduling: Analysis of Project Performance
-
Kurtulus, I.S. and S.C. Narula. (1985). "Multi-Project Scheduling: Analysis of Project Performance." IIE Transactions 17, 58-66.
-
(1985)
IIE Transactions
, vol.17
, pp. 58-66
-
-
Kurtulus, I.S.1
Narula, S.C.2
-
12
-
-
0034559445
-
A Multicriteria Heuristic Method to Improve Resource Allocation in Multiproject Scheduling
-
Lova, A., C. Maroto, and P. Tormos. (2000). "A Multicriteria Heuristic Method to Improve Resource Allocation in Multiproject Scheduling." European Journal of Operational Research 127, 408-424.
-
(2000)
European Journal of Operational Research
, vol.127
, pp. 408-424
-
-
Lova, A.1
Maroto, C.2
Tormos, P.3
-
16
-
-
0035599178
-
Uncertainty Modelling in Software Development Projects (with Case Study)
-
Özdamar, L. and E. Alanya. (2001). "Uncertainty Modelling in Software Development Projects (with Case Study)." Annals of Operations Research 102, 157-178.
-
(2001)
Annals of Operations Research
, vol.102
, pp. 157-178
-
-
Özdamar, L.1
Alanya, E.2
-
17
-
-
0029393209
-
A Survey on the Resource Constrained Project Scheduling Problem
-
Özdamar, L. and G. Ulusoy. (1995). "A Survey on the Resource Constrained Project Scheduling Problem." IIE Transactions 27, 574-586.
-
(1995)
IIE Transactions
, vol.27
, pp. 574-586
-
-
Özdamar, L.1
Ulusoy, G.2
-
19
-
-
0032210453
-
Using Tabu Search to Schedule Activities of Stochastic ResourceConstrained Projects
-
Tsai, Y. and D. Gemmill. (1998). "Using Tabu Search to Schedule Activities of Stochastic ResourceConstrained Projects." European Journal of Operational Research 111, 129-141.
-
(1998)
European Journal of Operational Research
, vol.111
, pp. 129-141
-
-
Tsai, Y.1
Gemmill, D.2
-
20
-
-
0033524327
-
Statistical Dependence in Risk Analysis for Project Networks Using Monte Carlo Methods
-
van Dorp, J.R. and M.R. Duffey. (1999). "Statistical Dependence in Risk Analysis for Project Networks Using Monte Carlo Methods." International Journal of Production Economics 58, 17-29.
-
(1999)
International Journal of Production Economics
, vol.58
, pp. 17-29
-
-
Dorp, J.R.1
Duffey, M.R.2
-
21
-
-
0035454491
-
Comparision of Linear Scheduling Model (LSM) and Critical Path Method (CPM)
-
Yamín, R. and D. Harmelink. (2001). "Comparision of Linear Scheduling Model (LSM) and Critical Path Method (CPM)." Journal of Construction Engineering and Management 127, 374-381.
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, pp. 374-381
-
-
Yamín, R.1
Harmelink, D.2
|