Resource constrained project scheduling: A hybrid neural approach

Author keywords

Heuristics; Neural networks; Project management; Resource constrained project scheduling

Indexed keywords


EID: 84955240346     PISSN: 08848289     EISSN: None     Source Type: Book Series    
DOI: None     Document Type: Chapter
Times cited : (18)

References (61)
  • 2
    • 27144483384 scopus 로고    scopus 로고
    • Improvement heuristic for the flow-shop scheduling problem: An adaptive-learning approach
    • Agarwal, A., Colak, S. and Eryarsoy, E. (2005). Improvement heuristic for the flow-shop scheduling problem: an adaptive-learning approach, European Journal of Operational Research, 169(3):801-815.
    • (2005) European Journal of Operational Research , vol.169 , Issue.3 , pp. 801-815
    • Agarwal, A.1    Colak, S.2    Eryarsoy, E.3
  • 3
    • 0042287689 scopus 로고    scopus 로고
    • A robust genetic algorithm for resource allocation in Project Scheduling
    • Alcaraz, J. and Maroto, C. (2001). A robust genetic algorithm for resource allocation in Project Scheduling, Annals of Operations Research. 102:83-109.
    • (2001) Annals of Operations Research , vol.102 , pp. 83-109
    • Alcaraz, J.1    Maroto, C.2
  • 5
    • 0001849846 scopus 로고
    • Heuristic algorithms for resourceconstrained project scheduling: A review and an empirical analysis
    • R. Slowinski, J. WeglarzElsevier, Amsterdam
    • Alvares-Valdes, R. and Tamarit, J.M. (1989). Heuristic algorithms for resourceconstrained project scheduling: A review and an empirical analysis, in: Advances in Project Scheduling, R. Slowinski, J. Weglarz (Eds.), Elsevier, Amsterdam, pp. 113-134.
    • (1989) Advances in Project Scheduling , pp. 113-134
    • Alvares-Valdes, R.1    Tamarit, J.M.2
  • 6
    • 0003131416 scopus 로고    scopus 로고
    • Tabu search algorithms for resourceconstrained project scheduling problems
    • S. Voss, S. Martello, I. Osman, C. RoucairolKluwer
    • Baar, T., Brucker, P. and Knust, S. (1997). Tabu search algorithms for resourceconstrained project scheduling problems, in: Metaheuristics: Advances and Trends in Local Search Paradigms for Optimisation, S. Voss, S. Martello, I. Osman, C. Roucairol (Eds.), Kluwer, pp. 1-18.
    • (1997) Metaheuristics: Advances and Trends in Local Search Paradigms for Optimisation , pp. 1-18
    • Baar, T.1    Brucker, P.2    Knust, S.3
  • 8
    • 0025701919 scopus 로고
    • Some efficient multi-heuristic procedures for resourceconstrained project scheduling
    • Boctor, F.F. (1990). Some efficient multi-heuristic procedures for resourceconstrained project scheduling, European Journal of Operational Research 49:3-13.
    • (1990) European Journal of Operational Research , vol.49 , pp. 3-13
    • Boctor, F.F.1
  • 9
    • 0030216966 scopus 로고    scopus 로고
    • An adaptation of the simulated annealing algorithm for solving resource-constrained project scheduling problems
    • Boctor, F.F. (1996). An adaptation of the simulated annealing algorithm for solving resource-constrained project scheduling problems, International Journal of Production Research, 34:2335-2351.
    • (1996) International Journal of Production Research , vol.34 , pp. 2335-2351
    • Boctor, F.F.1
  • 10
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version
    • Bouleimen, K. and Lecocq, H. (2003). A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version, European Journal of Operational Research, 149:268-281.
    • (2003) European Journal of Operational Research , vol.149 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 11
    • 0032096810 scopus 로고    scopus 로고
    • A branch & bound algorithm for the resource-constrained project scheduling problem
    • Brucker, P., Knust, S., Schoo, A. and Thiele, O. (1998). A branch & bound algorithm for the resource-constrained project scheduling problem, European Journal of Operational Research 107(2):272-288.
    • (1998) European Journal of Operational Research , vol.107 , Issue.2 , pp. 272-288
    • Brucker, P.1    Knust, S.2    Schoo, A.3    Thiele, O.4
  • 14
    • 0031188915 scopus 로고    scopus 로고
    • A simulated annealing algorithm for resourceconstrained project scheduling problems
    • Cho, J.H. and Kim, Y.D. (1997). A simulated annealing algorithm for resourceconstrained project scheduling problems, Journal of the Operational Research Society, 48:736-744.
