메뉴 건너뛰기




Volumn 2, Issue 3, 2014, Pages 167-178

A rolling horizon-based heuristic to solve a multi-level general lot sizing and scheduling problem with multiple machines (MLGLSP_MM) in job shop manufacturing system

Author keywords

Capacitated lot sizing and scheduling; Heuristic; Job shop; Rolling horizon approach; Sequence dependent setup

Indexed keywords


EID: 85009198816     PISSN: 22916822     EISSN: 22916830     Source Type: Journal    
DOI: 10.5267/j.uscm.2014.4.003     Document Type: Article
Times cited : (8)

References (46)
  • 1
    • 34547145422 scopus 로고    scopus 로고
    • Joint rolling horizon scheduling of materials processing and lot-sizing with sequence dependent setups
    • Araujo, S.A., Arenales, M.N., & Clark, A.R. (2007).Joint rolling horizon scheduling of materials processing and lot-sizing with sequence dependent setups. Journal of Heuristics, 13(4), 337–358.
    • (2007) Journal of Heuristics , vol.13 , Issue.4 , pp. 337-358
    • Araujo, S.A.1    Arenales, M.N.2    Clark, A.R.3
  • 4
    • 41149118126 scopus 로고    scopus 로고
    • Rolling horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs
    • Beraldi, P., Ghiani, G., Grieco, A., & Guerriero, E. (2008). Rolling horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs. Computer and Operation Research, 35(11), 3644–3656.
    • (2008) Computer and Operation Research , vol.35 , Issue.11 , pp. 3644-3656
    • Beraldi, P.1    Ghiani, G.2    Grieco, A.3    Guerriero, E.4
  • 5
    • 38249038883 scopus 로고
    • Production lot sizing for deterministic rolling schedules
    • Bookbinder, J. H., & H'ng, B. T. (1986).Production lot sizing for deterministic rolling schedules. Journal of Operations Management, 6(3), 349-362.
    • (1986) Journal of Operations Management , vol.6 , Issue.3 , pp. 349-362
    • Bookbinder, J.H.1    H'ng, B.T.2
  • 6
    • 0020704199 scopus 로고
    • Rolling horizon procedures for the facilities in series inventory model with nested schedules
    • Chand, S. (1983). Rolling horizon procedures for the facilities in series inventory model with nested schedules. Management Science, 29(2), 237-249.
    • (1983) Management Science , vol.29 , Issue.2 , pp. 237-249
    • Chand, S.1
  • 7
    • 0031506199 scopus 로고    scopus 로고
    • Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates
    • Chand, S., Traub, R., & Uzsoy, R. (1997).Rolling horizon procedures for the single machine deterministic total completion time scheduling problem with release dates. Annals of Operations Research, 70, 115-125.
    • (1997) Annals of Operations Research , vol.70 , pp. 115-125
    • Chand, S.1    Traub, R.2    Uzsoy, R.3
  • 9
    • 0037432979 scopus 로고    scopus 로고
    • Optimization approximations for capacity constrained material requirements planning
    • Clark, A.R. (2003). Optimization approximations for capacity constrained material requirements planning. International Journal of Production Economics, 84 (2),115–131.
    • (2003) International Journal of Production Economics , vol.84 , Issue.2 , pp. 115-131
    • Clark, A.R.1
  • 10
    • 0034631279 scopus 로고    scopus 로고
    • Rolling-horizon lot-sizing when setup times are sequence dependent
    • Clark, A.R., & Clark, S.J. (2000). Rolling-horizon lot-sizing when setup times are sequence dependent. International Journal of Production Research, 38 (10), 2287–2308.
    • (2000) International Journal of Production Research , vol.38 , Issue.10 , pp. 2287-2308
    • Clark, A.R.1    Clark, S.J.2
  • 11
    • 0038789162 scopus 로고    scopus 로고
    • A flexible decision support system for steel hot rolling mill scheduling
    • Cowling, P. (2003).A flexible decision support system for steel hot rolling mill scheduling. Computers and Industrial Engineering, 45(2), 307-321.
