메뉴 건너뛰기




Volumn 31, Issue 1, 2017, Pages 24-37

Evaluating crusher system location in an open pit mine using Markov chains

Author keywords

Markov chains; Open pit crusher location; reliability; simulation

Indexed keywords

CHAINS; COPPER MINES; CRUSHERS; LOCATION; MARKOV PROCESSES; OPEN PIT MINING; OPERATING COSTS; RELIABILITY;

EID: 84955072747     PISSN: 17480930     EISSN: 17480949     Source Type: Journal    
DOI: 10.1080/17480930.2015.1105649     Document Type: Article
Times cited : (19)

References (29)
  • 1
    • 84973003402 scopus 로고
    • In-pit crushing and conveying system at Bingham Canyon Mine
    • B.A., Kammerer, In-pit crushing and conveying system at Bingham Canyon Mine. Int. J. Surf. Min. Reclamat. Environ. 2 (1988), pp. 143–147. doi:10.1080/09208118808944149.10.1080/09208118808944149
    • (1988) Int. J. Surf. Min. Reclamat. Environ. , vol.2 , pp. 143-147
    • Kammerer, B.A.1
  • 2
    • 85006772364 scopus 로고
    • Proceedings of the 1st APCOM Symposium–Application of Computers and Operations Research in the Mineral Industry, Tucson, USA:
    • K., Rist, The solution of a transportation problem by use of a Monte Carlo technique, Proceedings of the 1st APCOM Symposium–Application of Computers and Operations Research in the Mineral Industry, 1961, Tucson, USA.
    • (1961) The solution of a transportation problem by use of a Monte Carlo technique
    • Rist, K.1
  • 3
    • 0009083631 scopus 로고
    • Probability simulation for mine haulage systems
    • T.V., Falkie and D.R., Mitchell, Probability simulation for mine haulage systems. Soc. Min. Eng. 266 (1963), pp. 467–473.
    • (1963) Soc. Min. Eng. , vol.266 , pp. 467-473
    • Falkie, T.V.1    Mitchell, D.R.2
  • 4
    • 85006784227 scopus 로고
    • Proceedings of the 4th APCOM Symposium–Application of Computers and Operations Research in the Mineral Industry, Colorado, USA:
    • P.R., Harvey, Analysis of production capabilities, Proceedings of the 4th APCOM Symposium–Application of Computers and Operations Research in the Mineral Industry, 1964, Colorado, USA.
    • (1964) Analysis of production capabilities
    • Harvey, P.R.1
  • 5
    • 85006764983 scopus 로고
    • Proceedings of the 4th APCOM Symposium–Application of Computers and Operations Research in the Mineral Industry, Colorado, USA:
    • J., Elbrond, Capacity calculations at KLAB, Kiruna, Proceedings of the 4th APCOM Symposium–Application of Computers and Operations Research in the Mineral Industry, 1964, Colorado, USA.
    • (1964) Capacity calculations at KLAB, Kiruna
    • Elbrond, J.1
  • 6
    • 85006770309 scopus 로고
    • Proceedings of the 4th APCOM Symposium–Application of Computers and Operations Research in the Mineral Industry, Colorado, USA:
    • D., Redmon, Solving mine haulage problems by system simulation, Proceedings of the 4th APCOM Symposium–Application of Computers and Operations Research in the Mineral Industry, 1964, Colorado, USA.
    • (1964) Solving mine haulage problems by system simulation
    • Redmon, D.1
  • 7
    • 0019632692 scopus 로고
    • Dispatching and simulation methods in open-pit operations
    • P.K., Chatterjee and D.J., Brake, Dispatching and simulation methods in open-pit operations. CIM Bull. 74 (1981), pp. 102–107.
    • (1981) CIM Bull. , vol.74 , pp. 102-107
    • Chatterjee, P.K.1    Brake, D.J.2
  • 8
    • 0020312012 scopus 로고
    • Proceedings of the 17th APCOM Symposium–Application of Computers and Operations Research in the Mineral Industry, SME/AIME, New York:
    • F.L., Wilke, and K., Heck, Simulation studies on truck dispatching, Proceedings of the 17th APCOM Symposium–Application of Computers and Operations Research in the Mineral Industry, 1982, SME/AIME, New York, pp. 620–626.
    • (1982) Simulation studies on truck dispatching , pp. 620-626
    • Wilke, F.L.1    Heck, K.2
  • 9
    • 0022100529 scopus 로고
    • Analysis of open-pit truck haulage system by use of a computer model
    • J.H., Tu and V.J., Hucka, Analysis of open-pit truck haulage system by use of a computer model. CIM Bull. (1985), Vol 78 pp. 53–59.
    • (1985) CIM Bull. , vol.78 , pp. 53-59
    • Tu, J.H.1    Hucka, V.J.2
  • 10
    • 0345005178 scopus 로고
    • Simulation models for surface mines
    • J.R., Sturgul, and J., Harrison, Simulation models for surface mines. Int. J. Surf. Min. (1987), Vol 1 pp. 187–198.
    • (1987) Int. J. Surf. Min , vol.1 , pp. 187-198
    • Sturgul, J.R.1    Harrison, J.2
  • 12
    • 1242265088 scopus 로고    scopus 로고
    • Predicting equipment requirements using SIMAN simulation a case study
    • K., Awuah-Offei, V.A., Temeng, and S., Al-Hassan, Predicting equipment requirements using SIMAN simulation a case study. Trans. Inst. Min. Metall. 112 (2003), pp. 180–184.
