Volumn 31, Issue 5, 2015, Pages

Hybrid genetic algorithm with simulated annealing for resource-constrained project scheduling

Author keywords

Genetic algorithms; Hybrid algorithms; Project management software; Resource constrained project scheduling; Simulated annealing

Indexed keywords

BENCHMARKING; GENETIC ALGORITHMS; SIMULATED ANNEALING;

EID: 84939475842     PISSN: 0742597X     EISSN: 19435479     Source Type: Journal    
DOI: 10.1061/(ASCE)ME.1943-5479.0000323     Document Type: Article
Times cited : (47)

References (45)
  • 1
    • 79954584606 scopus 로고    scopus 로고
    • Artificial bee colony for resource constrained project scheduling problem
    • Akbari, R., Zeighami, V., and, Ziarati, K. (2011). " Artificial bee colony for resource constrained project scheduling problem." Int. J. Ind. Eng. Comput., 2 (1), 45-60.
    • (2011) Int. J. Ind. Eng. Comput. , vol.2 , Issue.1 , pp. 45-60
    • Akbari, R.1    Zeighami, V.2    Ziarati, K.3
  • 4
    • 0019342681 scopus 로고
    • Scheduling subject to resource constraints: Classification and complexity
    • Blazewicz, J., Lenstra, J., and, Rinnooy Kan, A. H. G. (1983). " Scheduling subject to resource constraints: Classification and complexity." Discrete Appl. Math., 5 (1), 11-24. 10.1016/0166-218X(83)90012-4 DAMADU 0166-218X
    • (1983) Discrete Appl. Math. , vol.5 , Issue.1 , pp. 11-24
    • Blazewicz, J.1    Lenstra, J.2    Rinnooy Kan, A.H.G.3
  • 5
    • 46949084708 scopus 로고    scopus 로고
    • Hybrid metaheuristics: An introduction
    • Blum, C., and, Roli, A. (2008). " Hybrid metaheuristics: An introduction." Stud. Comput. Intell., 114, 1-30. 10.1007/978-3-540-78295-7
    • (2008) Stud. Comput. Intell. , vol.114 , pp. 1-30
    • Blum, C.1    Roli, A.2
  • 6
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple modes version
    • Bouleimen, K., and, Lecocq, H. (2003). " A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple modes version." Eur. J. Oper. Res., 149 (2), 268-281. 10.1016/S0377-2217(02)00761-0 EJORDT 0377-2217
    • (2003) Eur. J. Oper. Res. , vol.149 , Issue.2 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 7
    • 77956717086 scopus 로고    scopus 로고
    • Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources
    • Bozorg Haddad, O., Mirmomeni, M., Zarezadeh Mehrizi, M., and, Mariño, M. A. (2010). " Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources." Comput. Optim. Appl., 47 (1), 97-128. 10.1007/s10589-008-9210-9 CPPPEF 0926-6003
    • (2010) Comput. Optim. Appl. , vol.47 , Issue.1 , pp. 97-128
    • Bozorg Haddad, O.1    Mirmomeni, M.2    Zarezadeh Mehrizi, M.3    Mariño, M.A.4
  • 8
    • 0021819411 scopus 로고
    • A thermodynamical approach to the travelling salesman problem: An efficient simulation algorithm
    • Cerny, V. (1985). " A thermodynamical approach to the travelling salesman problem: An efficient simulation algorithm." J. Optim. Theor. Appl., 45 (1), 41-51. 10.1007/BF00940812 JOTABN 0022-3239
    • (1985) J. Optim. Theor. Appl. , vol.45 , Issue.1 , pp. 41-51
    • Cerny, V.1
  • 10
    • 63549149518 scopus 로고    scopus 로고
    • Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints
    • Chen, P. H., and, Shahandashti, S. M. (2009). " Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints." Autom. Constr., 18 (4), 434-443. 10.1016/j.autcon.2008.10.007 AUCOES 0926-5805
    • (2009) Autom. Constr. , vol.18 , Issue.4 , pp. 434-443
