-
1
-
-
80053911225
-
On electrical load tracking scheduling for a steel plant
-
Hait Alain, and Artigues Christian On electrical load tracking scheduling for a steel plant Comput. Chem. Eng. 35 2011 3044 3047
-
(2011)
Comput. Chem. Eng.
, vol.35
, pp. 3044-3047
-
-
Alain, H.1
Christian, A.2
-
2
-
-
49849094402
-
A summary of demand response in electricity markets
-
M.H. Albadi, and E.F. El-Saadany A summary of demand response in electricity markets Electr. Power Syst. Res. 78 11 2008 1989 1996
-
(2008)
Electr. Power Syst. Res.
, vol.78
, Issue.11
, pp. 1989-1996
-
-
Albadi, M.H.1
El-Saadany, E.F.2
-
3
-
-
62549097706
-
The two-stage assembly scheduling problem to minimize total completion time with setup times
-
A. Allahverdi, and F.S. Al-Anzi The two-stage assembly scheduling problem to minimize total completion time with setup times Comput. Oper. Res. 36 10 2009 2740 2747
-
(2009)
Comput. Oper. Res.
, vol.36
, Issue.10
, pp. 2740-2747
-
-
Allahverdi, A.1
Al-Anzi, F.S.2
-
4
-
-
6944244339
-
An application of a multi objective tabu search algorithm to a bi-criteria flow shop problem
-
V.A. Armentano, and J.E.C. Arroyo An application of a multi objective tabu search algorithm to a bi-criteria flow shop problem J. Meta-heuristics 10 2004 463 481
-
(2004)
J. Meta-heuristics
, vol.10
, pp. 463-481
-
-
Armentano, V.A.1
Arroyo, J.E.C.2
-
5
-
-
33644518668
-
Peak-load management in steel plants
-
S. Ashok Peak-load management in steel plants Appl. Energy 83 2006 413 424
-
(2006)
Appl. Energy
, vol.83
, pp. 413-424
-
-
Ashok, S.1
-
7
-
-
9544220684
-
Beam-ACO hybridizing ant colony optimization with beam search: An application to open shop scheduling
-
C. Blum Beam-ACO hybridizing ant colony optimization with beam search: an application to open shop scheduling Comput. Oper. Res. 32 6 2005 1565 1591
-
(2005)
Comput. Oper. Res.
, vol.32
, Issue.6
, pp. 1565-1591
-
-
Blum, C.1
-
8
-
-
34250084648
-
Routing and scheduling in a flexible job shop by tabu search
-
P. Brandimarte Routing and scheduling in a flexible job shop by tabu search Ann. Oper. Res. 41 3 1993 157 183
-
(1993)
Ann. Oper. Res.
, vol.41
, Issue.3
, pp. 157-183
-
-
Brandimarte, P.1
-
9
-
-
0025531716
-
Job-shop scheduling with multi-purpose machines
-
P. Brucker, and R. Schlie Job-shop scheduling with multi-purpose machines Computing 45 4 1990 369 375
-
(1990)
Computing
, vol.45
, Issue.4
, pp. 369-375
-
-
Brucker, P.1
Schlie, R.2
-
10
-
-
33847658312
-
Sub-population genetic algorithm with mining gene structures for multi-objective flow shop scheduling problems
-
P.C. Chang, S.H. Chen, and C.H. Liu Sub-population genetic algorithm with mining gene structures for multi-objective flow shop scheduling problems Expert Syst. Appl. 33 2007 762 771
-
(2007)
Expert Syst. Appl.
, vol.33
, pp. 762-771
-
-
Chang, P.C.1
Chen, S.H.2
Liu, C.H.3
-
11
-
-
79951581770
-
Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem
-
Ruey Maw Chen Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem Expert Syst. Appl. 38 2011 7102 7111
-
(2011)
Expert Syst. Appl.
, vol.38
, pp. 7102-7111
-
-
Chen, R.M.1
-
13
-
-
0000131850
-
A taxonomy of discrete manufacturing systems
-
B.L. Dietrich A taxonomy of discrete manufacturing systems Oper. Res. 39 6 1991 886 902
-
(1991)
Oper. Res.
