메뉴 건너뛰기




Volumn 143, Issue 8, 2017, Pages

Stochastic Assessment of the Material Haulage Efficiency in the Earthmoving Industry

Author keywords

Fleet efficiency; Markov chains; Markov chain Monte Carlo simulation; Match factor; Ordinary Monte Carlo simulation; Quantitative methods

Indexed keywords

CHAINS; CONSTRUCTION INDUSTRY; EFFICIENCY; EQUIPMENT; INTELLIGENT SYSTEMS; LOADERS; MARKOV PROCESSES; MATERIALS HANDLING; PRODUCTION CONTROL; RISK ASSESSMENT; STOCHASTIC SYSTEMS; TRUCKS; UNCERTAINTY ANALYSIS;

EID: 85018176332     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0001336     Document Type: Article
Times cited : (13)

References (32)
  • 1
    • 81855184582 scopus 로고    scopus 로고
    • Research in modeling and simulation for improving construction engineering operations
    • AbouRizk, S., Halpin, D., Mohamed, Y., and, Hermann, U. (2011). " Research in modeling and simulation for improving construction engineering operations." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000288, 843-852. JCEMD4 0733-9364
    • (2011) J. Constr. Eng. Manage. , pp. 843-852
    • Abourizk, S.1    Halpin, D.2    Mohamed, Y.3    Hermann, U.4
  • 2
    • 0026913088 scopus 로고
    • Statistical properties of construction duration data
    • AbouRizk, S. M., and, Halpin, D. W. (1992). " Statistical properties of construction duration data." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1992)118:3(525), 525-544. JCEMD4 0733-9364
    • (1992) J. Constr. Eng. Manage. , pp. 525-544
    • Abourizk, S.M.1    Halpin, D.W.2
  • 3
    • 84905658355 scopus 로고    scopus 로고
    • Evaluation of queuing systems for knowledge-based simulation of construction processes
    • Akhavian, R., and, Behzadan, A. H. (2014). " Evaluation of queuing systems for knowledge-based simulation of construction processes." Autom. Constr., 47, 37-49. 10.1016/j.autcon.2014.07.007 0926-5805
    • (2014) Autom. Constr. , vol.47 , pp. 37-49
    • Akhavian, R.1    Behzadan, A.H.2
  • 4
    • 39649120768 scopus 로고    scopus 로고
    • Match factor for heterogeneous truck and loader fleets
    • Burt, C. N., and, Caccetta, L. (2008). " Match factor for heterogeneous truck and loader fleets." Int. J. Min. Reclam. Environ., 22 (1), 84-85. 10.1080/17480930801943334
    • (2008) Int. J. Min. Reclam. Environ. , vol.22 , Issue.1 , pp. 84-85
    • Burt, C.N.1    Caccetta, L.2
  • 6
    • 84982297863 scopus 로고    scopus 로고
    • A cognitive model of construction workers' unsafe behaviors
    • Fang, D., Zhao, C., and, Zhang, M. (2016). " A cognitive model of construction workers' unsafe behaviors." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0001118,. JCEMD4 0733-9364
    • (2016) J. Constr. Eng. Manage.
    • Fang, D.1    Zhao, C.2    Zhang, M.3
  • 7
    • 85009064435 scopus 로고    scopus 로고
    • Simulating uncertainties in construction projects with chronographical scheduling logic
    • Francis, A. (2016). " Simulating uncertainties in construction projects with chronographical scheduling logic." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0001212,. JCEMD4 0733-9364
    • (2016) J. Constr. Eng. Manage.
    • Francis, A.1
  • 8
    • 84918818472 scopus 로고    scopus 로고
    • Introduction to Markov chain Monte Carlo
    • S. Brooks, A. Gelman, G. L. Jones, and X.-L. Meng, eds. CRC, Boca Raton, FL
    • Geyer, C. (2011). " Introduction to Markov chain Monte Carlo." Handbook of Markov chain Monte Carlo, S. Brooks, A. Gelman, G. L. Jones, and X.-L. Meng., eds., CRC, Boca Raton, FL, 3-48.
    • (2011) Handbook of Markov Chain Monte Carlo , pp. 3-48
    • Geyer, C.1
  • 10
    • 84961251292 scopus 로고    scopus 로고
    • Learning curves in construction: A critical review and new model
