메뉴 건너뛰기




Volumn 16, Issue 4, 2010, Pages 323-333

Influence of highway project characteristics on contract type selection: Empirical assessment

Author keywords

Construction planning; Contract management; Highway construction; Project management; Rehabilitation

Indexed keywords

CONSTRUCTION PLANNING; CONTRACT MANAGEMENT; EMPIRICAL ASSESSMENT; EXPECTED COSTS; HIGHWAY CONSTRUCTION; HIGHWAY MAINTENANCE; HIGHWAY PROJECTS; LEAST SQUARE; MAINTENANCE ACTIVITY; PROJECT COST; PROJECT DURATION; REHABILITATION; TYPE SELECTION; WORK ACTIVITIES;

EID: 78449246212     PISSN: 10760342     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)IS.1943-555X.0000035     Document Type: Article
Times cited : (19)

References (39)
  • 1
    • 76549098095 scopus 로고    scopus 로고
    • Performance-based contracting for roadway maintenance operations in Indiana
    • MS thesis, Purdue Univ., West Lafayette, Ind.
    • Anastasopoulos P. Performance-based contracting for roadway maintenance operations in Indiana. 2007, MS thesis, Purdue Univ., West Lafayette, Ind.
    • (2007)
    • Anastasopoulos, P.1
  • 2
    • 78449262970 scopus 로고    scopus 로고
    • Performance-based contracting for roadway maintenance: An exploratory empirical analysis
    • Transportation and Development Institute, Transportation Research Board, National Technical University of Athens, and the Hellenic Ministry of Transport and Communications.
    • Anastasopoulos P. Gkritza K. McCullouch B. Mannering F.L. Sinha K.C. Performance-based contracting for roadway maintenance: An exploratory empirical analysis. Proc., 10th Int. Conf. on Applications of Advanced Technologies in Transportation 2008, and Transportation and Development Institute, Transportation Research Board, National Technical University of Athens, and the Hellenic Ministry of Transport and Communications.
    • (2008) Proc., 10th Int. Conf. on Applications of Advanced Technologies in Transportation
    • Anastasopoulos, P.1    Gkritza, K.2    McCullouch, B.3    Mannering, F.L.4    Sinha, K.C.5
  • 3
    • 78449257652 scopus 로고    scopus 로고
    • Cost savings analysis of performance-based contracts for highway maintenance operations
    • JITSE4, 1076-0342, 10.1061/(ASCE)IS.1943-555X.0000012
    • Anastasopoulos P. McCullouch B. Gkritza K. Mannering F.L. Sinha K.C. Cost savings analysis of performance-based contracts for highway maintenance operations. J. Infrastruct. Syst. 2010, 16(4):251-263. JITSE4, 1076-0342, 10.1061/(ASCE)IS.1943-555X.0000012, and.
    • (2010) J. Infrastruct. Syst. , vol.16 , Issue.4 , pp. 251-263
    • Anastasopoulos, P.1    McCullouch, B.2    Gkritza, K.3    Mannering, F.L.4    Sinha, K.C.5
  • 4
    • 26644445713 scopus 로고    scopus 로고
    • Time-cost optimization of construction projects with generalized activity constraints
    • JCEMD4, 0733-9364, 10.1061/(ASCE)0733-9364(2005)131:10(1115)
    • Chassiakos A.P. Sakellaropoulos S.P. Time-cost optimization of construction projects with generalized activity constraints. J. Constr. Eng. Manage. 2005, 131(10):1115-1124. JCEMD4, 0733-9364, 10.1061/(ASCE)0733-9364(2005)131:10(1115), and.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.10 , pp. 1115-1124
    • Chassiakos, A.P.1    Sakellaropoulos, S.P.2
  • 5
    • 0001036327 scopus 로고
    • Nonlinear time/cost trade-off models in project management
    • CINDDL, 0360-8352, 10.1016/0360-8352(94)00199-W
    • Deckro R.F. Hebert J.E. Verdini W.A. Grimsrud P.H. Venkateshwar S. Nonlinear time/cost trade-off models in project management. Comput. Ind. Eng. 1995, 28(2):219-229. CINDDL, 0360-8352, 10.1016/0360-8352(94)00199-W, and.
    • (1995) Comput. Ind. Eng. , vol.28 , Issue.2 , pp. 219-229
    • Deckro, R.F.1    Hebert, J.E.2    Verdini, W.A.3    Grimsrud, P.H.4    Venkateshwar, S.5
