메뉴 건너뛰기




Volumn 125, Issue 3, 1999, Pages 133-141

Earthmoving productivity estimation using linear regression techniques

Author keywords

[No Author keywords available]

Indexed keywords

EXCAVATION; JOB ANALYSIS; MATHEMATICAL MODELS; PRODUCTIVITY; REGRESSION ANALYSIS;

EID: 0032640764     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(1999)125:3(133)     Document Type: Article
Times cited : (90)

References (16)
  • 2
    • 0025503204 scopus 로고
    • Level of significance selection in engineering analysis
    • ASCE
    • Brubaker, K. L., and McCuen, R. H. (1990). "Level of significance selection in engineering analysis." J. Prof. Issues in Engrg., ASCE, 116(4), 375-387.
    • (1990) J. Prof. Issues in Engrg. , vol.116 , Issue.4 , pp. 375-387
    • Brubaker, K.L.1    McCuen, R.H.2
  • 3
    • 0022785030 scopus 로고
    • Erlang loading models in earthmoving
    • Carmichael, D. G. (1986). "Erlang loading models in earthmoving." Civ. Engrg. Sys., 3, 118-124.
    • (1986) Civ. Engrg. Sys. , vol.3 , pp. 118-124
    • Carmichael, D.G.1
  • 5
    • 0029768469 scopus 로고    scopus 로고
    • Improving earthmoving by more realistic knowledge
    • Ottawa
    • Christian, J., and Xie, T. X. (1996). "Improving earthmoving by more realistic knowledge." Can. J. Civ. Engrg., Ottawa, 23, 250-259.
    • (1996) Can. J. Civ. Engrg. , vol.23 , pp. 250-259
    • Christian, J.1    Xie, T.X.2
  • 6
    • 0018159874 scopus 로고
    • The Scrapesim computer simulation
    • ASCE
    • Clemmens, J. P., and Willenbrock, J. H. (1978). "The Scrapesim computer simulation." J. Constr. Div., ASCE, 4(4), 419-435.
    • (1978) J. Constr. Div. , vol.4 , Issue.4 , pp. 419-435
    • Clemmens, J.P.1    Willenbrock, J.H.2
  • 7
    • 0028452701 scopus 로고
    • Simulation verifies queuing program for selecting loader truck fleets
    • ASCE
    • Farid, F., and Koning, T. L. (1994). "Simulation verifies queuing program for selecting loader truck fleets." J. Constr. Engrg. and Mgmt., ASCE, 120(2), 386-404.
    • (1994) J. Constr. Engrg. and Mgmt. , vol.120 , Issue.2 , pp. 386-404
    • Farid, F.1    Koning, T.L.2
  • 8
    • 0344494308 scopus 로고    scopus 로고
    • Optimizing haul unit size and number based on loading facility characteristics
    • ASCE
    • Gransberg, D. D. (1996). "Optimizing haul unit size and number based on loading facility characteristics." J. Constr. Engrg. and Mgmt., ASCE, 122(3), 248-253.
    • (1996) J. Constr. Engrg. and Mgmt. , vol.122 , Issue.3 , pp. 248-253
    • Gransberg, D.D.1
  • 9
    • 0017539255 scopus 로고
    • CYCLONE: Method for modeling of job site processes
    • ASCE
    • Halpin, D. W. (1977). "CYCLONE: Method for modeling of job site processes." J. Constr. Div., ASCE, 103, 489-499.
    • (1977) J. Constr. Div. , vol.103 , pp. 489-499
    • Halpin, D.W.1
  • 11
    • 0009068346 scopus 로고
    • Determining shovel-truck productivity
    • December
    • Morgan, W. C., and Peterson, L. L. (1968). "Determining shovel-truck productivity." Mining Engrg., December, 76-80.
    • (1968) Mining Engrg. , pp. 76-80
    • Morgan, W.C.1    Peterson, L.L.2
  • 13
    • 0003119697 scopus 로고    scopus 로고
    • Resource-based modeling for construction simulation
    • ASCE
    • Shi, J., and AbouRizk, S. M. (1997). "Resource-based modeling for construction simulation." J. Constr. Engrg. and Mgmt., ASCE, 123(1), 26-33.
    • (1997) J. Constr. Engrg. and Mgmt. , vol.123 , Issue.1 , pp. 26-33
    • Shi, J.1    AbouRizk, S.M.2
  • 14
    • 0029522572 scopus 로고
    • Analysis of earth-moving systems using discrete-event simulation
    • ASCE
    • Smith, S. D., Osborne, J. R., and Forde, M. C. (1995a). "Analysis of earth-moving systems using discrete-event simulation." J. Constr. Engrg. and Mgmt., ASCE, 121(4), 388-396.
    • (1995) J. Constr. Engrg. and Mgmt. , vol.121 , Issue.4 , pp. 388-396
    • Smith, S.D.1    Osborne, J.R.2    Forde, M.C.3
  • 15
    • 0029304813 scopus 로고
    • Productivity estimation in back-acter/dumptruck earth-moving operations
    • Smith, S. D., Osborne, J. R., and Forde, M. C. (1995b). "Productivity estimation in back-acter/dumptruck earth-moving operations." Proc., Instn. of Civ. Engrs., Transport., 1 11(2), 125-131.
    • (1995) Proc., Instn. of Civ. Engrs., Transport. , vol.111 , Issue.2 , pp. 125-131
    • Smith, S.D.1    Osborne, J.R.2    Forde, M.C.3
  • 16
    • 0006377177 scopus 로고    scopus 로고
    • The use of a discrete-event simulation model with Erlang probability distributions in the estimation of earthmoving production
    • Smith, S. D., Osborne, J. R., and Forde, M. C. (1996). "The use of a discrete-event simulation model with Erlang probability distributions in the estimation of earthmoving production." Civ. Engrg. Sys., 13(1), 25-44.
    • (1996) Civ. Engrg. Sys. , vol.13 , Issue.1 , pp. 25-44
    • Smith, S.D.1    Osborne, J.R.2    Forde, M.C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.