메뉴 건너뛰기




Volumn 18, Issue 4, 1998, Pages 336-355

Theory of constraints: A review of the philosophy and its applications

Author keywords

Operations management; Philosophy; Production management; Theory of constraints

Indexed keywords


EID: 0032376210     PISSN: 01443577     EISSN: None     Source Type: Journal    
DOI: 10.1108/01443579810199720     Document Type: Review
Times cited : (226)

References (64)
  • 1
  • 2
    • 85058199139 scopus 로고
    • Relevance lost? a critical discussion of different cost accounting principles in connection with decision making for both short and long term production scheduling
    • Blake, N.A. and Hellberg, R. (1991, "Relevance lost? A critical discussion of different cost accounting principles in connection with decision making for both short and long term production scheduling", International Journal of Production Economics, Vol. 24 No. 1-2, pp. 1-18. [AC]
    • (1991) International Journal of Production Economics , vol.24 , Issue.12 , pp. 1-18
    • Blake, N.A.1    Hellberg, R.2
  • 3
    • 0028546903 scopus 로고
    • How theory of constraints can be used to direct preventive maintenance
    • Chakravorty, S.S. and Atwater, J.B. (1994, "How theory of constraints can be used to direct preventive maintenance", Industrial Management, Vol. 36 No. 6, pp. 10-13. [Q]
    • (1994) Industrial Management , vol.36 , Issue.6 , pp. 10-13
    • Chakravorty, S.S.1    Atwater, J.B.2
  • 4
    • 84974761179 scopus 로고
    • IS management by constraints: Coupling IS effort to changes in business bottlenecks
    • Coman, A. and Ronen, B. (1994, "IS management by constraints: coupling IS effort to changes in business bottlenecks", Human Systems Management, Vol. 13 No. 1, pp. 65-70. [I]
    • (1994) Human Systems Management , vol.13 , Issue.1 , pp. 65-70
    • Coman, A.1    Ronen, B.2
  • 5
    • 0028403388 scopus 로고
    • A simulation comparison of traditional, JIT and TOC manufacturing systems in a flow shop with bottlenecks
    • First Quarter
    • Cook, D. P. (1994, "A simulation comparison of traditional, JIT and TOC manufacturing systems in a flow shop with bottlenecks", Production and Inventory Management, First Quarter, pp. 73-8. [CN]
    • (1994) Production and Inventory Management , pp. 73-8
    • Cook, D.P.1
  • 6
    • 0347751442 scopus 로고
    • Optimizing production resources
    • Darlington, J. (1995, "Optimizing production resources", Management Accounting, Vol. 3 No. 4, pp. 57-60. [P]
    • (1995) Management Accounting , vol.3 , Issue.4 , pp. 57-60
    • Darlington, J.1
  • 7
    • 0012746688 scopus 로고
    • Quality and the theory of constraints
    • Dettmer, H.W. (1995a, "Quality and the theory of constraints", Quality Progress, Vol. 28 No. 4, pp. 77-81. [C]
    • (1995) Quality Progress , vol.28 , Issue.4 , pp. 77-81
    • Dettmer, H.W.1
  • 9
    • 0013241238 scopus 로고
    • Service organization costing: A synchronized manufacturing approach
    • Eden, Y. and Ronen, B. (1990, "Service organization costing: a synchronized manufacturing approach", Industrial Management, Vol. 32 No. 5, pp. 24-6. [AC]
    • (1990) Industrial Management , vol.32 , Issue.5 , pp. 24-6
    • Eden, Y.1    Ronen, B.2
  • 11
    • 0023831955 scopus 로고
    • Workflow analysis, just-in-time techniques simplify administrative process in paperwork operation
    • Feather, J.J. and Cross, K.F. (1989, "Workflow analysis, just-in-time techniques simplify administrative process in paperwork operation", Industrial Engineering, Vol. 20 No. 1, pp. 32-40. [A]
    • (1989) Industrial Engineering , vol.20 , Issue.1 , pp. 32-40
    • Feather, J.J.1    Cross, K.F.2
  • 12
    • 0002675248 scopus 로고
    • MRP, Kanban or OPT, what's best?
    • Fox, R.E. (1982a, "MRP, Kanban or OPT, what's best?", Inventories and Production, January-February. [CN]]
    • (1982) Inventories and Production
    • Fox, R.E.1
  • 13
    • 3343007915 scopus 로고
    • OPT: An answer for America, Part II
    • Fox, R.E. (1982b, "OPT: an answer for America, Part II", Inventories and Production, November-December. [C]]
    • (1982) Inventories and Production
    • Fox, R.E.1
  • 14
    • 0000372287 scopus 로고
    • An analysis and discussion of the optimized production technology software and its use
    • Fry, T.D., Fox, J.F. and Blackstone, J.H. (1992, "An analysis and discussion of the optimized production technology software and its use", Production and Operations Management, Vol. 1 No. 2, pp. 229-43. [E]
    • (1992) Production and Operations Management , vol.1 , Issue.2 , pp. 229-43
    • Fry, T.D.1    Fox, J.F.2    Blackstone, J.H.3