  • 6
    • 0015484051 scopus 로고
    • Critical path problems with concave cost-time curve
    • MSCIAM, 0025-1909, 10.1287/mnsc.19.4.446
    • Falk J. Horowitz J.L. Critical path problems with concave cost-time curve. Manage. Sci. 1972, 19:446-455. MSCIAM, 0025-1909, 10.1287/mnsc.19.4.446, and.
    • (1972) Manage. Sci. , vol.19 , pp. 446-455
    • Falk, J.1    Horowitz, J.L.2
  • 7
    • 0027222453 scopus 로고
    • Pert and crashing revisited: Mathematical generalizations
    • EJORDT, 0377-2217, 10.1016/0377-2217(93)90183-N
    • Foldes S. Soumis F. Pert and crashing revisited: Mathematical generalizations. Eur. J. Oper. Res. 1993, 64:286-294. EJORDT, 0377-2217, 10.1016/0377-2217(93)90183-N, and.
    • (1993) Eur. J. Oper. Res. , vol.64 , pp. 286-294
    • Foldes, S.1    Soumis, F.2
  • 8
    • 0000181338 scopus 로고
    • A network flow computation for project cost curves
    • MSCIAM, 0025-1909, 10.1287/mnsc.7.2.167.
    • Fulkerson D.R. A network flow computation for project cost curves. Manage. Sci. 1961, 7:167-178. MSCIAM, 0025-1909, 10.1287/mnsc.7.2.167.
    • (1961) Manage. Sci. , vol.7 , pp. 167-178
    • Fulkerson, D.R.1
  • 10
    • 78449263665 scopus 로고    scopus 로고
    • Limdep version 9.0, Econometric Software, Inc., Plainview, N.Y.
    • Greene W. 2007, Limdep version 9.0, Econometric Software, Inc., Plainview, N.Y.
    • (2007)
    • Greene, W.1
  • 11
    • 0000250716 scopus 로고
    • Specification tests in econometrics
    • ECMTA7, 0012-9682, 10.2307/1913827.
    • Hausman J.A. Specification tests in econometrics. Econometrica 1978, 46(6):1251-1271. ECMTA7, 0012-9682, 10.2307/1913827.
    • (1978) Econometrica , vol.46 , Issue.6 , pp. 1251-1271
    • Hausman, J.A.1
  • 12
    • 0023363930 scopus 로고
    • Hierarchical rule-based activity duration estimation
    • JCEMD4, 0733-9364, 10.1061/(ASCE)0733-9364(1987)113:2(288)
    • Hendrickson C. Martinelli D. Rehak D. Hierarchical rule-based activity duration estimation. J. Constr. Eng. Manage. 1987, 113(2):288-301. JCEMD4, 0733-9364, 10.1061/(ASCE)0733-9364(1987)113:2(288), and.
    • (1987) J. Constr. Eng. Manage. , vol.113 , Issue.2 , pp. 288-301
    • Hendrickson, C.1    Martinelli, D.2    Rehak, D.3
  • 13
    • 11644308477 scopus 로고    scopus 로고
    • Lane rental: Innovative way to reduce road construction time
    • JCEMD4, 0733-9364, 10.1061/(ASCE)0733-9364(1998)124:5(411)
    • Herbsman Z.J. Glagola C.R. Lane rental: Innovative way to reduce road construction time. J. Constr. Eng. Manage. 1998, 124(5):411-417. JCEMD4, 0733-9364, 10.1061/(ASCE)0733-9364(1998)124:5(411), and.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.5 , pp. 411-417
    • Herbsman, Z.J.1    Glagola, C.R.2
  • 15
    • 13944250419 scopus 로고    scopus 로고
    • Joint Legislative Audit and Review Commission of the Virginia General Assembly (JLARC), , Richmond, Va.
    • Review of VDOT's administration of the interstate asset management contract 2001, Joint Legislative Audit and Review Commission of the Virginia General Assembly (JLARC), Richmond, Va.
    • (2001) Review of VDOT's administration of the interstate asset management contract
  • 17
    • 13944265628 scopus 로고    scopus 로고
    • Flexible model for time-cost trade-off problem
    • JCEMD4, 0733-9364, 10.1061/(ASCE)0733-9364(2004)130:3(307)
    • Moussourakis J. Haksever C. Flexible model for time-cost trade-off problem. J. Constr. Eng. Manage. 2004, 130(3):307-314. JCEMD4, 0733-9364, 10.1061/(ASCE)0733-9364(2004)130:3(307), and.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.3 , pp. 307-314
    • Moussourakis, J.1    Haksever, C.2
  • 18
    • 29044442114 scopus 로고    scopus 로고
    • Using Weibull analysis for evaluation of cost and schedule performance
