메뉴 건너뛰기




Volumn 69, Issue , 1997, Pages 323-349

Rolling horizon scheduling in a rolling-mill

Author keywords

Combinatorial optimization; Operations management; Production scheduling; Rolling horizon scheduling; Rolling mill; Tabu search

Indexed keywords


EID: 2242448099     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1023/a:1018993331077     Document Type: Article
Times cited : (22)

References (13)
  • 2
    • 84873007291 scopus 로고
    • Tabu search
    • Preliminary draft of a paper presented, St. Louis, MO
    • F. Glover, Tabu search, Preliminary draft of a paper presented at the ORSA/TIMS Joint National Meeting, St. Louis, MO, 1987.
    • (1987) ORSA/TIMS Joint National Meeting
    • Glover, F.1
  • 3
    • 2242443773 scopus 로고
    • Target analysis to improve a tabu search method for machine scheduling
    • F. Glover and M. Laguna, Target analysis to improve a tabu search method for machine scheduling, The Arabian Journal for Science and Engineering 16, no. 2B(1991).
    • (1991) The Arabian Journal for Science and Engineering , vol.16 , Issue.2 B
    • Glover, F.1    Laguna, M.2
  • 6
    • 0001262012 scopus 로고
    • Tabu search techniques
    • A. Hertz and D. de Werra, Tabu search techniques, OR Spektrum 11(1989) 131-141.
    • (1989) OR Spektrum , vol.11 , pp. 131-141
    • Hertz, A.1    De Werra, D.2
  • 8
    • 84872985767 scopus 로고
    • Scheduling jobs with linear delay penalties and sequencedependent setup costs and times using tabu search
    • M. Laguna, W. Barnes and F. Glover, Scheduling jobs with linear delay penalties and sequencedependent setup costs and times using tabu search, Applied Intelligence (1990).
    • (1990) Applied Intelligence
    • Laguna, M.1    Barnes, W.2    Glover, F.3
  • 12
    • 84987039881 scopus 로고
    • Sequencing and batching for two classes of jobs with deadlines and setup times
    • D. Woodruff and M. Spearman, Sequencing and batching for two classes of jobs with deadlines and setup times, Production and Operations Management1(1992).
    • (1992) Production and Operations Management , vol.1
    • Woodruff, D.1    Spearman, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.