-
1
-
-
0041368822
-
Disassembly modeling, planning, and application
-
Y. Tang, M. C. Zhou, E. Zussman, and R. J. Caudill, "Disassembly modeling, planning, and application," J. Manuf. Syst., vol. 21, no. 3, pp. 200-217, 2002.
-
(2002)
J. Manuf. Syst.
, vol.21
, Issue.3
, pp. 200-217
-
-
Tang, Y.1
Zhou, M.C.2
Zussman, E.3
Caudill, R.J.4
-
2
-
-
0031247813
-
An evaluation methodology for disassembly processes
-
Oct.
-
A. Gungor and S. M. Gupta, "An evaluation methodology for disassembly processes," Comput. Ind. Eng., vol. 33, nos. 1-2, pp. 329-332, Oct. 1997.
-
(1997)
Comput. Ind. Eng.
, vol.33
, Issue.1-2
, pp. 329-332
-
-
Gungor, A.1
Gupta, S.M.2
-
3
-
-
0034651061
-
An approach for estimating the end-of-life product disassembly effort and cost
-
S. K. Das, P. Yedlarajiah, and R. Narendra, "An approach for estimating the end-of-life product disassembly effort and cost," Int. J. Prod. Res., vol. 38, no. 3, pp. 657-673, 2000.
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.3
, pp. 657-673
-
-
Das, S.K.1
Yedlarajiah, P.2
Narendra, R.3
-
4
-
-
0001378506
-
Environmentally conscious design and manufacturing: A state-of-the-art survey
-
H. C. Zhang, T. C. Kuo, H. Lu, and S. H. Huang, "Environmentally conscious design and manufacturing: A state-of-the-art survey," J. Manuf. Syst., vol. 16, no. 5, pp. 352-371, 1997.
-
(1997)
J. Manuf. Syst.
, vol.16
, Issue.5
, pp. 352-371
-
-
Zhang, H.C.1
Kuo, T.C.2
Lu, H.3
Huang, S.H.4
-
5
-
-
0033078088
-
A methodology for modeling and adaptive planning of disassembly processes
-
Feb.
-
E. Zussman and M. Zhou, "A methodology for modeling and adaptive planning of disassembly processes," IEEE Trans. Robot. Autom., vol. 15, no. 1, pp. 190-194, Feb. 1999.
-
(1999)
IEEE Trans. Robot. Autom.
, vol.15
, Issue.1
, pp. 190-194
-
-
Zussman, E.1
Zhou, M.2
-
6
-
-
0035707986
-
An integrated approach to disassembly planning and demanufacturing operation
-
Dec.
-
Y. Tang, M. Zhou, and R. J. Caudill, "An integrated approach to disassembly planning and demanufacturing operation," IEEE Trans. Robot. Autom., vol. 17, no. 6, pp. 773-784, Dec. 2001.
-
(2001)
IEEE Trans. Robot. Autom.
, vol.17
, Issue.6
, pp. 773-784
-
-
Tang, Y.1
Zhou, M.2
Caudill, R.J.3
-
7
-
-
0141750712
-
Fuzzy reasoning Petri nets
-
May
-
M. Gao, M. Zhou, X. Huang, and Z. Wu, "Fuzzy reasoning Petri nets," IEEE Trans. Syst., Man, Cybern. A, Syst., Humans, vol. 33, no. 3, pp. 314-324, May 2003.
-
(2003)
IEEE Trans. Syst., Man, Cybern. A, Syst., Humans
, vol.33
, Issue.3
, pp. 314-324
-
-
Gao, M.1
Zhou, M.2
Huang, X.3
Wu, Z.4
-
8
-
-
4844227632
-
Intelligent decision making in disassembly process based on fuzzy reasoning Petri nets
-
Oct.
-
M. Gao, M. Zhou, and Y. Tang, "Intelligent decision making in disassembly process based on fuzzy reasoning Petri nets," IEEE Trans. Syst. Man, Cybern. B, Cybern., vol. 34, no. 5, pp. 2029-2034, Oct. 2004.
-
(2004)
IEEE Trans. Syst. Man, Cybern. B, Cybern.
, vol.34
, Issue.5
, pp. 2029-2034
-
-
Gao, M.1
Zhou, M.2
Tang, Y.3
-
9
-
-
33947114793
-
Fuzzy-Petri-net-based disassembly planning considering human factors
-
Jul.
-
Y. Tang, M. C. Zhou, and M. Gao, "Fuzzy-Petri-net-based disassembly planning considering human factors," IEEE Trans. Syst., Man, Cybern. A, Syst., Humans, vol. 36, no. 4, pp. 718-726, Jul. 2006.