    • (2003) Computers and Industrial Engineering , vol.45 , Issue.2 , pp. 307-321
    • Cowling, P.1
  • 12
    • 0000685021 scopus 로고    scopus 로고
    • RTN-based rolling horizon algorithms for medium term scheduling of multipurpose plants
    • Dimitriadis, A. D., Shah, N., & Pantelides, C. C. (1997). RTN-based rolling horizon algorithms for medium term scheduling of multipurpose plants. Computers & Chemical Engineering, 21, S1061-S1066.
    • (1997) Computers & Chemical Engineering , vol.21 , pp. S1061-S1066
    • Dimitriadis, A.D.1    Shah, N.2    Pantelides, C.C.3
  • 13
    • 0030676526 scopus 로고    scopus 로고
    • A rolling horizon job shop rescheduling strategy in the dynamic environment
    • Fang, J., & Xi, Y. (1997). A rolling horizon job shop rescheduling strategy in the dynamic environment. International Journal of Advanced Manufacturing Technology, 13(3), 227-232.
    • (1997) International Journal of Advanced Manufacturing Technology , vol.13 , Issue.3 , pp. 227-232
    • Fang, J.1    Xi, Y.2
  • 14
    • 33748884885 scopus 로고    scopus 로고
    • Simultaneous lot-sizing and scheduling for multi-product multi-level production
    • Fandel, G., & Stammen-Hegene, C. (2006).Simultaneous lot-sizing and scheduling for multi-product multi-level production. International Journal of Production Economics, 104(2), 308–316.
    • (2006) International Journal of Production Economics , vol.104 , Issue.2 , pp. 308-316
    • Fandel, G.1    Stammen-Hegene, C.2
  • 15
    • 70350569826 scopus 로고    scopus 로고
    • Relax and fix heuristics to solve one-stage one-machine lot-scheduling models for small-scale soft drink plants
    • Ferreira, D., Morabitoa, R., & Rangel, S. (2010). Relax and fix heuristics to solve one-stage one-machine lot-scheduling models for small-scale soft drink plants. Computers and Operations Research, 37, 684 - 691.
    • (2010) Computers and Operations Research , vol.37
    • Ferreira, D.1    Morabitoa, R.2    Rangel, S.3
  • 17
    • 76549102833 scopus 로고    scopus 로고
    • The genetic algorithms-based rolling horizon scheduling strategy
    • Jian, F., & Yuseng, X. I. (1997).The genetic algorithms-based rolling horizon scheduling strategy. Control Theory & Applications, 4, 023.
    • (1997) Control Theory & Applications , vol.4 , pp. 023
    • Jian, F.1    Yuseng, X.I.2
  • 18
    • 0041511823 scopus 로고    scopus 로고
    • The capacitated lot sizing problem: A review of models and algorithms
    • Karimi, B., FatemiGhomi, S.M.T., & Wilson, J. (2003). The capacitated lot sizing problem: a review of models and algorithms. Omega, 31, 365–378.
    • (2003) Omega , vol.31 , pp. 365-378
    • Karimi, B.1    Fatemighomi, S.M.T.2    Wilson, J.3
  • 19
    • 84881228205 scopus 로고    scopus 로고
    • Multi-level lot sizing and job shop scheduling with compressible process times: A cutting plane approach
    • Karimi-Nasab, M., & Seyedhoseini, S. M. (2013). Multi-level lot sizing and job shop scheduling with compressible process times: A cutting plane approach.European Journal of Operational Research, 231(3), 598-616.
    • (2013) European Journal of Operational Research , vol.231 , Issue.3 , pp. 598-616
    • Karimi-Nasab, M.1    Seyedhoseini, S.M.2
  • 20
    • 84861189507 scopus 로고    scopus 로고
    • Fix-and-optimize heuristics for capacitated lot-sizing with sequence-dependent setups and substitutions
    • Lang, J.C., & Shen, Z.J.M. (2011). Fix-and-optimize heuristics for capacitated lot-sizing with sequence-dependent setups and substitutions. European Journal of Operational Research, 214, 595–605.
    • (2011) European Journal of Operational Research , vol.214 , pp. 595-605
    • Lang, J.C.1    Shen, Z.J.M.2
  • 21
    • 70249093672 scopus 로고    scopus 로고