    • (1997) Journal of the Operational Research Society , vol.48 , pp. 736-744
    • Cho, J.H.1    Kim, Y.D.2
  • 15
    • 24944581849 scopus 로고    scopus 로고
    • Comparative analysis of meta-heuricstics for the resource constrained project scheduling problem
    • Instituto Superior Tecnico, Portugal
    • Coelho, J. and Tavares, L. (2003). Comparative analysis of meta-heuricstics for the resource constrained project scheduling problem. Technical report. Department of Civil Engineering, Instituto Superior Tecnico, Portugal.
    • (2003) Technical Report. Department of Civil Engineering
    • Coelho, J.1    Tavares, L.2
  • 16
    • 0016972372 scopus 로고
    • Heuristics for scheduling resource-constrained projects: An experimental investigation
    • Cooper, D.F. (1976). Heuristics for scheduling resource-constrained projects: An experimental investigation. Management Science 22:1186-1194.
    • (1976) Management Science , vol.22 , pp. 1186-1194
    • Cooper, D.F.1
  • 17
    • 0000813734 scopus 로고
    • An algorithm for optimal project scheduling under multiple resource constraints
    • Davis, E.W. and Heidom, G.E. (1971). An algorithm for optimal project scheduling under multiple resource constraints. Management Science 17:803-816.
    • (1971) Management Science , vol.17 , pp. 803-816
    • Davis, E.W.1    Heidom, G.E.2
  • 18
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimum solutions in resource-constrained project scheduling
    • Davis, E.W. and Patterson, J.H. (1975). A comparison of heuristic and optimum solutions in resource-constrained project scheduling. Management Science, 21:944-955.
    • (1975) Management Science , vol.21 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 19
  • 20
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problems
    • Demeulemeester, E. and Herroelen, W. (1992). A branch-and-bound procedure for the multiple resource-constrained project scheduling problems. Management Science, 38(12):1803-1818.
    • (1992) Management Science , vol.38 , Issue.12 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 21
    • 0031272722 scopus 로고    scopus 로고
    • New benchmark results for the resource-constrained project scheduling problem
    • Demeulemeester, E. and Herroelen, W. (1997). New benchmark results for the resource-constrained project scheduling problem. Management Science 43(11): 1485-92.
    • (1997) Management Science , vol.43 , Issue.11 , pp. 1485-1492
    • Demeulemeester, E.1    Herroelen, W.2
  • 22
    • 0038708604 scopus 로고    scopus 로고
    • A branch-and-bound algorithm for the resource-constrained project scheduling problem
    • Domdorf, U., Pesch, E. and Phan-Huy, T. (2000). A branch-and-bound algorithm for the resource-constrained project scheduling problem, Mathematical Methods of Operations Research, 52:413-439.
    • (2000) Mathematical Methods of Operations Research , vol.52 , pp. 413-439
    • Domdorf, U.1    Pesch, E.2    Phan-Huy, T.3
  • 23
    • 0026376478 scopus 로고
    • Scheduling of project networks by job assignment
    • Drexl, A. (1991). Scheduling of project networks by job assignment, Management Science. 37:1590-1602.
    • (1991) Management Science , vol.37 , pp. 1590-1602
    • Drexl, A.1
  • 25
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for the resource-constrained project scheduling
    • Hartmann, S. (1998). A competitive genetic algorithm for the resource-constrained project scheduling, Naval Research Logistics, 45:733-750.
    • (1998) Naval Research Logistics , vol.45 , pp. 733-750
    • Hartmann, S.1
  • 26
    • 0036684673 scopus 로고    scopus 로고
    • A self-adapting genetic algorithm for project scheduling under resource constraints
    • Hartmann, S. (2002). A self-adapting genetic algorithm for project scheduling under resource constraints. Naval Research Logistics. 49:433-448.
    • (2002) Naval Research Logistics , vol.49 , pp. 433-448
    • Hartmann, S.1
  • 27
    • 0034559432 scopus 로고    scopus 로고
    • Experimental evaluation of state-oftheart heuristics for the resource-constrained project scheduling problem
    • Hartmann, S. and Kolisch, R. (2000). Experimental evaluation of state-oftheart heuristics for the resource-constrained project scheduling problem, European Journal of Operational Research 127:394-407.
    • (2000) European Journal of Operational Research , vol.127 , pp. 394-407
    • Hartmann, S.1    Kolisch, R.2
  • 28
    • 0032042933 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: A survey of recent developments
    • Herroelen, W., Demeulemeester, E. and De Reyck, B. (1998). Resource-constrained project scheduling: A survey of recent developments. Computers & Operations Research 25(4):279-302.