-
(2006)
IEEE Trans. Syst., Man, Cybern. A, Syst., Humans
, vol.36
, Issue.4
, pp. 718-726
-
-
Tang, Y.1
Zhou, M.C.2
Gao, M.3
-
10
-
-
0031233911
-
Optimal disassembly of complex products
-
A. J. D. Lambert, "Optimal disassembly of complex products," Int. J. Prod. Res., vol. 35, no. 9, pp. 2509-2523, 1997.
-
(1997)
Int. J. Prod. Res.
, vol.35
, Issue.9
, pp. 2509-2523
-
-
Lambert, A.J.D.1
-
11
-
-
78650593531
-
Rule-based recursive selective disassembly sequence planning for green design
-
Jan.
-
S. S. Smith and W.-H. Chen, "Rule-based recursive selective disassembly sequence planning for green design," Adv. Eng. Inform., vol. 25, no. 1, pp. 77-87, Jan. 2011.
-
(2011)
Adv. Eng. Inform.
, vol.25
, Issue.1
, pp. 77-87
-
-
Smith, S.S.1
Chen, W.-H.2
-
12
-
-
43449083231
-
Parallel RRT-based path planning for selective disassembly planning
-
I. Aguinaga, D. Borro, and L. Matey, "Parallel RRT-based path planning for selective disassembly planning," Int. J. Adv. Manuf. Technol., vol. 36, no. 11, pp. 1221-1233, 2008.
-
(2008)
Int. J. Adv. Manuf. Technol.
, vol.36
, Issue.11
, pp. 1221-1233
-
-
Aguinaga, I.1
Borro, D.2
Matey, L.3
-
13
-
-
24144494525
-
An object-oriented intelligent disassembly sequence planner for maintenance
-
Sep.
-
J. R. Li, L. P. Khoo, and S. B. Tor, "An object-oriented intelligent disassembly sequence planner for maintenance," Comput. Ind., vol. 56, no. 7, pp. 699-718, Sep. 2005.
-
(2005)
Comput. Ind.
, vol.56
, Issue.7
, pp. 699-718
-
-
Li, J.R.1
Khoo, L.P.2
Tor, S.B.3
-
14
-
-
84867576451
-
Disassembly sequence planning approach for product virtual maintenance based on improved max-min ant system
-
X. H. Liu, G. L. Peng, X. M. Liu, and Y. F. Hou, "Disassembly sequence planning approach for product virtual maintenance based on improved max-min ant system," Int. J. Adv. Manuf. Technol., vol. 59, no. 5, pp. 829-839, 2012.
-
(2012)
Int. J. Adv. Manuf. Technol.
, vol.59
, Issue.5
, pp. 829-839
-
-
Liu, X.H.1
Peng, G.L.2
Liu, X.M.3
Hou, Y.F.4
-
15
-
-
84655163249
-
Optimization of the disassembly sequencing problem on the basis of self-adaptive simplified swarm optimization
-
Jan.
-
W.-C. Yeh, "Optimization of the disassembly sequencing problem on the basis of self-adaptive simplified swarm optimization," IEEE Trans. Syst., Man, Cybern. A, Syst., Humans, vol. 42, no. 1, pp. 250-261, Jan. 2012.
-
(2012)
IEEE Trans. Syst., Man, Cybern. A, Syst., Humans
, vol.42
, Issue.1
, pp. 250-261
-
-
Yeh, W.-C.1
-
16
-
-
42949112952
-
A path-relinking approach for a bi-criteria disassembly sequencing problem
-
B. Adenso-Díaz, S. García-Carbajal, and S. M. Gupta, "A path-relinking approach for a bi-criteria disassembly sequencing problem," Comput. Oper. Res., vol. 35, no. 12, pp. 3989-3997, 2008.
-
(2008)
Comput. Oper. Res.
, vol.35
, Issue.12
, pp. 3989-3997
-
-
Adenso-Díaz, B.1
García-Carbajal, S.2
Gupta, S.M.3
-
17
-
-
0033726694
-
Combining a neural network with a genetic algorithm for process parameter optimization
-
D. F. Cook, C. T. Ragsdale, and R. L. Major, "Combining a neural network with a genetic algorithm for process parameter optimization," Eng. Appl. Artif. Intell., vol. 13, pp. 391-396, 2000.
-
(2000)
Eng. Appl. Artif. Intell.
