메뉴 건너뛰기




Volumn 225, Issue 3, 2013, Pages 404-419

A lot-sizing and scheduling model for multi-stage flow lines with zero lead times

Author keywords

Fix and Optimize; Lot sizing; Scheduling; Zero lead time offset

Indexed keywords

COMPUTATIONAL TESTS; COMPUTATIONAL TIME; FIX-AND-OPTIMIZE; HIGH-QUALITY SOLUTIONS; LEADTIME; LOT SIZING; LOT-SIZING MODELS; MATERIAL FLOW; MODEL FORMULATION; MULTI-STAGE; NUMERICAL RESULTS; SCHEDULING MODELS; SOLUTION APPROACH;

EID: 84870250034     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2012.10.011     Document Type: Article
Times cited : (36)

References (23)
  • 1
    • 78751682869 scopus 로고    scopus 로고
    • An milp approach to short-term scheduling of an industrial make-and-pack production facility with batch splitting and quality release times
    • Lian, Z., Wu, Z., Xie, M., Jiao, R. (Eds.)
    • Baumann, P., Trautmann, N., 2010. An milp approach to short-term scheduling of an industrial make-and-pack production facility with batch splitting and quality release times. In: Lian, Z., Wu, Z., Xie, M., Jiao, R. (Eds.), Proceedings of the 2010 IEEE International Conference on Industrial Engineering and Engineering Management. Macau, pp. 1230-1234.
    • (2010) Proceedings of the 2010 IEEE International Conference on Industrial Engineering and Engineering Management. Macau , pp. 1230-1234
    • Baumann, P.1    Trautmann, N.2
  • 2
    • 78649634883 scopus 로고    scopus 로고
    • An extension of the multi-machine multi-level proportional lot sizing and scheduling model for product-life-cycle demand
    • P.-T. Chang, C.-H. Chang, and C.-T. Chen An extension of the multi-machine multi-level proportional lot sizing and scheduling model for product-life-cycle demand International Journal of Operations Research 1 2004 11 22
    • (2004) International Journal of Operations Research , vol.1 , pp. 11-22
    • Chang, P.-T.1    Chang, C.-H.2    Chen, C.-T.3
  • 3
    • 33748884885 scopus 로고    scopus 로고
    • Simultaneous lot sizing and scheduling for multi-product multi-level production
    • G. Fandel, and C. Stammen-Hegener Simultaneous lot sizing and scheduling for multi-product multi-level production International Journal of Production Economics 104 2006 308 316
    • (2006) International Journal of Production Economics , vol.104 , pp. 308-316
    • Fandel, G.1    Stammen-Hegener, C.2
  • 6
    • 0010775487 scopus 로고    scopus 로고
    • Capacitated lot-sizing with sequence dependent setup costs
    • K. Haase Capacitated lot-sizing with sequence dependent setup costs OR Spektrum 18 1996 51 59
    • (1996) OR Spektrum , vol.18 , pp. 51-59
    • Haase, K.1
  • 7
    • 74149086575 scopus 로고    scopus 로고
    • A fix-and-optimize approach for the multi-level capacitated lot sizing problem
    • S. Helber, and F. Sahling A fix-and-optimize approach for the multi-level capacitated lot sizing problem International Journal of Production Economics 123 2010 247 256
    • (2010) International Journal of Production Economics , vol.123 , pp. 247-256
    • Helber, S.1    Sahling, F.2
  • 8
    • 0022022738 scopus 로고
    • The deterministic dynamic product cycling problem
    • U.S. Karmarkar, and L. Schrage The deterministic dynamic product cycling problem Operations Research 33 1985 326 345
    • (1985) Operations Research , vol.33 , pp. 326-345
    • Karmarkar, U.S.1    Schrage, L.2
  • 9
    • 0033166857 scopus 로고    scopus 로고
    • A genetic algorithm for multi-level, multi-machine lot sizing and scheduling
    • A. Kimms A genetic algorithm for multi-level, multi-machine lot sizing and scheduling Computers & Operations Research 26 1999 829 848