    • Chen, P.H.1    Shahandashti, S.M.2
  • 11
    • 79951581770 scopus 로고    scopus 로고
    • Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem
    • Chen, R.-M. (2011). " Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem." Expert Syst. Appl., 38 (6), 7102-7111. 10.1016/j.eswa.2010.12.059 ESAPEH 0957-4174
    • (2011) Expert Syst. Appl. , vol.38 , Issue.6 , pp. 7102-7111
    • Chen, R.-M.1
  • 12
    • 79955395629 scopus 로고    scopus 로고
    • RESCON: Educational project scheduling software
    • Deblaere, F., Demeulemeester, E., and, Herroelen, W. (2011). " RESCON: Educational project scheduling software." Comput. Appl. Eng. Educ., 19 (2), 327-336. 10.1002/cae.v19.2 CAPEED
    • (2011) Comput. Appl. Eng. Educ. , vol.19 , Issue.2 , pp. 327-336
    • Deblaere, F.1    Demeulemeester, E.2    Herroelen, W.3
  • 15
    • 0034321183 scopus 로고    scopus 로고
    • Algorithm for scheduling with multiskilled constrained resources
    • Hegazy, T., Shabeeb, A. K., Elbeltagi, E., and, Cheema, T. (2000). " Algorithm for scheduling with multiskilled constrained resources." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2000)126:6(414), 414-421. JCEMD4 0733-9364
    • (2000) J. Constr. Eng. Manage. , pp. 414-421
    • Hegazy, T.1    Shabeeb, A.K.2    Elbeltagi, E.3    Cheema, T.4
  • 17
    • 12144278410 scopus 로고    scopus 로고
    • Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment
    • Herroelen, W., and, Leus, R. (2005). " Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment." J. Oper. Res. Soc., 56 (1), 102-109. 10.1057/palgrave.jors.2601813 JORSDZ
    • (2005) J. Oper. Res. Soc. , vol.56 , Issue.1 , pp. 102-109
    • Herroelen, W.1    Leus, R.2
  • 19
    • 33644910198 scopus 로고    scopus 로고
    • Improving real-parameter genetic algorithm with simulated annealing for engineering problems
    • Hwang, S. F., and, He, R. S. (2006). " Improving real-parameter genetic algorithm with simulated annealing for engineering problems." Adv. Eng. Software, 37 (6), 406-418. 10.1016/j.advengsoft.2005.08.002
    • (2006) Adv. Eng. Software , vol.37 , Issue.6 , pp. 406-418
    • Hwang, S.F.1    He, R.S.2
  • 20
    • 36749094527 scopus 로고    scopus 로고
    • A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
    • Jarboui, B., Damak, N., Siarry, P., and, Rebai, A. (2008). " A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems." Appl. Math. Comput., 195 (1), 299-308. 10.1016/j.amc.2007.04.096 AMHCBQ 0096-3003
    • (2008) Appl. Math. Comput. , vol.195 , Issue.1 , pp. 299-308
    • Jarboui, B.1    Damak, N.2    Siarry, P.3    Rebai, A.4
  • 21
    • 54249088030 scopus 로고    scopus 로고
    • Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling
    • Kim, J. L., and, Ellis, R. D. (2008). " Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2008)134:11(904), 904-913. JCEMD4 0733-9364
    • (2008) J. Constr. Eng. Manage. , pp. 904-913
    • Kim, J.L.1    Ellis, R.D.2
  • 22
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • Kirkpatrick, S., Gelatt, C. D., and, Vecchi, M. P. (1983). " Optimization by simulated annealing." Science, 220 (4598), 671-680. 10.1126/science.220.4598.671 SCIEAS 0036-8075
    • (1983) Science , vol.220 , Issue.4598 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt, C.D.2    Vecchi, M.P.3
  • 23
    • 0030788844 scopus 로고    scopus 로고
    • PSPLIB - A project scheduling library