, vol.13
, pp. 391-396
-
-
Cook, D.F.1
Ragsdale, C.T.2
Major, R.L.3
-
18
-
-
80053914177
-
Expected energy analysis for industrial process planning problem with fuzzy time parameters
-
Dec.
-
G. Tian, J. Chu, Y. Liu, H. Ke, X. Zhao, and G. Xu, "Expected energy analysis for industrial process planning problem with fuzzy time parameters," Comput. Chem. Eng., vol. 35, no. 12, pp. 2905-2912, Dec. 2011.
-
(2011)
Comput. Chem. Eng.
, vol.35
, Issue.12
, pp. 2905-2912
-
-
Tian, G.1
Chu, J.2
Liu, Y.3
Ke, H.4
Zhao, X.5
Xu, G.6
-
19
-
-
84866316396
-
Energy evaluation method and its optimization models for process planning with stochastic characteristics: A case study in disassembly decision-making
-
Nov.
-
G. D. Tian, Y. M. Liu, H. Ke, and J. W. Chu, "Energy evaluation method and its optimization models for process planning with stochastic characteristics: A case study in disassembly decision-making," Comput. Ind. Eng., vol. 63, no. 3, pp. 553-563, Nov. 2012.
-
(2012)
Comput. Ind. Eng.
, vol.63
, Issue.3
, pp. 553-563
-
-
Tian, G.D.1
Liu, Y.M.2
Ke, H.3
Chu, J.W.4
-
20
-
-
0036967254
-
Integration of disassembly leveling and bin assignment for demanufacturing automation
-
Dec.
-
M. Gao, M. Zhou, and R. J. Caudill, "Integration of disassembly leveling and bin assignment for demanufacturing automation," IEEE Trans. Robot. Autom., vol. 18, no. 6, pp. 867-874, Dec. 2002.
-
(2002)
IEEE Trans. Robot. Autom.
, vol.18
, Issue.6
, pp. 867-874
-
-
Gao, M.1
Zhou, M.2
Caudill, R.J.3
-
21
-
-
72149096791
-
Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art
-
M. A. Ilgin and S. M. Gupta, "Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art," J. Environ. Manage., vol. 91, no. 3, pp. 563-591, 2010.
-
(2010)
J. Environ. Manage.
, vol.91
, Issue.3
, pp. 563-591
-
-
Ilgin, M.A.1
Gupta, S.M.2
-
22
-
-
21844513640
-
Operations planning issues in an assembly/disassembly environment
-
L. Brennan, S. M. Gupta, and K. N. Taleb, "Operations planning issues in an assembly/disassembly environment," Int. J. Oper. Prod. Manag., vol. 14, no. 9, pp. 57-67, 1994.
-
(1994)
Int. J. Oper. Prod. Manag.
, vol.14
, Issue.9
, pp. 57-67
-
-
Brennan, L.1
Gupta, S.M.2
Taleb, K.N.3
-
23
-
-
84862118118
-
Evaluation model and algorithm of product disassembly process with stochastic feature
-
Apr.
-
G. Tian, Y. Liu, Q. Tian, and J. Chu, "Evaluation model and algorithm of product disassembly process with stochastic feature," Clean Techn. Environ. Policy, vol. 14, no. 2, pp. 345-356, Apr. 2012.
-
(2012)
Clean Techn. Environ. Policy
, vol.14
, Issue.2
, pp. 345-356
-
-
Tian, G.1
Liu, Y.2
Tian, Q.3
Chu, J.4
-
24
-
-
84885444046
-
A chance constrained programming approach to determine the optimal disassembly sequence
-
Oct.
-
G. Tian, M. Zhou, and J. Chu, "A chance constrained programming approach to determine the optimal disassembly sequence," IEEE Trans. Autom. Sci. Eng., vol. 10, no. 4, pp. 1004-1013, Oct. 2013.
-
(2013)
IEEE Trans. Autom. Sci. Eng.
, vol.10
, Issue.4
, pp. 1004-1013
-
-
Tian, G.1
Zhou, M.2
Chu, J.3
-
25
-
-
84862794782
-
Probability evaluation models of product disassembly cost subject to random removal time and different removal labor cost
-
Apr.
-
G. Tian, M. Zhou, J. Chu, and Y. Liu, "Probability evaluation models of product disassembly cost subject to random removal time and different removal labor cost," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 2, pp. 288-295, Apr. 2012.
-
(2012)
IEEE Trans. Autom. Sci. Eng.