    • (1999) Computers & Operations Research , vol.26 , pp. 829-848
    • Kimms, A.1
  • 10
    • 0041175224 scopus 로고    scopus 로고
    • Proportional lot sizing and scheduling: Some extensions
    • A. Kimms, and A. Drexl Proportional lot sizing and scheduling: some extensions Networks 32 1998 85 101
    • (1998) Networks , vol.32 , pp. 85-101
    • Kimms, A.1    Drexl, A.2
  • 11
    • 63049139085 scopus 로고    scopus 로고
    • Development of heuristics for multi-product multi-level capacitated lotsizing problem with sequence-dependent setups
    • M. Mohammadi, S. Fatemi Ghomi, B. Karimi, and S. Torabi Development of heuristics for multi-product multi-level capacitated lotsizing problem with sequence-dependent setups Journal of Applied Sciences 9 2009 296 303
    • (2009) Journal of Applied Sciences , vol.9 , pp. 296-303
    • Mohammadi, M.1    Fatemi Ghomi, S.2    Karimi, B.3    Torabi, S.4
  • 12
    • 78649467567 scopus 로고    scopus 로고
    • A genetic algorithm for simultaneous optimisation of lot sizing and scheduling in a flow line assembly
    • P. Palaniappan, and N. Jawahar A genetic algorithm for simultaneous optimisation of lot sizing and scheduling in a flow line assembly International Journal of Production Research 49 2011 375 400
    • (2011) International Journal of Production Research , vol.49 , pp. 375-400
    • Palaniappan, P.1    Jawahar, N.2
  • 13
    • 0030084421 scopus 로고    scopus 로고
    • Optimal campaign planning/ scheduling of multipurpose batch/semicontinuous plants. 2. A mathematical decomposition approach
    • L.G. Papageorgiou, and C.C. Pantelides Optimal campaign planning/ scheduling of multipurpose batch/semicontinuous plants. 2. A mathematical decomposition approach Industrial & Engineering Chemistry Research 35 1996 510 529
    • (1996) Industrial & Engineering Chemistry Research , vol.35 , pp. 510-529
    • Papageorgiou, L.G.1    Pantelides, C.C.2
  • 17
    • 78649635846 scopus 로고    scopus 로고
    • Multi-level single machine lot-sizing and scheduling with zero lead times
    • H. Stadtler Multi-level single machine lot-sizing and scheduling with zero lead times European Journal of Operational Research 209 2011 241 252
    • (2011) European Journal of Operational Research , vol.209 , pp. 241-252
    • Stadtler, H.1
  • 20
    • 53849140089 scopus 로고    scopus 로고
    • Time continuity in discrete time models: New approaches for production planning in process industries
    • Springer Berlin
    • C. Suerie Time continuity in discrete time models: new approaches for production planning in process industries Lecture Notes in Economics and Mathematical Systems vol. 552 2005 Springer Berlin
    • (2005) Lecture Notes in Economics and Mathematical Systems , vol.552
    • Suerie, C.1
  • 21
    • 41549111411 scopus 로고    scopus 로고
    • Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource
    • H. Tempelmeier, and L. Buschkühl Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource International Journal of Production Economics 113 2008 401 412
    • (2008) International Journal of Production Economics , vol.113 , pp. 401-412
    • Tempelmeier, H.1    Buschkühl, L.2
  • 22
    • 0000857408 scopus 로고    scopus 로고
    • A lagrangean-based heuristic for dynamic multilevel multiitem constrained lotsizing with setup times
    • H. Tempelmeier, and M. Derstroff A lagrangean-based heuristic for dynamic multilevel multiitem constrained lotsizing with setup times Management Science 42 1996 738 757
    • (1996) Management Science , vol.42 , pp. 738-757
    • Tempelmeier, H.1    Derstroff, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.