메뉴 건너뛰기




Volumn 129, Issue 4, 2003, Pages 382-387

Project delivery systems and project change: Quantitative analysis

Author keywords

Delivery; Design build; Project management

Indexed keywords

CONSTRUCTION INDUSTRY INSTITUTE (CII); DESIGN/BUILD; PROJECT DELIVERY SYSTEMS; PROJECT PERFORMANCE;

EID: 13944260870     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2003)129:4(382)     Document Type: Article
Times cited : (187)

References (13)
  • 1
    • 11644250485 scopus 로고    scopus 로고
    • Managing mega projects
    • Capps, R. (1997). "Managing mega projects." Constr. Business Rev., 6(6), 56-59.
    • (1997) Constr. Business Rev. , vol.6 , Issue.6 , pp. 56-59
    • Capps, R.1
  • 2
    • 0028397624 scopus 로고
    • Choosing appropriate construction contracting method
    • Gordon, C. M. (1994). "Choosing appropriate construction contracting method." J. Constr. Eng. Manage., 120(1), 196-210.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.1 , pp. 196-210
    • Gordon, C.M.1
  • 3
    • 0032659199 scopus 로고    scopus 로고
    • Impact of change orders on labor efficiency for electrical construction
    • Hanna, A. S., Russell, J. S., Nordheim, E. V., and Bruggink, M. J. (1999). "Impact of change orders on labor efficiency for electrical construction." J. Constr. Eng. Manage., 125(4), 224-232.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.4 , pp. 224-232
    • Hanna, A.S.1    Russell, J.S.2    Nordheim, E.V.3    Bruggink, M.J.4
  • 5
    • 0004652780 scopus 로고    scopus 로고
    • Quantitative impacts of project change: Size issues
    • Ibbs, W. (1997). "Quantitative impacts of project change: Size issues." J. Constr. Eng. Manage., 123(3), 308-311.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.3 , pp. 308-311
    • Ibbs, W.1
  • 6
    • 0032207592 scopus 로고    scopus 로고
    • Comparison of U.S. projects delivery systems
    • Konchar, M., and Sanvido, V. (1998). "Comparison of U.S. projects delivery systems." J. Constr. Eng. Manage., 124(6), 435-444.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 435-444
    • Konchar, M.1    Sanvido, V.2
  • 7
    • 0033101744 scopus 로고    scopus 로고
    • Public-sector design-build evolution and performance
    • Molenaar, K. R., Songer, A. D., and Barash, M. (1999). "Public-sector design-build evolution and performance." J. Manage. Eng., 15(2), 54-62.
    • (1999) J. Manage. Eng. , vol.15 , Issue.2 , pp. 54-62
    • Molenaar, K.R.1    Songer, A.D.2    Barash, M.3
  • 8
    • 0006531663 scopus 로고    scopus 로고
    • Alternative approaches to projects: Better or worse?
    • Pocock, J., and Liu, L. (1996). "Alternative approaches to projects: Better or worse?" Mil. Eng., 88(578), 57-59.
    • (1996) Mil. Eng. , vol.88 , Issue.578 , pp. 57-59
    • Pocock, J.1    Liu, L.2
  • 9
    • 0030282253 scopus 로고    scopus 로고
    • Selective design-build: Public and private sector owner's attitudes
    • Songer, A. D., and Molenaar, K. R. (1996). "Selective design-build: Public and private sector owner's attitudes." J. Manage. Eng., 12(6), 47-53.
    • (1996) J. Manage. Eng. , vol.12 , Issue.6 , pp. 47-53
    • Songer, A.D.1    Molenaar, K.R.2
  • 10
    • 3042534900 scopus 로고    scopus 로고
    • Design-build it, and they will come
    • Tarricon, P. (1996). "Design-build it, and they will come." Facil. Des. Manage., 15(9), 60-63.
    • (1996) Facil. Des. Manage. , vol.15 , Issue.9 , pp. 60-63
    • Tarricon, P.1
  • 11
    • 0034225578 scopus 로고    scopus 로고
    • Schedule acceleration, work flow, and labor productivity
    • Thomas, R. (2000). "Schedule acceleration, work flow, and labor productivity." J. Constr. Eng. Manage., 126(4), 261-267.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.4 , pp. 261-267
    • Thomas, R.1
  • 12
    • 0000849119 scopus 로고    scopus 로고
    • Scheduled overtime and labor productivity: Quantitative analysis
    • Thomas, R., and Raynar, K. A. (1997). "Scheduled overtime and labor productivity: Quantitative analysis." J. Constr. Eng. Manage., 123(2), 181-188.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.2 , pp. 181-188
    • Thomas, R.1    Raynar, K.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.