Risk-Based Project Delivery Selection Model for Highway Design and Construction

Author keywords

Crossimpact analysis; Monte Carlo simulation; Project delivery selection process; Project planning and design; Risk analysis and management

Indexed keywords

COMPUTATION THEORY; DECISION MAKING; HIGHWAY PLANNING; MONTE CARLO METHODS; MULTIVARIANT ANALYSIS; RISK ANALYSIS; RISK ASSESSMENT; SENSITIVITY ANALYSIS; STRUCTURAL DESIGN; UNCERTAINTY ANALYSIS;

EID: 84947241994     PISSN: 07339364     EISSN: 19437862     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0001024     Document Type: Article
Times cited : (56)

References (41)
  • 3
    • 11944252554 scopus 로고    scopus 로고
    • Performance modeling for contractor selection
    • Alarcón, L., and, Mourgues, C. (2002). " Performance modeling for contractor selection." J. Manage. Eng., 10.1061/(ASCE)0742-597X(2002)18:2(52), 52-60. JMENEA 0742-597X
    • (2002) J. Manage. Eng. , pp. 52-60
    • Alarcón, L.1    Mourgues, C.2
  • 4
    • 0001386480 scopus 로고    scopus 로고
    • Modeling project performance for decision making
    • Alarcón, L. F., and, Ashley, D. B. (1996). " Modeling project performance for decision making." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1996)122:3(265), 265-273. JCEMD4 0733-9364
    • (1996) J. Constr. Eng. Manage. , pp. 265-273
    • Alarcón, L.F.1    Ashley, D.B.2
  • 5
    • 14744290547 scopus 로고    scopus 로고
    • Assessing project execution strategies for embassy projects
    • U.S. Dept. of State, Washington, DC
    • Alarcón, L. F., and, Ashley, D. B. (2000). " Assessing project execution strategies for embassy projects." Rep. to the Foreign Building Operations (FBO), U.S. Dept. of State, Washington, DC.
    • (2000) Rep. to the Foreign Building Operations (FBO)
    • Alarcón, L.F.1    Ashley, D.B.2
  • 6
    • 0000365630 scopus 로고    scopus 로고
    • Project procurement system selection model
    • Alhazmi, T., and, McCaffer, R. (2000). " Project procurement system selection model." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2000)126:3(176), 176-184. JCEMD4 0733-9364
    • (2000) J. Constr. Eng. Manage. , pp. 176-184
    • Alhazmi, T.1    McCaffer, R.2
  • 7
    • 67649108901 scopus 로고    scopus 로고
    • A decision support system for selecting the optimal contracting strategy in highway work zone projects
    • Bayraktar, M. E., and, Hastak, M. (2009). " A decision support system for selecting the optimal contracting strategy in highway work zone projects." Autom. Constr., 18 (6), 834-843. 10.1016/j.autcon.2009.03.007 AUCOES 0926-5805
    • (2009) Autom. Constr. , vol.18 , Issue.6 , pp. 834-843
    • Bayraktar, M.E.1    Hastak, M.2
  • 8
    • 0006619356 scopus 로고
    • Decision net: An architecture for modeling and decision support over the World Wide Web
    • International Society for Decision Support Systems, Austin, TX
    • Bhargava, H. K., King, A. S., and, McQuay, D. S. (1995). " Decision net: An architecture for modeling and decision support over the World Wide Web." Proc., 3rd Int. Conf. on Decision Support System, International Society for Decision Support Systems, Austin, TX, 499-506.
    • (1995) Proc. 3rd Int. Conf. on Decision Support System , pp. 499-506
    • Bhargava, H.K.1    King, A.S.2    McQuay, D.S.3
  • 10
    • 84947235839 scopus 로고    scopus 로고
    • FHWA (Federal Highway Administration). (Jul. 7, 2013)
    • FHWA (Federal Highway Administration). (2004). " Major project program cost estimating guidance." (http://www.fhwa.dot.gov/ipd/project-delivery/tools-programs/cost-estimating/guidance.htm) (Jul. 7, 2013).
    • (2004) Major Project Program Cost Estimating Guidance
  • 11
    • 70349318535 scopus 로고    scopus 로고
    • Owner's risks versus control in transit projects
    • Ghavamifar, K., and, Touran, A. (2009). " Owner's risks versus control in transit projects." J. Manage. Eng., 25 (4), 230-233.
    • (2009) J. Manage. Eng. , vol.25 , Issue.4 , pp. 230-233
    • Ghavamifar, K.1    Touran, A.2
  • 12
    • 0028397624 scopus 로고
    • Choosing appropriate construction contracting method
    • Gordon, C. M. (1994). " Choosing appropriate construction contracting method." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1994)120:1(196), 196-210. JCEMD4 0733-9364
    • (1994) J. Constr. Eng. Manage. , pp. 196-210
    • Gordon, C.M.1
  • 13
    • 0001898118 scopus 로고
    • Initial experiments with the cross impact method of forecasting
    • Gordon, T., and, Hayward, H. (1968). " Initial experiments with the cross impact method of forecasting." Futures, 1 (2), 100-116. 10.1016/S0016-3287(68)80003-5