, vol.9
, Issue.2
, pp. 288-295
-
-
Tian, G.1
Zhou, M.2
Chu, J.3
Liu, Y.4
-
26
-
-
84889077460
-
Influence factor analysis and prediction models for component removal time in manufacturing
-
G. Tian, J. Chu, and T. Qiang, "Influence factor analysis and prediction models for component removal time in manufacturing," Proc. Inst. Mech. Eng., B, J. Eng. Manuf., vol. 227, no. 10, pp. 1533-1540, 2013.
-
(2013)
Proc. Inst. Mech. Eng., B, J. Eng. Manuf.
, vol.227
, Issue.10
, pp. 1533-1540
-
-
Tian, G.1
Chu, J.2
Qiang, T.3
-
27
-
-
84918841294
-
Technology innovation system and its integrated structure for automotive components remanufacturing industry development in China
-
Dec.
-
G. D. Tian, J. W. Chu, H. S. Hu, and H. Li, "Technology innovation system and its integrated structure for automotive components remanufacturing industry development in China," J. Clean. Prod., vol. 85, pp. 419-432, Dec. 2014.
-
(2014)
J. Clean. Prod.
, vol.85
, pp. 419-432
-
-
Tian, G.D.1
Chu, J.W.2
Hu, H.S.3
Li, H.4
-
28
-
-
77953610368
-
A new multiobjective ant colony algorithm for solving the disassembly line balancing problem
-
L.-P. Ding, Y.-X. Feng, J.-R. Tan, and Y.-C. Gao, "A new multiobjective ant colony algorithm for solving the disassembly line balancing problem," Int. J. Adv. Manuf. Technol., vol. 48, no. 5, pp. 761-771, 2010.
-
(2010)
Int. J. Adv. Manuf. Technol.
, vol.48
, Issue.5
, pp. 761-771
-
-
Ding, L.-P.1
Feng, Y.-X.2
Tan, J.-R.3
Gao, Y.-C.4
-
29
-
-
33746432209
-
A systematic approach to design and operation of disassembly lines
-
Jul.
-
Y. Tang and M. C. Zhou, "A systematic approach to design and operation of disassembly lines," IEEE Trans. Autom. Sci. Eng., vol. 3, no. 3, pp. 324-329, Jul. 2006.
-
(2006)
IEEE Trans. Autom. Sci. Eng.
, vol.3
, Issue.3
, pp. 324-329
-
-
Tang, Y.1
Zhou, M.C.2
-
30
-
-
85008057941
-
Learning-based disassembly process planner for uncertainty management
-
Jan.
-
Y. Tang, "Learning-based disassembly process planner for uncertainty management," IEEE Trans. Syst., Man, Cybern. A, Syst., Humans, vol. 39, no. 1, pp. 134-143, Jan. 2009.
-
(2009)
IEEE Trans. Syst., Man, Cybern. A, Syst., Humans
, vol.39
, Issue.1
, pp. 134-143
-
-
Tang, Y.1
-
31
-
-
72149101895
-
A machine learning approach for optimal disassembly planning
-
D. E. Grochowski and Y. Tang, "A machine learning approach for optimal disassembly planning," Int. J. Comput. Integr. Manuf., vol. 22, no. 4, pp. 374-383, 2009.
-
(2009)
Int. J. Comput. Integr. Manuf.
, vol.22
, Issue.4
, pp. 374-383
-
-
Grochowski, D.E.1
Tang, Y.2
-
32
-
-
33947652668
-
Uncertainty management in optimal disassembly planning through learning-based strategies
-
S. A. Reveliotis, "Uncertainty management in optimal disassembly planning through learning-based strategies," IIE Trans., vol. 30, no. 6, pp. 645-658, 2007.
-
(2007)
IIE Trans.
, vol.30
, Issue.6
, pp. 645-658
-
-
Reveliotis, S.A.1
-
33
-
-
31044434767
-
Determining optimal disassembly and recovery strategies
-
Dec.
-
R. H. Teunter, "Determining optimal disassembly and recovery strategies," Omega, vol. 34, no. 6, pp. 533-537, Dec. 2006.
-
(2006)
Omega
, vol.34
, Issue.6
, pp. 533-537
-
-
Teunter, R.H.1
-
34
-
-
0032183779
-
Disassembly sequence planning for products with defective parts in product recovery
-
A. Gungor and S. M. Gupta, "Disassembly sequence planning for products with defective parts in product recovery," Comput. Ind. Eng., vol. 35, nos. 1-2, pp. 161-164, 1998.
-
(1998)
Comput. Ind. Eng.
