메뉴 건너뛰기




Volumn 7, Issue 2, 2008, Pages 319-322

A framework of scheduling models in machining workshop for green manufacturing

Author keywords

Environmentally conscious manufacturing; Green manufacturing; Scheduling

Indexed keywords

MACHINING; MANUFACTURE; PROCESS ENGINEERING; PRODUCTION ENGINEERING; SCHEDULING; TECHNICAL PRESENTATIONS;

EID: 55849097321     PISSN: 02196867     EISSN: None     Source Type: Journal    
DOI: 10.1142/S0219686708001413     Document Type: Article
Times cited : (21)

References (3)
  • 3
    • 34249301375 scopus 로고    scopus 로고
    • Job scheduling model of a machining system for green manufacturing
    • Y. He, F. Liu and H. J. Cao, Job scheduling model of a machining system for green manufacturing, Chinese Journal of Mechanical Engineering 43 (2007) 27-33.
    • (2007) Chinese Journal of Mechanical Engineering , vol.43 , pp. 27-33
    • He, Y.1    Liu, F.2    Cao, H.J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.