메뉴 건너뛰기




Volumn 107, Issue 1-3, 2000, Pages 390-397

Fine planning for supply chains in semiconductor manufacture

Author keywords

[No Author keywords available]

Indexed keywords

INDUSTRY; OPTIMIZATION; PRODUCTION CONTROL; PRODUCTION ENGINEERING; SOCIETIES AND INSTITUTIONS; STRATEGIC PLANNING;

EID: 0034316827     PISSN: 09240136     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0924-0136(00)00724-X     Document Type: Article
Times cited : (44)

References (24)
  • 1
    • 0032164289 scopus 로고    scopus 로고
    • Demand chain management in a global enterprise - information management view
    • Korhonen P., Huttunen K., Eloranta E. Demand chain management in a global enterprise - information management view. Prod. Plann. Control. 9(6):1998;526-531.
    • (1998) Prod. Plann. Control , vol.9 , Issue.6 , pp. 526-531
    • Korhonen, P.1    Huttunen, K.2    Eloranta, E.3
  • 2
    • 0031120944 scopus 로고    scopus 로고
    • Manufacturing supply chain modelling and re-engineering
    • Bhaskaran K., Leung Y.T. Manufacturing supply chain modelling and re-engineering. Sadhana-Acad. Proc. Eng. Sci. 22(2):1997;165-187.
    • (1997) Sadhana-Acad. Proc. Eng. Sci. , vol.22 , Issue.2 , pp. 165-187
    • Bhaskaran, K.1    Leung, Y.T.2
  • 3
    • 0031219775 scopus 로고    scopus 로고
    • Supply chain partnerships: Opportunities for operations research
    • Maloni M.J., Benton W.C. Supply chain partnerships: opportunities for operations research. Eur. J. Oper. Res. 101(3):1997;419-429.
    • (1997) Eur. J. Oper. Res. , vol.101 , Issue.3 , pp. 419-429
    • Maloni, M.J.1    Benton, W.C.2
  • 6
    • 0032157896 scopus 로고    scopus 로고
    • Configuration and co-ordination of virtual production networks
    • Tuma A. Configuration and co-ordination of virtual production networks. Int. J. Prod. Econ. 56(7):1998;641-648.
    • (1998) Int. J. Prod. Econ. , vol.56 , Issue.7 , pp. 641-648
    • Tuma, A.1
  • 8
    • 0001877785 scopus 로고    scopus 로고
    • Supply chain management in complex manufacturing
    • Gupta S. Supply chain management in complex manufacturing. IIE Solutions. 29(3):1997;18-21.
    • (1997) IIE Solutions , vol.29 , Issue.3 , pp. 18-21
    • Gupta, S.1
  • 9
    • 0041760308 scopus 로고    scopus 로고
    • Co-ordinated supply chain management
    • Thomas D.J., Griffin P.M. Co-ordinated supply chain management. Eur. J. Oper. Res. 94(1):1996;1-15.
    • (1996) Eur. J. Oper. Res. , vol.94 , Issue.1 , pp. 1-15
    • Thomas, D.J.1    Griffin, P.M.2
  • 10
    • 0011603980 scopus 로고    scopus 로고
    • Planning and scheduling multi-site semiconductor production chains: A survey of needs, current practices and integration issues
    • Galway, Ireland
    • F. Frederix, Planning and scheduling multi-site semiconductor production chains: a survey of needs, current practices and integration issues, in: Proceedings of the Conference on Integration in Manufacturing, Galway, Ireland, 1996, pp. 107-116.
    • (1996) In: Proceedings of the Conference on Integration in Manufacturing , pp. 107-116
    • Frederix, F.1
  • 11
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry, Part I: System characteristics, performance evaluation and production planning
    • Uzsoy R., Lee C.-Y., Martin-Vega L.A. A review of production planning and scheduling models in the semiconductor industry, Part I: system characteristics, performance evaluation and production planning. IIE Trans. Scheduling Logistics. 24(4):1992;47-61.
