메뉴 건너뛰기




Volumn 108, Issue , 2015, Pages 256-270

Econological scheduling of a manufacturing enterprise operating under a time-of-use electricity tariff

Author keywords

Discrete event simulation; Econological scheduling; Sustainable manufacturing; Time of use tariff

Indexed keywords

DISCRETE EVENT SIMULATION; ENERGY UTILIZATION; ENVIRONMENTAL IMPACT; MANUFACTURE; SCHEDULING;

EID: 84946479907     PISSN: 09596526     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jclepro.2015.06.002     Document Type: Article
Times cited : (81)

References (51)
  • 1
    • 80053911225 scopus 로고    scopus 로고
    • On electrical load tracking scheduling for a steel plant
    • Hait Alain, and Artigues Christian On electrical load tracking scheduling for a steel plant Comput. Chem. Eng. 35 2011 3044 3047
    • (2011) Comput. Chem. Eng. , vol.35 , pp. 3044-3047
    • Alain, H.1    Christian, A.2
  • 2
    • 49849094402 scopus 로고    scopus 로고
    • A summary of demand response in electricity markets
    • M.H. Albadi, and E.F. El-Saadany A summary of demand response in electricity markets Electr. Power Syst. Res. 78 11 2008 1989 1996
    • (2008) Electr. Power Syst. Res. , vol.78 , Issue.11 , pp. 1989-1996
    • Albadi, M.H.1    El-Saadany, E.F.2
  • 3
    • 62549097706 scopus 로고    scopus 로고
    • The two-stage assembly scheduling problem to minimize total completion time with setup times
    • A. Allahverdi, and F.S. Al-Anzi The two-stage assembly scheduling problem to minimize total completion time with setup times Comput. Oper. Res. 36 10 2009 2740 2747
    • (2009) Comput. Oper. Res. , vol.36 , Issue.10 , pp. 2740-2747
    • Allahverdi, A.1    Al-Anzi, F.S.2
  • 4
    • 6944244339 scopus 로고    scopus 로고
    • An application of a multi objective tabu search algorithm to a bi-criteria flow shop problem
    • V.A. Armentano, and J.E.C. Arroyo An application of a multi objective tabu search algorithm to a bi-criteria flow shop problem J. Meta-heuristics 10 2004 463 481
    • (2004) J. Meta-heuristics , vol.10 , pp. 463-481
    • Armentano, V.A.1    Arroyo, J.E.C.2
  • 5
    • 33644518668 scopus 로고    scopus 로고
    • Peak-load management in steel plants
    • S. Ashok Peak-load management in steel plants Appl. Energy 83 2006 413 424
    • (2006) Appl. Energy , vol.83 , pp. 413-424
    • Ashok, S.1
  • 7
    • 9544220684 scopus 로고    scopus 로고
    • Beam-ACO hybridizing ant colony optimization with beam search: An application to open shop scheduling
    • C. Blum Beam-ACO hybridizing ant colony optimization with beam search: an application to open shop scheduling Comput. Oper. Res. 32 6 2005 1565 1591
    • (2005) Comput. Oper. Res. , vol.32 , Issue.6 , pp. 1565-1591
    • Blum, C.1
  • 8
    • 34250084648 scopus 로고
    • Routing and scheduling in a flexible job shop by tabu search
    • P. Brandimarte Routing and scheduling in a flexible job shop by tabu search Ann. Oper. Res. 41 3 1993 157 183
    • (1993) Ann. Oper. Res. , vol.41 , Issue.3 , pp. 157-183
    • Brandimarte, P.1
  • 9
    • 0025531716 scopus 로고
    • Job-shop scheduling with multi-purpose machines
    • P. Brucker, and R. Schlie Job-shop scheduling with multi-purpose machines Computing 45 4 1990 369 375
    • (1990) Computing , vol.45 , Issue.4 , pp. 369-375
    • Brucker, P.1    Schlie, R.2
  • 10
    • 33847658312 scopus 로고    scopus 로고
    • Sub-population genetic algorithm with mining gene structures for multi-objective flow shop scheduling problems