    • (1968) Futures , vol.1 , Issue.2 , pp. 100-116
    • Gordon, T.1    Hayward, H.2
  • 15
    • 84865202664 scopus 로고    scopus 로고
    • National Cooperative Highway Research Program (NCHRP) Synthesis 402, Transportation Research Board of the National Academies, Washington, DC
    • Gransberg, D. D., and, Shane, J. S. (2010). " Construction manager-at-risk project delivery for highway programs." National Cooperative Highway Research Program (NCHRP) Synthesis 402, Transportation Research Board of the National Academies, Washington, DC.
    • (2010) Construction Manager-at-risk Project Delivery for Highway Programs
    • Gransberg, D.D.1    Shane, J.S.2
  • 16
    • 83755178364 scopus 로고    scopus 로고
    • Interrelationships among highly effective construction injury prevention strategies
    • Hallowell, M., and, Calhoun, M. (2011). " Interrelationships among highly effective construction injury prevention strategies." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000354, 985-993. JCEMD4 0733-9364
    • (2011) J. Constr. Eng. Manage. , pp. 985-993
    • Hallowell, M.1    Calhoun, M.2
  • 17
    • 0035392728 scopus 로고    scopus 로고
    • Approaches for making risk-based go/no-go decision for international projects
    • Han, S. H., and, Diekmann, J. E. (2001). " Approaches for making risk-based go/no-go decision for international projects." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2001)127:4(300), 300-308. JCEMD4 0733-9364
    • (2001) J. Constr. Eng. Manage. , pp. 300-308
    • Han, S.H.1    Diekmann, J.E.2
  • 19
    • 13944260870 scopus 로고    scopus 로고
    • Project delivery systems and project change: Quantitative analysis
    • Ibbs, C. W., Kwak, Y. H., Ng, T., and, Odabasi, A. M. (2003). " Project delivery systems and project change: Quantitative analysis." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2003)129:4(382), 382-387. JCEMD4 0733-9364
    • (2003) J. Constr. Eng. Manage. , pp. 382-387
    • Ibbs, C.W.1    Kwak, Y.H.2    Ng, T.3    Odabasi, A.M.4
  • 21
    • 0000611906 scopus 로고    scopus 로고
    • Selecting a suitable procurement method for a building project
    • Love, P. E., Skitmore, M., and, Earl, G. (1998). " Selecting a suitable procurement method for a building project." Constr. Manage. Econ., 16 (2), 221-233. 10.1080/014461998372501
    • (1998) Constr. Manage. Econ. , vol.16 , Issue.2 , pp. 221-233
    • Love, P.E.1    Skitmore, M.2    Earl, G.3
  • 22
    • 84859618045 scopus 로고    scopus 로고
    • Participatory action research approach to public sector procurement selection
    • Love, P. E. D., Edwards, D. J., Irani, Z., and, Sharif, A. (2012). " Participatory action research approach to public sector procurement selection." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000440, 311-322. JCEMD4 0733-9364
    • (2012) J. Constr. Eng. Manage. , pp. 311-322
    • Love, P.E.D.1    Edwards, D.J.2    Irani, Z.3    Sharif, A.4
  • 23
    • 27744450360 scopus 로고    scopus 로고
    • Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP)
    • Mahdi, I. M., and, Alreshaid, K. (2005). " Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP)." Int. J. Project Manage., 23 (7), 564-572. 10.1016/j.ijproman.2005.05.007 IPMAEL
    • (2005) Int. J. Project Manage. , vol.23 , Issue.7 , pp. 564-572
    • Mahdi, I.M.1    Alreshaid, K.2
  • 24
    • 0033739039 scopus 로고    scopus 로고
    • Toward a new paradigm: Simultaneous use of multiple project delivery methods
    • Miller, J. B., Garvin, M. J., Ibbs, C. W., and, Mahoney, S. E. (2000). " Toward a new paradigm: Simultaneous use of multiple project delivery methods." J. Manage. Eng., 10.1061/(ASCE)0742-597X(2000)16:3(58), 58-67. JMENEA 0742-597X
    • (2000) J. Manage. Eng. , pp. 58-67
    • Miller, J.B.1    Garvin, M.J.2    Ibbs, C.W.3    Mahoney, S.E.4
  • 26
    • 0017504275 scopus 로고
    • Scenario generation limitation and development in CIA
    • Mitchell, R. B. (1977). " Scenario generation limitation and development in CIA." Futures, 9 (3), 205-215. 10.1016/0016-3287(77)90034-9
    • (1977) Futures , vol.9 , Issue.3 , pp. 205-215
    • Mitchell, R.B.1
  • 27
    • 14544291098 scopus 로고    scopus 로고
    • Programmatic cost risk analysis for highway megaprojects
    • Molenaar, K. R. (2005). " Programmatic cost risk analysis for highway megaprojects." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2005)131:3(343), 343-353. JCEMD4 0733-9364
    • (2005) J. Constr. Eng. Manage. , pp. 343-353
    • Molenaar, K.R.1
  • 28
    • 0035482649 scopus 로고    scopus 로고
    • Web-based decision support systems: Case study in project delivery