    • JCEMD4, 0733-9364, 10.1061/(ASCE)0733-9364(2005)131:12(1257)
    • Nassar K.M. Gunnarsson H.G. Hegab M.Y. Using Weibull analysis for evaluation of cost and schedule performance. J. Constr. Eng. Manage. 2005, 131(12):1257-1262. JCEMD4, 0733-9364, 10.1061/(ASCE)0733-9364(2005)131:12(1257), and.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.12 , pp. 1257-1262
    • Nassar, K.M.1    Gunnarsson, H.G.2    Hegab, M.Y.3
  • 19
    • 78449236330 scopus 로고    scopus 로고
    • PB2 performance report
    • Office of Program Policy Analysis and Government Accountability (OPPAGA), Rep. No.98-59, Tallahassee, Fla.
    • PB2 performance report. 1999, Office of Program Policy Analysis and Government Accountability (OPPAGA), Rep. No.98-59, Tallahassee, Fla.
    • (1999)
  • 20
    • 9644304687 scopus 로고    scopus 로고
    • Progress report
    • Office of Program Policy Analysis and Government Accountability (OPPAGA), Rep. No.03-30, Tallahassee, Fla.
    • Progress report. 2003, Office of Program Policy Analysis and Government Accountability (OPPAGA), Rep. No.03-30, Tallahassee, Fla.
    • (2003)
  • 23
    • 78449241215 scopus 로고    scopus 로고
    • Maintenance delivery in Ontario
    • PIARC, The World Road Association-Canada, Rep. prepared for PIARC, Kananaskis, Canada.
    • Maintenance delivery in Ontario. 2004, PIARC, The World Road Association-Canada, Rep. prepared for PIARC, Kananaskis, Canada.
    • (2004)
  • 24
    • 76749157380 scopus 로고    scopus 로고
    • International trends in procurement models for highway maintenance
    • Opus International Consultants, Ltd., 〈〉 (Sept. 17, 2006).
    • Porter T. International trends in procurement models for highway maintenance. 2002, Opus International Consultants, Ltd., 〈〉 (Sept. 17, 2006).
    • (2002)
    • Porter, T.1
  • 25
    • 13944273694 scopus 로고    scopus 로고
    • Highway maintenance outsourcing experience: Synopsis of Washington State department of transportation's review
    • TRREDM, 0361-1981, 10.3141/1877-01.
    • Ribreau N. Highway maintenance outsourcing experience: Synopsis of Washington State department of transportation's review. Transp. Res. Rec. 2004, 1877:3-9. TRREDM, 0361-1981, 10.3141/1877-01.
    • (2004) Transp. Res. Rec. , vol.1877 , pp. 3-9
    • Ribreau, N.1
  • 27
    • 33847115676 scopus 로고    scopus 로고
    • Cost-effectiveness of warranty projects in Indiana
    • JCEMD4, 0733-9364, 10.1061/(ASCE)0733-9364(2007)133:3(217)
    • Singh P. Labi S. Sinha K.C. Cost-effectiveness of warranty projects in Indiana. J. Constr. Eng. Manage. 2007, 133(3):217-224. JCEMD4, 0733-9364, 10.1061/(ASCE)0733-9364(2007)133:3(217), and.
    • (2007) J. Constr. Eng. Manage. , vol.133 , Issue.3 , pp. 217-224
    • Singh, P.1    Labi, S.2    Sinha, K.C.3
  • 29
    • 0032208139 scopus 로고    scopus 로고
    • Approximation algorithms for the discrete time-cost trade-off problem
    • ZZZZZZ, 0209-6137, 10.1287/moor.23.4.909.
    • Skutella M. Approximation algorithms for the discrete time-cost trade-off problem. Math. Methods Oper. Res. 1998, 23(4):909-929. ZZZZZZ, 0209-6137, 10.1287/moor.23.4.909.
    • (1998) Math. Methods Oper. Res. , vol.23 , Issue.4 , pp. 909-929
    • Skutella, M.1
  • 30
    • 78449252532 scopus 로고    scopus 로고
    • Contrats basés sur les résultats pour la préservation et l'amélioration des actifs routiers
    • and Transport NoteTN-27, The World Bank, Washington, D.C.
    • Stankevich N. Qureshi N. Queiroz C. Contrats basés sur les résultats pour la préservation et l'amélioration des actifs routiers. 2005, and Transport NoteTN-27, The World Bank, Washington, D.C.
    • (2005)
    • Stankevich, N.1    Qureshi, N.2    Queiroz, C.3
  • 31
    • 78449235606 scopus 로고    scopus 로고