    • P.C. Chang, S.H. Chen, and C.H. Liu Sub-population genetic algorithm with mining gene structures for multi-objective flow shop scheduling problems Expert Syst. Appl. 33 2007 762 771
    • (2007) Expert Syst. Appl. , vol.33 , pp. 762-771
    • Chang, P.C.1    Chen, S.H.2    Liu, C.H.3
  • 11
    • 79951581770 scopus 로고    scopus 로고
    • Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem
    • Ruey Maw Chen Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem Expert Syst. Appl. 38 2011 7102 7111
    • (2011) Expert Syst. Appl. , vol.38 , pp. 7102-7111
    • Chen, R.M.1
  • 13
    • 0000131850 scopus 로고
    • A taxonomy of discrete manufacturing systems
    • B.L. Dietrich A taxonomy of discrete manufacturing systems Oper. Res. 39 6 1991 886 902
    • (1991) Oper. Res. , vol.39 , Issue.6 , pp. 886-902
    • Dietrich, B.L.1
  • 15
    • 84894049604 scopus 로고    scopus 로고
    • Optimizing the production scheduling of a single machine to minimize total energy consumption costs
    • Shrouf Fadi, Ordieres-Meré Joaquin, García-Sánchez Alvaro, and Ortega-Mier Miguel Optimizing the production scheduling of a single machine to minimize total energy consumption costs J. Clean. Prod. 67 2014 197 207
    • (2014) J. Clean. Prod. , vol.67 , pp. 197-207
    • Fadi, S.1    Joaquin, O.-M.2    Alvaro, G.-S.3    Miguel, O.-M.4
  • 16
    • 80054680608 scopus 로고    scopus 로고
    • A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction
    • Kan Fang, Uhan Nelson, Zhao Fu, and John W. Sutherland A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction J. Manuf. Syst. 3 2011 234 240
    • (2011) J. Manuf. Syst. , vol.3 , pp. 234-240
    • Fang, K.1    Nelson, U.2    Fu, Z.3    Sutherland, J.W.4
  • 17
    • 0017012325 scopus 로고
    • Open shop scheduling to minimize finish time
    • T. Gonzalez, and S. Sahni Open shop scheduling to minimize finish time J. ACM 23 4 1976 665 679
    • (1976) J. ACM , vol.23 , Issue.4 , pp. 665-679
    • Gonzalez, T.1    Sahni, S.2
  • 19
    • 55849097321 scopus 로고    scopus 로고
    • A framework of scheduling models in machining workshop for green manufacturing
    • Y.A.N. He, F.E.I. Liu, and J. Shi A framework of scheduling models in machining workshop for green manufacturing J. Adv. Manuf. Syst. 7 02 2008 319 322
    • (2008) J. Adv. Manuf. Syst. , vol.7 , Issue.2 , pp. 319-322
    • He, Y.A.N.1    Liu, F.E.I.2    Shi, J.3
  • 20
    • 82055191581 scopus 로고    scopus 로고
    • A modeling method of task-oriented energy consumption for machining manufacturing system
    • Y. He, B. Liu, X. Zhang, H. Gao, and X. Liu A modeling method of task-oriented energy consumption for machining manufacturing system J. Clean. Prod. 23 1 2012 167 174
    • (2012) J. Clean. Prod. , vol.23 , Issue.1 , pp. 167-174
    • He, Y.1    Liu, B.2    Zhang, X.3    Gao, H.4    Liu, X.5
  • 21
    • 79957656407 scopus 로고    scopus 로고
    • Energy oriented simulation of manufacturing systems - Concept and application
    • C. Herrmann, S. Thiede, S. Kara, and J. Hesselbach Energy oriented simulation of manufacturing systems - concept and application CIRP Ann. Manuf. Technol. 60 2011 45 48
    • (2011) CIRP Ann. Manuf. Technol. , vol.60 , pp. 45-48
    • Herrmann, C.1    Thiede, S.2    Kara, S.3    Hesselbach, J.4
  • 22
    • 0030701160 scopus 로고    scopus 로고
    • An analytical method for integrating environmental and traditional design considerations
    • Paul Jackson, David Wallace, Esther Harold, E. Edgerton, and Richard Kegg An analytical method for integrating environmental and traditional design considerations CIRP Ann. Manuf. Technol. 46 1997 355 360