, vol.39
, Issue.6
, pp. 886-902
-
-
Dietrich, B.L.1
-
14
-
-
84861629310
-
Towards energy and resource efficient manufacturing: A processes and systems approach
-
R.J. Duflou, J.W. Sutherland, David Dornfeld, Herrman Christoph, Jeswiet Jack, Kara Sami, Hauschild Michael, and Kellens Karel Towards energy and resource efficient manufacturing: a processes and systems approach CIRP Ann. Manuf. Technol. 61 2012 587 609
-
(2012)
CIRP Ann. Manuf. Technol.
, vol.61
, pp. 587-609
-
-
Duflou, R.J.1
Sutherland, J.W.2
Dornfeld, D.3
Christoph, H.4
Jack, J.5
Sami, K.6
Michael, H.7
Karel, K.8
-
15
-
-
84894049604
-
Optimizing the production scheduling of a single machine to minimize total energy consumption costs
-
Shrouf Fadi, Ordieres-Meré Joaquin, García-Sánchez Alvaro, and Ortega-Mier Miguel Optimizing the production scheduling of a single machine to minimize total energy consumption costs J. Clean. Prod. 67 2014 197 207
-
(2014)
J. Clean. Prod.
, vol.67
, pp. 197-207
-
-
Fadi, S.1
Joaquin, O.-M.2
Alvaro, G.-S.3
Miguel, O.-M.4
-
16
-
-
80054680608
-
A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction
-
Kan Fang, Uhan Nelson, Zhao Fu, and John W. Sutherland A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction J. Manuf. Syst. 3 2011 234 240
-
(2011)
J. Manuf. Syst.
, vol.3
, pp. 234-240
-
-
Fang, K.1
Nelson, U.2
Fu, Z.3
Sutherland, J.W.4
-
17
-
-
0017012325
-
Open shop scheduling to minimize finish time
-
T. Gonzalez, and S. Sahni Open shop scheduling to minimize finish time J. ACM 23 4 1976 665 679
-
(1976)
J. ACM
, vol.23
, Issue.4
, pp. 665-679
-
-
Gonzalez, T.1
Sahni, S.2
-
19
-
-
55849097321
-
A framework of scheduling models in machining workshop for green manufacturing
-
Y.A.N. He, F.E.I. Liu, and J. Shi A framework of scheduling models in machining workshop for green manufacturing J. Adv. Manuf. Syst. 7 02 2008 319 322
-
(2008)
J. Adv. Manuf. Syst.
, vol.7
, Issue.2
, pp. 319-322
-
-
He, Y.A.N.1
Liu, F.E.I.2
Shi, J.3
-
20
-
-
82055191581
-
A modeling method of task-oriented energy consumption for machining manufacturing system
-
Y. He, B. Liu, X. Zhang, H. Gao, and X. Liu A modeling method of task-oriented energy consumption for machining manufacturing system J. Clean. Prod. 23 1 2012 167 174
-
(2012)
J. Clean. Prod.
, vol.23
, Issue.1
, pp. 167-174
-
-
He, Y.1
Liu, B.2
Zhang, X.3
Gao, H.4
Liu, X.5
-
22
-
-
0030701160
-
An analytical method for integrating environmental and traditional design considerations
-
Paul Jackson, David Wallace, Esther Harold, E. Edgerton, and Richard Kegg An analytical method for integrating environmental and traditional design considerations CIRP Ann. Manuf. Technol. 46 1997 355 360
-
(1997)
CIRP Ann. Manuf. Technol.
, vol.46
, pp. 355-360
-
-
Jackson, P.1
Wallace, D.2
Harold, E.3
Edgerton, E.4
Kegg, R.5
-
23
-
-
84864373970
-
Price-based demand side management, assessing the impacts of time-of-use tariffs on residential electricity demand and peak shifting in Northern Italy
-
Torriti Jacopo Price-based demand side management, assessing the impacts of time-of-use tariffs on residential electricity demand and peak shifting in Northern Italy Energy 44 2012 576 583
-
(2012)
Energy
, vol.44
, pp. 576-583
-
-
Jacopo, T.1
-
24
-
-
77956872862
-
Electrical load tracking scheduling of a steel plant
-
Nolde Kristian, and Morari Manfred Electrical load tracking scheduling of a steel plant Comput. Chem. Eng. 34 2010 1899 1903
-
(2010)
Comput. Chem. Eng.