  • 25
    • 0003710588 scopus 로고
    • North River Press New York, NY.
    • Goldratt, E.M. and Fox, J. (1986, The Race, North River Press, New York, NY.
    • (1986) The Race
    • Goldratt, E.M.1    Fox, J.2
  • 27
    • 0029370747 scopus 로고
    • Implementation of Drum-Buffer-Rope at a military rework depot engine works
    • Third Quarter
    • Guide, V.D.R. and Ghishelli, G.A. (1995, "Implementation of Drum-Buffer-Rope at a military rework depot engine works", Production and Inventory Management, Third Quarter, pp. 79-82. [P]
    • (1995) Production and Inventory Management , pp. 79-82
    • Guide, V.D.R.1    Ghishelli, G.A.2
  • 28
    • 0002813825 scopus 로고
    • ABC v. TOC: It's a matter of time
    • Holmen, J.S. (1995, "ABC v. TOC: it's a matter of time", Management Accounting, Vol. 76 No. 7, pp. 37-40. [AC]
    • (1995) Management Accounting , vol.76 , Issue.7 , pp. 37-40
    • Holmen, J.S.1
  • 29
    • 0025243219 scopus 로고
    • Maximizing throughput in some simple time constrained scheduling situations
    • Huisman, H.H., Polderman, G.L. and Weeda, P.J. (1990, "Maximizing throughput in some simple time constrained scheduling situations", Engineering Costs & Production Economics, Vol. 18 No. 3, pp. 293-9. [P]
    • (1990) Engineering Costs & Production Economics , vol.18 , Issue.3 , pp. 293-9
    • Huisman, H.H.1    Polderman, G.L.2    Weeda, P.J.3
  • 30
    • 0020822392 scopus 로고
    • The OPT scheduling system: A review of a new production scheduling system
    • Jacobs, F.R. (1983, "The OPT scheduling system: a review of a new production scheduling system", Production and Inventory Management, 3rd Quarter. [E]
    • (1983) Production and Inventory Management
    • Jacobs, F.R.1
  • 31
    • 0021503050 scopus 로고
    • OPT uncovered: Many production planning and scheduling concepts can be applied with or without the software
    • Jacobs, F.R. (1984, "OPT uncovered: many production planning and scheduling concepts can be applied with or without the software", Industrial Engineering, Vol. 16 No. 10, pp. 32-41. [C]
    • (1984) Industrial Engineering , vol.16 , Issue.10 , pp. 32-41
    • Jacobs, F.R.1
  • 32
    • 0003162762 scopus 로고
    • Optimizing theory of constraints when new product alternatives exist
    • Lee, T.N. and Plenert, G. (1993, "Optimizing theory of constraints when new product alternatives exist", Production and Inventory Management, Third Quarter, pp. 51-7. [CN]
    • (1993) Production and Inventory Management , pp. 51-7
    • Lee, T.N.1    Plenert, G.2
  • 33
    • 0026205378 scopus 로고
    • Using V-A-T analysis for determining the priority and location of JIT manufacturing techniques
    • Lockamy, A. and Cox, J.F. (1991, "Using V-A-T analysis for determining the priority and location of JIT manufacturing techniques", International Journal of Production Research, Vol. 29 No. 8, pp. 1661-72. [E]
    • (1991) International Journal of Production Research , vol.29 , Issue.8 , pp. 1661-72
    • Lockamy, A.1    Cox, J.F.2
  • 35
    • 0026880669 scopus 로고
    • Theory of constraints and linear programming: A comparison
    • Luebbe, R. and Finch, B. (1992, "Theory of constraints and linear programming: a comparison", International Journal of Production Research, Vol. 30 No. 6, pp. 1471-8. [CN]
    • (1992) International Journal of Production Research , vol.30 , Issue.6 , pp. 1471-8
    • Luebbe, R.1    Finch, B.2
  • 42
    • 0027577357 scopus 로고
    • Analysis of setup time at constraint resources
    • Patterson, M. C. (1993, "Analysis of setup time at constraint resources", International Journal of Production Research, Vol. 31 No. 4, pp. 845-9. [E]
    • (1993) International Journal of Production Research , vol.31 , Issue.4 , pp. 845-9
    • Patterson, M.C.1
  • 44
    • 0028402580 scopus 로고
    • Theory of constraints: Improper applications yield improper conclusions
    • Posnack, A.J. (1994, "Theory of constraints: improper applications yield improper conclusions", Production and Inventory Management, First Quarter, pp. 85-6. [CN]
    • (1994) Production and Inventory Management , pp. 85-6
    • Posnack, A.J.1
  • 45
    • 0026414537 scopus 로고
    • MRP, MRPII, OPT, JIT and CIM - Succession, evolution, or necessary combination
    • Ptak, C.A. (1991, "MRP, MRPII, OPT, JIT and CIM - succession, evolution, or necessary combination", Production and Inventory Management, Second Quarter, pp. 7-11. [CN]
    • (1991) Production and Inventory Management , pp. 7-11
    • Ptak, C.A.1
  • 46
    • 0010843780 scopus 로고
    • Push, pull and squeeze shop floor control with computer simulation