, vol.35
, Issue.1-2
, pp. 161-164
-
-
Gungor, A.1
Gupta, S.M.2
-
35
-
-
33751309683
-
Assembly and disassembly planning by using fuzzy logic & genetic algorithms
-
L. M. Galantucci, G. Percoco, and R. Spina, "Assembly and disassembly planning by using fuzzy logic & genetic algorithms," Int. J. Adv. Robot. Syst., vol. 1, no. 2, pp. 67-74, 2004.
-
(2004)
Int. J. Adv. Robot. Syst.
, vol.1
, Issue.2
, pp. 67-74
-
-
Galantucci, L.M.1
Percoco, G.2
Spina, R.3
-
36
-
-
84885657218
-
Flexible disassembly planning considering product conditions
-
C. Ullerich and U. Buscher, "Flexible disassembly planning considering product conditions," Int. J. Prod. Res., vol. 51, no. 20, pp. 6209-6228, 2013.
-
(2013)
Int. J. Prod. Res.
, vol.51
, Issue.20
, pp. 6209-6228
-
-
Ullerich, C.1
Buscher, U.2
-
37
-
-
34248666540
-
Fuzzy sets
-
Jun.
-
L. A. Zadeh, "Fuzzy sets," Inf. Control, vol. 8, no. 3, pp. 338-353, Jun. 1965.
-
(1965)
Inf. Control
, vol.8
, Issue.3
, pp. 338-353
-
-
Zadeh, L.A.1
-
39
-
-
33746954064
-
Optimizing disassembly processes subjected to sequence-dependent cost
-
A. J. D. Lambert, "Optimizing disassembly processes subjected to sequence-dependent cost," Comput. Oper. Res., vol. 34, no. 2, pp. 536-551, 2007.
-
(2007)
Comput. Oper. Res.
, vol.34
, Issue.2
, pp. 536-551
-
-
Lambert, A.J.D.1
-
40
-
-
84944088831
-
Disassembly sequence optimization for large-scale products with multiresource constraints using scatter search and Petri nets
-
Nov.
-
X. Guo, S. Liu, M. Zhou, and G. Tian, "Disassembly sequence optimization for large-scale products with multiresource constraints using scatter search and Petri nets," IEEE Trans. Cybern., vol. 46, no. 11, pp. 2435-2446, Nov. 2016.
-
(2016)
IEEE Trans. Cybern.
, vol.46
, Issue.11
, pp. 2435-2446
-
-
Guo, X.1
Liu, S.2
Zhou, M.3
Tian, G.4
-
41
-
-
84918835940
-
Fuzzy cost-profit tradeoff model for locating a vehicle inspection station considering regional constraints
-
G. Tian, H. Ke, and X. Chen, "Fuzzy cost-profit tradeoff model for locating a vehicle inspection station considering regional constraints," J. Zhejiang Univ.-Sci. C (Comput. Electron)., vol. 15, no. 12, pp. 1138-1146, 2014.
-
(2014)
J. Zhejiang Univ.-Sci. C (Comput. Electron).
, vol.15
, Issue.12
, pp. 1138-1146
-
-
Tian, G.1
Ke, H.2
Chen, X.3
-
42
-
-
0036685786
-
Expected value of fuzzy variable and fuzzy expected value models
-
Aug.
-
B. Liu and Y.-K. Liu, "Expected value of fuzzy variable and fuzzy expected value models," IEEE Trans. Fuzzy Syst., vol. 10, no. 4, pp. 445-450, Aug. 2002.
-
(2002)
IEEE Trans. Fuzzy Syst.
, vol.10
, Issue.4
, pp. 445-450
-
-
Liu, B.1
Liu, Y.-K.2
-
43
-
-
70449532358
-
Value-at-risk-based two-stage fuzzy facility location problems
-
Nov.
-
S. Wang, J. Watada, and W. Pedrycz, "Value-at-risk-based two-stage fuzzy facility location problems," IEEE Trans. Ind. Informat., vol. 5, no. 4, pp. 465-482, Nov. 2009.
-
(2009)
IEEE Trans. Ind. Informat.
, vol.5
, Issue.4
, pp. 465-482
-
-
Wang, S.1
Watada, J.2
Pedrycz, W.3
-
44
-
-
85027944616
-
Multi-objective artificial bee colony algorithm for simultaneous sequencing and balancing of mixed model assembly line
-
U. Saif, Z. Guan, W. Liu, B. Wang, and C. Zhang, "Multi-objective artificial bee colony algorithm for simultaneous sequencing and balancing of mixed model assembly line," Int. J. Adv. Manuf. Tech., vol. 75, no. 9, pp. 1809-1827, 2014.