    • Best practices of outsourcing winter maintenance services
    • VMS, Inc., Richmond, Virginia, 〈〉 (Feb. 2007).
    • Best practices of outsourcing winter maintenance services. 2001, VMS, Inc., Richmond, Virginia, 〈〉 (Feb. 2007).
    • (2001)
  • 33
    • 24944537152 scopus 로고    scopus 로고
    • Chance-constrained time-cost tradeoff analysis considering funding variability
    • JCEMD4, 0733-9364, 10.1061/(ASCE)0733-9364(2005)131:9(1002).
    • Yang I.T. Chance-constrained time-cost tradeoff analysis considering funding variability. J. Constr. Eng. Manage. 2005, 131(9):1002-1012. JCEMD4, 0733-9364, 10.1061/(ASCE)0733-9364(2005)131:9(1002).
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.9 , pp. 1002-1012
    • Yang, I.T.1
  • 34
    • 34250644399 scopus 로고    scopus 로고
    • Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis
    • JCEMD4, 0733-9364, 10.1061/(ASCE)0733-9364(2007)133:7(498).
    • Yang I.T. Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis. J. Constr. Eng. Manage. 2007, 133(7):498-505. JCEMD4, 0733-9364, 10.1061/(ASCE)0733-9364(2007)133:7(498).
    • (2007) J. Constr. Eng. Manage. , vol.133 , Issue.7 , pp. 498-505
    • Yang, I.T.1
  • 35
    • 2342615793 scopus 로고    scopus 로고
    • Applying a genetic algorithm-based multiobjective approach for time-cost optimization
    • JCEMD4, 0733-9364, 10.1061/(ASCE)0733-9364(2004)130:2(168)
    • Zheng D.X.M. Ng S.T. Kumaraswamy M.M. Applying a genetic algorithm-based multiobjective approach for time-cost optimization. J. Constr. Eng. Manage. 2004, 130(2):168-176. JCEMD4, 0733-9364, 10.1061/(ASCE)0733-9364(2004)130:2(168), and.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.2 , pp. 168-176
    • Zheng, D.X.M.1    Ng, S.T.2    Kumaraswamy, M.M.3
  • 36
    • 76749096241 scopus 로고    scopus 로고
    • Implementing performance-based road management and maintenance contracts in developing countries-An instrument of German technical cooperation
    • Eschborn, Germany, 〈〉 (Feb. 2007).
    • Zietlow G. Implementing performance-based road management and maintenance contracts in developing countries-An instrument of German technical cooperation. 2004, Eschborn, Germany, 〈〉 (Feb. 2007).
    • (2004)
    • Zietlow, G.1
  • 37
    • 76549114840 scopus 로고    scopus 로고
    • Cutting costs and improving quality through performance-based road management and maintenance contracts-The Latin American and OECD experiences
    • Univ. of Birmingham (UK), Senior Road Executives Programme, Restructuring Road Management, 〈〉 (Feb. 2007).
    • Zietlow G. Cutting costs and improving quality through performance-based road management and maintenance contracts-The Latin American and OECD experiences. 2005a, Univ. of Birmingham (UK), Senior Road Executives Programme, Restructuring Road Management, 〈〉 (Feb. 2007).
    • (2005)
    • Zietlow, G.1
  • 38
    • 76549115104 scopus 로고    scopus 로고
    • Using micro-enterprises to create local contracting capacity-The Latin American experience
    • Univ. of Birmingham (UK), Senior Road Executives Programme, Restructuring Road Management, 〈〉 (Feb. 2007).
    • Zietlow G. Using micro-enterprises to create local contracting capacity-The Latin American experience. 2005b, Univ. of Birmingham (UK), Senior Road Executives Programme, Restructuring Road Management, 〈〉 (Feb. 2007).
    • (2005)
    • Zietlow, G.1
  • 39
    • 78449243198 scopus 로고    scopus 로고
    • Performance measures for performance based maintenance contracts
    • Texas Transportation Institute, U.S.A., 〈〉 (Dec. 2006).
    • Zietsman J. Performance measures for performance based maintenance contracts. 2005, Texas Transportation Institute, U.S.A., 〈〉 (Dec. 2006).
    • (2005)
    • Zietsman, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.