메뉴 건너뛰기




Volumn 47, Issue , 2014, Pages 37-49

Evaluation of queuing systems for knowledge-based simulation of construction processes

Author keywords

Construction; Data mining; Discrete event simulation; Infrastructure; Knowledge; Queue; Queue discipline; Simulation; Ultra wideband; Wireless data collection

Indexed keywords

CONSTRUCTION; DISCRETE EVENT SIMULATION; KNOWLEDGE BASED SYSTEMS; QUEUEING NETWORKS; QUEUEING THEORY; ULTRA-WIDEBAND (UWB); DATA MINING;

EID: 84905658355     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2014.07.007     Document Type: Article
Times cited : (39)

References (36)
  • 3
    • 77956838319 scopus 로고    scopus 로고
    • Role of simulation in construction engineering and management
    • S. AbouRizk Role of simulation in construction engineering and management J. Constr. Eng. Manag. 136 10 2010 1140 1153
    • (2010) J. Constr. Eng. Manag. , vol.136 , Issue.10 , pp. 1140-1153
    • Abourizk, S.1
  • 4
    • 75649106487 scopus 로고    scopus 로고
    • Methodology for conducting discrete-event simulation studies in construction engineering and management
    • J.C. Martinez Methodology for conducting discrete-event simulation studies in construction engineering and management J. Constr. Eng. Manag. 136 1 2009 3 16
    • (2009) J. Constr. Eng. Manag. , vol.136 , Issue.1 , pp. 3-16
    • Martinez, J.C.1
  • 5
    • 6344232286 scopus 로고    scopus 로고
    • Simplified discrete-event simulation approach for construction simulation
    • DOI 10.1061/(ASCE)0733-9364(2003)129:5(537)
    • M. Lu Simplified discrete-event simulation approach for construction simulation J. Constr. Eng. Manag. 129 5 2003 537 546 (Pubitemid 40265441)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.5 , pp. 537-546
    • Lu, M.1
  • 6
    • 84892942274 scopus 로고    scopus 로고
    • Analysis of disruptions caused by construction field rework on productivity in residential projects
    • M. Arashpour, R. Wakefield, N. Blismas, and E. Lee Analysis of disruptions caused by construction field rework on productivity in residential projects J. Constr. Eng. Manag. 140 2 2013 04013053
    • (2013) J. Constr. Eng. Manag. , vol.140 , Issue.2 , pp. 04013053
    • Arashpour, M.1    Wakefield, R.2    Blismas, N.3    Lee, E.4
  • 7
    • 84877728352 scopus 로고    scopus 로고
    • Stabilizing production flow of interior and finishing works with reentrant flow in building construction
    • I. Brodetskaia, R. Sacks, and A. Shapira Stabilizing production flow of interior and finishing works with reentrant flow in building construction J. Constr. Eng. Manag. 139 6 2012 665 674
    • (2012) J. Constr. Eng. Manag. , vol.139 , Issue.6 , pp. 665-674
    • Brodetskaia, I.1    Sacks, R.2    Shapira, A.3
  • 8
    • 0007707099 scopus 로고    scopus 로고
    • Prentice Hall, New Jersey, 2nd ed., Prentice-Hall, Upper Saddle River, N.J.
    • S. Nunnally, Managing construction equipment, Prentice Hall, New Jersey, 2nd ed., Prentice-Hall, Upper Saddle River, N.J., 2000.
    • (2000) Managing Construction Equipment
    • Nunnally, S.1
  • 10
    • 0028452701 scopus 로고
    • Simulation verifies queuing program for selecting loader-truck fleets
    • F. Farid, and T.L. Koning Simulation verifies queuing program for selecting loader-truck fleets J. Constr. Eng. Manag. 120 2 1994 386 404
    • (1994) J. Constr. Eng. Manag. , vol.120 , Issue.2 , pp. 386-404
    • Farid, F.1    Koning, T.L.2
  • 13
    • 0030401333 scopus 로고    scopus 로고
    • Simulation of complex construction processes
    • D.M.J. Charnes, D. Brunner, J. Swain, Institute of Electrical and Electronics Engineers, Inc.
    • P.G. Ioannou, and J.C. Martinez Simulation of complex construction processes D.M.J. Charnes, D. Brunner, J. Swain, Proceedings of the 28th Conference on Winter Simulation 1996 Institute of Electrical and Electronics Engineers, Inc. 1321 1328
    • (1996) Proceedings of the 28th Conference on Winter Simulation , pp. 1321-1328
    • Ioannou, P.G.1    Martinez, J.C.2
  • 14
    • 49749119140 scopus 로고    scopus 로고
    • Enabling smooth and scalable dynamic 3D visualization of discrete-event construction simulations in outdoor augmented reality
    • A.H. Behzadan, and V.R. Kamat Enabling smooth and scalable dynamic 3D visualization of discrete-event construction simulations in outdoor augmented reality 2007 Simulation Conference (WSC), Washington, DC 2007 2168 2176
    • (2007) 2007 Simulation Conference (WSC), Washington, DC , pp. 2168-2176
    • Behzadan, A.H.1    Kamat, V.R.2
  • 15
    • 81855184582 scopus 로고    scopus 로고
    • Research in modeling and simulation for improving construction engineering operations
    • S. AbouRizk, D. Halpin, Y. Mohamed, and U. Hermann Research in modeling and simulation for improving construction engineering operations J. Constr. Eng. Manag. 137 10 2011 843 852
    • (2011) J. Constr. Eng. Manag. , vol.137 , Issue.10 , pp. 843-852