    • (1997) CIRP Ann. Manuf. Technol. , vol.46 , pp. 355-360
    • Jackson, P.1    Wallace, D.2    Harold, E.3    Edgerton, E.4    Kegg, R.5
  • 23
    • 84864373970 scopus 로고    scopus 로고
    • Price-based demand side management, assessing the impacts of time-of-use tariffs on residential electricity demand and peak shifting in Northern Italy
    • Torriti Jacopo Price-based demand side management, assessing the impacts of time-of-use tariffs on residential electricity demand and peak shifting in Northern Italy Energy 44 2012 576 583
    • (2012) Energy , vol.44 , pp. 576-583
    • Jacopo, T.1
  • 24
    • 77956872862 scopus 로고    scopus 로고
    • Electrical load tracking scheduling of a steel plant
    • Nolde Kristian, and Morari Manfred Electrical load tracking scheduling of a steel plant Comput. Chem. Eng. 34 2010 1899 1903
    • (2010) Comput. Chem. Eng. , vol.34 , pp. 1899-1903
    • Kristian, N.1    Manfred, M.2
  • 25
    • 0027590319 scopus 로고
    • Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem
    • C.Y. Lee, T.C.E. Cheng, and B.M.T. Lin Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem Manag. Sci. 39 5 1993 616 625
    • (1993) Manag. Sci. , vol.39 , Issue.5 , pp. 616-625
    • Lee, C.Y.1    Cheng, T.C.E.2    Lin, B.M.T.3
  • 26
    • 77955268719 scopus 로고    scopus 로고
    • Integrated process planning and scheduling by an agent-based ant colony optimization
    • C.W. Leung, T.N. Wong, K.L. Maka, and R.Y.K. Fung Integrated process planning and scheduling by an agent-based ant colony optimization Comput. Ind. Eng. 59 2010 166 180
    • (2010) Comput. Ind. Eng. , vol.59 , pp. 166-180
    • Leung, C.W.1    Wong, T.N.2    Maka, K.L.3    Fung, R.Y.K.4
  • 27
    • 79955656034 scopus 로고    scopus 로고
    • A simulation-based scheduling system for real-time optimization and decision making support
    • Frantzen Marcus, Amos, H.C. Ng, and Philip Marcus Moore A simulation-based scheduling system for real-time optimization and decision making support Robot. Computer-Integrated Manuf. 27 2011 696 705
    • (2011) Robot. Computer-Integrated Manuf. , vol.27 , pp. 696-705
    • Marcus, F.1    Amos2    Ng, H.C.3    Moore, P.M.4
  • 28
    • 34948883274 scopus 로고    scopus 로고
    • Metameta-heuristic multiobjective optimisation approach for the scheduling of multiproduct batch chemical plants
    • José Arbiza María, Bonfill Anna, Guillén Gonzalo, D. Mele Fernando, Espuña Antonio, and Puigjaner Luis Metameta-heuristic multiobjective optimisation approach for the scheduling of multiproduct batch chemical plants J. Clean. Prod. 16 2 2008 233 244
    • (2008) J. Clean. Prod. , vol.16 , Issue.2 , pp. 233-244
    • María, J.A.1    Anna, B.2    Gonzalo, G.3    Fernando, D.M.4    Antonio, E.5    Luis, P.6
  • 30
    • 78650636006 scopus 로고    scopus 로고
    • A framework to minimise total energy consumption and total tardiness on a single machine
    • G. Mouzon, and M.B. Yildirim A framework to minimise total energy consumption and total tardiness on a single machine Int. J. Sustain. Eng. 1 2008 105 116
    • (2008) Int. J. Sustain. Eng. , vol.1 , pp. 105-116
    • Mouzon, G.1    Yildirim, M.B.2
  • 31
    • 0029369363 scopus 로고
    • An analytical approach for determining the environmental impact of machining processes
    • A.A. Munoz, and P. Sheng An analytical approach for determining the environmental impact of machining processes J. Mater. Process. Technol. 53 1995 736 758
