메뉴 건너뛰기




Volumn 34, Issue 2, 2010, Pages 301-308

Fuzzy project scheduling problem and its hybrid intelligent algorithm

Author keywords

Fuzzy programming; Fuzzy simulation; Genetic algorithm; Project scheduling

Indexed keywords

COMPLETION TIME; FUZZY ACTIVITY; FUZZY MODELS; FUZZY PROGRAMMING; FUZZY SIMULATION; HYBRID INTELLIGENT ALGORITHMS; MANAGEMENT GOALS; NUMERICAL EXAMPLE; PROJECT SCHEDULING; PROJECT SCHEDULING PROBLEM; TOTAL COSTS;

EID: 70349759564     PISSN: 0307904X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.apm.2009.04.011     Document Type: Article
Times cited : (80)

References (31)
  • 1
    • 0001620447 scopus 로고
    • Critical path planning and scheduling, mathematical basis
    • Kelley Jr. J.E. Critical path planning and scheduling, mathematical basis. Operations Research 9 3 (1961) 296-320
    • (1961) Operations Research , vol.9 , Issue.3 , pp. 296-320
    • Kelley Jr., J.E.1
  • 2
    • 0002866635 scopus 로고
    • The critical path method: resources planning and scheduling
    • Muth, and Thompson (Eds), Prentice-Hall, Englewood Cliffs, New Jersey (Chapter 21)
    • Kelley Jr. J.E. The critical path method: resources planning and scheduling. In: Muth, and Thompson (Eds). Industrial Scheduling (1963), Prentice-Hall, Englewood Cliffs, New Jersey (Chapter 21)
    • (1963) Industrial Scheduling
    • Kelley Jr., J.E.1
  • 3
  • 4
    • 0000463458 scopus 로고
    • Minimizing resource availability costs in time-limited project networks
    • Demeulemeester E. Minimizing resource availability costs in time-limited project networks. Management Science 41 10 (1995) 1590-1598
    • (1995) Management Science , vol.41 , Issue.10 , pp. 1590-1598
    • Demeulemeester, E.1
  • 5
    • 0033357402 scopus 로고    scopus 로고
    • The project scheduling problem with irregular starting time costs
    • Maniezzo V., and Mingozzi A. The project scheduling problem with irregular starting time costs. Operations Research Letters 25 4 (1999) 175-182
    • (1999) Operations Research Letters , vol.25 , Issue.4 , pp. 175-182
    • Maniezzo, V.1    Mingozzi, A.2
  • 6
    • 0021161421 scopus 로고
    • Minimizing costs of resource requirements in project networks subject to a fixed completion time
    • Mohring R.H. Minimizing costs of resource requirements in project networks subject to a fixed completion time. Operations Research 32 1 (1984) 89-120
    • (1984) Operations Research , vol.32 , Issue.1 , pp. 89-120
    • Mohring, R.H.1
  • 7
    • 11144319928 scopus 로고
    • A generalized PERT
    • Freeman R.J. A generalized PERT. Operations Research 8 2 (1960) 281
    • (1960) Operations Research , vol.8 , Issue.2 , pp. 281
    • Freeman, R.J.1
  • 8
    • 11144332073 scopus 로고
    • A generalized network approach to project activity sequencing
    • Freeman R.J. A generalized network approach to project activity sequencing. IRE Transactions on Engineering Management 7 3 (1960) 103-107
    • (1960) IRE Transactions on Engineering Management , vol.7 , Issue.3 , pp. 103-107
    • Freeman, R.J.1
  • 9
    • 0005374191 scopus 로고
    • A network interpretation and a direct sub-dual algorithm for critical path scheduling
    • Charnes A., and Cooper W.W. A network interpretation and a direct sub-dual algorithm for critical path scheduling. Journal of Industrial Engineering 13 (1962) 213-219
    • (1962) Journal of Industrial Engineering , vol.13 , pp. 213-219
    • Charnes, A.1    Cooper, W.W.2
  • 10
    • 0002431201 scopus 로고
    • Deterministic equivalents for optimizing and satisfising under chance constraints
    • Charnes A., and Cooper W.W. Deterministic equivalents for optimizing and satisfising under chance constraints. Operational Research 11 (1963) 18-39
    • (1963) Operational Research , vol.11 , pp. 18-39
    • Charnes, A.1    Cooper, W.W.2
  • 11
    • 0005350580 scopus 로고
    • Critical path analysis via chance constrained and stochastic programming
    • Charnes A., Cooper W.W., and Thompson G.L. Critical path analysis via chance constrained and stochastic programming. Operational Research 12 (1964) 460-470
    • (1964) Operational Research , vol.12 , pp. 460-470
    • Charnes, A.1    Cooper, W.W.2    Thompson, G.L.3
  • 12
    • 0030735291 scopus 로고    scopus 로고
    • Stochastic network project scheduling with non-consumable limited resources
    • Golenko-Ginzburg D., and Gonik A. Stochastic network project scheduling with non-consumable limited resources. International Journal of Production Economics 48 1 (1997) 29-37
    • (1997) International Journal of Production Economics , vol.48 , Issue.1 , pp. 29-37
    • Golenko-Ginzburg, D.1    Gonik, A.2
  • 13
    • 25644451090 scopus 로고    scopus 로고
    • Project scheduling problem with stochastic activity duration times
    • Ke H., and Liu B. Project scheduling problem with stochastic activity duration times. Applied Mathematics and Computation 168 1 (2005) 342-353
