A hybrid cross-impact approach to predicting cost variance of project delivery decisions for highways

Author keywords

Cross impact analysis; Factor analysis; Monte carlo simulation; Project delivery selection

Indexed keywords

FACTOR ANALYSIS; HIGHWAY ENGINEERING; HIGHWAY PLANNING; INTELLIGENT SYSTEMS; MONTE CARLO METHODS; MULTIVARIANT ANALYSIS; RISK ASSESSMENT; TRANSPORTATION;

EID: 84958581073     PISSN: 10760342     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)IS.1943-555X.0000270     Document Type: Article
Times cited : (24)

References (38)
  • 1
    • 0001386480 scopus 로고    scopus 로고
    • Modeling project performance for decision making.
    • Alarcón, L. F., and Ashley, D. B. (1996). "Modeling project performance for decision making." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1996)122:3(265), 265-273.
    • (1996) J. Constr. Eng. Manage. , pp. 265-273
    • Alarcón, L.F.1    Ashley, D.B.2
  • 2
    • 11944252554 scopus 로고    scopus 로고
    • Performance modeling for contractor selection.
    • Alarcón, L. F., and Mourgues, C. (2002). "Performance modeling for contractor selection." J. Manage. Eng., 10.1061/(ASCE)0742-597X(2002) 18:2(52), 52-60.
    • (2002) J. Manage. Eng. , pp. 52-60
    • Alarcón, L.F.1    Mourgues, C.2
  • 3
    • 14744286613 scopus 로고    scopus 로고
    • Identification of critical factors in the owner-contractor relationship
    • L. F. Alarcon, ed., Balkema, Rotterdam, Netherlands
    • Alarcón, L. F., Venegas, P., Bastias, A., and Campero, M. (1997). "Identification of critical factors in the owner-contractor relationship." Lean construction, L. F. Alarcon, ed., Balkema, Rotterdam, Netherlands, 127-142.
    • (1997) Lean construction , pp. 127-142
    • Alarcón, L.F.1    Venegas, P.2    Bastias, A.3    Campero, M.4
  • 4
    • 0000365630 scopus 로고    scopus 로고
    • Project procurement system selection model.
    • Alhazmi, T., and McCaffer, R. (2000). "Project procurement system selection model." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364 (2000)126:3(176), 176-184.
    • (2000) J. Constr. Eng. Manage. , pp. 176-184
    • Alhazmi, T.1    McCaffer, R.2
  • 5
    • 78449246212 scopus 로고    scopus 로고
    • Influence of highway project characteristics on contract type selection: Empirical assessment.
    • Anastasopoulos, P. C., Labi, S., McCullouch, B. G., Karlaftis, M. G., and Moavenzadeh, F. (2010). "Influence of highway project characteristics on contract type selection: Empirical assessment." J. Infrastruct. Syst., 10.1061/(ASCE)IS.1943-555X.0000035, 323-333.
    • (2010) J. Infrastruct. Syst. , pp. 323-333
    • Anastasopoulos, P.C.1    Labi, S.2    McCullouch, B.G.3    Karlaftis, M.G.4    Moavenzadeh, F.5
  • 6
    • 0033020477 scopus 로고    scopus 로고
    • Cross-impact analysis using group decision support systems: An application to the future of Hong Kong.
    • Blanning, R. W., and Reinig, B. A. (1999). "Cross-impact analysis using group decision support systems: An application to the future of Hong Kong." Futures, 31(1), 39-56.
    • (1999) Futures , vol.31 , Issue.1 , pp. 39-56
    • Blanning, R.W.1    Reinig, B.A.2
  • 7
    • 38249043459 scopus 로고
    • An empirical comparison of cross-impact models for forecasting sales.
    • Caselles-Moncho, A. (1986). "An empirical comparison of cross-impact models for forecasting sales." Int. J. Forecasting, 2(3), 295-303.
