1
-
-
70350618623
-
Flexible solutions in disjunctive scheduling: General formulation and study of the flow-shop case
-
Aloulou, M.A. and Artigues, C., 2010. Flexible solutions in disjunctive scheduling: general formulation and study of the flow-shop case. Computers and Operations Research, 37 (5), 890-898.
-
(2010)
Computers and Operations Research
, vol.37
, Issue.5
, pp. 890-898
-
-
Aloulou, M.A.1
Artigues, C.2
-
2
-
-
0037432979
-
Optimization approximations for capacity constrained material requirements planning
-
Clark, A.R., 2003. Optimization approximations for capacity constrained material requirements planning. International Journal of Production Economics, 84 (2), 115-131.
-
(2003)
International Journal of Production Economics
, vol.84
, Issue.2
, pp. 115-131
-
-
Clark, A.R.1
-
3
-
-
0034631279
-
Rolling-horizon lot-sizing when setup times are sequence-dependent
-
Clark, A.R. and Clark, S.J., 2000. Rolling-horizon lot-sizing when setup times are sequence-dependent. International Journal of Production Research, 38 (10), 2287-2308.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.10
, pp. 2287-2308
-
-
Clark, A.R.1
Clark, S.J.2
-
4
-
-
35848946365
-
A linear programming embedded genetic algorithm for an integrated cell formation and lot sizing considering product quality
-
Defersha, F.M. and Chen, M., 2008. A linear programming embedded genetic algorithm for an integrated cell formation and lot sizing considering product quality. European Journal of Operational Research, 187 (1), 46-69.
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.1
, pp. 46-69
-
-
Defersha, F.M.1
Chen, M.2
-
5
-
-
70350572217
-
New multi-objective method to solve reentrant hybrid flow shop scheduling problem
-
Dugardin, F., Yalaoui, F., and Amedeo, L., 2010. New multi-objective method to solve reentrant hybrid flow shop scheduling problem. European Journal of Operational Research, 203 (1), 22-31.
-
(2010)
European Journal of Operational Research
, vol.203
, Issue.1
, pp. 22-31
-
-
Dugardin, F.1
Yalaoui, F.2
Amedeo, L.3
-
6
-
-
33748884885
-
Simultaneous lot sizing and scheduling for multi-product multi-level production
-
Fandel, G. and Stammen-Hegene, C., 2006. Simultaneous lot sizing and scheduling for multi-product multi-level production. International Journal of Production Economics, 104 (2), 308-316.
-
(2006)
International Journal of Production Economics
, vol.104
, Issue.2
, pp. 308-316
-
-
Fandel, G.1
Stammen-Hegene, C.2
-
10
-
-
33750728882
-
Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches
-
Jans, R. and Degraeve, Z., 2007. Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches. European Journal of Operational Research, 177 (3), 1851-1875.
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 1851-1875
-
-
Jans, R.1
Degraeve, Z.2
-
11
-
-
0031076889
-
A genetic algorithm-based approach to flexible flow-line scheduling with variable lot sizes
-
Lee, I., Sikora, R., and Shaw, M.J., 1997. A genetic algorithm-based approach to flexible flow-line scheduling with variable lot sizes. IEEE Transactions, Systems, Man, Cybernetics, 27 (1), 36-54.
-
(1997)
IEEE Transactions, Systems, Man, Cybernetics
, vol.27
, Issue.1
, pp. 36-54
-
-
Lee, I.1
Sikora, R.2
Shaw, M.J.3
-
12
-
-
67349220457
-
Genetic-based scheduling to solve the parcel hub scheduling problem
-
McWilliams, D.L., 2009. Genetic-based scheduling to solve the parcel hub scheduling problem. Computers and Industrial Engineering, 56 (4), 1607-1616.
-
(2009)
Computers and Industrial Engineering
, vol.56
, Issue.4
, pp. 1607-1616
-
-
McWilliams, D.L.1
-
13
-
-
77955661126
-
Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups
-
Mohammadi, M., Fatemi Ghomi, S.M.T., Karimi, B., and Torabi, S.A., 2008. Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups. Journal of Intelligent Manufacturing, 21 (4), 501-510.
-
(2008)
Journal of Intelligent Manufacturing
, vol.21
, Issue.4
, pp. 501-510
-
-
Mohammadi, M.1
Fatemi Ghomi, S.M.T.2
Karimi, B.3
Torabi, S.A.4
-
14
-
-
77951134643
-
MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups
-
Mohammadi, M., Fatemi Ghomi, S.M.T., Karimi, B., and Torabi, S.A., 2009a. MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups. International Journal of Production Research, 48 (10), 2957-2973.
