1
-
-
81855184582
-
Research in modeling and simulation for improving construction engineering operations
-
AbouRizk, S., Halpin, D., Mohamed, Y., and, Hermann, U. (2011). " Research in modeling and simulation for improving construction engineering operations." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000288, 843-852. JCEMD4 0733-9364
-
(2011)
J. Constr. Eng. Manage.
, pp. 843-852
-
-
Abourizk, S.1
Halpin, D.2
Mohamed, Y.3
Hermann, U.4
-
2
-
-
0026913088
-
Statistical properties of construction duration data
-
AbouRizk, S. M., and, Halpin, D. W. (1992). " Statistical properties of construction duration data." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1992)118:3(525), 525-544. JCEMD4 0733-9364
-
(1992)
J. Constr. Eng. Manage.
, pp. 525-544
-
-
Abourizk, S.M.1
Halpin, D.W.2
-
3
-
-
84905658355
-
Evaluation of queuing systems for knowledge-based simulation of construction processes
-
Akhavian, R., and, Behzadan, A. H. (2014). " Evaluation of queuing systems for knowledge-based simulation of construction processes." Autom. Constr., 47, 37-49. 10.1016/j.autcon.2014.07.007 0926-5805
-
(2014)
Autom. Constr.
, vol.47
, pp. 37-49
-
-
Akhavian, R.1
Behzadan, A.H.2
-
4
-
-
39649120768
-
Match factor for heterogeneous truck and loader fleets
-
Burt, C. N., and, Caccetta, L. (2008). " Match factor for heterogeneous truck and loader fleets." Int. J. Min. Reclam. Environ., 22 (1), 84-85. 10.1080/17480930801943334
-
(2008)
Int. J. Min. Reclam. Environ.
, vol.22
, Issue.1
, pp. 84-85
-
-
Burt, C.N.1
Caccetta, L.2
-
6
-
-
84982297863
-
A cognitive model of construction workers' unsafe behaviors
-
Fang, D., Zhao, C., and, Zhang, M. (2016). " A cognitive model of construction workers' unsafe behaviors." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0001118,. JCEMD4 0733-9364
-
(2016)
J. Constr. Eng. Manage.
-
-
Fang, D.1
Zhao, C.2
Zhang, M.3
-
7
-
-
85009064435
-
Simulating uncertainties in construction projects with chronographical scheduling logic
-
Francis, A. (2016). " Simulating uncertainties in construction projects with chronographical scheduling logic." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0001212,. JCEMD4 0733-9364
-
(2016)
J. Constr. Eng. Manage.
-
-
Francis, A.1
-
8
-
-
84918818472
-
Introduction to Markov chain Monte Carlo
-
S. Brooks, A. Gelman, G. L. Jones, and X.-L. Meng, eds. CRC, Boca Raton, FL
-
Geyer, C. (2011). " Introduction to Markov chain Monte Carlo." Handbook of Markov chain Monte Carlo, S. Brooks, A. Gelman, G. L. Jones, and X.-L. Meng., eds., CRC, Boca Raton, FL, 3-48.
-
(2011)
Handbook of Markov Chain Monte Carlo
, pp. 3-48
-
-
Geyer, C.1
-
9
-
-
0004020261
-
-
Markov chains 7th Ed. McGraw-Hill Higher Education, New York
-
Hillier, F. S., and, Lieberman, G. J. (2001). " Markov chains." Advance praise for introduction to operation research, 7th Ed., McGraw-Hill Higher Education, New York, 802-833.
-
(2001)
Advance Praise for Introduction to Operation Research
, pp. 802-833
-
-
Hillier, F.S.1
Lieberman, G.J.2
-
10
-
-
84961251292
-
Learning curves in construction: A critical review and new model
-
Jordan Srour, F., Kiomjian, D., and, Srour, I. M. (2015). " Learning curves in construction: A critical review and new model." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0001096,. JCEMD4 0733-9364
-
(2015)
J. Constr. Eng. Manage.
-
-
Jordan Srour, F.1
Kiomjian, D.2
Srour, I.M.3
-
11
-
-
18244389105
-
Truck capacity selection for earthmoving
-
Karshenas, S. (1989). " Truck capacity selection for earthmoving." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1989)115:2(212), 212-227. JCEMD4 0733-9364
-
(1989)
J. Constr. Eng. Manage.
, pp. 212-227
-
-
Karshenas, S.1
-
12
-
-
85018186059
-
Earthmoving productivity in urban bridge construction
-
Kim, S., and, Bai, Y. (2015). " Earthmoving productivity in urban bridge construction." Civ. Eng. Archit., 3 (3), 48-55. 10.13189/cea.2015.030302 2332-1121
-
(2015)
Civ. Eng. Archit.