, vol.34
, pp. 1899-1903
-
-
Kristian, N.1
Manfred, M.2
-
25
-
-
0027590319
-
Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem
-
C.Y. Lee, T.C.E. Cheng, and B.M.T. Lin Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem Manag. Sci. 39 5 1993 616 625
-
(1993)
Manag. Sci.
, vol.39
, Issue.5
, pp. 616-625
-
-
Lee, C.Y.1
Cheng, T.C.E.2
Lin, B.M.T.3
-
26
-
-
77955268719
-
Integrated process planning and scheduling by an agent-based ant colony optimization
-
C.W. Leung, T.N. Wong, K.L. Maka, and R.Y.K. Fung Integrated process planning and scheduling by an agent-based ant colony optimization Comput. Ind. Eng. 59 2010 166 180
-
(2010)
Comput. Ind. Eng.
, vol.59
, pp. 166-180
-
-
Leung, C.W.1
Wong, T.N.2
Maka, K.L.3
Fung, R.Y.K.4
-
27
-
-
79955656034
-
A simulation-based scheduling system for real-time optimization and decision making support
-
Frantzen Marcus, Amos, H.C. Ng, and Philip Marcus Moore A simulation-based scheduling system for real-time optimization and decision making support Robot. Computer-Integrated Manuf. 27 2011 696 705
-
(2011)
Robot. Computer-Integrated Manuf.
, vol.27
, pp. 696-705
-
-
Marcus, F.1
Amos2
Ng, H.C.3
Moore, P.M.4
-
28
-
-
34948883274
-
Metameta-heuristic multiobjective optimisation approach for the scheduling of multiproduct batch chemical plants
-
José Arbiza María, Bonfill Anna, Guillén Gonzalo, D. Mele Fernando, Espuña Antonio, and Puigjaner Luis Metameta-heuristic multiobjective optimisation approach for the scheduling of multiproduct batch chemical plants J. Clean. Prod. 16 2 2008 233 244
-
(2008)
J. Clean. Prod.
, vol.16
, Issue.2
, pp. 233-244
-
-
María, J.A.1
Anna, B.2
Gonzalo, G.3
Fernando, D.M.4
Antonio, E.5
Luis, P.6
-
29
-
-
80052483162
-
A parallel bi-objective hybrid metaheuristic for energy-aware scheduling for cloud computing systems
-
M. Mezmaz, N. Melab, Y. Kessaci, Y.C. Lee, E.G. Talbi, A.Y. Zomaya, and D. Tuyttens A parallel bi-objective hybrid metaheuristic for energy-aware scheduling for cloud computing systems J. Parallel Distributed Comput. 71 11 2011 1497 1508
-
(2011)
J. Parallel Distributed Comput.
, vol.71
, Issue.11
, pp. 1497-1508
-
-
Mezmaz, M.1
Melab, N.2
Kessaci, Y.3
Lee, Y.C.4
Talbi, E.G.5
Zomaya, A.Y.6
Tuyttens, D.7
-
30
-
-
78650636006
-
A framework to minimise total energy consumption and total tardiness on a single machine
-
G. Mouzon, and M.B. Yildirim A framework to minimise total energy consumption and total tardiness on a single machine Int. J. Sustain. Eng. 1 2008 105 116
-
(2008)
Int. J. Sustain. Eng.
, vol.1
, pp. 105-116
-
-
Mouzon, G.1
Yildirim, M.B.2
-
31
-
-
0029369363
-
An analytical approach for determining the environmental impact of machining processes
-
A.A. Munoz, and P. Sheng An analytical approach for determining the environmental impact of machining processes J. Mater. Process. Technol. 53 1995 736 758
-
(1995)
J. Mater. Process. Technol.
, vol.53
, pp. 736-758
-
-
Munoz, A.A.1
Sheng, P.2
-
32
-
-
77955420167
-
Cleaner manufacture of multipurpose batch chemical and biochemical plants. Scheduling and optimal choice of production recipes
-
Gr Natasha, Vaklieva-Bancheva, and Elisaveta G. Kirilova Cleaner manufacture of multipurpose batch chemical and biochemical plants. Scheduling and optimal choice of production recipes J. Clean. Prod. 18 13 2010 1300 1310
-
(2010)