    • (1986) Int. J. Forecasting , vol.2 , Issue.3 , pp. 295-303
    • Caselles-Moncho, A.1
  • 8
    • 0014177873 scopus 로고
    • The study of sampling errors in factor analysis by means of artificial experiments.
    • Cliff, N., and Hamburger, C. D. (1967). "The study of sampling errors in factor analysis by means of artificial experiments." Psychol. Bull., 68(6), 430-445.
    • (1967) Psychol. Bull. , vol.68 , Issue.6 , pp. 430-445
    • Cliff, N.1    Hamburger, C.D.2
  • 9
    • 0000796639 scopus 로고
    • SMIC 74-A method for constructing and ranking scenarios.
    • Duperrin, J. C., and Godet, M. (1975). "SMIC 74-A method for constructing and ranking scenarios." Futures, 7(4), 302-312.
    • (1975) Futures , vol.7 , Issue.4 , pp. 302-312
    • Duperrin, J.C.1    Godet, M.2
  • 10
    • 0006767993 scopus 로고
    • Cross-impact techniques in technology assessment.
    • Enzer, S. (1972). "Cross-impact techniques in technology assessment." Futures, 4(1), 30-51.
    • (1972) Futures , vol.4 , Issue.1 , pp. 30-51
    • Enzer, S.1
  • 11
    • 0017982532 scopus 로고
    • Cross-impact analysis and classical probability:The question of consistency.
    • Enzer, S., and Alter, S. (1978). "Cross-impact analysis and classical probability:The question of consistency." Futures, 10(3), 227-239.
    • (1978) Futures , vol.10 , Issue.3 , pp. 227-239
    • Enzer, S.1    Alter, S.2
  • 13
    • 1442285136 scopus 로고    scopus 로고
    • State of the future.
    • Futures Research Methodology, Washington, DC
    • Glenn, J. C., Gordon, T. J., and Florescu, E. (2007). "State of the future." The Millennium Project, Futures Research Methodology, Washington, DC, 1-21.
    • (2007) The Millennium Project , pp. 1-21
    • Glenn, J.C.1    Gordon, T.J.2    Florescu, E.3
  • 14
    • 0028397624 scopus 로고
    • Choosing appropriate construction contracting method.
    • Gordon, C. M. (1994). "Choosing appropriate construction contracting method." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364 (1994)120:1(196), 196-210.
    • (1994) J. Constr. Eng. Manage. , pp. 196-210
    • Gordon, C.M.1
  • 15
    • 0001898118 scopus 로고
    • Initial experiments with the cross impact method of forecasting.
    • Gordon, T., and Hayward, H. (1968). "Initial experiments with the cross impact method of forecasting." Futures, 1(2), 100-116.
    • (1968) Futures , vol.1 , Issue.2 , pp. 100-116
    • Gordon, T.1    Hayward, H.2
  • 17
    • 0035392728 scopus 로고    scopus 로고
    • Approaches for making risk-based Go/No-Go decision for international projects.
    • Han, S. H., and Diekmann, J. E. (2001). "Approaches for making risk-based Go/No-Go decision for international projects." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2001)127:4(300), 300-308.
    • (2001) J. Constr. Eng. Manage. , pp. 300-308
    • Han, S.H.1    Diekmann, J.E.2
  • 19
    • 13944260870 scopus 로고    scopus 로고
    • Project delivery systems and project change: Quantitative analysis.
    • Ibbs, C. W., Kwak, Y. H., Ng, T., and Odabasi, A. M. (2003). "Project delivery systems and project change: Quantitative analysis." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2003)129:4(382), 382-387.
    • (2003) J. Constr. Eng. Manage. , pp. 382-387
    • Ibbs, C.W.1    Kwak, Y.H.2    Ng, T.3    Odabasi, A.M.4
  • 20
    • 0018507394 scopus 로고
    • A revised cross-impact method and its applications to the forecast of urban transportation technology.
    • Kaya, Y., Ishikawa, M., and Mori, S. (1979). "A revised cross-impact method and its applications to the forecast of urban transportation technology." Technol. Forecasting Social Change, 14(3), 243-257.
