메뉴 건너뛰기




Volumn 27, Issue 1, 2011, Pages 21-27

Selection of project delivery method in transit: Drivers and objectives

Author keywords

Cost growth; Project delivery method; Risk analysis; Schedule compression; Structured interview

Indexed keywords

AGGRESSIVE SCHEDULE; ALTERNATIVE PROJECT DELIVERY METHODS; CASE STUDY ANALYSIS; CONSTRUCTION MANAGER; CROSS SECTION; DELIVERY METHODS; DESIGN/BUILD; INFLUENTIAL FACTORS; PROJECT DELIVERY METHOD; PROJECT DEVELOPMENT; RESEARCH PROGRAMS; SCHEDULE COMPRESSION; SELECTION DECISIONS; STRUCTURED INTERVIEW; TRANSIT AGENCIES; TRANSIT PROJECTS;

EID: 78650388363     PISSN: 0742597X     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)ME.1943-5479.0000027     Document Type: Article
Times cited : (98)

References (16)
  • 3
    • 33750116999 scopus 로고    scopus 로고
    • Construction delivery systems: A comparative analysis of their performance within school districts
    • 0733-9364.
    • Debella, D. C., and Ries, R. (2006). " Construction delivery systems: A comparative analysis of their performance within school districts." J. Constr. Eng. Manage. 0733-9364, 132 (11), 1131-1138.
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.11 , pp. 1131-1138
    • Debella, D.C.1    Ries, R.2
  • 4
    • 32944469606 scopus 로고    scopus 로고
    • Comparing procurement methods for design-build projects
    • DOI 10.1061/(ASCE)0733-9364(2006)132:3(230)
    • El Wardani, M., Messner, J., and Horman, M. (2006). " Comparing procurement methods for design-build projects." J. Constr. Eng. Manage. 0733-9364, 132 (3), 230-238. 10.1061/(ASCE)0733-9364(2006)132:3(230) (Pubitemid 43260123)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.3 , pp. 230-238
    • El Wardani, M.A.1    Messner, J.I.2    Horman, M.J.3
  • 5
    • 0008534674 scopus 로고
    • Redesign of managerial tasks: A requisite for successful decision support systems
    • 0276-7783, 10.2307/249105
    • Ginzberg, M. J. (1978). " Redesign of managerial tasks: A requisite for successful decision support systems." MIS Q. 0276-7783, 2 (1), 39-52. 10.2307/249105
    • (1978) MIS Q. , vol.2 , Issue.1 , pp. 39-52
    • Ginzberg, M.J.1
  • 6
    • 0028397624 scopus 로고
    • Choosing appropriate construction contracting method
    • 0733-9364, 10.1061/(ASCE)0733-9364(1994)120:1(196)
    • Gordon, C. M. (1994). " Choosing appropriate construction contracting method." J. Constr. Eng. Manage. 0733-9364, 120 (1), 196-210. 10.1061/(ASCE)0733-9364(1994)120:1(196)
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.1 , pp. 196-210
    • Gordon, C.M.1
  • 8
    • 13944260870 scopus 로고    scopus 로고
    • Project delivery systems and project change: Quantitative analysis
    • DOI 10.1061/(ASCE)0733-9364(2003)129:4(382)
    • Ibbs, C. W., Kwak, Y., and Odabasi, A. (2003). " Project delivery system and project change: A quantitative analysis." J. Constr. Eng. Manage. 0733-9364, 129 (4), 382-387. 10.1061/(ASCE)0733-9364(2003)129:4(382) (Pubitemid 40265451)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.4 , pp. 382-387
    • Ibbs, C.W.1    Kwak, Y.H.2    Ng, T.3    Murat Odabasi, A.4
  • 9
    • 0032207592 scopus 로고    scopus 로고
    • Comparison of U.S. project delivery systems
    • 0733-9364, 10.1061/(ASCE)0733-9364(1998)124:6(435)
    • Konchar, M., and Sanvido, V. (1998). " Comparison of U.S. project delivery systems." J. Constr. Eng. Manage. 0733-9364, 124 (6), 435-444. 10.1061/(ASCE)0733-9364(1998)124:6(435)
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 435-444
    • Konchar, M.1    Sanvido, V.2
  • 10
    • 27744450360 scopus 로고    scopus 로고
    • Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP)
    • DOI 10.1016/j.ijproman.2005.05.007, PII S0263786305000608
    • Mahdi, I. M., and Alreshaid, K. (2005). " Decision support system for selecting the proper project delivery method using analytical hierarchy process." Int. J. Proj. Manage. 0263-7863, 23, 564-572. 10.1016/j.ijproman.2005.05.007 (Pubitemid 41600529)
    • (2005) International Journal of Project Management , vol.23 , Issue.7 , pp. 564-572
    • Mahdi, I.M.1    Alreshaid, K.2
  • 12
    • 33645517629 scopus 로고    scopus 로고
    • Relative effectiveness of project delivery and contract strategies
    • 0733-9364, 10.1061/(ASCE)0733-9364(2006)132:1(3)
    • Oyetunji, A. A., and Anderson, S. D. (2006). " Relative effectiveness of project delivery and contract strategies." J. Constr. Eng. Manage. 0733-9364, 132 (1), 3-13. 10.1061/(ASCE)0733-9364(2006)132:1(3)
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.1 , pp. 3-13
    • Oyetunji, A.A.1    Anderson, S.D.2
  • 13
    • 0003050647 scopus 로고
    • A theory of requisite decision models
    • 0001-6918, 10.1016/0001-6918(84)90005-2
    • Phillips, L. (1984). " A theory of requisite decision models." Acta Psychol. 0001-6918, 56, 29-48. 10.1016/0001-6918(84)90005-2
    • (1984) Acta Psychol. , vol.56 , pp. 29-48
    • Phillips, L.1
  • 14
    • 0030282253 scopus 로고    scopus 로고
    • Selecting design-build: Public and private sector owner attitude
    • 0742-597X, 10.1061/(ASCE)0742-597X(1996)12:6(47)
    • Songer, A. D., and Molenaar, K. R. (1996). " Selecting design-build: Public and private sector owner attitude." J. Manage. Eng. 0742-597X, 12 (6), 47-53. 10.1061/(ASCE)0742-597X(1996)12:6(47)
    • (1996) J. Manage. Eng. , vol.12 , Issue.6 , pp. 47-53
    • Songer, A.D.1    Molenaar, K.R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.