-
(2014)
Int. J. Adv. Manuf. Tech.
, vol.75
, Issue.9
, pp. 1809-1827
-
-
Saif, U.1
Guan, Z.2
Liu, W.3
Wang, B.4
Zhang, C.5
-
45
-
-
84905820775
-
Pareto based artificial bee colony algorithm for multi objective single model assembly line balancing with uncertain task times
-
Oct.
-
U. Saif, Z. Guan, W. Liu, B. Wang, and C. Zhang, "Pareto based artificial bee colony algorithm for multi objective single model assembly line balancing with uncertain task times," Comput. Ind. Eng., vol. 76, pp. 1-15, Oct. 2014.
-
(2014)
Comput. Ind. Eng.
, vol.76
, pp. 1-15
-
-
Saif, U.1
Guan, Z.2
Liu, W.3
Wang, B.4
Zhang, C.5
-
46
-
-
84906766162
-
An effective hybrid honey bee mating optimization algorithm for balancing mixed-model two-sided assembly lines
-
Jan.
-
B. Yuan, C. Zhang, X. Shao, and Z. Jiang, "An effective hybrid honey bee mating optimization algorithm for balancing mixed-model two-sided assembly lines," Comput. Oper. Res., vol. 53, pp. 32-41, Jan. 2015.
-
(2015)
Comput. Oper. Res.
, vol.53
, pp. 32-41
-
-
Yuan, B.1
Zhang, C.2
Shao, X.3
Jiang, Z.4
-
47
-
-
70349759564
-
Fuzzy project scheduling problem and its hybrid intelligent algorithm
-
Feb.
-
H. Ke and B. Liu, "Fuzzy project scheduling problem and its hybrid intelligent algorithm," Appl. Math. Model., vol. 34, no. 2, pp. 301-308, Feb. 2010.
-
(2010)
Appl. Math. Model.
, vol.34
, Issue.2
, pp. 301-308
-
-
Ke, H.1
Liu, B.2
-
48
-
-
33748428941
-
Chance-constrained programming models for capital budgeting with NPV as fuzzy parameters
-
Jan.
-
X. Huang, "Chance-constrained programming models for capital budgeting with NPV as fuzzy parameters," J. Comput. Appl. Math., vol. 198, no. 1, pp. 149-159, Jan. 2007.
-
(2007)
J. Comput. Appl. Math.
, vol.198
, Issue.1
, pp. 149-159
-
-
Huang, X.1
-
49
-
-
70349932411
-
Logistics network design for product recovery in fuzzy environment
-
Z. Qin and X. Ji, "Logistics network design for product recovery in fuzzy environment," Eur. J. Oper. Res., vol. 202, no. 2, pp. 479-490, 2010.
-
(2010)
Eur. J. Oper. Res.
, vol.202
, Issue.2
, pp. 479-490
-
-
Qin, Z.1
Ji, X.2
-
50
-
-
84872039347
-
A discrete artificial bee colony algorithm for minimizing the total flow time in the blocking flow shop scheduling
-
G. Deng, Z. Xu, and X. Gu, "A discrete artificial bee colony algorithm for minimizing the total flow time in the blocking flow shop scheduling," Chin. J. Chem. Eng., vol. 20, no. 6, pp. 1067-1073, 2012.
-
(2012)
Chin. J. Chem. Eng.
, vol.20
, Issue.6
, pp. 1067-1073
-
-
Deng, G.1
Xu, Z.2
Gu, X.3
-
51
-
-
79961021676
-
Pareto-based discrete artificial bee colony algorithm for multi-objective flexible job shop scheduling problems
-
Apr.
-
J.-Q. Li, Q.-K. Pan, and K.-Z. Gao, "Pareto-based discrete artificial bee colony algorithm for multi-objective flexible job shop scheduling problems," Int. J. Adv. Manuf. Tech., vol. 55, no. 9, pp. 1159-1169, Apr. 2011.
-
(2011)
Int. J. Adv. Manuf. Tech.
, vol.55
, Issue.9
, pp. 1159-1169
-
-
Li, J.-Q.1
Pan, Q.-K.2
Gao, K.-Z.3
-
52
-
-
84960434942
-
Composite particle swarm optimizer with historical memory for function optimization
-
Oct.
-
J. Li, J. Zhang, C. Jiang, and M. Zhou, "Composite particle swarm optimizer with historical memory for function optimization," IEEE Trans. Cybern., vol. 45, no. 10, pp. 2350-2363, Oct. 2015.
-
(2015)
IEEE Trans. Cybern.