    • (2003) Trans. Inst. Min. Metall. , vol.112 , pp. 180-184
    • Awuah-Offei, K.1    Temeng, V.A.2    Al-Hassan, S.3
  • 16
    • 0242548779 scopus 로고
    • Selecting a portfolio of credit risks by Markov chains
    • R.M., Cyert and G.L., Thompson, Selecting a portfolio of credit risks by Markov chains. J. Bus. (1968), Vol 1 pp. 39–46.10.1086/jb.1968.41.issue-1
    • (1968) J. Bus. , vol.1 , pp. 39-46
    • Cyert, R.M.1    Thompson, G.L.2
  • 17
    • 58249132069 scopus 로고
    • Markov chains: Basic concepts and suggested uses in agricultural economics
    • G.G., Judge and E.R., Swanson, Markov chains:Basic concepts and suggested uses in agricultural economics. Aus. J. Agric. Econ. 6 (1962), pp. 49–61.10.1111/j.1467-8489.1962.tb00301.x
    • (1962) Aus. J. Agric. Econ. , vol.6 , pp. 49-61
    • Judge, G.G.1    Swanson, E.R.2
  • 18
    • 0001895974 scopus 로고
    • Markov intertemporal land use simulation model
    • B.O., Burnham, Markov intertemporal land use simulation model. South. J. Agric. Econ. 5 (1973), pp. 253–258.
    • (1973) South. J. Agric. Econ. , vol.5 , pp. 253-258
    • Burnham, B.O.1
  • 19
    • 0035247534 scopus 로고    scopus 로고
    • A discrete-time Markov production-inventory model with machine breakdowns
    • N., Abboud, A discrete-time Markov production-inventory model with machine breakdowns. Comput. Indus. Eng. 39 (2001), pp. 95–107.
    • (2001) Comput. Indus. Eng. , vol.39 , pp. 95-107
    • Abboud, N.1
  • 20
    • 0026626775 scopus 로고
    • Mine maintenance analysis through Markov chain schemes
    • J.-L., Collins, R.K., Singhal, and K., Fytas, Mine maintenance analysis through Markov chain schemes. Int. J. Surf. Min. Reclamat. Environ. 6 (1992), pp. 47–56. doi:10.1080/09208119208944315.10.1080/09208119208944315
    • (1992) Int. J. Surf. Min. Reclamat. Environ. , vol.6 , pp. 47-56
    • Collins, J.-L.1    Singhal, R.K.2    Fytas, K.3
  • 22
    • 0025263515 scopus 로고
    • Proceedings of the Annual Reliability and Maintainability Symposium, California, USA:
    • L.H., Crow, Evaluating the reliability of repairable systems, Proceedings of the Annual Reliability and Maintainability Symposium, 1990, pp. 275–279, California, USA.
    • (1990) Evaluating the reliability of repairable systems , pp. 275-279
    • Crow, L.H.1
  • 23
    • 0026760051 scopus 로고
    • Reliability analysis of hydraulic systems of LHD machines using the power law process model
    • U., Kumar, and B., Klefsjö, Reliability analysis of hydraulic systems of LHD machines using the power law process model. Reliab. Eng. Syst. Saf. 35 (1992), pp. 217–224. Available at http://www.sciencedirect.com/science/article/pii/0951832092900805.
    • (1992) Reliab. Eng. Syst. Saf. , vol.35 , pp. 217-224
    • Kumar, U.1    Klefsjö, B.2
  • 24
    • 0029274576 scopus 로고
    • Time-varying failure rates in the availability and reliability analysis of repairable systems
    • T.F., Hassett, D.L., Dietrich, and F., Szidarovszky, Time-varying failure rates in the availability and reliability analysis of repairable systems. IEEE Trans. Reliab. 44 (1995), pp. 155–160.10.1109/24.376543
    • (1995) IEEE Trans. Reliab. , vol.44 , pp. 155-160
    • Hassett, T.F.1    Dietrich, D.L.2    Szidarovszky, F.3
  • 25
    • 27744590665 scopus 로고    scopus 로고
    • Maintainability and reliability analysis of a fleet of shovels
    • S.K., Roy, M.M., Bhattacharyya, and V.N.A., Naikan, Maintainability and reliability analysis of a fleet of shovels. Min. Technol. 110 (2001), pp. 163–171. http://www.maneyonline.com/doi/abs/10.1179/mnt.2001.110.3.163.10.1179/mnt.2001.110.3.163
    • (2001) Min. Technol. , vol.110 , pp. 163-171
    • Roy, S.K.1    Bhattacharyya, M.M.2    Naikan, V.N.A.3
  • 26
    • 84871604995 scopus 로고    scopus 로고
    • Mining truck scheduling with stochastic maintenance cost
    • E., Topal, and S., Ramazan, Mining truck scheduling with stochastic maintenance cost. J. Coal Sci. Eng. 18 (2012), pp. 313–319. http://link.springer.com/10.1007/s12404-012-0316-4.10.1007/s12404-012-0316-4
    • (2012) J. Coal Sci. Eng. , vol.18 , pp. 313-319
    • Topal, E.1    Ramazan, S.2
  • 27
    • 84969829004 scopus 로고    scopus 로고
    • An interactive planning and scheduling framework for optimising pits-to-crushers operations
    • S.Q., Liu, and E., Kozan, An interactive planning and scheduling framework for optimising pits-to-crushers operations. Ind. Eng. Manage. Syst. 11 (2012), pp. 94–102. Available at http://koreascience.or.kr/journal/view.jsp?kj=SGHHEA&py=2012&vnc=v11n1&sp=94.10.7232/iems.2012.11.1.094
    • (2012) Ind. Eng. Manage. Syst. , vol.11 , pp. 94-102
    • Liu, S.Q.1    Kozan, E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.