    • Kolisch, R., and, Sprecher, A. (1997). " PSPLIB-A project scheduling library." Eur. J. Oper. Res., 96 (1), 205-216. 10.1016/S0377-2217(96)00170-1 EJORDT 0377-2217
    • (1997) Eur. J. Oper. Res. , vol.96 , Issue.1 , pp. 205-216
    • Kolisch, R.1    Sprecher, A.2
  • 24
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch, R., Sprecher, A., and, Drexl, A. (1995). " Characterization and generation of a general class of resource-constrained project scheduling problems." Manage. Sci., 41 (10), 1693-1703. 10.1287/mnsc.41.10.1693 MSCIAM 0025-1909
    • (1995) Manage. Sci. , vol.41 , Issue.10 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 25
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling: An update
    • Kolisch, R., and, Hartmann, S. (2006). " Experimental investigation of heuristics for resource-constrained project scheduling: An update." Eur. J. Oper. Res., 174 (1) 23-37. 10.1016/j.ejor.2005.01.065 EJORDT 0377-2217
    • (2006) Eur. J. Oper. Res. , vol.174 , Issue.1 , pp. 23-37
    • Kolisch, R.1    Hartmann, S.2
  • 26
    • 0020087944 scopus 로고
    • Multi-project scheduling: Categorization of heuristic rules performance
    • Kurtulus, I., and, Davis, E. W. (1982). " Multi-project scheduling: Categorization of heuristic rules performance." Manage. Sci., 28 (2), 161-172. 10.1287/mnsc.28.2.161 MSCIAM 0025-1909
    • (1982) Manage. Sci. , vol.28 , Issue.2 , pp. 161-172
    • Kurtulus, I.1    Davis, E.W.2
  • 27
    • 0030151930 scopus 로고    scopus 로고
    • Search heuristics for resource constrained project scheduling
    • Lee, J. K., and, Kim, Y. D. (1996). " Search heuristics for resource constrained project scheduling." J. Oper. Res. Soc., 47 (5), 678-689. 10.1057/jors.1996.79 JORSDZ
    • (1996) J. Oper. Res. Soc. , vol.47 , Issue.5 , pp. 678-689
    • Lee, J.K.1    Kim, Y.D.2
  • 28
    • 2342418329 scopus 로고    scopus 로고
    • A GA-based model for maximizing precast plant production under resource constraints
    • Leu, S. S., and, Hwang, S. T. (2001). " A GA-based model for maximizing precast plant production under resource constraints." Eng. Optim., 33 (5), 619-642. 10.1080/03052150108940936 EGOPAX 0305-215X
    • (2001) Eng. Optim. , vol.33 , Issue.5 , pp. 619-642
    • Leu, S.S.1    Hwang, S.T.2
  • 29
    • 0031236881 scopus 로고    scopus 로고
    • Degree of population diversity - A perspective on premature convergence in genetic algorithms and its Markov-chain analysis
    • Leung, Y., Gao, Y., and, Xu, Z. B. (1997). " Degree of population diversity-A perspective on premature convergence in genetic algorithms and its Markov-chain analysis." IEEE Trans. Neural Networks, 8 (5), 1165-1176. 10.1109/72.623217 ITNNEP 1045-9227
    • (1997) IEEE Trans. Neural Networks , vol.8 , Issue.5 , pp. 1165-1176
    • Leung, Y.1    Gao, Y.2    Xu, Z.B.3
  • 30
    • 0035279805 scopus 로고    scopus 로고
    • Project management in construction: Software use and research directions
    • Liberatore, M. J., Pollack-Johnson, B., and, Smith, C. A. (2001). " Project management in construction: Software use and research directions." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2001)127:2(101), 101-107. JCEMD4 0733-9364
    • (2001) J. Constr. Eng. Manage. , pp. 101-107
    • Liberatore, M.J.1    Pollack-Johnson, B.2    Smith, C.A.3
  • 31
    • 84875218491 scopus 로고    scopus 로고
    • Multi-level genetic algorithm for the resource-constrained re-entrant scheduling problem in the flow shop