    • Abourizk, S.1    Halpin, D.2    Mohamed, Y.3    Hermann, U.4
  • 17
    • 84886507375 scopus 로고    scopus 로고
    • Knowledge-based simulation modeling of construction fleet operations using multimodal-process data mining
    • R. Akhavian, and A.H. Behzadan Knowledge-based simulation modeling of construction fleet operations using multimodal-process data mining J. Constr. Eng. Manag. 2013 04013021
    • (2013) J. Constr. Eng. Manag. , pp. 04013021
    • Akhavian, R.1    Behzadan, A.H.2
  • 18
    • 84867902111 scopus 로고    scopus 로고
    • An integrated data collection and analysis framework for remote monitoring and planning of construction operations
    • R. Akhavian, and A.H. Behzadan An integrated data collection and analysis framework for remote monitoring and planning of construction operations Adv. Eng. Inform. 26 4 2012 749 761
    • (2012) Adv. Eng. Inform. , vol.26 , Issue.4 , pp. 749-761
    • Akhavian, R.1    Behzadan, A.H.2
  • 19
    • 84866253267 scopus 로고    scopus 로고
    • Remote monitoring of dynamic construction processes using automated equipment tracking
    • ASCE
    • R. Akhavian, and A.H. Behzadan Remote monitoring of dynamic construction processes using automated equipment tracking Construction Research Congress 2012 2012 ASCE 1360 1369
    • (2012) Construction Research Congress 2012 , pp. 1360-1369
    • Akhavian, R.1    Behzadan, A.H.2
  • 20
    • 84863295559 scopus 로고    scopus 로고
    • Towards real-time simulation of construction activities considering spatio-temporal resolution requirements for improving safety and productivity
    • R.R.C.S. Jain, J. Himmelspach, K.P. White, M. Fu, Institute of Electrical and Electronics Engineers, Inc.
    • A. Hammad, and C. Zhang Towards real-time simulation of construction activities considering spatio-temporal resolution requirements for improving safety and productivity R.R.C.S. Jain, J. Himmelspach, K.P. White, M. Fu, Proceedings of the 2011 Winter Simulation Conference 2011 Institute of Electrical and Electronics Engineers, Inc. 3533 3544
    • (2011) Proceedings of the 2011 Winter Simulation Conference , pp. 3533-3544
    • Hammad, A.1    Zhang, C.2
  • 21
    • 84863701904 scopus 로고    scopus 로고
    • Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling
    • L. Song, and N.N. Eldin Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling Autom. Constr. 27 2012 32 39
    • (2012) Autom. Constr. , vol.27 , pp. 32-39
    • Song, L.1    Eldin, N.N.2
  • 23
    • 12744256710 scopus 로고    scopus 로고
    • Lognormal distribution provides an optimum representation of the concrete delivery and placement process
    • DOI 10.1061/(ASCE)0733-9364(2005)131:2(230)
    • L. Darren Graham, S.D. Smith, and P. Dunlop Lognormal distribution provides an optimum representation of the concrete delivery and placement process J. Constr. Eng. Manag. 131 2 2005 230 238 (Pubitemid 40155183)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.2 , pp. 230-238
    • Graham, L.D.1    Smith, S.D.2    Dunlop, P.3
  • 28
    • 0000107197 scopus 로고
    • Stochastic processes occurring in the theory of queues and their analysis by the method of the imbedded Markov chain
    • D.G. Kendall Stochastic processes occurring in the theory of queues and their analysis by the method of the imbedded Markov chain Ann. Math. Stat. 1953 338 354
    • (1953) Ann. Math. Stat. , pp. 338-354
    • Kendall, D.G.1
  • 30
    • 0015315831 scopus 로고
    • Estimating costs of earthwork via simulation
    • J.H. Willenbrock Estimating costs of earthwork via simulation J. Constr. Div. 98 1 1972 49 60
    • (1972) J. Constr. Div. , vol.98 , Issue.1 , pp. 49-60
    • Willenbrock, J.H.1
  • 32
    • 0034225611 scopus 로고    scopus 로고
    • Probability distribution functions for construction simulation
    • C. Maio, C. Schexnayder, K. Knutson, and S. Weber Probability distribution functions for construction simulation J. Constr. Eng. Manag. 126 4 2000 285 292
    • (2000) J. Constr. Eng. Manag. , vol.126 , Issue.4 , pp. 285-292
    • Maio, C.1    Schexnayder, C.2    Knutson, K.3    Weber, S.4
  • 33
    • 0002337501 scopus 로고
    • Priority queues
    • R.G. Miller Priority queues Ann. Math. Stat. 31 1 1960 86 103
    • (1960) Ann. Math. Stat. , vol.31 , Issue.1 , pp. 86-103
    • Miller, R.G.1
  • 34
    • 0004505873 scopus 로고
    • Priority queues
    • L. Takács Priority queues Oper. Res. 12 1 1964 63 74
    • (1964) Oper. Res. , vol.12 , Issue.1 , pp. 63-74
    • Takács, L.1
  • 35
    • 80054858717 scopus 로고    scopus 로고
    • Experimental test of airplane boarding methods
    • J.H. Steffen, and J. Hotchkiss Experimental test of airplane boarding methods J. Air Transp. Manag. 18 1 2012 64 67
    • (2012) J. Air Transp. Manag. , vol.18 , Issue.1 , pp. 64-67
    • Steffen, J.H.1    Hotchkiss, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.