    • (1995) J. Mater. Process. Technol. , vol.53 , pp. 736-758
    • Munoz, A.A.1    Sheng, P.2
  • 32
    • 77955420167 scopus 로고    scopus 로고
    • Cleaner manufacture of multipurpose batch chemical and biochemical plants. Scheduling and optimal choice of production recipes
    • Gr Natasha, Vaklieva-Bancheva, and Elisaveta G. Kirilova Cleaner manufacture of multipurpose batch chemical and biochemical plants. Scheduling and optimal choice of production recipes J. Clean. Prod. 18 13 2010 1300 1310
    • (2010) J. Clean. Prod. , vol.18 , Issue.13 , pp. 1300-1310
    • Natasha, G.1    Vaklieva-Bancheva2    Kirilova, E.G.3
  • 33
    • 38249025037 scopus 로고
    • Simulated annealing for permutation flow-shop scheduling
    • I.H. Osman, and C.N. Potts Simulated annealing for permutation flow-shop scheduling Omega 17 6 1989 551 557
    • (1989) Omega , vol.17 , Issue.6 , pp. 551-557
    • Osman, I.H.1    Potts, C.N.2
  • 34
    • 40249118429 scopus 로고    scopus 로고
    • A genetic algorithm for the flexible job-shop scheduling problem
    • F. Pezzella, G. Morganti, and G. Ciaschetti A genetic algorithm for the flexible job-shop scheduling problem Comput. Oper. Res. 35 10 2008 3202 3212
    • (2008) Comput. Oper. Res. , vol.35 , Issue.10 , pp. 3202-3212
    • Pezzella, F.1    Morganti, G.2    Ciaschetti, G.3
  • 36
    • 0033835974 scopus 로고    scopus 로고
    • Describing water quality with aggregate Index
    • K. Swamee Prabhat, and Tyagi Aditya Describing water quality with aggregate Index J. Environ. Eng. 126 2000 451 455
    • (2000) J. Environ. Eng. , vol.126 , pp. 451-455
    • Prabhat, K.S.1    Aditya, T.2
  • 37
    • 34948838203 scopus 로고    scopus 로고
    • Effective scheduling of a large-scale paint production system
    • Adonyi Róbert, Biros Gábor, Holczinger Tibor, and Friedler Ferenc Effective scheduling of a large-scale paint production system J. Clean. Prod. 16 2 2008 225 232
    • (2008) J. Clean. Prod. , vol.16 , Issue.2 , pp. 225-232
    • Róbert, A.1    Gábor, B.2    Tibor, H.3    Ferenc, F.4
  • 38
    • 79960566619 scopus 로고    scopus 로고
    • A discrete firefly meta-heuristic with local search for makespan minimization in permutation flow shop scheduling problems
    • M. Sayadi, R. Ramezanian, and N. Ghaffari-Nasab A discrete firefly meta-heuristic with local search for makespan minimization in permutation flow shop scheduling problems Int. J. Ind. Eng. Comput. 1 1 2010 1 10
    • (2010) Int. J. Ind. Eng. Comput. , vol.1 , Issue.1 , pp. 1-10
    • Sayadi, M.1    Ramezanian, R.2    Ghaffari-Nasab, N.3
  • 41
    • 84894049604 scopus 로고    scopus 로고
    • Optimizing the production scheduling of a single machine to minimize total energy consumption costs
    • F. Shrouf, J. Ordieres-Meré, A. García-Sánchez, and M. Ortega-Mier Optimizing the production scheduling of a single machine to minimize total energy consumption costs J. Clean. Prod. 67 2014 197 207
    • (2014) J. Clean. Prod. , vol.67 , pp. 197-207
    • Shrouf, F.1    Ordieres-Meré, J.2    García-Sánchez, A.3    Ortega-Mier, M.4
  • 42
    • 27644439216 scopus 로고    scopus 로고
    • Scheduling issues for environmentally responsible manufacturing, the case of hoist scheduling in an electroplating line
    • C. Subai, and N.E. Baptiste Scheduling issues for environmentally responsible manufacturing, the case of hoist scheduling in an electroplating line Int. J. Prod. Eng. 99 2006 74 87
    • (2006) Int. J. Prod. Eng. , vol.99 , pp. 74-87
