1
-
-
0027590319
-
Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem
-
Lee C.Y., Cheng T.C.E., and Lin B.M.T. Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem. Management Science 39 (1993) 616-625
-
(1993)
Management Science
, vol.39
, pp. 616-625
-
-
Lee, C.Y.1
Cheng, T.C.E.2
Lin, B.M.T.3
-
2
-
-
0000655488
-
The two-stage assembly scheduling problem: complexity and approximation
-
Potts C.N., Sevast'janov S.V., Strusevich V.A., Van Wassenhove L.N., and Zwaneveld C.M. The two-stage assembly scheduling problem: complexity and approximation. Operations Research 43 (1995) 346-355
-
(1995)
Operations Research
, vol.43
, pp. 346-355
-
-
Potts, C.N.1
Sevast'janov, S.V.2
Strusevich, V.A.3
Van Wassenhove, L.N.4
Zwaneveld, C.M.5
-
3
-
-
27144557504
-
A PSO and a tabu search heuristics for assembly scheduling problem of the two-stage distributed database application
-
Allahverdi A., and Al-Anzi F.S. A PSO and a tabu search heuristics for assembly scheduling problem of the two-stage distributed database application. Computers & Operations Research 33 (2006) 1056-1080
-
(2006)
Computers & Operations Research
, vol.33
, pp. 1056-1080
-
-
Allahverdi, A.1
Al-Anzi, F.S.2
-
4
-
-
0031351397
-
A branch and bound algorithm for the two-stage assembly scheduling problem
-
Hariri A.M.A., and Potts C.N. A branch and bound algorithm for the two-stage assembly scheduling problem. European Journal of Operational Research 103 (1997) 547-556
-
(1997)
European Journal of Operational Research
, vol.103
, pp. 547-556
-
-
Hariri, A.M.A.1
Potts, C.N.2
-
5
-
-
0346932895
-
Optimal scheduling of the 3-machine assembly-type flow shop
-
Haouari M., and Daouas T. Optimal scheduling of the 3-machine assembly-type flow shop. RAIRO Recherche Operationnelle 33 (1999) 439-445
-
(1999)
RAIRO Recherche Operationnelle
, vol.33
, pp. 439-445
-
-
Haouari, M.1
Daouas, T.2
-
6
-
-
0037402009
-
Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling
-
Sun X., Morizawa K., and Nagasawa H. Powerful heuristics to minimize makespan in fixed, 3-machine, assembly-type flowshop scheduling. European Journal of Operational Research 146 (2003) 498-516
-
(2003)
European Journal of Operational Research
, vol.146
, pp. 498-516
-
-
Sun, X.1
Morizawa, K.2
Nagasawa, H.3
-
7
-
-
33749548509
-
Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times
-
Allahverdi A., and Al-Anzi F.S. Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times. International Journal of Production Research 44 (2006) 4713-4735
-
(2006)
International Journal of Production Research
, vol.44
, pp. 4713-4735
-
-
Allahverdi, A.1
Al-Anzi, F.S.2
-
8
-
-
34147159638
-
A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times
-
Al-Anzi F.S., and Allahverdi A. A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times. European Journal of Operational Research 182 (2007) 80-94
-
(2007)
European Journal of Operational Research
, vol.182
, pp. 80-94
-
-
Al-Anzi, F.S.1
Allahverdi, A.2
-
9
-
-
0037290545
-
A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem
-
Tozkapan A., Kirca O., and Chung C.S. A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem. Computers & Operations Research 30 (2003) 309-320
-
(2003)
Computers & Operations Research
, vol.30
, pp. 309-320
-
-
Tozkapan, A.1
Kirca, O.2
Chung, C.S.3
-
10
-
-
34147189601
-
A hybrid tabu search heuristic for the two-stage assembly scheduling problem
-
Al-Anzi F., and Allahverdi A. A hybrid tabu search heuristic for the two-stage assembly scheduling problem. International Journal of Operations Research 3 (2006) 109-119
-
(2006)
International Journal of Operations Research
, vol.3
, pp. 109-119
-
-
Al-Anzi, F.1
Allahverdi, A.2
-
16
-
-
33646834457
-
Self-adaptive differential evolution
-
December, Xi'an, China
-
Omran M, Salman A, Engelbrecht A. Self-adaptive differential evolution. In: Proceedings of the international conference on computational intelligence and security, December, Xi'an, China, 2005. p. 192-9.
-
(2005)
Proceedings of the international conference on computational intelligence and security
, pp. 192-199
-
-
Omran, M.1
Salman, A.2
Engelbrecht, A.3
-
18
-
-
40449129709
-
Modelling and solving a multimode and multisite industrial problem: Lagrangian relaxation and heuristic approaches
-
Gourgand M., Tchomte S.K., and Quilliot A. Modelling and solving a multimode and multisite industrial problem: Lagrangian relaxation and heuristic approaches. European Journal of Industrial Engineering 2 (2008) 190-206
-
(2008)
European Journal of Industrial Engineering
, vol.2
, pp. 190-206
-
-
Gourgand, M.1
Tchomte, S.K.2
Quilliot, A.3
-
20
-
-
84969451575
-
Heuristics for the single machine scheduling problem with early and quadratic tardy penalties
-
Valente J.M.S. Heuristics for the single machine scheduling problem with early and quadratic tardy penalties. European Journal of Industrial Engineering 1 (2007) 431-448
-
(2007)
European Journal of Industrial Engineering
, vol.1
, pp. 431-448
-
-
Valente, J.M.S.1
-
21
-
-
84969452433
-
Parameter setting in a bio-inspired model for dynamic flexible job shop scheduling with sequence-dependent setups
-
Yu X., Ram B., and Jiang X. Parameter setting in a bio-inspired model for dynamic flexible job shop scheduling with sequence-dependent setups. European Journal of Industrial Engineering 1 (2007) 182-199
-
(2007)
European Journal of Industrial Engineering
, vol.1
, pp. 182-199
-
-
Yu, X.1
Ram, B.2
Jiang, X.3
-
23
-
-
40449084200
-
An unrelated parallel machines model for an industrial production resetting problem
-
Pessan C., Bouquard J.L., and Neron E. An unrelated parallel machines model for an industrial production resetting problem. European Journal of Industrial Engineering 2 (2008) 153-171
-
(2008)
European Journal of Industrial Engineering
, vol.2
, pp. 153-171
-
-
Pessan, C.1
Bouquard, J.L.2
Neron, E.3
|