메뉴 건너뛰기




Volumn 55, Issue 2, 1998, Pages 113-119

A quantitative approach to estimate the size of the time buffer in the theory of constraints

Author keywords

The theory of constraints; Time buffer

Indexed keywords

DECISION MAKING; OPERATIONS RESEARCH; PLANNING; PRODUCTION; PRODUCTIVITY; RESOURCE ALLOCATION; SCHEDULING; SENSITIVITY ANALYSIS;

EID: 0032114853     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0925-5273(97)00131-X     Document Type: Article
Times cited : (70)

References (18)
  • 1
    • 0042957414 scopus 로고
    • Applying theory of constraints in a service environment (a case study of performance, measurement and manufacturing design)
    • Montreal, Canada
    • P. Adelman, G. Loucks, Applying theory of constraints in a service environment (A case study of performance, measurement and manufacturing design). 35th Internat. Conf. APICS, Montreal, Canada, 1992, pp. 1-10.
    • (1992) 35th Internat. Conf. APICS , pp. 1-10
    • Adelman, P.1    Loucks, G.2
  • 2
    • 0041955804 scopus 로고
    • Synchronous manufacturing: New methods, new mind-set
    • W. Beckett, K. Dang, Synchronous manufacturing: New methods, new mind-set, J. Business Strategy 13(1), (1992) 53-54.
    • (1992) J. Business Strategy , vol.13 , Issue.1 , pp. 53-54
    • Beckett, W.1    Dang, K.2
  • 4
    • 0042957417 scopus 로고
    • Quaker furniture manages using synchronous manufacturing
    • March
    • W. Libby, Quaker furniture manages using synchronous manufacturing, APICS - The Performance Advantage, March 1992, pp. 24-26.
    • (1992) APICS - The Performance Advantage , pp. 24-26
    • Libby, W.1
  • 5
    • 0009058971 scopus 로고
    • Material requirements planning and theory of constraints: Can they coexist? A case study
    • G. Reimer, Material requirements planning and theory of constraints: Can they coexist? A case study, Prod. Inv. Mgmt. J. 32(4), (1991) 48-52.
    • (1991) Prod. Inv. Mgmt. J. , vol.32 , Issue.4 , pp. 48-52
    • Reimer, G.1
  • 6
    • 0042456349 scopus 로고
    • Synchronous manufacturing in action at GM-allison transmittion: A change in attitude
    • W. Renn, M. Stevens, Synchronous manufacturing in action at GM-Allison transmittion: A change in attitude, 1991 Conf. Proc. American Prod. Inv. Control Society, 1991, pp. 504-511.
    • (1991) 1991 Conf. Proc. American Prod. Inv. Control Society , pp. 504-511
    • Renn, W.1    Stevens, M.2
  • 7
    • 0004244248 scopus 로고
    • North River Press, Croton-on-Hudson, NY
    • E. Goldratt, J. Cox, The Goal, North River Press, Croton-on-Hudson, NY, 1986.
    • (1986) The Goal
    • Goldratt, E.1    Cox, J.2
  • 9
    • 0003710588 scopus 로고
    • North River Press, Croton-on-Hudson, NY
    • E. Goldratt, R. Fox, The Race, North River Press, Croton-on-Hudson, NY, 1986.
    • (1986) The Race
    • Goldratt, E.1    Fox, R.2
  • 11
    • 0040976766 scopus 로고
    • Analyzing manufacturing problems using V-A-T analysis
    • M. Umble, Analyzing manufacturing problems using V-A-T analysis. Prod. Inv. Mgmt. J. 32(2), (1992) 55-60.
    • (1992) Prod. Inv. Mgmt. J. , vol.32 , Issue.2 , pp. 55-60
    • Umble, M.1
  • 13
    • 0002574242 scopus 로고
    • Using "the goal" in an MRP
    • M. Spencer, Using "The Goal" in an MRP, Prod. Inv. Mgmt. J. 32(4), (1991) 22-27.
    • (1991) Prod. Inv. Mgmt. J. , vol.32 , Issue.4 , pp. 22-27
    • Spencer, M.1
  • 15
    • 84947637958 scopus 로고
    • Automatic transfer lines with buffer stacks
    • J. Buzacott, Automatic transfer lines with buffer stacks, Internat. J. Prod. Res. 5(3), (1967) 183-200.
    • (1967) Internat. J. Prod. Res. , vol.5 , Issue.3 , pp. 183-200
    • Buzacott, J.1
  • 16
    • 0001520382 scopus 로고
    • A variable buffer-size model and its use in analyzing closed queuing networks with blocking
    • R. Suri, G. Diehl, A variable buffer-size model and its use in analyzing closed queuing networks with blocking, Mgmt. Sci. 32(2), (1986) 206-224.
    • (1986) Mgmt. Sci. , vol.32 , Issue.2 , pp. 206-224
    • Suri, R.1    Diehl, G.2
  • 17
    • 0003228793 scopus 로고
    • Availability and average inventory of balanced assembly-like flow systems
    • J. Simon, W. Hopp, Availability and average inventory of balanced assembly-like flow systems, IIE Transitions, 23(2), (1991) 161-168.
    • (1991) IIE Transitions , vol.23 , Issue.2 , pp. 161-168
    • Simon, J.1    Hopp, W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.