    • (1979) Technol. Forecasting Social Change , vol.14 , Issue.3 , pp. 243-257
    • Kaya, Y.1    Ishikawa, M.2    Mori, S.3
  • 21
    • 36448937440 scopus 로고    scopus 로고
    • Realized economic efficiency of road project delivery systems.
    • Koppinen, T., and Lahdenperä, P. (2007). "Realized economic efficiency of road project delivery systems." J. Infrastruct. Syst., 10.1061/(ASCE) 1076-0342(2007)13:4(321), 321-329.
    • (2007) J. Infrastruct. Syst. , pp. 321-329
    • Koppinen, T.1    Lahdenperä, P.2
  • 22
    • 84923197834 scopus 로고    scopus 로고
    • Conceptual framework for the performance measurement of public-private partnerships.
    • Liu, J., Love, P. E., Davis, P. R., Smith, J., and Regan, M. (2014). "Conceptual framework for the performance measurement of public-private partnerships." J. Infrastruct. Syst., 10.1061/(ASCE)IS.1943-555X.0000210, 04014023.
    • (2014) J. Infrastruct. Syst. , pp. 04014023
    • Liu, J.1    Love, P.E.2    Davis, P.R.3    Smith, J.4    Regan, M.5
  • 23
    • 84859618045 scopus 로고    scopus 로고
    • Participatory action research approach to public sector procurement selection.
    • Love, P. E. D., Edwards, D. J., Irani, Z., and Sharif, A. (2012). "Participatory action research approach to public sector procurement selection." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000440, 311-322.
    • (2012) J. Constr. Eng. Manage. , pp. 311-322
    • Love, P.E.D.1    Edwards, D.J.2    Irani, Z.3    Sharif, A.4
  • 24
    • 0000611906 scopus 로고    scopus 로고
    • Selecting a suitable procurement method for a building project.
    • Love, P. E. D., Skitmore, M., and Earl, G. (1998). "Selecting a suitable procurement method for a building project." Constr. Manage. Econ., 16(2), 221-233.
    • (1998) Constr. Manage. Econ. , vol.16 , Issue.2 , pp. 221-233
    • Love, P.E.D.1    Skitmore, M.2    Earl, G.3
  • 25
    • 0038823873 scopus 로고    scopus 로고
    • A case-based procurement advisory system for construction.
    • Luu, D. T., Ng, S. T., and Chen, S. E. (2003). "A case-based procurement advisory system for construction." Adv. Eng. Softw., 34(7), 429-438.
    • (2003) Adv. Eng. Softw. , vol.34 , Issue.7 , pp. 429-438
    • Luu, D.T.1    Ng, S.T.2    Chen, S.E.3
  • 26
    • 27744450360 scopus 로고    scopus 로고
    • Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP).
    • Mahdi, I. M., and Alreshaid, K. (2005). "Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP)." Int. J. Project Manage., 23(7), 564-572.
    • (2005) Int. J. Project Manage. , vol.23 , Issue.7 , pp. 564-572
    • Mahdi, I.M.1    Alreshaid, K.2
  • 27
    • 0017504275 scopus 로고
    • Scenario generation:limitations and developments in cross-impact analysis.
    • Mitchell, R. B., Tydeman, J., and Curnow, R. (1977). "Scenario generation:limitations and developments in cross-impact analysis." Futures, 9(3), 205-215.
    • (1977) Futures , vol.9 , Issue.3 , pp. 205-215
    • Mitchell, R.B.1    Tydeman, J.2    Curnow, R.3
  • 28
    • 14544291098 scopus 로고    scopus 로고
    • Programmatic cost risk analysis for highway mega-projects.
    • Molenaar, K. R. (2005). "Programmatic cost risk analysis for highway mega-projects." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2005)131:3(343), 343-353.
    • (2005) J. Constr. Eng. Manage. , pp. 343-353
    • Molenaar, K.R.1
  • 29
    • 33645517629 scopus 로고    scopus 로고
    • Relative effectiveness of project delivery and contract strategies.
