An efficient method for scheduling construction projects with resource constraints
-
Abeyasinghe, M. C., Greenwood, D. J., and Johansen, D. E. (2001). "An efficient method for scheduling construction projects with resource constraints." Int. J. Proj. Manage., 19(1), 29-45.
-
(2001)
Int. J. Proj. Manage.
, vol.19
, Issue.1
, pp. 29-45
-
-
Abeyasinghe, M.C.1
Greenwood, D.J.2
Johansen, D.E.3
-
2
-
-
0003727195
-
-
Wiley, New York
-
Ahuja, H., Dozzi, S. P., and AbouRizk, S. M. (1994). Project management techniques in planning and controlling construction projects, 2nd Ed., Wiley, New York.
-
(1994)
Project Management Techniques in Planning and Controlling Construction Projects, 2nd Ed.
-
-
Ahuja, H.1
Dozzi, S.P.2
Abourizk, S.M.3
-
3
-
-
0004278233
-
-
McGraw-Hill, New York
-
Callahan, M. T., Quackenbush, D. G., and Rowings, J. E. (1992). Construction project scheduling, McGraw-Hill, New York.
-
(1992)
Construction Project Scheduling
-
-
Callahan, M.T.1
Quackenbush, D.G.2
Rowings, J.E.3
-
4
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
Chan, W. T., Chua, D. K. H., and Kannan, G. (1996). "Construction resource scheduling with genetic algorithms." J. Constr. Eng. Manage., 122(2), 125-132.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.T.1
Chua, D.K.H.2
Kannan, G.3
-
5
-
-
0031272722
-
New benchmark results for the resource-constrained project scheduling problem
-
Demeulemeester, E., and Herroelen, W. (1997). "New benchmark results for the resource-constrained project scheduling problem." Manage. Sci., 43, 1485-1492.
-
(1997)
Manage. Sci.
, vol.43
, pp. 1485-1492
-
-
Demeulemeester, E.1
Herroelen, W.2
-
6
-
-
0030652261
-
Optimized scheduling for highway construction
-
El-Rayes, K., and Moselhi, O. (1997). "Optimized scheduling for highway construction." AACE Int. Trans., 3, 1-4.
-
(1997)
AACE Int. Trans.
, vol.3
, pp. 1-4
-
-
El-Rayes, K.1
Moselhi, O.2
-
7
-
-
0035132257
-
Optimizing resource utilization for repetitive construction projects
-
El-Rayes, K., and Moselhi, O. (2001). "Optimizing resource utilization for repetitive construction projects." J. Constr. Eng. Manage., 127(1), 18-27.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.1
, pp. 18-27
-
-
El-Rayes, K.1
Moselhi, O.2
-
8
-
-
0038909957
-
A non-computer approach to the critical path method for the construction industry
-
Construction Institute, Stanford University, Stanford, Calif.
-
Fondahl, J. W. (1961). "A non-computer approach to the critical path method for the construction industry." Tech. Rep. No. 9, Construction Institute, Stanford University, Stanford, Calif.
-
(1961)
Tech. Rep. No. 9
, vol.9
-
-
Fondahl, J.W.1
-
9
-
-
0026223051
-
The development of the construction engineer: Past progress and future problems
-
Fondahl, J. W. (1991). "The development of the construction engineer: past progress and future problems." J. Constr. Eng. Manage., 117(3), 380-392.
-
(1991)
J. Constr. Eng. Manage.
, vol.117
, Issue.3
, pp. 380-392
-
-
Fondahl, J.W.1
-
11
-
-
0004172988
-
-
Wiley, New York
-
Halpin, D., and Woodhead, R. (1998). Construction management, 2nd Ed., Wiley, New York.
-
(1998)
Construction Management, 2nd Ed.
-
-
Halpin, D.1
Woodhead, R.2
-
12
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithm
-
Hegazy, T. (1999). "Optimization of resource allocation and leveling using genetic algorithm." J. Constr. Eng. Manage., 125(3), 167-175.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
13
-
-
0035335808
-
Cost optimization in projects with repetitive nonserial activities
-
Hegazy, T., and Wasset, N. (2001). "Cost optimization in projects with repetitive nonserial activities." J. Constr. Eng. Manage., 127(3), 183-191.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.3
, pp. 183-191
-
-
Hegazy, T.1
Wasset, N.2
-
14
-
-
0028734880
-
Construction scheduling based on resource constraints
-
Lee, Y., and Gatton, T. M. (1994). "Construction scheduling based on resource constraints." AACE Trans., 3, 1-6.
-
(1994)
AACE Trans.
, vol.3
, pp. 1-6
-
-
Lee, Y.1
Gatton, T.M.2
-
15
-
-
0033156974
-
Fuzzy optimal model for resource-constrained construction scheduling
-
Leu, S., Chen, A., and Yang, C. (1999). "Fuzzy optimal model for resource-constrained construction scheduling." J. Comput. Civ. Eng., 13(3), 207-216.
-
(1999)
J. Comput. Civ. Eng.
, vol.13
, Issue.3
, pp. 207-216
-
-
Leu, S.1
Chen, A.2
Yang, C.3
-
16
-
-
0033312040
-
GA-based multicriteria optimal model for construction scheduling
-
Leu, S., and Yang, C. (1999). "GA-based multicriteria optimal model for construction scheduling." J. Constr. Eng. Manage., 125(6), 420-427.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.6
, pp. 420-427
-
-
Leu, S.1
Yang, C.2
-
17
-
-
0030830501
-
Resource-constrained project scheduling with renewable and non-renewable resources and time-resources tradeoffs
-
Nudtasomboon, N., and Randhawa, S. (1996). "Resource-constrained project scheduling with renewable and non-renewable resources and time-resources tradeoffs." Comp. Ind. Eng., 32(1), 227-242.
-
(1996)
Comp. Ind. Eng.
, vol.32
, Issue.1
, pp. 227-242
-
-
Nudtasomboon, N.1
Randhawa, S.2
-
19
-
-
0035138778
-
Resource scheduling using neural dynamics model of Adeli and Park
-
Senouci, A. B., and Adeli, H. (2001). "Resource scheduling using neural dynamics model of Adeli and Park." J. Constr. Eng. Manage., 127(1), 28-34.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.1
, pp. 28-34
-
-
Senouci, A.B.1
Adeli, H.2
-
20
-
-
0343952309
-
A scheduling procedure for a general class of resource-constrained projects
-
Sung, C. S., and Lim, S. K. (1996). "A scheduling procedure for a general class of resource-constrained projects." Comp. Ind. Eng., 12(1), 227-242.
-
(1996)
Comp. Ind. Eng.
, vol.12
, Issue.1
, pp. 227-242
-
-
Sung, C.S.1
Lim, S.K.2
-
21
-
-
0030825017
-
SCaRC: Space-constrained resource-constrained scheduling system
-
Thabet, W. Y., and Beliveau, Y. J. (1997). "SCaRC: space-constrained resource-constrained scheduling system." J. Comput. Civ. Eng., 11(1), 48-59.
-
(1997)
J. Comput. Civ. Eng.
, vol.11
, Issue.1
, pp. 48-59
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
22
-
-
0025601132
-
Constraint knowledge for construction scheduling
-
London
-
Waugh, L. M., and Froese, T. M. (1990). "Constraint knowledge for construction scheduling." IEE Conf. Publ., Institute of Electrical Engineers, London, 114-118.
-
(1990)
IEE Conf. Publ., Institute of Electrical Engineers
, pp. 114-118
-
-
Waugh, L.M.1
Froese, T.M.2
|