    • Integration of production planning and scheduling: Overview, challenges and opportunities
    • Maravelias, C.T, & Sung, C. (2009). Integration of production planning and scheduling: Overview, challenges and opportunities. Computers and Chemical Engineering, 33, 1919–1930.
    • (2009) Computers and Chemical Engineering , vol.33 , pp. 1919-1930
    • Maravelias, C.T.1    Sung, C.2
  • 22
    • 77955925568 scopus 로고    scopus 로고
    • Capacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integration
    • Mateus, G. R., Ravetti, M.G., De Souza, M.C., & Valeriano, T.M. (2010). Capacitated lot sizing and sequence dependent setup scheduling: an iterative approach for integration. Journal of Scheduling, 13, 245-259.
    • (2010) Journal of Scheduling , vol.13 , pp. 245-259
    • Mateus, G.R.1    Ravetti, M.G.2    De Souza, M.C.3    Valeriano, T.M.4
  • 23
    • 79955599518 scopus 로고    scopus 로고
    • Addressing lot sizing and warehousing scheduling problem in manufacturing environment
    • Mishra, N., Kumar, V., Kumar, N., Kumar, M., & Tiwari, M.K. (2011).Addressing lot sizing and warehousing scheduling problem in manufacturing environment. Expert Systems with Applications, 38, 11751–11762.
    • (2011) Expert Systems with Applications , vol.38 , pp. 11751-11762
    • Mishra, N.1    Kumar, V.2    Kumar, N.3    Kumar, M.4    Tiwari, M.K.5
  • 24
    • 0036604813 scopus 로고    scopus 로고
    • Simultaneous lotsizing and scheduling on parallel machines
    • Meyr, H. (2002). Simultaneous lotsizing and scheduling on parallel machines. European Journal of Operational Research, 139, 277–292.
    • (2002) European Journal of Operational Research , vol.139 , pp. 277-292
    • Meyr, H.1
  • 25
    • 84877719734 scopus 로고    scopus 로고
    • A decomposition approach for the General Lot sizing and Scheduling Problem for Parallel production Lines
    • Meyr, H., & Mann, M. (2013).A decomposition approach for the General Lot sizing and Scheduling Problem for Parallel production Lines. European Journal of Operational Research, 229, 718–731.
    • (2013) European Journal of Operational Research , vol.229 , pp. 718-731
    • Meyr, H.1    Mann, M.2
  • 26
  • 27
    • 77955661126 scopus 로고    scopus 로고
    • Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups
    • Mohammadi, M., Ghomi, S. F., Karimi, B., & Torabi, S. A. (2010). Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups. Journal of Intelligent Manufacturing, 21(4), 501-510.
    • (2010) Journal of Intelligent Manufacturing , vol.21 , Issue.4 , pp. 501-510
    • Mohammadi, M.1    Ghomi, S.F.2    Karimi, B.3    Torabi, S.A.4
  • 30
    • 79951579589 scopus 로고    scopus 로고
    • Genetic algorithm-based heuristic for capacitated lot-sizing problem in flow shops with sequence-dependent setups
    • Mohammadi, M., & FatemiGhomi, S.M.T. (2011). Genetic algorithm-based heuristic for capacitated lot-sizing problem in flow shops with sequence-dependent setups. Expert Systems with Applications, 38, 7201–7207.
    • (2011) Expert Systems with Applications , vol.38 , pp. 7201-7207
    • Mohammadi, M.1    Fatemighomi, S.M.T.2
  • 31
    • 78650596925 scopus 로고    scopus 로고
    • A genetic algorithm for simultaneous lot-sizing and sequencing of the permutation flow shops with sequence-dependent setups
    • Mohammadi, M., FatemiGhomi, S.M.T., & Jafari, J. (2011). A genetic algorithm for simultaneous lot-sizing and sequencing of the permutation flow shops with sequence-dependent setups. International Journal of Computer Integrated Manufacturing, 1, 87-93.
    • (2011) International Journal of Computer Integrated Manufacturing , Issue.1 , pp. 87-93
    • Mohammadi, M.1    Fatemighomi, S.M.T.2    Jafari, J.3
  • 33
    • 79958849993 scopus 로고    scopus 로고
