1
-
-
0001620447
-
Critical path planning and scheduling, mathematical basis
-
Kelley Jr. J.E. Critical path planning and scheduling, mathematical basis. Operations Research 9 3 (1961) 296-320
-
(1961)
Operations Research
, vol.9
, Issue.3
, pp. 296-320
-
-
Kelley Jr., J.E.1
-
2
-
-
0002866635
-
The critical path method: resources planning and scheduling
-
Muth, and Thompson (Eds), Prentice-Hall, Englewood Cliffs, New Jersey (Chapter 21)
-
Kelley Jr. J.E. The critical path method: resources planning and scheduling. In: Muth, and Thompson (Eds). Industrial Scheduling (1963), Prentice-Hall, Englewood Cliffs, New Jersey (Chapter 21)
-
(1963)
Industrial Scheduling
-
-
Kelley Jr., J.E.1
-
4
-
-
0000463458
-
Minimizing resource availability costs in time-limited project networks
-
Demeulemeester E. Minimizing resource availability costs in time-limited project networks. Management Science 41 10 (1995) 1590-1598
-
(1995)
Management Science
, vol.41
, Issue.10
, pp. 1590-1598
-
-
Demeulemeester, E.1
-
5
-
-
0033357402
-
The project scheduling problem with irregular starting time costs
-
Maniezzo V., and Mingozzi A. The project scheduling problem with irregular starting time costs. Operations Research Letters 25 4 (1999) 175-182
-
(1999)
Operations Research Letters
, vol.25
, Issue.4
, pp. 175-182
-
-
Maniezzo, V.1
Mingozzi, A.2
-
6
-
-
0021161421
-
Minimizing costs of resource requirements in project networks subject to a fixed completion time
-
Mohring R.H. Minimizing costs of resource requirements in project networks subject to a fixed completion time. Operations Research 32 1 (1984) 89-120
-
(1984)
Operations Research
, vol.32
, Issue.1
, pp. 89-120
-
-
Mohring, R.H.1
-
7
-
-
11144319928
-
A generalized PERT
-
Freeman R.J. A generalized PERT. Operations Research 8 2 (1960) 281
-
(1960)
Operations Research
, vol.8
, Issue.2
, pp. 281
-
-
Freeman, R.J.1
-
8
-
-
11144332073
-
A generalized network approach to project activity sequencing
-
Freeman R.J. A generalized network approach to project activity sequencing. IRE Transactions on Engineering Management 7 3 (1960) 103-107
-
(1960)
IRE Transactions on Engineering Management
, vol.7
, Issue.3
, pp. 103-107
-
-
Freeman, R.J.1
-
9
-
-
0005374191
-
A network interpretation and a direct sub-dual algorithm for critical path scheduling
-
Charnes A., and Cooper W.W. A network interpretation and a direct sub-dual algorithm for critical path scheduling. Journal of Industrial Engineering 13 (1962) 213-219
-
(1962)
Journal of Industrial Engineering
, vol.13
, pp. 213-219
-
-
Charnes, A.1
Cooper, W.W.2
-
10
-
-
0002431201
-
Deterministic equivalents for optimizing and satisfising under chance constraints
-
Charnes A., and Cooper W.W. Deterministic equivalents for optimizing and satisfising under chance constraints. Operational Research 11 (1963) 18-39
-
(1963)
Operational Research
, vol.11
, pp. 18-39
-
-
Charnes, A.1
Cooper, W.W.2
-
11
-
-
0005350580
-
Critical path analysis via chance constrained and stochastic programming
-
Charnes A., Cooper W.W., and Thompson G.L. Critical path analysis via chance constrained and stochastic programming. Operational Research 12 (1964) 460-470
-
(1964)
Operational Research
, vol.12
, pp. 460-470
-
-
Charnes, A.1
Cooper, W.W.2
Thompson, G.L.3
-
13
-
-
25644451090
-
Project scheduling problem with stochastic activity duration times
-
Ke H., and Liu B. Project scheduling problem with stochastic activity duration times. Applied Mathematics and Computation 168 1 (2005) 342-353
-
(2005)
Applied Mathematics and Computation
, vol.168
, Issue.1
, pp. 342-353
-
-
Ke, H.1
Liu, B.2
-
14
-
-
0000788322
-
On the expected duration of PERT type network
-
Elmaghraby S.E. On the expected duration of PERT type network. Management Science 13 5 (1967) 299-306
-
(1967)
Management Science
, vol.13
, Issue.5
, pp. 299-306
-
-
Elmaghraby, S.E.1
-
15
-
-