, vol.45
, Issue.10
, pp. 2350-2363
-
-
Li, J.1
Zhang, J.2
Jiang, C.3
Zhou, M.4
-
53
-
-
84912112663
-
Last-position eliminationbased learning automata
-
Dec.
-
J. Zhang, C. Wang, and M. C. Zhou, "Last-position eliminationbased learning automata," IEEE Trans. Cybern., vol. 44, no. 12, pp. 2484-2492, Dec. 2014.
-
(2014)
IEEE Trans. Cybern.
, vol.44
, Issue.12
, pp. 2484-2492
-
-
Zhang, J.1
Wang, C.2
Zhou, M.C.3
-
54
-
-
84911071747
-
Fast and epsilon-optimal discretized pursuit learning automata
-
Oct.
-
J. Zhang, C. Wang, and M. C. Zhou, "Fast and epsilon-optimal discretized pursuit learning automata," IEEE Trans. Cybern., vol. 45, no. 10, pp. 2089-2099, Oct. 2015.
-
(2015)
IEEE Trans. Cybern.
, vol.45
, Issue.10
, pp. 2089-2099
-
-
Zhang, J.1
Wang, C.2
Zhou, M.C.3
-
55
-
-
84901475896
-
Gaussian classifier-based evolutionary strategy for multimodal optimization
-
Jun.
-
W. Dong and M. Zhou, "Gaussian classifier-based evolutionary strategy for multimodal optimization," IEEE Trans. Neural Netw. Learn. Syst., vol. 25, no. 6, pp. 1200-1216, Jun. 2014.
-
(2014)
IEEE Trans. Neural Netw. Learn. Syst.
, vol.25
, Issue.6
, pp. 1200-1216
-
-
Dong, W.1
Zhou, M.2
-
56
-
-
85027930422
-
An effective subgradient method for scheduling a steelmaking-continuous casting process
-
Jul.
-
K. Ma, Q.-K. Pan, T. Chai, and P. B. Luh, "An effective subgradient method for scheduling a steelmaking-continuous casting process," IEEE Trans. Autom. Sci. Eng., vol. 12, no. 3, pp. 1140-1152, Jul. 2015.
-
(2015)
IEEE Trans. Autom. Sci. Eng.
, vol.12
, Issue.3
, pp. 1140-1152
-
-
Ma, K.1
Pan, Q.-K.2
Chai, T.3
Luh, P.B.4
-
57
-
-
84901748179
-
An improved migrating birds optimisation for a hybrid flowshop scheduling with total flowtime minimisation
-
Sep.
-
Q.-K. Pan and Y. Dong, "An improved migrating birds optimisation for a hybrid flowshop scheduling with total flowtime minimisation," Inf. Sci., vol. 227, pp. 643-655, Sep. 2014.
-
(2014)
Inf. Sci.
, vol.227
, pp. 643-655
-
-
Pan, Q.-K.1
Dong, Y.2
-
58
-
-
84938505448
-
Incorporation of optimal computing budget allocation for ordinal optimization into learning automata
-
Apr.
-
J. Zhang, C. Wang, D. Zang, and M. C. Zhou, "Incorporation of optimal computing budget allocation for ordinal optimization into learning automata," IEEE Trans. Autom. Sci. Eng., vol. 13, no. 2, pp. 1008-1017, Apr. 2016.
-
(2016)
IEEE Trans. Autom. Sci. Eng.
, vol.13
, Issue.2
, pp. 1008-1017
-
-
Zhang, J.1
Wang, C.2
Zang, D.3
Zhou, M.C.4
-
59
-
-
85027922529
-
Vehicle scheduling of urban bus line via an improved multi-objective genetic algorithm
-
Apr.
-
X. Zuo, C. Chen, W. Tan, and M. C. Zhou, "Vehicle scheduling of urban bus line via an improved multi-objective genetic algorithm," IEEE Trans. Intell. Transp. Syst., vol. 16, no. 2, pp. 1030-1041, Apr. 2015.
-
(2015)
IEEE Trans. Intell. Transp. Syst.
, vol.16
, Issue.2
, pp. 1030-1041
-
-
Zuo, X.1
Chen, C.2
Tan, W.3
Zhou, M.C.4
-
60
-
-
79956211070
-
Development pattern and enhancing system of automotive components remanufacturing industry in China
-
T. Zhang, J. Chu, X.Wang, H. Liu, and P. Cui, "Development pattern and enhancing system of automotive components remanufacturing industry in China," Resour., Conservation Recycling, vol. 55, no. 6, pp. 613-622, 2011.