    • A new mathematical model for integrating lot sizing, loading, and scheduling decisions in flexible flow shops
    • Mohammadi, M., & Jafari, N. (2011).A new mathematical model for integrating lot sizing, loading, and scheduling decisions in flexible flow shops. International Journal of Advanced Manufacturing Technology, 55,709–721.
    • (2011) International Journal of Advanced Manufacturing Technology , vol.55 , pp. 709-721
    • Mohammadi, M.1    Jafari, N.2
  • 34
    • 0028452709 scopus 로고
    • Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times
    • Ovacikt, I. M., & Uzsoy, R. (1994).Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times. The international Journal of Production Research, 32(6),1243-1263.
    • (1994) The International Journal of Production Research , vol.32 , Issue.6 , pp. 1243-1263
    • Ovacikt, I.M.1    Uzsoy, R.2
  • 35
    • 0029404198 scopus 로고
    • Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times
    • Ovacik, I. M., & Uzsoy, R. (1995).Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times. International Journal of Production Research, 33(11), 3173-3192.
    • (1995) International Journal of Production Research , vol.33 , Issue.11 , pp. 3173-3192
    • Ovacik, I.M.1    Uzsoy, R.2
  • 38
    • 84872619181 scopus 로고    scopus 로고
    • Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system
    • Ramezanian, R., & Saidi-Mehrabad, M. (2012). Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system. Applied Mathematical Modeling, 37(7), 5134–5147.
    • (2012) Applied Mathematical Modeling , vol.37 , Issue.7 , pp. 5134-5147
    • Ramezanian, R.1    Saidi-Mehrabad, M.2
  • 39
    • 0036689253 scopus 로고    scopus 로고
    • Rolling horizon appointment scheduling: A simulation study
    • Rohleder, T. R., & Klassen, K. J. (2002). Rolling horizon appointment scheduling: a simulation study.Health care management science, 5(3), 201-209.
    • (2002) Health Care Management Science , vol.5 , Issue.3 , pp. 201-209
    • Rohleder, T.R.1    Klassen, K.J.2
  • 40
    • 0027539456 scopus 로고
    • Horizon extension for rolling production schedules: Length and accuracy requirements
    • Russell, R. A., & Urban, T. L. (1993). Horizon extension for rolling production schedules: Length and accuracy requirements. International Journal of Production Economics, 29(1), 111-122.
    • (1993) International Journal of Production Economics , vol.29 , Issue.1 , pp. 111-122
    • Russell, R.A.1    Urban, T.L.2
  • 43
    • 84870250034 scopus 로고    scopus 로고
    • A lot-sizing and scheduling model for multi-stage flow lines with zero lead times
    • Stadtler, H., & Sahling, F. (2013). A lot-sizing and scheduling model for multi-stage flow lines with zero lead times. European Journal of Operational Research. 225, 404–419.
    • (2013) European Journal of Operational Research , vol.225 , pp. 404-419
    • Stadtler, H.1    Sahling, F.2
  • 45
    • 84866736983 scopus 로고    scopus 로고
    • Demand forecasting, lot sizing and scheduling on a rolling horizon basis
    • Tiacci, L., & Saetta, S. (2012). Demand forecasting, lot sizing and scheduling on a rolling horizon basis. International Journal of Production Economics, 140, 803–814.
    • (2012) International Journal of Production Economics , vol.140 , pp. 803-814
    • Tiacci, L.1    Saetta, S.2
  • 46
    • 0036631210 scopus 로고    scopus 로고
    • Heuristic genetic algorithms for general capacitated lot-Sizing problem
    • Xie, J., & Dong, J. (2001). Heuristic genetic algorithms for general capacitated lot-Sizing problem. Computer and Mathematics with Applications, 44, 263-276.
    • (2001) Computer and Mathematics with Applications , vol.44 , pp. 263-276
    • Xie, J.1    Dong, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.