-
1
-
-
21844513640
-
Operations planning issues in an assembly/disassembly environment
-
L. Brennan, S. M. Gupta, and K. N. Talcb, "Operations Planning Issues In An Assembly/Disassembly Environment," Internatlonal Joumal of Operations and Production Planning, Vol 14, No. 9, pp. 57-67, 1994.
-
(1994)
Internatlonal Joumal of Operations and Production Planning
, vol.14
, Issue.9
, pp. 57-67
-
-
Brennan, L.1
Gupta, S.M.2
Talcb, K.N.3
-
2
-
-
0035837942
-
A solution approach to the disassembly line problem in the presence of task failures
-
A. Gungor and S. M. Gupta, "A Solution Approach To The Disassembly Line Problem In The Presence Of Task Failures," International Journal of Production Research, Vol 39, No. 7, pp. 1427-1467, 2001.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.7
, pp. 1427-1467
-
-
Gungor, A.1
Gupta, S.M.2
-
3
-
-
0037143030
-
Disassembly line in product recovery
-
A. Gungor, and S. M. Gupta, "Disassembly Line In Product Recovery," International Journal of Production Research, Vol 40, No. 11, pp. 2569-2589, 2002.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.11
, pp. 2569-2589
-
-
Gungor, A.1
Gupta, S.M.2
-
4
-
-
0035866455
-
Disassembly sequence plan generation using a branch-and-bound algorithm
-
A. Gungor and S. M. Gupta, "Disassembly Sequence Plan Generation Using A Branch-And-Bound Algorithm," International Journal of Production Research, Vol 39, pp. 481-509, 2001.
-
(2001)
International Journal of Production Research
, vol.39
, pp. 481-509
-
-
Gungor, A.1
Gupta, S.M.2
-
5
-
-
0033358107
-
Issues in environmentally conscious manufacturing and product recovery: A survey
-
A. Gungor and S. M. Gupta, "Issues In Environmentally Conscious Manufacturing And Product Recovery: A Survey," Computers and Industrial Engineering, Vol 36, No. 4, pp. 811-853, 1999.
-
(1999)
Computers and Industrial Engineering
, vol.36
, Issue.4
, pp. 811-853
-
-
Gungor, A.1
Gupta, S.M.2
-
6
-
-
17044367356
-
Multi-objective optimization in disassembly sequencing problems
-
April 30-May 3, Cancun, Mexico, CD-ROM
-
th Annual Production & Operations Management Conference, April 30-May 3, Cancun, Mexico, CD-ROM, 2004.
-
(2004)
th Annual Production & Operations Management Conference
-
-
Gupta, S.M.1
McGovern, S.M.2
-
7
-
-
0036611840
-
A multi-criteria decision making approach for disassembly-to-order systems
-
E. Kongar and S. M. Gupta, "A Multi-Criteria Decision Making Approach For Disassembly-To-Order Systems," Journal of Electronics Manufacturing, Vol 11, No. 2, pp. 171-183, 2002.
-
(2002)
Journal of Electronics Manufacturing
, vol.11
, Issue.2
, pp. 171-183
-
-
Kongar, E.1
Gupta, S.M.2
-
8
-
-
0038156629
-
Disassembly sequencing: A survey
-
A. J. D. Lambert, "Disassembly Sequencing: A Survey," International Journal of Production Research, Vol 41, No. 16, pp. 3721-3759, 2003.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.16
, pp. 3721-3759
-
-
Lambert, A.J.D.1
-
9
-
-
0035546631
-
Petri net approach to disassembly process planning for products with complex and/or precedence relationships
-
K. E. Moore, A. Gungor, and S. M. Gupta, "Petri Net Approach To Disassembly Process Planning For Products With Complex AND/OR Precedence Relationships," European Journal of Operational Research, Vol 135, pp. 428-449, 2001.
-
(2001)
European Journal of Operational Research
, vol.135
, pp. 428-449
-
-
Moore, K.E.1
Gungor, A.2
Gupta, S.M.3
-
10
-
-
2142661748
-
2-Opt heuristic for the disassembly line balancing problem
-
October 27-31, Providence, Rhode Island
-
S. M. McGovern and S. M. Gupta, "2-Opt Heuristic For The Disassembly Line Balancing Problem," Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing III, October 27-31, Providence, Rhode Island, pp. 71-84, 2003.