    • Jordan Srour, F., Kiomjian, D., and, Srour, I. M. (2015). " Learning curves in construction: A critical review and new model." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0001096,. JCEMD4 0733-9364
    • (2015) J. Constr. Eng. Manage.
    • Jordan Srour, F.1    Kiomjian, D.2    Srour, I.M.3
  • 11
    • 18244389105 scopus 로고
    • Truck capacity selection for earthmoving
    • Karshenas, S. (1989). " Truck capacity selection for earthmoving." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1989)115:2(212), 212-227. JCEMD4 0733-9364
    • (1989) J. Constr. Eng. Manage. , pp. 212-227
    • Karshenas, S.1
  • 12
    • 85018186059 scopus 로고    scopus 로고
    • Earthmoving productivity in urban bridge construction
    • Kim, S., and, Bai, Y. (2015). " Earthmoving productivity in urban bridge construction." Civ. Eng. Archit., 3 (3), 48-55. 10.13189/cea.2015.030302 2332-1121
    • (2015) Civ. Eng. Archit. , vol.3 , Issue.3 , pp. 48-55
    • Kim, S.1    Bai, Y.2
  • 15
    • 34548379596 scopus 로고    scopus 로고
    • Markov chain Monte Carlo implementation of rock fracture modelling
    • Mardia, K., et al. (2007). " Markov chain Monte Carlo implementation of rock fracture modelling." Math. Geol., 39 (4), 355-381. 10.1007/s11004-007-9099-3
    • (2007) Math. Geol. , vol.39 , Issue.4 , pp. 355-381
    • Mardia, K.1
  • 16
    • 85018161625 scopus 로고    scopus 로고
    • Earth loading and hauling optimal trade-off
    • Marinelli, M., and, Lambropoulos, S. (2012). " Earth loading and hauling optimal trade-off." Procedia Social Behav. Sci., 48, 2325-2335. 10.1016/j.sbspro.2012.06.1204 1877-0428
    • (2012) Procedia Social Behav. Sci. , vol.48 , pp. 2325-2335
    • Marinelli, M.1    Lambropoulos, S.2
  • 17
    • 14544291098 scopus 로고    scopus 로고
    • Programmatic cost risk analysis for highway megaprojects
    • Molenaar, K. R. (2005). " Programmatic cost risk analysis for highway megaprojects." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2005)131:3(343), 343-353. JCEMD4 0733-9364
    • (2005) J. Constr. Eng. Manage. , pp. 343-353
    • Molenaar, K.R.1
  • 18
    • 0009068346 scopus 로고
    • Determining shovel-truck productivity
    • Morgan, W., and, Peterson, L. (1968). " Determining shovel-truck productivity." Min. Eng., 20 (12), 76-80.
    • (1968) Min. Eng. , vol.20 , Issue.12 , pp. 76-80
    • Morgan, W.1    Peterson, L.2
  • 20
    • 0000936303 scopus 로고
    • Markov renewal processes: Definitions and preliminary properties
    • Pyke, R. (1961). " Markov renewal processes: Definitions and preliminary properties." Ann. Math. Stat., 32 (4), 1231-1242. 10.1214/aoms/1177704863
    • (1961) Ann. Math. Stat. , vol.32 , Issue.4 , pp. 1231-1242
    • Pyke, R.1
  • 21
    • 0023366791 scopus 로고
    • Bunching theory applied to minimize cost
    • Ringwald, R. C. (1987). " Bunching theory applied to minimize cost." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1987)113:2(321), 321-326. JCEMD4 0733-9364
    • (1987) J. Constr. Eng. Manage. , pp. 321-326
    • Ringwald, R.C.1
  • 22
    • 82955202811 scopus 로고    scopus 로고
    • A short history of Markov chain Monte Carlo: Subjective recollections from incomplete data
    • Robert, C., and, Casella, G. (2011). " A short history of Markov chain Monte Carlo: Subjective recollections from incomplete data." Stat. Sci., 26 (1), 102-115. 10.1214/10-STS351
    • (2011) Stat. Sci. , vol.26 , Issue.1 , pp. 102-115
    • Robert, C.1    Casella, G.2
  • 23
    • 0029304813 scopus 로고
    • Productivity estimation in back-acter/dump-truck earth-moving operations
    • Institution of Civil Engineers, London
    • Smith, S., Osborne, J., and, Forde, M. (1995). " Productivity estimation in back-acter/dump-truck earth-moving operations." Proc., Institution of Civil Engineers-Transport, Vol. 111, Institution of Civil Engineers, London, 125-131.