-
(2011)
Resour., Conservation Recycling
, vol.55
, Issue.6
, pp. 613-622
-
-
Zhang, T.1
Chu, J.2
Wang, X.3
Liu, H.4
Cui, P.5
-
61
-
-
85010297226
-
Fuzzy Petri nets for knowledge representation and reasoning: A literature review
-
Apr.
-
H.-C. Liu, J. X. You, Z. Li, and G. Tian, "Fuzzy Petri nets for knowledge representation and reasoning: A literature review," Eng. Appl. Artif. Intell., vol. 60, pp. 45-56, Apr. 2017.
-
(2017)
Eng. Appl. Artif. Intell.
, vol.60
, pp. 45-56
-
-
Liu, H.-C.1
You, J.X.2
Li, Z.3
Tian, G.4
-
62
-
-
84994537874
-
Anti-vibration optimization of the key components in a turbo-generator based on heterogeneous axiomatic design
-
Jan.
-
J. Cheng, Y. Feng, Z. Lin, Z. Liu, and J. Tan, "Anti-vibration optimization of the key components in a turbo-generator based on heterogeneous axiomatic design," J. Cleaner Prod., vol. 141, pp. 1467-1477, Jan. 2017.
-
(2017)
J. Cleaner Prod.
, vol.141
, pp. 1467-1477
-
-
Cheng, J.1
Feng, Y.2
Lin, Z.3
Liu, Z.4
Tan, J.5
-
63
-
-
85014709856
-
Scheduling of singlearm cluster tools for an atomic layer deposition process with residency time constraints
-
Mar.
-
F. Yang, N. Wu, Y. Qiao, M. Zhou, and Z. Li, "Scheduling of singlearm cluster tools for an atomic layer deposition process with residency time constraints," IEEE Trans. Syst., Man, Cybern., Syst., vol. 47, no. 3, pp. 502-516, Mar. 2017.
-
(2017)
IEEE Trans. Syst., Man, Cybern., Syst.
, vol.47
, Issue.3
, pp. 502-516
-
-
Yang, F.1
Wu, N.2
Qiao, Y.3
Zhou, M.4
Li, Z.5
-
64
-
-
85014639386
-
Pareto-optimization for scheduling of crude oil operations in refinery via genetic algorithm
-
Mar.
-
Y. Hou, N. Wu, M. Zhou, and Z. Li, "Pareto-optimization for scheduling of crude oil operations in refinery via genetic algorithm," IEEE Trans. Syst., Man, Cybern., Syst., vol. 47, no. 3, pp. 517-530, Mar. 2017.
-
(2017)
IEEE Trans. Syst., Man, Cybern., Syst.
, vol.47
, Issue.3
, pp. 517-530
-
-
Hou, Y.1
Wu, N.2
Zhou, M.3
Li, Z.4
-
65
-
-
84979009828
-
Traffic Signal Timing via Deep Reinforcement Learning
-
Jul.
-
L. Li, Y. Lv, and F.-Y. Wang, "Traffic Signal Timing via Deep Reinforcement Learning," IEEE/CAA J. Autom. Sinica, vol. 3, no. 3, pp. 247-254, Jul. 2016.
-
(2016)
IEEE/CAA J. Autom. Sinica
, vol.3
, Issue.3
, pp. 247-254
-
-
Li, L.1
Lv, Y.2
Wang, F.-Y.3
-
66
-
-
84962881516
-
An efficient scheduling method for crude oil operations in refinery with crude oil type mixing requirements
-
Mar.
-
N. Q.Wu, L. P. Bai, and M. C. Zhou, "An efficient scheduling method for crude oil operations in refinery with crude oil type mixing requirements," IEEE Trans. Syst., Man, Cybern. Syst., vol. 46, no. 3, pp. 413-426, Mar. 2016.
-
(2016)
IEEE Trans. Syst., Man, Cybern. Syst.
, vol.46
, Issue.3
, pp. 413-426
-
-
Wu, N.Q.1
Bai, L.P.2
Zhou, M.C.3
-
67
-
-
84963765604
-
Cuckoo-search and particle-filter-based inversing approach to estimating defects via magnetic flux leakage signals
-
Apr
-
W. Han et al., "Cuckoo-search and particle-filter-based inversing approach to estimating defects via magnetic flux leakage signals," IEEE Trans. Mag., vol. 52, no. 4, Apr. 2016, Art. no. 6200511.
-
(2016)
IEEE Trans. Mag.
, vol.52
, Issue.4
-
-
Han, W.1
|