    • (1998) Computers & Operations Research , vol.25 , Issue.4 , pp. 279-302
    • Herroelen, W.1    Demeulemeester, E.2    De Reyck, B.3
  • 30
    • 0021835689 scopus 로고
    • Neural computation of decisions in optimization problems
    • Hopfield, J.J. and Tank, D.W. (1985). Neural computation of decisions in optimization problems. Biological Cybernetics. 52:141-152.
    • (1985) Biological Cybernetics , vol.52 , pp. 141-152
    • Hopfield, J.J.1    Tank, D.W.2
  • 33
    • 0030231487 scopus 로고    scopus 로고
    • Efficient priority rule for the resource-constrained project scheduling problem
    • Kolisch, R. (1996a). Efficient priority rule for the resource-constrained project scheduling problem. Journal of Operations Management. 14(3): 179-192.
    • (1996) Journal of Operations Management , vol.14 , Issue.3 , pp. 179-192
    • Kolisch, R.1
  • 34
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • Kolisch, R. (1996b). Serial and parallel resource-constrained project scheduling methods revisited: theory and computation, European Journal of Operational Research 90:320-333.
    • (1996) European Journal of Operational Research , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 35
    • 0001896880 scopus 로고    scopus 로고
    • Adaptive search for solving hard project scheduling problems
    • Kolisch, R. and Drexl, A. (1996). Adaptive search for solving hard project scheduling problems. Naval Research Logistics. 43:230.
    • (1996) Naval Research Logistics , vol.43
    • Kolisch, R.1    Drexl, A.2
  • 37
    • 0000801563 scopus 로고    scopus 로고
    • An integrated survey of deterministic project scheduling
    • Kolisch, R. and Padman, R. (2001). An integrated survey of deterministic project scheduling, OMEGA. 29:249-272.
    • (2001) OMEGA , vol.29 , pp. 249-272
    • Kolisch, R.1    Padman, R.2
  • 39
    • 0000698758 scopus 로고
    • Characterisation and generation of a general class of resource-constrained project scheduling problem
    • Kolisch, R., Sprecher, A, and Drexl, A. (1995). Characterisation and generation of a general class of resource-constrained project scheduling problem, Management Science, 41(10): 1693-1703.
    • (1995) Management Science , vol.41 , Issue.10 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 40
    • 0030151930 scopus 로고    scopus 로고
    • Search heuristics for resource-constrained project scheduling
    • Lee, J.K. and Kim, Y.D., 1996, Search heuristics for resource-constrained project scheduling. Journal of the Operational Research Society, 47:678-689.
    • (1996) Journal of the Operational Research Society , vol.47 , pp. 678-689
    • Lee, J.K.1    Kim, Y.D.2
  • 41
    • 33845274958 scopus 로고
    • Strength and adaptability of problemspace based neighborhoods for resource-constrained scheduling
    • Leon, V.J. and Ramamoorthy, B. (1995). Strength and adaptability of problemspace based neighborhoods for resource-constrained scheduling, OR Spektrum, 17:173-182.
    • (1995) OR Spektrum , vol.17 , pp. 173-182
    • Leon, V.J.1    Ramamoorthy, B.2
  • 42
    • 0032070635 scopus 로고    scopus 로고
    • An exact algorithm for project scheduling with resource constraints based on new mathematical formulation
    • Mingozzi, A. , Maniezzo, V, Ricciardelli, S. and Bianco, L. (1998). An exact algorithm for project scheduling with resource constraints based on new mathematical formulation. Management Science, 44(5):714-29.
    • (1998) Management Science , vol.44 , Issue.5 , pp. 714-729
    • Mingozzi, A.1    Maniezzo, V.2    Ricciardelli, S.3    Bianco, L.4
  • 44
    • 84888782064 scopus 로고    scopus 로고
    • Formulation and tabu search algorithm for the resource constrained project scheduling problem
    • C. C. Ribeiro and R HansenKluwer Academic Publishers
    • Nonobe, K. and Ibaraki, T. (2002). Formulation and tabu search algorithm for the resource constrained project scheduling problem, in: Essays and Surveys in Metaheuristics, C. C. Ribeiro and R Hansen, eds, Kluwer Academic Publishers, pp. 557-588.
    • (2002) Essays and Surveys in Metaheuristics , pp. 557-588
    • Nonobe, K.1    Ibaraki, T.2
  • 45
    • 0009627197 scopus 로고
    • A local constraint based analysis approach to project scheduling under general resource constraints
    • Ozdamar, L. and Ulusoy, G., (1994). A local constraint based analysis approach to project scheduling under general resource constraints, European Journal of Operational Research, 79:287-298.
