-
1
-
-
56149103746
-
Efficiency and feasibility of product disassembly: A case-based study
-
Duflou JR, Seliger G, Kara S., Umeda Y, Ometto A, Willems B. (2008) Efficiency and feasibility of product disassembly: A case-based study. CIRP Annals 57(2): 583-600.
-
(2008)
CIRP Annals
, vol.57
, Issue.2
, pp. 583-600
-
-
Duflou, J.R.1
Seliger, G.2
Kara, S.3
Umeda, Y.4
Ometto, A.5
Willems, B.6
-
2
-
-
33750068327
-
Selective disassembly sequencing: A methodology for the disassembly of end-of-life products
-
Kara S, Pornprasitpol P, Kaebernick H. (2006) Selective Disassembly Sequencing: A Methodology for the Disassembly of End-of-Life Products. CIRP Annals 55(1): 37-40.
-
(2006)
CIRP Annals
, vol.55
, Issue.1
, pp. 37-40
-
-
Kara, S.1
Pornprasitpol, P.2
Kaebernick, H.3
-
3
-
-
34547662257
-
Disassembly planning of mechanical systems for service and recovery: A genetic algorithms based approach
-
Giudice F, Fargione G. (2007) Disassembly planning of mechanical systems for service and recovery: a genetic algorithms based approach. Journal of Intelligient Manufacturing 18(3): 313-329.
-
(2007)
Journal of Intelligient Manufacturing
, vol.18
, Issue.3
, pp. 313-329
-
-
Giudice, F.1
Fargione, G.2
-
5
-
-
0034689113
-
Disassembly analysis for electromechanical products: A graph-based heuristic approach
-
SH
-
Kuo TC, Zhang HC, SH (2000) Disassembly Analysis for electromechanical products: a graph-based heuristic approach. International Journal of Production Research 38(5): 993-1007.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.5
, pp. 993-1007
-
-
Kuo, T.C.1
Zhang, H.C.2
-
7
-
-
33748523509
-
A hierarchical approach to disassembly sequence planning for mechanical product
-
Dong T, Zhang L, Tong R., Dong J. (2006) A hierarchical approach to disassembly sequence planning for mechanical product. International Journal of Advanced Manufacturing Technology 30(5-6): 507-520.
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.30
, Issue.5-6
, pp. 507-520
-
-
Dong, T.1
Zhang, L.2
Tong, R.3
Dong, J.4
-
8
-
-
77955416142
-
A hierarchical end-of-life decion model for determining the economic levels of remanufacturing and disassembly under environmental regulations
-
Lee HB, Cho NW, Hong Y.S. (2010) A hierarchical end-of-life decion model for determining the economic levels of remanufacturing and disassembly under environmental regulations. Journal of Cleaner Production 18(13): 1276-1283.
-
(2010)
Journal of Cleaner Production
, vol.18
, Issue.13
, pp. 1276-1283
-
-
Lee, H.B.1
Cho, N.W.2
Hong, Y.S.3
-
10
-
-
46649084597
-
Tag clouds and the case for vernacular visualization
-
Viegas FB, Wattenber M. (2008) Tag Clouds and the Case for Vernacular Visualization. Interactions 15(4): 49-52.
-
(2008)
Interactions
, vol.15
, Issue.4
, pp. 49-52
-
-
Viegas, F.B.1
Wattenber, M.2
-
12
-
-
0029707115
-
ASPEN: Computer-aided assembly sequence planning and evaluation system based on predetermined time standard
-
Kanai S, Takahashi H, Makino H. (1996) ASPEN: Computer-aided assembly sequence planning and evaluation system based on predetermined time standard. CIRP Annals 45(1): 35-39.
-
(1996)
CIRP Annals
, vol.45
, Issue.1
, pp. 35-39
-
-
Kanai, S.1
Takahashi, H.2
Makino, H.3
-
13
-
-
80051668632
-
Assembly system design and operations for product variety
-
Hu SJ, Ko J, Weyland L., ElMaraghy HA, Lien TK, Koren Y, Bley H., Chryssolouris G, Nasr N, Shpitalni M. (2011) Assembly system design and operations for product variety. CIRP Annals 60(2): 715-733.
-
(2011)
CIRP Annals
, vol.60
, Issue.2
, pp. 715-733
-
-
Hu, S.J.1
Ko, J.2
Weyland, L.3
ElMaraghy, H.A.4
Lien, T.K.5
Koren, Y.6
Bley, H.7
Chryssolouris, G.8
Nasr, N.9
Shpitalni, M.10
-
14
-
-
0032178371
-
Product family-based assembly sequence design methodology
-
Gupta S, Krishnan V. (1998) Product family-based assembly sequence design methodology. IIE Transactions 30(10): 933-945.
-
(1998)
IIE Transactions
, vol.30
, Issue.10
, pp. 933-945
-
-
Gupta, S.1
Krishnan, V.2
|