J. Clean. Prod.
, vol.18
, Issue.13
, pp. 1300-1310
-
-
Natasha, G.1
Vaklieva-Bancheva2
Kirilova, E.G.3
-
33
-
-
38249025037
-
Simulated annealing for permutation flow-shop scheduling
-
I.H. Osman, and C.N. Potts Simulated annealing for permutation flow-shop scheduling Omega 17 6 1989 551 557
-
(1989)
Omega
, vol.17
, Issue.6
, pp. 551-557
-
-
Osman, I.H.1
Potts, C.N.2
-
34
-
-
40249118429
-
A genetic algorithm for the flexible job-shop scheduling problem
-
F. Pezzella, G. Morganti, and G. Ciaschetti A genetic algorithm for the flexible job-shop scheduling problem Comput. Oper. Res. 35 10 2008 3202 3212
-
(2008)
Comput. Oper. Res.
, vol.35
, Issue.10
, pp. 3202-3212
-
-
Pezzella, F.1
Morganti, G.2
Ciaschetti, G.3
-
35
-
-
0000655488
-
The two-stage assembly scheduling problem: Complexity and approximation
-
C.N. Potts, S.V. Sevast'Janov, V.A. Strusevich, L.N. Van Wassenhove, and C.M. Zwaneveld The two-stage assembly scheduling problem: complexity and approximation Oper. Res. 43 2 1995 346 355
-
(1995)
Oper. Res.
, vol.43
, Issue.2
, pp. 346-355
-
-
Potts, C.N.1
Sevast'Janov, S.V.2
Strusevich, V.A.3
Van Wassenhove, L.N.4
Zwaneveld, C.M.5
-
36
-
-
0033835974
-
Describing water quality with aggregate Index
-
K. Swamee Prabhat, and Tyagi Aditya Describing water quality with aggregate Index J. Environ. Eng. 126 2000 451 455
-
(2000)
J. Environ. Eng.
, vol.126
, pp. 451-455
-
-
Prabhat, K.S.1
Aditya, T.2
-
37
-
-
34948838203
-
Effective scheduling of a large-scale paint production system
-
Adonyi Róbert, Biros Gábor, Holczinger Tibor, and Friedler Ferenc Effective scheduling of a large-scale paint production system J. Clean. Prod. 16 2 2008 225 232
-
(2008)
J. Clean. Prod.
, vol.16
, Issue.2
, pp. 225-232
-
-
Róbert, A.1
Gábor, B.2
Tibor, H.3
Ferenc, F.4
-
38
-
-
79960566619
-
A discrete firefly meta-heuristic with local search for makespan minimization in permutation flow shop scheduling problems
-
M. Sayadi, R. Ramezanian, and N. Ghaffari-Nasab A discrete firefly meta-heuristic with local search for makespan minimization in permutation flow shop scheduling problems Int. J. Ind. Eng. Comput. 1 1 2010 1 10
-
(2010)
Int. J. Ind. Eng. Comput.
, vol.1
, Issue.1
, pp. 1-10
-
-
Sayadi, M.1
Ramezanian, R.2
Ghaffari-Nasab, N.3
-
41
-
-
84894049604
-
Optimizing the production scheduling of a single machine to minimize total energy consumption costs
-
F. Shrouf, J. Ordieres-Meré, A. García-Sánchez, and M. Ortega-Mier Optimizing the production scheduling of a single machine to minimize total energy consumption costs J. Clean. Prod. 67 2014 197 207
-
(2014)
J. Clean. Prod.
, vol.67
, pp. 197-207
-
-
Shrouf, F.1
Ordieres-Meré, J.2
García-Sánchez, A.3
Ortega-Mier, M.4
-
42
-
-
27644439216
-
Scheduling issues for environmentally responsible manufacturing, the case of hoist scheduling in an electroplating line
-
C. Subai, and N.E. Baptiste Scheduling issues for environmentally responsible manufacturing, the case of hoist scheduling in an electroplating line Int. J. Prod. Eng. 99 2006 74 87
-
(2006)
Int. J. Prod. Eng.
