A heuristic for network project scheduling with random activity durations depending on the resource allocation

Author keywords

Lexicographical scanning; Non consumable resources; Resource constrained project scheduling; variable resource capacities; Stochastic network project

Indexed keywords

ALGORITHMS; COMPUTATIONAL COMPLEXITY; HEURISTIC METHODS; RESOURCE ALLOCATION;

EID: 0032120296     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(98)00044-9     Document Type: Article
Times cited : (66)

References (19)
  • 1
    • 0042455307 scopus 로고    scopus 로고
    • Characterization of a set of schedules in a resource-constrained multi-project scheduling problem with multiple modes
    • in press
    • C. Artigues, F. Roubellat, J. Billaut, Characterization of a set of schedules in a resource-constrained multi-project scheduling problem with multiple modes, International Journal of Industrial Engineering (1998), in press.
    • (1998) International Journal of Industrial Engineering
    • Artigues, C.1    Roubellat, F.2    Billaut, J.3
  • 2
    • 84989743918 scopus 로고
    • A new heuristic solution method in resource constrained project scheduling
    • C.E. Bell, J. Han, A new heuristic solution method in resource constrained project scheduling, Naval Research Logistics 38 (3) (1991) 315-331.
    • (1991) Naval Research Logistics , vol.38 , Issue.3 , pp. 315-331
    • Bell, C.E.1    Han, J.2
  • 3
    • 0030216966 scopus 로고    scopus 로고
    • Resource-constrained project scheduling by simulated annealing
    • F. Boctor, Resource-constrained project scheduling by simulated annealing, International Journal of Production Research 34 (8) (1996) 2335-2351.
    • (1996) International Journal of Production Research , vol.34 , Issue.8 , pp. 2335-2351
    • Boctor, F.1
  • 6
    • 0002818342 scopus 로고
    • A fuzzy heuristic method for resource constrained project scheduling
    • P. Lorterapong, A fuzzy heuristic method for resource constrained project scheduling, Project Management Journal 25 (4) (1994) 12-18.
    • (1994) Project Management Journal , vol.25 , Issue.4 , pp. 12-18
    • Lorterapong, P.1
  • 7
    • 0008683630 scopus 로고
    • A non-linear minimax allocation problem with multiple knapsack constraints
    • H. Luss, A non-linear minimax allocation problem with multiple knapsack constraints, Operations Research Letters 10 (4) (1991) 183-187.
    • (1991) Operations Research Letters , vol.10 , Issue.4 , pp. 183-187
    • Luss, H.1
  • 9
    • 84989730007 scopus 로고
    • Local search techniques for the generalized resource constrained project scheduling problem
    • S.E. Sampson, E.N. Weiss, Local search techniques for the generalized resource constrained project scheduling problem, Naval Research Logistics 40 (5) (1993) 665-675.
    • (1993) Naval Research Logistics , vol.40 , Issue.5 , pp. 665-675
    • Sampson, S.E.1    Weiss, E.N.2
  • 11
    • 3543056985 scopus 로고
    • A heuristic scheduling algorithm for improving the duration and net present value of a project
    • G. Ulisoy, R. Ozdamar, A heuristic scheduling algorithm for improving the duration and net present value of a project, International Journal of Operations Production Management 15 (1) (1995) 89-98.
    • (1995) International Journal of Operations Production Management , vol.15 , Issue.1 , pp. 89-98
    • Ulisoy, G.1    Ozdamar, R.2
  • 12
    • 0022107667 scopus 로고
    • Critical path analysis and resource constrained project scheduling. Theory and practice
    • R.J. Willis, Critical path analysis and resource constrained project scheduling. Theory and practice, European Journal of Operations Research 21 (1985) 149-155.
    • (1985) European Journal of Operations Research , vol.21 , pp. 149-155
    • Willis, R.J.1
  • 13
    • 0028766751 scopus 로고
    • Heuristics for scheduling resource constrained projects in MPM networks
    • J. Zhan, Heuristics for scheduling resource constrained projects in MPM networks, European Journal of Operations Research 76 (1) (1994) 192-205.
    • (1994) European Journal of Operations Research , vol.76 , Issue.1 , pp. 192-205
    • Zhan, J.1
  • 14
    • 0041453249 scopus 로고
    • Planning and control in research and development
    • A.W. Pearson, Planning and control in research and development, OMEGA 18 (1990) 573-581.
    • (1990) OMEGA , vol.18 , pp. 573-581
    • Pearson, A.W.1
  • 16
    • 0030106495 scopus 로고    scopus 로고
    • Production control in semi-automated systems: Comparison between constant and stochastic speeds
    • L. Friedman, D. Golenko-Ginzburg, Z. Sinuany-Stern, Production control in semi-automated systems: comparison between constant and stochastic speeds, Production Planning and Control 7 (2) (1996) 176-185.
    • (1996) Production Planning and Control , vol.7 , Issue.2 , pp. 176-185
    • Friedman, L.1    Golenko-Ginzburg, D.2    Sinuany-Stern, Z.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.