, vol.3
, Issue.3
, pp. 48-55
-
-
Kim, S.1
Bai, Y.2
-
13
-
-
52049093738
-
-
Markov chain Monte Carlo CRC, Boca Raton, FL
-
King, R., Morgan, B., Gimenez, O., and, Brooks, S. (2010). " Markov chain Monte Carlo." Bayesian analysis for population ecology, CRC, Boca Raton, FL, 99-142.
-
(2010)
Bayesian Analysis for Population Ecology
, pp. 99-142
-
-
King, R.1
Morgan, B.2
Gimenez, O.3
Brooks, S.4
-
15
-
-
34548379596
-
Markov chain Monte Carlo implementation of rock fracture modelling
-
Mardia, K., et al. (2007). " Markov chain Monte Carlo implementation of rock fracture modelling." Math. Geol., 39 (4), 355-381. 10.1007/s11004-007-9099-3
-
(2007)
Math. Geol.
, vol.39
, Issue.4
, pp. 355-381
-
-
Mardia, K.1
-
16
-
-
85018161625
-
Earth loading and hauling optimal trade-off
-
Marinelli, M., and, Lambropoulos, S. (2012). " Earth loading and hauling optimal trade-off." Procedia Social Behav. Sci., 48, 2325-2335. 10.1016/j.sbspro.2012.06.1204 1877-0428
-
(2012)
Procedia Social Behav. Sci.
, vol.48
, pp. 2325-2335
-
-
Marinelli, M.1
Lambropoulos, S.2
-
17
-
-
14544291098
-
Programmatic cost risk analysis for highway megaprojects
-
Molenaar, K. R. (2005). " Programmatic cost risk analysis for highway megaprojects." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2005)131:3(343), 343-353. JCEMD4 0733-9364
-
(2005)
J. Constr. Eng. Manage.
, pp. 343-353
-
-
Molenaar, K.R.1
-
18
-
-
0009068346
-
Determining shovel-truck productivity
-
Morgan, W., and, Peterson, L. (1968). " Determining shovel-truck productivity." Min. Eng., 20 (12), 76-80.
-
(1968)
Min. Eng.
, vol.20
, Issue.12
, pp. 76-80
-
-
Morgan, W.1
Peterson, L.2
-
19
-
-
84866707485
-
Improving truck-shovel matching
-
Porter, eds. Wollongong, NSW, Australia
-
Nel, S., Kizil, M. S., and, Knights, P. (2011). " Improving truck-shovel matching." Proc., 35th APCOM Symp., E. Y. Baafi, R. Kinimonth, and I. Porter., eds., Wollongong, NSW, Australia, 381-391.
-
(2011)
Proc. 35th APCOM Symp. E. Y. Baafi, R. Kinimonth, and i
, pp. 381-391
-
-
Nel, S.1
Kizil, M.S.2
Knights, P.3
-
20
-
-
0000936303
-
Markov renewal processes: Definitions and preliminary properties
-
Pyke, R. (1961). " Markov renewal processes: Definitions and preliminary properties." Ann. Math. Stat., 32 (4), 1231-1242. 10.1214/aoms/1177704863
-
(1961)
Ann. Math. Stat.
, vol.32
, Issue.4
, pp. 1231-1242
-
-
Pyke, R.1
-
21
-
-
0023366791
-
Bunching theory applied to minimize cost
-
Ringwald, R. C. (1987). " Bunching theory applied to minimize cost." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1987)113:2(321), 321-326. JCEMD4 0733-9364
-
(1987)
J. Constr. Eng. Manage.
, pp. 321-326
-
-
Ringwald, R.C.1
-
22
-
-
82955202811
-
A short history of Markov chain Monte Carlo: Subjective recollections from incomplete data
-
Robert, C., and, Casella, G. (2011). " A short history of Markov chain Monte Carlo: Subjective recollections from incomplete data." Stat. Sci., 26 (1), 102-115. 10.1214/10-STS351
-
(2011)
Stat. Sci.
, vol.26
, Issue.1
, pp. 102-115
-
-
Robert, C.1
Casella, G.2
-
23
-
-
0029304813
-
Productivity estimation in back-acter/dump-truck earth-moving operations
-
Institution of Civil Engineers, London
-
Smith, S., Osborne, J., and, Forde, M. (1995). " Productivity estimation in back-acter/dump-truck earth-moving operations." Proc., Institution of Civil Engineers-Transport, Vol. 111, Institution of Civil Engineers, London, 125-131.