0015667795
-
Another look at the PERT assumptions
-
Kotiah T.C.T., and Wallace N.D. Another look at the PERT assumptions. Management Science 20 1 (1973) 44-49
-
(1973)
Management Science
, vol.20
, Issue.1
, pp. 44-49
-
-
Kotiah, T.C.T.1
Wallace, N.D.2
-
16
-
-
11144284696
-
Network planning with stochastic activity durations, an evaluation of PERT
-
Loostma F.A. Network planning with stochastic activity durations, an evaluation of PERT. Statistica Neerlandica 20 (1966) 43-69
-
(1966)
Statistica Neerlandica
, vol.20
, pp. 43-69
-
-
Loostma, F.A.1
-
17
-
-
0002641538
-
An analytical study of PERT assumptions
-
MacCrimmon K.R., and Ryavec C.A. An analytical study of PERT assumptions. Operations Research 12 1 (1964) 16-37
-
(1964)
Operations Research
, vol.12
, Issue.1
, pp. 16-37
-
-
MacCrimmon, K.R.1
Ryavec, C.A.2
-
18
-
-
11144304606
-
The use of the compound Poisson in PERT
-
Parks W.H., and Ramsing K.D. The use of the compound Poisson in PERT. Management Science 15 8 (1969) B397-B402
-
(1969)
Management Science
, vol.15
, Issue.8
-
-
Parks, W.H.1
Ramsing, K.D.2
-
19
-
-
0001497209
-
Using fuzzy set theory in a scheduling problem: a case study
-
Prade H. Using fuzzy set theory in a scheduling problem: a case study. Fuzzy Sets and Systems 2 2 (1979) 153-165
-
(1979)
Fuzzy Sets and Systems
, vol.2
, Issue.2
, pp. 153-165
-
-
Prade, H.1
-
21
-
-
0011830667
-
Decision-making under fuzziness
-
Gupta M.M., Ragade R.K., and Yager R.R. (Eds), North-Holland, Amsterdam
-
Dubios D., and Prade H. Decision-making under fuzziness. In: Gupta M.M., Ragade R.K., and Yager R.R. (Eds). Advances in Fuzzy Set Theory and Applications (1979), North-Holland, Amsterdam 279-302
-
(1979)
Advances in Fuzzy Set Theory and Applications
, pp. 279-302
-
-
Dubios, D.1
Prade, H.2
-
22
-
-
84953063276
-
A DSS for resource-constrained project scheduling under uncertainty
-
Hapke M., and Slowinski R. A DSS for resource-constrained project scheduling under uncertainty. Journal of Decision Systems 2 2 (1993) 111-128
-
(1993)
Journal of Decision Systems
, vol.2
, Issue.2
, pp. 111-128
-
-
Hapke, M.1
Slowinski, R.2
-
24
-
-
0036685786
-
Expected value of fuzzy variable and fuzzy expected value models
-
Liu B., and Liu Y.-K. Expected value of fuzzy variable and fuzzy expected value models. IEEE Transactions on Fuzzy Systems 10 4 (2002) 445-450
-
(2002)
IEEE Transactions on Fuzzy Systems
, vol.10
, Issue.4
, pp. 445-450
-
-
Liu, B.1
Liu, Y.-K.2
-
26
-
-
0002395681
-
Chance-constrained programming
-
Charnes A., and Cooper W.W. Chance-constrained programming. Management Science 6 1 (1959) 73-79
-
(1959)
Management Science
, vol.6
, Issue.1
, pp. 73-79
-
-
Charnes, A.1
Cooper, W.W.2
-
27
-
-
0032290201
-
Minimax chance constrained programming models for fuzzy decision systems
-
Liu B. Minimax chance constrained programming models for fuzzy decision systems. Information Sciences 112 1-4 (1998) 25-38
-
(1998)
Information Sciences
, vol.112
, Issue.1-4
, pp. 25-38
-
-
Liu, B.1
-
28
-
-
0000804474
-
Chance constrained programming with fuzzy parameters
-
Liu B., and Iwamura K. Chance constrained programming with fuzzy parameters. Fuzzy Sets and Systems 94 2 (1998) 227-237
-
(1998)
Fuzzy Sets and Systems
, vol.94
, Issue.2
, pp. 227-237
-
-
Liu, B.1
Iwamura, K.2
-
29
-
-
0031342423
-
Dependent-chance programming: a class of stochastic programming
-
Liu B. Dependent-chance programming: a class of stochastic programming. Computers & Mathematics with Applications 34 12 (1997) 89-104
-
(1997)
Computers & Mathematics with Applications
, vol.34
, Issue.12
, pp. 89-104
-
-
Liu, B.1
-
30
-
-
0032625741
-
Dependent-chance programming with fuzzy decisions
-
Liu B. Dependent-chance programming with fuzzy decisions. IEEE Transactions on Fuzzy Systems 7 3 (1999) 354-360
-
(1999)
IEEE Transactions on Fuzzy Systems
, vol.7
, Issue.3
, pp. 354-360
-
-
Liu, B.1
|