    • (1995) Proc. Institution of Civil Engineers Transport , vol.111 , pp. 125-131
    • Smith, S.1    Osborne, J.2    Forde, M.3
  • 24
    • 0032640764 scopus 로고    scopus 로고
    • Earthmoving productivity estimation using linear regression techniques
    • Smith, S. D. (1999). " Earthmoving productivity estimation using linear regression techniques." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1999)125:3(133), 133-141. JCEMD4 0733-9364
    • (1999) J. Constr. Eng. Manage. , pp. 133-141
    • Smith, S.D.1
  • 25
    • 0006609394 scopus 로고    scopus 로고
    • A new earthworks estimating methodology
    • Smith, S. D., Wood, G. S., and, Gould, M. (2000). " A new earthworks estimating methodology." Constr. Manage. Econ., 18 (2), 219-228. 10.1080/014461900370843
    • (2000) Constr. Manage. Econ. , vol.18 , Issue.2 , pp. 219-228
    • Smith, S.D.1    Wood, G.S.2    Gould, M.3
  • 26
    • 77149127396 scopus 로고    scopus 로고
    • Models for managing contingency construction operations
    • Thomas, M. U. (2010). " Models for managing contingency construction operations." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000133, 391-398. JCEMD4 0733-9364
    • (2010) J. Constr. Eng. Manage. , pp. 391-398
    • Thomas, M.U.1
  • 27
    • 84947241994 scopus 로고    scopus 로고
    • Risk-based project delivery selection model for highway design and construction
    • Tran, D. Q., and, Molenaar, K. R. (2015). " Risk-based project delivery selection model for highway design and construction." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0001024,. JCEMD4 0733-9364
    • (2015) J. Constr. Eng. Manage.
    • Tran, D.Q.1    Molenaar, K.R.2
  • 28
    • 84944187347 scopus 로고    scopus 로고
    • Planning tunnel construction using Markov chain Monte Carlo (MCMC)
    • Vargas, J. P., Koppe, J. C., Pérez, S., and, Hurtado, J. P. (2015). " Planning tunnel construction using Markov chain Monte Carlo (MCMC)." Math. Prob. Eng., 2015, 8. 10.1155/2015/797953
    • (2015) Math. Prob. Eng. , vol.2015 , pp. 8
    • Vargas, J.P.1    Koppe, J.C.2    Pérez, S.3    Hurtado, J.P.4
  • 29
    • 84965105409 scopus 로고    scopus 로고
    • Risk analysis: A quantitative guide
    • Wiley, Chichester, U.K
    • Vose, D. (2008). " Data and statistics." Risk analysis: A quantitative guide, Wiley, Chichester, U.K., 207-262.
    • (2008) Data and Statistics , pp. 207-262
    • Vose, D.1
  • 30
    • 84989878176 scopus 로고    scopus 로고
    • Planning two or more level constant-stress accelerated life tests with competing risks
    • Wu, S.-J., and, Huang, S.-R. (2017). " Planning two or more level constant-stress accelerated life tests with competing risks." Reliab. Eng. Syst. Saf., 158, 1-8. 10.1016/j.ress.2016.09.007 0951-8320
    • (2017) Reliab. Eng. Syst. Saf. , vol.158 , pp. 1-8
    • Wu, S.-J.1    Huang, S.-R.2
  • 31
    • 84885585175 scopus 로고    scopus 로고
    • Optimisation of a stochastic rock fracture model using Markov chain Monte Carlo simulation
    • Xu, C., Dowd, P. A., and, Wyborn, D. (2013). " Optimisation of a stochastic rock fracture model using Markov chain Monte Carlo simulation." Min. Technol., 122 (3), 153-158. 10.1179/1743286312Y.0000000023
    • (2013) Min. Technol. , vol.122 , Issue.3 , pp. 153-158
    • Xu, C.1    Dowd, P.A.2    Wyborn, D.3
  • 32
    • 84955072747 scopus 로고    scopus 로고
    • Evaluating crusher system location in an open pit mine using Markov chains
    • Yarmuch, J., Epstein, R., Cancino, R., and, Peña, J. C. (2016). " Evaluating crusher system location in an open pit mine using Markov chains." Int. J. Min. Reclam. Environ., 31 (1), 24-37. 1748-0930 10.1080/17480930.2015.1105649
    • (2016) Int. J. Min. Reclam. Environ. , vol.31 , Issue.1 , pp. 24-37
    • Yarmuch, J.1    Epstein, R.2    Cancino, R.3    Peña, J.C.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.