    • Subai, C.1    Baptiste, N.E.2
  • 43
    • 84893817036 scopus 로고    scopus 로고
    • Potential capability estimation for real time electricity demand response of sustainable manufacturing systems using Markov Decision Process
    • Zeyi Sun, and Lin Li Potential capability estimation for real time electricity demand response of sustainable manufacturing systems using Markov Decision Process J. Clean. Prod. 65 2014 184 193
    • (2014) J. Clean. Prod. , vol.65 , pp. 184-193
    • Sun, Z.1    Li, L.2
  • 45
    • 34548237317 scopus 로고    scopus 로고
    • A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: Weighted mean completion time and weighted mean tardiness
    • R. Tavakkoli-Moghaddam, A. Rahimi-Vahed, and A.H. Mirzaei A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: weighted mean completion time and weighted mean tardiness Inf. Sci. 177 22 2007 5072 5090
    • (2007) Inf. Sci. , vol.177 , Issue.22 , pp. 5072-5090
    • Tavakkoli-Moghaddam, R.1    Rahimi-Vahed, A.2    Mirzaei, A.H.3
  • 46
    • 53049097607 scopus 로고    scopus 로고
    • Cooperative metaheuristics for the permutation flowshop scheduling problem
    • E. Vallada, and R. Ruiz Cooperative metaheuristics for the permutation flowshop scheduling problem Eur. J. Oper. Res. 193 2 2009 365 376
    • (2009) Eur. J. Oper. Res. , vol.193 , Issue.2 , pp. 365-376
    • Vallada, E.1    Ruiz, R.2
  • 47
    • 13544263208 scopus 로고    scopus 로고
    • A multi-objective simulated- annealing algorithm for scheduling in flow shops to minimize the makespan and total flowtime of jobs
    • T.K. Varadharajan, and C. Rajendran A multi-objective simulated- annealing algorithm for scheduling in flow shops to minimize the makespan and total flowtime of jobs Eur. J. Oper. Res. 167 2005 772 795
    • (2005) Eur. J. Oper. Res. , vol.167 , pp. 772-795
    • Varadharajan, T.K.1    Rajendran, C.2
  • 49
    • 84869491524 scopus 로고    scopus 로고
    • A hybrid approach based on the variable neighbourhood search and particle swarm optimization for parallel machine scheduling problems - A case study for solar cell industry
    • Chen Yin-Yann, Cheng Chen-Yang, Wang Li-Chih, and Chen Tzu-Li A hybrid approach based on the variable neighbourhood search and particle swarm optimization for parallel machine scheduling problems - a case study for solar cell industry Int. J. Prod. Econ. 141 1 2013 66 78
    • (2013) Int. J. Prod. Econ. , vol.141 , Issue.1 , pp. 66-78
    • Yin-Yann, C.1    Chen-Yang, C.2    Li-Chih, W.3    Tzu-Li, C.4
  • 50
    • 84879843118 scopus 로고    scopus 로고
    • Control of machining parameters for energy and cost savings in micro-scale drilling of PCBs
    • H.S. Yoon, J.S. Moon, M.Q. Pham, G.B. Lee, and S.H. Ahn Control of machining parameters for energy and cost savings in micro-scale drilling of PCBs J. Clean. Prod. 54 2013 41 48
    • (2013) J. Clean. Prod. , vol.54 , pp. 41-48
    • Yoon, H.S.1    Moon, J.S.2    Pham, M.Q.3    Lee, G.B.4    Ahn, S.H.5
  • 51
    • 54449086192 scopus 로고    scopus 로고
    • Minimizing makespan in permutation flow shop scheduling problems using a hybrid metaheuristic algorithm
    • G.I. Zobolas, C.D. Tarantilis, and G. Loannou Minimizing makespan in permutation flow shop scheduling problems using a hybrid metaheuristic algorithm Comput. Oper. Res. 36 4 2009 1249 1267
    • (2009) Comput. Oper. Res. , vol.36 , Issue.4 , pp. 1249-1267
    • Zobolas, G.I.1    Tarantilis, C.D.2    Loannou, G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.