-
4
-
-
5244344893
-
Reflections on construction productivity
-
Technol.
-
Bennett, P. (1980). "Reflections on construction productivity." Constr. Productivity Frontiers, Technol., 5-9.
-
(1980)
Constr. Productivity Frontiers
, pp. 5-9
-
-
Bennett, P.1
-
6
-
-
0042944293
-
A survey of process modeling tools
-
Comp. Integrated Constr. Res. Program, Dept. of Arch. Engrg., Pennsylvania State Univ., University Park, PA
-
Chung, E. K. (1989). "A survey of process modeling tools." Tech. Rep. No. 7, Comp. Integrated Constr. Res. Program, Dept. of Arch. Engrg., Pennsylvania State Univ., University Park, PA.
-
(1989)
Tech. Rep. No. 7
-
-
Chung, E.K.1
-
8
-
-
0004886205
-
-
U.S. Department of Commerce, Washington, D.C. (July-Aug.)
-
Construction Review. (1987). U.S. Department of Commerce, Washington, D.C. (July-Aug.).
-
(1987)
Construction Review
-
-
-
10
-
-
0001898118
-
Initial experiments with the cross-impact method of forecasting
-
Gordon, T., and Hayward, H. (1968). "Initial experiments with the cross-impact method of forecasting." Futures, 1(2), 100-116.
-
(1968)
Futures
, vol.1
, Issue.2
, pp. 100-116
-
-
Gordon, T.1
Hayward, H.2
-
11
-
-
84915055342
-
-
Inst. for the Future, Menlo Park, Calif.
-
Gordon, T., Rochberg, R., and Enzer, S. (1970). "Research on cross-impact techniques with selected problems in economics, political science and technology assessment." Inst. for the Future, Menlo Park, Calif.
-
(1970)
Research on Cross-impact Techniques with Selected Problems in Economics, Political Science and Technology Assessment
-
-
Gordon, T.1
Rochberg, R.2
Enzer, S.3
-
12
-
-
0019691870
-
Worker productivity-characteristics and measurement
-
Gregerman, I. B. (1981). "Worker productivity-characteristics and measurement." AACE Trans., I.2.1-I.2.5.
-
(1981)
AACE Trans.
-
-
Gregerman, I.B.1
-
13
-
-
0006847102
-
-
Battelle, Columbus Div., Ohio
-
Honton, E. J., Stacey, G. S., and Millett, S. M. (1985). "Future scenarios: the BASICS computational method." Battelle, Columbus Div., Ohio.
-
(1985)
Future Scenarios: The BASICS Computational Method
-
-
Honton, E.J.1
Stacey, G.S.2
Millett, S.M.3
-
14
-
-
5244329839
-
The awkward truth about productivity
-
Judson, A. S. (1982). "The awkward truth about productivity." Harvard Business Rev., 82(5), 93-97.
-
(1982)
Harvard Business Rev.
, vol.82
, Issue.5
, pp. 93-97
-
-
Judson, A.S.1
-
15
-
-
0020918216
-
A computational model for causal and diagnostic reasoning in inference systems
-
Kim, J. H., and Pearl, J. (1983). "A computational model for causal and diagnostic reasoning in inference systems." Proc., 8th Int. Joint Conf. on Artificial Intelligence, Vol. 1, 190-193.
-
(1983)
Proc., 8th Int. Joint Conf. on Artificial Intelligence
, vol.1
, pp. 190-193
-
-
Kim, J.H.1
Pearl, J.2
-
16
-
-
0003906653
-
-
Van Nostrand Reinhold, New York, N.Y.
-
Moder, J. J., Phillips, C. R., and Davis, E. W. (1983). Project management with CPM, PERT and precedence diagramming, 3rd Ed., Van Nostrand Reinhold, New York, N.Y.
-
(1983)
Project Management with CPM, PERT and Precedence Diagramming, 3rd Ed.
-
-
Moder, J.J.1
Phillips, C.R.2
Davis, E.W.3
-
17
-
-
0023347981
-
Evidential reasoning using stochastic simulation of causal models
-
Pearl, J. (1987). "Evidential reasoning using stochastic simulation of causal models." Artificial Intelligence, 32, 245-257.
-
(1987)
Artificial Intelligence
, vol.32
, pp. 245-257
-
-
Pearl, J.1
-
18
-
-
0003991228
-
-
John Wiley & Sons, Inc., New York, N.Y.
-
Porter, A., Roper, T., Mason, T., Rossini, F., Banks, J., and Bradley, J. (1991). Forecasting and management of technology. John Wiley & Sons, Inc., New York, N.Y.
-
(1991)
Forecasting and Management of Technology
-
-
Porter, A.1
Roper, T.2
Mason, T.3
Rossini, F.4
Banks, J.5
Bradley, J.6
-
19
-
-
0025446319
-
Applying computer-integrated manufacturing concepts to construction
-
ASCE
-
Sanvido, V. E., and Medeiros, D. J. (1990). "Applying computer-integrated manufacturing concepts to construction." J. Constr. Engrg. and Mgmt., ASCE, 116(2).
-
(1990)
J. Constr. Engrg. and Mgmt.
, vol.116
, Issue.2
-
-
Sanvido, V.E.1
Medeiros, D.J.2
-
20
-
-
0024627384
-
A top-down approach to integrating the building process
-
Sanvido, V. E., Kumara, S., and Ham, I. (1989). "A top-down approach to integrating the building process." Engrg. with Comp., 5, 91-103.
-
(1989)
Engrg. with Comp.
, vol.5
, pp. 91-103
-
-
Sanvido, V.E.1
Kumara, S.2
Ham, I.3
-
21
-
-
0004100557
-
-
John Wiley & Sons, Inc., New York, N.Y.
-
Sink, D. S. (1985). Productivity management: planning, measurement and evaluation, control and improvement. John Wiley & Sons, Inc., New York, N.Y.
-
(1985)
Productivity Management: Planning, Measurement and Evaluation, Control and Improvement
-
-
Sink, D.S.1
-
22
-
-
5244367479
-
The use of probabilistic system dynamics in the analysis of national development policies: A study of economic growth and income distribution in Uruguay
-
Stover, J., (1975). "The use of probabilistic system dynamics in the analysis of national development policies: a study of economic growth and income distribution in Uruguay." Proc., 1975 Summer Comp. Simulation Conf.
-
(1975)
Proc., 1975 Summer Comp. Simulation Conf.
-
-
Stover, J.1
|