    • (1992) IIE Trans. Scheduling Logistics , vol.24 , Issue.4 , pp. 47-61
    • Uzsoy, R.1    Lee, C.-Y.2    Martin-Vega, L.A.3
  • 13
    • 0013367503 scopus 로고    scopus 로고
    • IMPReSS: An automated production-planning and delivery quotation system at Harris Corporation-Semiconductor Sector
    • Leachman R.C., Benson R.F., Liu C., Raar D.J. IMPReSS: an automated production-planning and delivery quotation system at Harris Corporation-Semiconductor Sector. Interfaces. 26(1):1996;6-37.
    • (1996) Interfaces , vol.26 , Issue.1 , pp. 6-37
    • Leachman, R.C.1    Benson, R.F.2    Liu, C.3    Raar, D.J.4
  • 14
    • 0030150549 scopus 로고    scopus 로고
    • A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
    • Hung Y.-F., Leachman R.C. A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations. IEEE Trans. Semiconductor Manuf. 9(2):1996;257-269.
    • (1996) IEEE Trans. Semiconductor Manuf. , vol.9 , Issue.2 , pp. 257-269
    • Hung, Y.-F.1    Leachman, R.C.2
  • 15
    • 0024055865 scopus 로고
    • Scheduling semiconductor Wafer Fabrication
    • Wein L.M. Scheduling semiconductor Wafer Fabrication. IEEE Trans. Semiconductor Manuf. 1(3):1988;115-129.
    • (1988) IEEE Trans. Semiconductor Manuf. , vol.1 , Issue.3 , pp. 115-129
    • Wein, L.M.1
  • 16
    • 0342394711 scopus 로고    scopus 로고
    • Supply chain control: Trade-offs and system requirements
    • Leach N.P., Makatsoris C., Richards H.D. Supply chain control: trade-offs and system requirements. Human Syst. Mgmt. 16:1997;159-169.
    • (1997) Human Syst. Mgmt. , vol.16 , pp. 159-169
    • Leach, N.P.1    Makatsoris, C.2    Richards, H.D.3
  • 20
    • 0031213179 scopus 로고    scopus 로고
    • Flow of orders through a Virtual Enterprise: Their proactive planning & scheduling and reactive control
    • Richards H.D., Dudenhausen H.M., Makatsoris C., de Ridder L. Flow of orders through a Virtual Enterprise: their proactive planning & scheduling and reactive control. Comput. Control Eng. J. 8(4):1997;173-179.
    • (1997) Comput. Control Eng. J. , vol.8 , Issue.4 , pp. 173-179
    • Richards, H.D.1    Dudenhausen, H.M.2    Makatsoris, C.3    De Ridder, L.4
  • 21
    • 0032761070 scopus 로고    scopus 로고
    • Information management in production planning for a Virtual Enterprise
    • Zhou Q., Besant C.B. Information management in production planning for a Virtual Enterprise. Int. J. Prod. Res. 37(1):1999;207-218.
    • (1999) Int. J. Prod. Res. , vol.37 , Issue.1 , pp. 207-218
    • Zhou, Q.1    Besant, C.B.2
  • 22
    • 0000536995 scopus 로고    scopus 로고
    • Heterarchical control of highly distributed manufacturing systems
    • Duffie N.A., Prabhu V.V. Heterarchical control of highly distributed manufacturing systems. Int. J. Comput. Integrated Manuf. 9(4):1996;270-281.
    • (1996) Int. J. Comput. Integrated Manuf. , vol.9 , Issue.4 , pp. 270-281
    • Duffie, N.A.1    Prabhu, V.V.2
  • 23
    • 0032050336 scopus 로고    scopus 로고
    • CAMPS: A constraint-based architecture for multiagent planning and scheduling
    • Miyashita K. CAMPS: a constraint-based architecture for multiagent planning and scheduling. J. Intell. Manuf. 9(2):1998;147-154.
    • (1998) J. Intell. Manuf. , vol.9 , Issue.2 , pp. 147-154
    • Miyashita, K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.