    • Molenaar, K. R., and, Songer, A. D. (2001). " Web-based decision support systems: Case study in project delivery." J. Comput. Civ. Eng., 10.1061/(ASCE)0887-3801(2001)15:4(259), 259-267. JCCEE5 0887-3801
    • (2001) J. Comput. Civ. Eng. , pp. 259-267
    • Molenaar, K.R.1    Songer, A.D.2
  • 29
    • 33645517629 scopus 로고    scopus 로고
    • Relative effectiveness of project delivery and contract strategies
    • Oyetunji, A. A., and, Anderson, S. D. (2006). " Relative effectiveness of project delivery and contract strategies." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2006)132:1(3), 3-13. JCEMD4 0733-9364
    • (2006) J. Constr. Eng. Manage. , pp. 3-13
    • Oyetunji, A.A.1    Anderson, S.D.2
  • 30
    • 84923163611 scopus 로고    scopus 로고
    • Best practices in design process development for accelerated construction project delivery
    • Research Publishing, Singapore
    • Ptschelinzew, L. R., et al. (2013). " Best practices in design process development for accelerated construction project delivery." 7th Int. Structural Engineering and Construction Conf., Research Publishing, Singapore.
    • (2013) 7th Int. Structural Engineering and Construction Conf.
    • Ptschelinzew, L.R.1
  • 31
    • 0032207789 scopus 로고    scopus 로고
    • FEATURE: Risky business
    • Rubin, R., and, Wordes, D. (1998). " FEATURE: Risky business." J. Manage. Eng., 14 (6), 36-43.
    • (1998) J. Manage. Eng. , vol.14 , Issue.6 , pp. 36-43
    • Rubin, R.1    Wordes, D.2
  • 32
    • 84872734011 scopus 로고    scopus 로고
    • Verification and validation of simulation models
    • Sargent, R. G. (2012). " Verification and validation of simulation models." J. Simul., 7 (1), 12-24. 10.1057/jos.2012.20
    • (2012) J. Simul. , vol.7 , Issue.1 , pp. 12-24
    • Sargent, R.G.1
  • 33
    • 84857343571 scopus 로고    scopus 로고
    • Homeland security: A case study in risk aversion for public decision-making
    • Stewart, M. G., Ellingwood, B. R., and, Mueller, J. (2011). " Homeland security: A case study in risk aversion for public decision-making." Int. J. Risk Assess. Manage., 15 (5), 367-386. 10.1504/IJRAM.2011.043690 IJRABZ 1466-8297
    • (2011) Int. J. Risk Assess. Manage. , vol.15 , Issue.5 , pp. 367-386
    • Stewart, M.G.1    Ellingwood, B.R.2    Mueller, J.3
  • 34
    • 78650388363 scopus 로고    scopus 로고
    • Selection of project delivery method in transit: Drivers and objectives
    • Touran, A., Gransberg, D. D., Molenaar, K. R., and, Ghavamifar, K. (2011). " Selection of project delivery method in transit: Drivers and objectives." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000027, 21-27. JMENEA 0742-597X
    • (2011) J. Manage. Eng. , pp. 21-27
    • Touran, A.1    Gransberg, D.D.2    Molenaar, K.R.3    Ghavamifar, K.4
  • 36
    • 84866254117 scopus 로고    scopus 로고
    • Critical risk factors in project delivery method selection for highway projects
    • Reston, VA
    • Tran, D., and, Molenaar, K. R. (2012). " Critical risk factors in project delivery method selection for highway projects." Construction Research Congress, ASCE, Reston, VA, 331-340.
    • (2012) Construction Research Congress, ASCE , pp. 331-340
    • Tran, D.1    Molenaar, K.R.2
  • 37
    • 84919687496 scopus 로고    scopus 로고
    • Exploring critical delivery selection risk factors for transportation design and construction projects
    • Tran, D., and, Molenaar, K. R. (2014 a). " Exploring critical delivery selection risk factors for transportation design and construction projects." J. Constr. Archit. Manage., 21 (6), 631-647.
    • (2014) J. Constr. Archit. Manage. , vol.21 , Issue.6 , pp. 631-647
    • Tran, D.1    Molenaar, K.R.2
  • 38
    • 84894444145 scopus 로고    scopus 로고
    • The impact of risk on design-build selection for highway design and construction projects
    • Tran, D., and, Molenaar, K. R. (2014 b). " The impact of risk on design-build selection for highway design and construction projects." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000210, 153-162. JMENEA 0742-597X
    • (2014) J. Manage. Eng. , pp. 153-162
    • Tran, D.1    Molenaar, K.R.2
  • 39
    • 0000697270 scopus 로고    scopus 로고
    • Selecting long-term strategies for construction firms
    • Venegas, C. P., and, Alarcón, C. L. F. (1997). " Selecting long-term strategies for construction firms." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1997)123:4(388), 388-398. JCEMD4 0733-9364
    • (1997) J. Constr. Eng. Manage. , pp. 388-398
    • Venegas, C.P.1    Alarcón, C.L.F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.