-
1
-
-
78751682869
-
An milp approach to short-term scheduling of an industrial make-and-pack production facility with batch splitting and quality release times
-
Lian, Z., Wu, Z., Xie, M., Jiao, R. (Eds.)
-
Baumann, P., Trautmann, N., 2010. An milp approach to short-term scheduling of an industrial make-and-pack production facility with batch splitting and quality release times. In: Lian, Z., Wu, Z., Xie, M., Jiao, R. (Eds.), Proceedings of the 2010 IEEE International Conference on Industrial Engineering and Engineering Management. Macau, pp. 1230-1234.
-
(2010)
Proceedings of the 2010 IEEE International Conference on Industrial Engineering and Engineering Management. Macau
, pp. 1230-1234
-
-
Baumann, P.1
Trautmann, N.2
-
2
-
-
78649634883
-
An extension of the multi-machine multi-level proportional lot sizing and scheduling model for product-life-cycle demand
-
P.-T. Chang, C.-H. Chang, and C.-T. Chen An extension of the multi-machine multi-level proportional lot sizing and scheduling model for product-life-cycle demand International Journal of Operations Research 1 2004 11 22
-
(2004)
International Journal of Operations Research
, vol.1
, pp. 11-22
-
-
Chang, P.-T.1
Chang, C.-H.2
Chen, C.-T.3
-
6
-
-
0010775487
-
Capacitated lot-sizing with sequence dependent setup costs
-
K. Haase Capacitated lot-sizing with sequence dependent setup costs OR Spektrum 18 1996 51 59
-
(1996)
OR Spektrum
, vol.18
, pp. 51-59
-
-
Haase, K.1
-
7
-
-
74149086575
-
A fix-and-optimize approach for the multi-level capacitated lot sizing problem
-
S. Helber, and F. Sahling A fix-and-optimize approach for the multi-level capacitated lot sizing problem International Journal of Production Economics 123 2010 247 256
-
(2010)
International Journal of Production Economics
, vol.123
, pp. 247-256
-
-
Helber, S.1
Sahling, F.2
-
8
-
-
0022022738
-
The deterministic dynamic product cycling problem
-
U.S. Karmarkar, and L. Schrage The deterministic dynamic product cycling problem Operations Research 33 1985 326 345
-
(1985)
Operations Research
, vol.33
, pp. 326-345
-
-
Karmarkar, U.S.1
Schrage, L.2
-
9
-
-
0033166857
-
A genetic algorithm for multi-level, multi-machine lot sizing and scheduling
-
A. Kimms A genetic algorithm for multi-level, multi-machine lot sizing and scheduling Computers & Operations Research 26 1999 829 848
-
(1999)
Computers & Operations Research
, vol.26
, pp. 829-848
-
-
Kimms, A.1
-
10
-
-
0041175224
-
Proportional lot sizing and scheduling: Some extensions
-
A. Kimms, and A. Drexl Proportional lot sizing and scheduling: some extensions Networks 32 1998 85 101
-
(1998)
Networks
, vol.32
, pp. 85-101
-
-
Kimms, A.1
Drexl, A.2
-
11
-
-
63049139085
-
Development of heuristics for multi-product multi-level capacitated lotsizing problem with sequence-dependent setups
-
M. Mohammadi, S. Fatemi Ghomi, B. Karimi, and S. Torabi Development of heuristics for multi-product multi-level capacitated lotsizing problem with sequence-dependent setups Journal of Applied Sciences 9 2009 296 303
-
(2009)
Journal of Applied Sciences
, vol.9
, pp. 296-303
-
-
Mohammadi, M.1
Fatemi Ghomi, S.2
Karimi, B.3
Torabi, S.4
-
12
-
-
78649467567
-
A genetic algorithm for simultaneous optimisation of lot sizing and scheduling in a flow line assembly
-
P. Palaniappan, and N. Jawahar A genetic algorithm for simultaneous optimisation of lot sizing and scheduling in a flow line assembly International Journal of Production Research 49 2011 375 400
-
(2011)
International Journal of Production Research
, vol.49
, pp. 375-400
-
-
Palaniappan, P.1
Jawahar, N.2
-
13
-
-
0030084421
-
Optimal campaign planning/ scheduling of multipurpose batch/semicontinuous plants. 2. A mathematical decomposition approach
-
L.G. Papageorgiou, and C.C. Pantelides Optimal campaign planning/ scheduling of multipurpose batch/semicontinuous plants. 2. A mathematical decomposition approach Industrial & Engineering Chemistry Research 35 1996 510 529
-
(1996)
Industrial & Engineering Chemistry Research
, vol.35
, pp. 510-529
-
-
Papageorgiou, L.G.1
Pantelides, C.C.2
-
16
-
-
84870243097
-
-
Working Paper, TU Darmstadt, Production and Supply Chain Management
-
Seanner, F., Meyr, H., 2011. Multi-stage simultaneous lot-sizing and scheduling for flow line production. Working Paper, TU Darmstadt, Production and Supply Chain Management.
-
(2011)
Multi-stage Simultaneous Lot-sizing and Scheduling for Flow Line Production
-
-
Seanner, F.1
Meyr, H.2
-
17
-
-
78649635846
-
Multi-level single machine lot-sizing and scheduling with zero lead times
-
H. Stadtler Multi-level single machine lot-sizing and scheduling with zero lead times European Journal of Operational Research 209 2011 241 252
-
(2011)
European Journal of Operational Research
, vol.209
, pp. 241-252
-
-
Stadtler, H.1
-
20
-
-
53849140089
-
Time continuity in discrete time models: New approaches for production planning in process industries
-
Springer Berlin
-
C. Suerie Time continuity in discrete time models: new approaches for production planning in process industries Lecture Notes in Economics and Mathematical Systems vol. 552 2005 Springer Berlin
-
(2005)
Lecture Notes in Economics and Mathematical Systems
, vol.552
-
-
Suerie, C.1
-
21
-
-
41549111411
-
Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource
-
H. Tempelmeier, and L. Buschkühl Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource International Journal of Production Economics 113 2008 401 412
-
(2008)
International Journal of Production Economics
, vol.113
, pp. 401-412
-
-
Tempelmeier, H.1
Buschkühl, L.2
-
22
-
-
0000857408
-
A lagrangean-based heuristic for dynamic multilevel multiitem constrained lotsizing with setup times
-
H. Tempelmeier, and M. Derstroff A lagrangean-based heuristic for dynamic multilevel multiitem constrained lotsizing with setup times Management Science 42 1996 738 757
-
(1996)
Management Science
, vol.42
, pp. 738-757
-
-
Tempelmeier, H.1
Derstroff, M.2
|