    • (2005) Applied Mathematics and Computation , vol.168 , Issue.1 , pp. 342-353
    • Ke, H.1    Liu, B.2
  • 14
    • 0000788322 scopus 로고
    • On the expected duration of PERT type network
    • Elmaghraby S.E. On the expected duration of PERT type network. Management Science 13 5 (1967) 299-306
    • (1967) Management Science , vol.13 , Issue.5 , pp. 299-306
    • Elmaghraby, S.E.1
  • 15
    • 0015667795 scopus 로고
    • Another look at the PERT assumptions
    • Kotiah T.C.T., and Wallace N.D. Another look at the PERT assumptions. Management Science 20 1 (1973) 44-49
    • (1973) Management Science , vol.20 , Issue.1 , pp. 44-49
    • Kotiah, T.C.T.1    Wallace, N.D.2
  • 16
    • 11144284696 scopus 로고
    • Network planning with stochastic activity durations, an evaluation of PERT
    • Loostma F.A. Network planning with stochastic activity durations, an evaluation of PERT. Statistica Neerlandica 20 (1966) 43-69
    • (1966) Statistica Neerlandica , vol.20 , pp. 43-69
    • Loostma, F.A.1
  • 17
    • 0002641538 scopus 로고
    • An analytical study of PERT assumptions
    • MacCrimmon K.R., and Ryavec C.A. An analytical study of PERT assumptions. Operations Research 12 1 (1964) 16-37
    • (1964) Operations Research , vol.12 , Issue.1 , pp. 16-37
    • MacCrimmon, K.R.1    Ryavec, C.A.2
  • 18
    • 11144304606 scopus 로고
    • The use of the compound Poisson in PERT
    • Parks W.H., and Ramsing K.D. The use of the compound Poisson in PERT. Management Science 15 8 (1969) B397-B402
    • (1969) Management Science , vol.15 , Issue.8
    • Parks, W.H.1    Ramsing, K.D.2
  • 19
    • 0001497209 scopus 로고
    • Using fuzzy set theory in a scheduling problem: a case study
    • Prade H. Using fuzzy set theory in a scheduling problem: a case study. Fuzzy Sets and Systems 2 2 (1979) 153-165
    • (1979) Fuzzy Sets and Systems , vol.2 , Issue.2 , pp. 153-165
    • Prade, H.1
  • 20
  • 21
    • 0011830667 scopus 로고
    • Decision-making under fuzziness
    • Gupta M.M., Ragade R.K., and Yager R.R. (Eds), North-Holland, Amsterdam
    • Dubios D., and Prade H. Decision-making under fuzziness. In: Gupta M.M., Ragade R.K., and Yager R.R. (Eds). Advances in Fuzzy Set Theory and Applications (1979), North-Holland, Amsterdam 279-302
    • (1979) Advances in Fuzzy Set Theory and Applications , pp. 279-302
    • Dubios, D.1    Prade, H.2
  • 22
    • 84953063276 scopus 로고
    • A DSS for resource-constrained project scheduling under uncertainty
    • Hapke M., and Slowinski R. A DSS for resource-constrained project scheduling under uncertainty. Journal of Decision Systems 2 2 (1993) 111-128
    • (1993) Journal of Decision Systems , vol.2 , Issue.2 , pp. 111-128
    • Hapke, M.1    Slowinski, R.2
  • 24
    • 0036685786 scopus 로고    scopus 로고
    • Expected value of fuzzy variable and fuzzy expected value models
    • Liu B., and Liu Y.-K. Expected value of fuzzy variable and fuzzy expected value models. IEEE Transactions on Fuzzy Systems 10 4 (2002) 445-450
    • (2002) IEEE Transactions on Fuzzy Systems , vol.10 , Issue.4 , pp. 445-450
    • Liu, B.1    Liu, Y.-K.2
  • 26
    • 0002395681 scopus 로고
    • Chance-constrained programming
    • Charnes A., and Cooper W.W. Chance-constrained programming. Management Science 6 1 (1959) 73-79
    • (1959) Management Science , vol.6 , Issue.1 , pp. 73-79
    • Charnes, A.1    Cooper, W.W.2
  • 27
    • 0032290201 scopus 로고    scopus 로고
    • Minimax chance constrained programming models for fuzzy decision systems
    • Liu B. Minimax chance constrained programming models for fuzzy decision systems. Information Sciences 112 1-4 (1998) 25-38
    • (1998) Information Sciences , vol.112 , Issue.1-4 , pp. 25-38
    • Liu, B.1
  • 28
    • 0000804474 scopus 로고    scopus 로고
    • Chance constrained programming with fuzzy parameters
    • Liu B., and Iwamura K. Chance constrained programming with fuzzy parameters. Fuzzy Sets and Systems 94 2 (1998) 227-237
    • (1998) Fuzzy Sets and Systems , vol.94 , Issue.2 , pp. 227-237
    • Liu, B.1    Iwamura, K.2
  • 29
    • 0031342423 scopus 로고    scopus 로고
    • Dependent-chance programming: a class of stochastic programming
    • Liu B. Dependent-chance programming: a class of stochastic programming. Computers & Mathematics with Applications 34 12 (1997) 89-104
    • (1997) Computers & Mathematics with Applications , vol.34 , Issue.12 , pp. 89-104
    • Liu, B.1
  • 30
    • 0032625741 scopus 로고    scopus 로고
    • Dependent-chance programming with fuzzy decisions
    • Liu B. Dependent-chance programming with fuzzy decisions. IEEE Transactions on Fuzzy Systems 7 3 (1999) 354-360
    • (1999) IEEE Transactions on Fuzzy Systems , vol.7 , Issue.3 , pp. 354-360
    • Liu, B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.