-
(2009)
International Journal of Production Research
, vol.48
, Issue.10
, pp. 2957-2973
-
-
Mohammadi, M.1
Fatemi Ghomi, S.M.T.2
Karimi, B.3
Torabi, S.A.4
-
15
-
-
77953612086
-
A new algorithmic approach for capacitated lot-sizing problem in flow shops with sequence-dependent setups
-
Mohammadi, M., Torabi, S.A., Fatemi Ghomi, S.M.T., and Karimi, B., 2009b. A new algorithmic approach for capacitated lot-sizing problem in flow shops with sequence-dependent setups. International Journal of Advanced Manufacturing Technology, 49, 201-211.
-
(2009)
International Journal of Advanced Manufacturing Technology
, vol.49
, pp. 201-211
-
-
Mohammadi, M.1
Torabi, S.A.2
Fatemi Ghomi, S.M.T.3
Karimi, B.4
-
16
-
-
44649108891
-
A constructive genetic algorithm for permutation flowshop scheduling
-
Nagano, M.S., Ruiz, R., and Lorena, L.A.N., 2008. A constructive genetic algorithm for permutation flowshop scheduling. Computers and Industrial Engineering, 55, 195-207.
-
(2008)
Computers and Industrial Engineering
, vol.55
, pp. 195-207
-
-
Nagano, M.S.1
Ruiz, R.2
Lorena, L.A.N.3
-
17
-
-
0001393583
-
Sequencing jobs through a multistage process in the minimum total time - A quick method of obtaining a near optimum
-
Palmer, D.S., 1965. Sequencing jobs through a multistage process in the minimum total time - a quick method of obtaining a near optimum. Operations Research, 16, 101-107.
-
(1965)
Operations Research
, vol.16
, pp. 101-107
-
-
Palmer, D.S.1
-
18
-
-
77955274194
-
Comparing three-step heuristics for the permutation flow shop problem
-
Ribas, I., Companys, R., and Tort-Martorell, X., 2008. Comparing three-step heuristics for the permutation flow shop problem. Computers and Operations Research, 37 (12), 2062-2070.
-
(2008)
Computers and Operations Research
, vol.37
, Issue.12
, pp. 2062-2070
-
-
Ribas, I.1
Companys, R.2
Tort-Martorell, X.3
-
19
-
-
0030241588
-
A genetic algorithm for integrating lot-sizing and sequencing in scheduling a capacitated flow line
-
DOI 10.1016/0360-8352(96)00046-0
-
Sikora, R., 1996. A genetic algorithm for integrating lotsizing and sequencing in scheduling a capacitated flow line. Computers and Industrial Engineering, 30 (4), 969-981. (Pubitemid 126375907)
-
(1996)
Computers and Industrial Engineering
, vol.30
, Issue.4
, pp. 969-981
-
-
Sikora, R.1
-
20
-
-
0030241757
-
Integrating the lot-sizing and sequencing decisions for scheduling a capacitated flow line
-
DOI 10.1016/0360-8352(96)00183-0
-
Sikora, R., Chhajed, D., and Shaw, M.J., 1996. Integrating the lotsizing and sequencing decisions for scheduling a capacitated flow line. Computers and Industrial Engineering, 30 (4), 659-679. (Pubitemid 126375884)
-
(1996)
Computers and Industrial Engineering
, vol.30
, Issue.4
, pp. 659-679
-
-
Sikora, R.1
Chhajed, D.2
Shaw, M.J.3
-
21
-
-
0002657699
-
A heuristic selection lot size requirement for the case of a deterministic time varying demand rate and discrete opportunities for replenishment
-
Silver, E.A. and Meal, H.C., 1973. A heuristic selection lot size requirement for the case of a deterministic time varying demand rate and discrete opportunities for replenishment. Production and Inventory Management, 14, 64-74.
-
(1973)
Production and Inventory Management
, vol.14
, pp. 64-74
-
-
Silver, E.A.1
Meal, H.C.2
-
22
-
-
33748492325
-
Scheduling and lotsizing with sequence-dependent setup: A literature review
-
Zhu, X. and Wilhelm, W.E., 2006. Scheduling and lotsizing with sequence-dependent setup: a literature review. IIE Transactions, 38, 987-1007.
-
(2006)
IIE Transactions
, vol.38
, pp. 987-1007
-
-
Zhu, X.1
Wilhelm, W.E.2
|