    • (1994) European Journal of Operational Research , vol.79 , pp. 287-298
    • Ozdamar, L.1    Ulusoy, G.2
  • 46
    • 0029393209 scopus 로고
    • A survey on the resource-constrained project scheduling problem
    • Ozdamar, L. and Ulusoy, G. (1995). A survey on the resource-constrained project scheduling problem, HE Transactions. 27:574-586.
    • (1995) HE Transactions , vol.27 , pp. 574-586
    • Ozdamar, L.1    Ulusoy, G.2
  • 47
    • 0016028677 scopus 로고
    • A horizon-varying, zero-one approach to project scheduling
    • Patterson, J.H. and Huber, W.D. (1974). A horizon-varying, zero-one approach to project scheduling. Management Science 20:990-998.
    • (1974) Management Science , vol.20 , pp. 990-998
    • Patterson, J.H.1    Huber, W.D.2
  • 48
    • 0017268482 scopus 로고
    • Scheduling a project under multiple resource constraints: A zero-one programming approach
    • Patterson, J.H. and Roth, G.W., 1976, Scheduling a project under multiple resource constraints: a zero-one programming approach, AIIE Transactions. 8:449-55.
    • (1976) AIIE Transactions , vol.8 , pp. 449-455
    • Patterson, J.H.1    Roth, G.W.2
  • 50
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • Pritsker, A.A.B., Watters, L.J. and Wolfe, P.M. (1969). Multiproject scheduling with limited resources: a zero-one programming approach. Management Science 16: 93-107.
    • (1969) Management Science , vol.16 , pp. 93-107
    • Pritsker, A.A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 53
    • 0000103290 scopus 로고    scopus 로고
    • Case-based reasoning and improved adaptive search for project scheduling
    • Schirmer, A. (2000). Case-based reasoning and improved adaptive search for project scheduling, Naval Research Logistics.47:201-222.
    • (2000) Naval Research Logistics , vol.47 , pp. 201-222
    • Schirmer, A.1
  • 54
    • 0017997005 scopus 로고
    • An efficient integer programming algorithm with network cuts for solving resource constrained scheduling problems
    • Talbot, F.B, and Patterson, J.H. (1978). An efficient integer programming algorithm with network cuts for solving resource constrained scheduling problems, Management Science, 24(11): 1163-74.
    • (1978) Management Science , vol.24 , Issue.11 , pp. 1163-1174
    • Talbot, F.B.1    Patterson, J.H.2
  • 55
    • 0032117729 scopus 로고    scopus 로고
    • A tabu search approach for the resource constrained project scheduling problem
    • Thomas, P. R. and Salhi, S. (1998). A tabu search approach for the resource constrained project scheduling problem. Journal of Heuristics, 4:123-139.
    • (1998) Journal of Heuristics , vol.4 , pp. 123-139
    • Thomas, P.R.1    Salhi, S.2
  • 56
    • 0036024939 scopus 로고    scopus 로고
    • Application of genetic algorithms to construction scheduling with or without resource constraints
    • Toklu, Y.C. (2002). Application of genetic algorithms to construction scheduling with or without resource constraints, Canadian Journal of Civil Engineering. 29:421-429.
    • (2002) Canadian Journal of Civil Engineering , vol.29 , pp. 421-429
    • Toklu, Y.C.1
  • 57
    • 0035617605 scopus 로고    scopus 로고
    • A competitive heuristic solution technique for resource constrained project scheduling
    • Tormos, P. and Lova, A,, 2001, A competitive heuristic solution technique for resource constrained project scheduling, Annals of Operations Research. 102:65-81.
    • (2001) Annals of Operations Research , vol.102 , pp. 65-81
    • Tormos, P.1    Lova, A.2
  • 58
    • 0242364615 scopus 로고    scopus 로고
    • An efficient multi-pass heuristic for project scheduling with constrained resources
    • Tormos, P. and Lova, A. (2003). An efficient multi-pass heuristic for project scheduling with constrained resources, International Journal of Production Research. 4l(5): l07l-l086.
    • (2003) International Journal of Production Research , vol.41 , Issue.5 , pp. l07l-l086
    • Tormos, P.1    Lova, A.2
  • 59
    • 84974870375 scopus 로고
    • Heuristic performance and network/ resource characteristics in resource-constrained project scheduling
    • Ulusoy, G. and Ozdamar, L. (1989). Heuristic performance and network/ resource characteristics in resource-constrained project scheduling. Journal of the Operational Research Society. 40:1145-1152.
    • (1989) Journal of the Operational Research Society , vol.40 , pp. 1145-1152
    • Ulusoy, G.1    Ozdamar, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.