, vol.99
, pp. 74-87
-
-
Subai, C.1
Baptiste, N.E.2
-
43
-
-
84893817036
-
Potential capability estimation for real time electricity demand response of sustainable manufacturing systems using Markov Decision Process
-
Zeyi Sun, and Lin Li Potential capability estimation for real time electricity demand response of sustainable manufacturing systems using Markov Decision Process J. Clean. Prod. 65 2014 184 193
-
(2014)
J. Clean. Prod.
, vol.65
, pp. 184-193
-
-
Sun, Z.1
Li, L.2
-
45
-
-
34548237317
-
A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: Weighted mean completion time and weighted mean tardiness
-
R. Tavakkoli-Moghaddam, A. Rahimi-Vahed, and A.H. Mirzaei A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: weighted mean completion time and weighted mean tardiness Inf. Sci. 177 22 2007 5072 5090
-
(2007)
Inf. Sci.
, vol.177
, Issue.22
, pp. 5072-5090
-
-
Tavakkoli-Moghaddam, R.1
Rahimi-Vahed, A.2
Mirzaei, A.H.3
-
46
-
-
53049097607
-
Cooperative metaheuristics for the permutation flowshop scheduling problem
-
E. Vallada, and R. Ruiz Cooperative metaheuristics for the permutation flowshop scheduling problem Eur. J. Oper. Res. 193 2 2009 365 376
-
(2009)
Eur. J. Oper. Res.
, vol.193
, Issue.2
, pp. 365-376
-
-
Vallada, E.1
Ruiz, R.2
-
47
-
-
13544263208
-
A multi-objective simulated- annealing algorithm for scheduling in flow shops to minimize the makespan and total flowtime of jobs
-
T.K. Varadharajan, and C. Rajendran A multi-objective simulated- annealing algorithm for scheduling in flow shops to minimize the makespan and total flowtime of jobs Eur. J. Oper. Res. 167 2005 772 795
-
(2005)
Eur. J. Oper. Res.
, vol.167
, pp. 772-795
-
-
Varadharajan, T.K.1
Rajendran, C.2
-
48
-
-
77953216458
-
Optimal scheduling to achieve energy reduction in auto-motive paint shops
-
J. Wang, J. Li, and N. Huang Optimal scheduling to achieve energy reduction in auto-motive paint shops Proceedings of 2009 ASME Manufacturing Science and Engineering Conference, West Lafayette, Indiana, USA 2009
-
(2009)
Proceedings of 2009 ASME Manufacturing Science and Engineering Conference, West Lafayette, Indiana, USA
-
-
Wang, J.1
Li, J.2
Huang, N.3
-
49
-
-
84869491524
-
A hybrid approach based on the variable neighbourhood search and particle swarm optimization for parallel machine scheduling problems - A case study for solar cell industry
-
Chen Yin-Yann, Cheng Chen-Yang, Wang Li-Chih, and Chen Tzu-Li A hybrid approach based on the variable neighbourhood search and particle swarm optimization for parallel machine scheduling problems - a case study for solar cell industry Int. J. Prod. Econ. 141 1 2013 66 78
-
(2013)
Int. J. Prod. Econ.
, vol.141
, Issue.1
, pp. 66-78
-
-
Yin-Yann, C.1
Chen-Yang, C.2
Li-Chih, W.3
Tzu-Li, C.4
-
50
-
-
84879843118
-
Control of machining parameters for energy and cost savings in micro-scale drilling of PCBs
-
H.S. Yoon, J.S. Moon, M.Q. Pham, G.B. Lee, and S.H. Ahn Control of machining parameters for energy and cost savings in micro-scale drilling of PCBs J. Clean. Prod. 54 2013 41 48
-
(2013)
J. Clean. Prod.
, vol.54
, pp. 41-48
-
-
Yoon, H.S.1
Moon, J.S.2
Pham, M.Q.3
Lee, G.B.4
Ahn, S.H.5
-
51
-
-
54449086192
-
Minimizing makespan in permutation flow shop scheduling problems using a hybrid metaheuristic algorithm
-
G.I. Zobolas, C.D. Tarantilis, and G. Loannou Minimizing makespan in permutation flow shop scheduling problems using a hybrid metaheuristic algorithm Comput. Oper. Res. 36 4 2009 1249 1267
-
(2009)
Comput. Oper. Res.
, vol.36
, Issue.4
, pp. 1249-1267
-
-
Zobolas, G.I.1
Tarantilis, C.D.2
Loannou, G.3
|