-
(1995)
Proc. Institution of Civil Engineers Transport
, vol.111
, pp. 125-131
-
-
Smith, S.1
Osborne, J.2
Forde, M.3
-
24
-
-
0032640764
-
Earthmoving productivity estimation using linear regression techniques
-
Smith, S. D. (1999). " Earthmoving productivity estimation using linear regression techniques." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1999)125:3(133), 133-141. JCEMD4 0733-9364
-
(1999)
J. Constr. Eng. Manage.
, pp. 133-141
-
-
Smith, S.D.1
-
25
-
-
0006609394
-
A new earthworks estimating methodology
-
Smith, S. D., Wood, G. S., and, Gould, M. (2000). " A new earthworks estimating methodology." Constr. Manage. Econ., 18 (2), 219-228. 10.1080/014461900370843
-
(2000)
Constr. Manage. Econ.
, vol.18
, Issue.2
, pp. 219-228
-
-
Smith, S.D.1
Wood, G.S.2
Gould, M.3
-
26
-
-
77149127396
-
Models for managing contingency construction operations
-
Thomas, M. U. (2010). " Models for managing contingency construction operations." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000133, 391-398. JCEMD4 0733-9364
-
(2010)
J. Constr. Eng. Manage.
, pp. 391-398
-
-
Thomas, M.U.1
-
27
-
-
84947241994
-
Risk-based project delivery selection model for highway design and construction
-
Tran, D. Q., and, Molenaar, K. R. (2015). " Risk-based project delivery selection model for highway design and construction." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0001024,. JCEMD4 0733-9364
-
(2015)
J. Constr. Eng. Manage.
-
-
Tran, D.Q.1
Molenaar, K.R.2
-
28
-
-
84944187347
-
Planning tunnel construction using Markov chain Monte Carlo (MCMC)
-
Vargas, J. P., Koppe, J. C., Pérez, S., and, Hurtado, J. P. (2015). " Planning tunnel construction using Markov chain Monte Carlo (MCMC)." Math. Prob. Eng., 2015, 8. 10.1155/2015/797953
-
(2015)
Math. Prob. Eng.
, vol.2015
, pp. 8
-
-
Vargas, J.P.1
Koppe, J.C.2
Pérez, S.3
Hurtado, J.P.4
-
29
-
-
84965105409
-
Risk analysis: A quantitative guide
-
Wiley, Chichester, U.K
-
Vose, D. (2008). " Data and statistics." Risk analysis: A quantitative guide, Wiley, Chichester, U.K., 207-262.
-
(2008)
Data and Statistics
, pp. 207-262
-
-
Vose, D.1
-
30
-
-
84989878176
-
Planning two or more level constant-stress accelerated life tests with competing risks
-
Wu, S.-J., and, Huang, S.-R. (2017). " Planning two or more level constant-stress accelerated life tests with competing risks." Reliab. Eng. Syst. Saf., 158, 1-8. 10.1016/j.ress.2016.09.007 0951-8320
-
(2017)
Reliab. Eng. Syst. Saf.
, vol.158
, pp. 1-8
-
-
Wu, S.-J.1
Huang, S.-R.2
-
31
-
-
84885585175
-
Optimisation of a stochastic rock fracture model using Markov chain Monte Carlo simulation
-
Xu, C., Dowd, P. A., and, Wyborn, D. (2013). " Optimisation of a stochastic rock fracture model using Markov chain Monte Carlo simulation." Min. Technol., 122 (3), 153-158. 10.1179/1743286312Y.0000000023
-
(2013)
Min. Technol.
, vol.122
, Issue.3
, pp. 153-158
-
-
Xu, C.1
Dowd, P.A.2
Wyborn, D.3
-
32
-
-
84955072747
-
Evaluating crusher system location in an open pit mine using Markov chains
-
Yarmuch, J., Epstein, R., Cancino, R., and, Peña, J. C. (2016). " Evaluating crusher system location in an open pit mine using Markov chains." Int. J. Min. Reclam. Environ., 31 (1), 24-37. 1748-0930 10.1080/17480930.2015.1105649
-
(2016)
Int. J. Min. Reclam. Environ.
, vol.31
, Issue.1
, pp. 24-37
-
-
Yarmuch, J.1
Epstein, R.2
Cancino, R.3
Peña, J.C.4
|