-
(2003)
Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing III
, pp. 71-84
-
-
McGovern, S.M.1
Gupta, S.M.2
-
11
-
-
30044440863
-
Demanufacturing strategy based upon metaheuristics
-
May 15-19, Houston, Texas, CD-ROM
-
S. M. McGovern and S.M. Gupta, "Demanufacturing Strategy Based Upon Metaheuristics," Proceedings of the 2004 Industrial Engineering Research Conference, May 15-19, Houston, Texas, CD-ROM, 2004.
-
(2004)
Proceedings of the 2004 Industrial Engineering Research Conference
-
-
McGovern, S.M.1
Gupta, S.M.2
-
12
-
-
0242492016
-
Greedy algorithm for disassembly line scheduling
-
October 5-8, Washington, DC
-
S. M. McGovern and S. M. Gupta, "Greedy Algorithm For Disassembly Line Scheduling," Proceedings of the 2003 IEEE International Conference on Systems, Man, and Cybernetics, October 5-8, Washington, DC, pp. 1737-1744, 2003.
-
(2003)
Proceedings of the 2003 IEEE International Conference on Systems, Man, and Cybernetics
, pp. 1737-1744
-
-
McGovern, S.M.1
Gupta, S.M.2
-
13
-
-
17044436946
-
Metaheuristic technique for the disassembly line balancing problem
-
March 24-26, Atlantic City, New Jersey
-
S. M. McGovern and S. M. Gupta, "Metaheuristic Technique For The Disassembly Line Balancing Problem," Proceedings of the 2004 Northeast Decision Sciences Institute Conference, March 24-26, Atlantic City, New Jersey, pp. 223-225, 2004.
-
(2004)
Proceedings of the 2004 Northeast Decision Sciences Institute Conference
, pp. 223-225
-
-
McGovern, S.M.1
Gupta, S.M.2
-
15
-
-
0242665170
-
Solving disassembly sequence planning problems using combinatorial optimization
-
March 27-29, Providence, Rhode Island
-
S. M. McGovern, S. M. Gupta, and S. V. Kamarthi, "Solving Disassembly Sequence Planning Problems Using Combinatorial Optimization," Proceedings of the 2003 Annual Meeting of the Northeast Decision Sciences Institute, March 27-29, Providence, Rhode Island, pp. 178-180, 2003.
-
(2003)
Proceedings of the 2003 Annual Meeting of the Northeast Decision Sciences Institute
, pp. 178-180
-
-
McGovern, S.M.1
Gupta, S.M.2
Kamarthi, S.V.3
-
16
-
-
17044410423
-
Multi-criteria optimization for non-linear end of lifecycle models
-
October 25-27, Tsukuba, Japan
-
S. M. McGovern, S. M. Gupta, and K. Nakashima, "Multi-Criteria Optimization For Non-Linear End Of Lifecycle Models," Proceedings of the Sixth Conference on EcoBalance, October 25-27, Tsukuba, Japan, 2004.
-
(2004)
Proceedings of the Sixth Conference on EcoBalance
-
-
McGovern, S.M.1
Gupta, S.M.2
Nakashima, K.3
-
17
-
-
0004944786
-
Analysis of design efficiency for the disassembly of modular electronic products
-
P. Veerakamolmal and S. M. Gupta, "Analysis Of Design Efficiency For The Disassembly Of Modular Electronic Products," Journal of Electronics Manufacturing, Vol 9, No. 1, pp. 79-95, 1999.
-
(1999)
Journal of Electronics Manufacturing
, vol.9
, Issue.1
, pp. 79-95
-
-
Veerakamolmal, P.1
Gupta, S.M.2
-
18
-
-
0032284905
-
Optimal analysis of lot-size balancing for multi-products selective disassembly
-
P. Veerakamolmal and S. M. Gupta, "Optimal Analysis Of Lot-Size Balancing For Multi-Products Selective Disassembly," International Journal of Flexible Automation and Integrated Manufacturing, Vol 6, No. 3-4, pp. 245-269, 1998.
-
(1998)
International Journal of Flexible Automation and Integrated Manufacturing
, vol.6
, Issue.3-4
, pp. 245-269
-
-
Veerakamolmal, P.1
Gupta, S.M.2
|