    • Oyetunji, A. A., and Anderson, S. D. (2006). "Relative effectiveness of project delivery and contract strategies." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2006)132:1(3), 3-13.
    • (2006) J. Constr. Eng. Manage. , pp. 3-13
    • Oyetunji, A.A.1    Anderson, S.D.2
  • 30
    • 0032632660 scopus 로고    scopus 로고
    • Appropriate or default project procurement systems?
    • Rwelamila, P. D., and Meyer, C. (1999). "Appropriate or default project procurement systems?" Cost Eng., 41(9), 40-44.
    • (1999) Cost Eng. , vol.41 , Issue.9 , pp. 40-44
    • Rwelamila, P.D.1    Meyer, C.2
  • 31
    • 0027560002 scopus 로고
    • Probabilistic cost estimating with subjective correlations.
    • Touran, A. (1993). "Probabilistic cost estimating with subjective correlations." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1993) 119:1(58), 58-71.
    • (1993) J. Constr. Eng. Manage. , pp. 58-71
    • Touran, A.1
  • 32
    • 78650388363 scopus 로고    scopus 로고
    • Selection of project delivery method in transit: Drivers and objectives.
    • Touran, A., Gransberg, D. D., Molenaar, K. R., and Ghavamifar, K. (2011). "Selection of project delivery method in transit: Drivers and objectives." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000027, 21-27.
    • (2011) J. Manage. Eng. , pp. 21-27
    • Touran, A.1    Gransberg, D.D.2    Molenaar, K.R.3    Ghavamifar, K.4
  • 33
    • 84958536858 scopus 로고    scopus 로고
    • A risk-based model to select delivery methods for highway design and construction projects.
    • Ph. D. dissertation, Univ. of Colorado, Boulder, CO
    • Tran, D. (2013). "A risk-based model to select delivery methods for highway design and construction projects." Ph. D. dissertation, Univ. of Colorado, Boulder, CO.
    • (2013)
    • Tran, D.1
  • 34
    • 84886474864 scopus 로고    scopus 로고
    • A project delivery selection matrix for highway design and construction.
    • Transportation Research Board, Washington, DC
    • Tran, D., Harper, C. M., Molenaar, K. R., Haddad, N. F., and Scholfield, M. M. (2013). "A project delivery selection matrix for highway design and construction." Transportation Research Record 2347, Transportation Research Board, Washington, DC, 3-10.
    • (2013) Transportation Research Record 2347 , pp. 3-10
    • Tran, D.1    Harper, C.M.2    Molenaar, K.R.3    Haddad, N.F.4    Scholfield, M.M.5
  • 35
    • 84919687496 scopus 로고    scopus 로고
    • Exploring critical delivery selection risk factors for transportation design and construction projects.
    • Tran, D. Q., and Molenaar, K. R. (2014). "Exploring critical delivery selection risk factors for transportation design and construction projects." Eng. Constr. Archit. Manage., 21(6), 631-647.
    • (2014) Eng. Constr. Archit. Manage. , vol.21 , Issue.6 , pp. 631-647
    • Tran, D.Q.1    Molenaar, K.R.2
  • 36
    • 0015482435 scopus 로고
    • An alternative approach to cross impact analysis.
    • Turoff, M. (1972). "An alternative approach to cross impact analysis." Technol. Forecasting Social Change, 3, 309-339.
    • (1972) Technol. Forecasting Social Change , vol.3 , pp. 309-339
    • Turoff, M.1
  • 37
    • 0000697270 scopus 로고    scopus 로고
    • Selecting long-term strategies for construction firms.
    • Venegas, C. P., and Alarcón, C. L. F. (1997). "Selecting long-term strategies for construction firms." J. Constr. Eng. Manage., 10.1061/(ASCE) 0733-9364(1997)123:4(388), 388-398.
    • (1997) J. Constr. Eng. Manage. , pp. 388-398
    • Venegas, C.P.1    Alarcón, C.L.F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.