    • Ramsay, M.L. (1990, "Push, pull and squeeze shop floor control with computer simulation", Industrial Engineering, Vol. 22 No. 2, pp. 39-45. [CN]
    • (1990) Industrial Engineering , vol.22 , Issue.2 , pp. 39-45
    • Ramsay, M.L.1
  • 47
    • 0009058971 scopus 로고
    • Material requirement planning and theory of constraints: Can they coexist? a case study
    • Reimer, G. (1991, "Material requirement planning and theory of constraints: can they coexist? A case study", Production and Inventory Management, Fourth Quarter, pp. 48-52. [P]
    • (1991) Production and Inventory Management , pp. 48-52
    • Reimer, G.1
  • 48
    • 0024073049 scopus 로고
    • The merit of making things fast
    • Schmenner, R.W. (1988, "The merit of making things fast", Sloan Management Review, Fall, pp. 11-17.
    • (1988) Sloan Management Review , pp. 11-17
    • Schmenner, R.W.1
  • 50
    • 0026414517 scopus 로고
    • Buffer management: A diagnostic tool for production control
    • Schragenheim, E. and Ronen, B. (1991, "Buffer management: a diagnostic tool for production control", Production and Inventory Management, Second Quarter, pp. 74-9. [E]
    • (1991) Production and Inventory Management , pp. 74-9
    • Schragenheim, E.1    Ronen, B.2
  • 51
    • 0029260367 scopus 로고
    • Master production scheduling developments in a theory of constraints environment
    • Spencer, M.S. and James, F.C. (1995, "Master production scheduling developments in a theory of constraints environment", Production and Inventory Management, First Quarter, pp. 8-13. [E]
    • (1995) Production and Inventory Management , pp. 8-13
    • Spencer, M.S.1    James, F.C.2
  • 55
    • 0022736152 scopus 로고
    • Using MRP for optimized schedules (emulating OPT)
    • Swann, D. (1986, "Using MRP for optimized schedules (emulating OPT)", Production and Inventory Management, Second Quarter, pp. 30-7. [E]
    • (1986) Production and Inventory Management , pp. 30-7
    • Swann, D.1
  • 58
    • 0039453188 scopus 로고
    • Competitive factors and performance measurement: Applying the theory of constraints to meet customer needs
    • Wahlers, J.L. and Cox, J.F. (1994, "Competitive factors and performance measurement: applying the theory of constraints to meet customer needs", International Journal of Production Economics, Vol. 37 No. 2-3, pp. 229-40. [P]
    • (1994) International Journal of Production Economics , vol.37 , Issue.23 , pp. 229-40
    • Wahlers, J.L.1    Cox, J.F.2
  • 59
    • 0002088367 scopus 로고
    • Throughput accounting. Part 1: The need for a new language for manufacturing
    • Waldron, D. and Galloway, D. (1988a, "Throughput accounting. Part 1: the need for a new language for manufacturing", Management Accounting, Vol. 66 No. 10, pp. 34-5. [AC]
    • (1988) Management Accounting , vol.66 , Issue.10 , pp. 34-5
    • Waldron, D.1    Galloway, D.2
  • 60
    • 0002088367 scopus 로고
    • Throughput accounting. Part 2: Ranking products profitability
    • Waldron, D. and Galloway, D. (1988b, "Throughput accounting. Part 2: ranking products profitability", Management Accounting, Vol. 66 No. 11, pp. 34-5. [AC]
    • (1988) Management Accounting , vol.66 , Issue.11 , pp. 34-5
    • Waldron, D.1    Galloway, D.2
  • 61
    • 0002752424 scopus 로고
    • Throughput accounting. Part 3: A better way to control labour costs
    • Waldron, D. and Galloway, D. (1989a, "Throughput accounting. Part 3: a better way to control labour costs", Management Accounting, Vol. 67, pp. 32-3. [AC]
    • (1989) Management Accounting , vol.67 , pp. 32-3
    • Waldron, D.1    Galloway, D.2
  • 62
    • 0010398105 scopus 로고
    • Throughput accounting. Part 4: Moving on to complex products
    • Waldron, D. and Galloway, D. (1989b, "Throughput accounting. Part 4: moving on to complex products", Management Accounting, Vol. 67, pp. 40-1. [AC]
    • (1989) Management Accounting , vol.67 , pp. 40-1
    • Waldron, D.1    Galloway, D.2
  • 63
    • 0025429861 scopus 로고
    • On the choice of batch mode in order to maximize throughput
    • Weeda, P.J. (1990, "On the choice of batch mode in order to maximize throughput", Engineering Costs and Production Economics, Vol. 19, pp. 241-47. [E]
    • (1990) Engineering Costs and Production Economics , vol.19 , pp. 241-47
    • Weeda, P.J.1
  • 64
    • 84862396016 scopus 로고
    • The power of the goal
    • January-February
    • Zmiran, J.P. (1994, "The power of the goal", Success, January-February, pp. 91-3. [C]
    • (1994) Success , pp. 91-3
    • Zmiran, J.P.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.