    • Lin, D., Lee, C. K. M., and, Ho, W. (2013). " Multi-level genetic algorithm for the resource-constrained re-entrant scheduling problem in the flow shop." Eng. Appl. Artif. Intell., 26 (4), 1282-1290. 10.1016/j.engappai.2012.10.006 EAAIE6 0952-1976
    • (2013) Eng. Appl. Artif. Intell. , vol.26 , Issue.4 , pp. 1282-1290
    • Lin, D.1    Lee, C.K.M.2    Ho, W.3
  • 32
    • 0034559445 scopus 로고    scopus 로고
    • A multicriteria heuristic method to improve resource allocation in multiproject scheduling
    • Lova, A., Maroto, C., and, Tormos, P. (2000). " A multicriteria heuristic method to improve resource allocation in multiproject scheduling." Eur. J. Oper. Res., 127 (2), 408-424. 10.1016/S0377-2217(99)00490-7 EJORDT 0377-2217
    • (2000) Eur. J. Oper. Res. , vol.127 , Issue.2 , pp. 408-424
    • Lova, A.1    Maroto, C.2    Tormos, P.3
  • 33
    • 0442280309 scopus 로고    scopus 로고
    • Resource allocation with project management software
    • Mellentien, C., and, Trautmann, N. (2001). " Resource allocation with project management software." OR Spektrum, 23 (3), 383-394. 10.1007/PL00013358 ORSPD5 1436-6304
    • (2001) OR Spektrum , vol.23 , Issue.3 , pp. 383-394
    • Mellentien, C.1    Trautmann, N.2
  • 34
    • 0036672003 scopus 로고    scopus 로고
    • Ant colony optimization for resource-constrained project scheduling
    • Merkle, D., Middendorf, M., and, Schmeck, H. (2002). " Ant colony optimization for resource-constrained project scheduling." IEEE Trans. Evol. Comput., 6 (4), 333-346. 10.1109/TEVC.2002.802450 1089-778X
    • (2002) IEEE Trans. Evol. Comput. , vol.6 , Issue.4 , pp. 333-346
    • Merkle, D.1    Middendorf, M.2    Schmeck, H.3
  • 35
    • 84891473432 scopus 로고    scopus 로고
    • Extraction of decision alternatives in project management: Application of hybrid PSO-SFLA
    • Orouji, H., Bozorg Haddad, O., Fallah-Mehdipour, E., and, Mariño, M. A. (2013). " Extraction of decision alternatives in project management: Application of hybrid PSO-SFLA." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000186, 50-59. JMENEA 0742-597X
    • (2013) J. Manage. Eng. , pp. 50-59
    • Orouji, H.1    Bozorg Haddad, O.2    Fallah-Mehdipour, E.3    Mariño, M.A.4
  • 37
    • 0009627197 scopus 로고
    • A local constraint based analysis approach to project scheduling under general resource constraints
    • Özdamar, L., and, Ulusoy, G. (1994). " A local constraint based analysis approach to project scheduling under general resource constraints." Eur. J. Oper. Res., 79 (2), 287-298. 10.1016/0377-2217(94)90359-X EJORDT 0377-2217
    • (1994) Eur. J. Oper. Res. , vol.79 , Issue.2 , pp. 287-298
    • Özdamar, L.1    Ulusoy, G.2
  • 38
    • 0028203106 scopus 로고
    • Convergence properties of canonical genetic algorithms
    • Rudolph, G. (1994). " Convergence properties of canonical genetic algorithms." IEEE Trans. Neural Networks, 5 (1), 96-101. 10.1109/72.265964 ITNNEP 1045-9227
    • (1994) IEEE Trans. Neural Networks , vol.5 , Issue.1 , pp. 96-101
    • Rudolph, G.1
  • 39
    • 84861348428 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for the discrete time-cost trade-off problem
    • Sonmez, R., and, Bettemir, Ö. H. (2012). " A hybrid genetic algorithm for the discrete time-cost trade-off problem." Expert Syst. Appl., 39 (13), 11428-11434. 10.1016/j.eswa.2012.04.019 ESAPEH 0957-4174
    • (2012) Expert Syst. Appl. , vol.39 , Issue.13 , pp. 11428-11434
    • Sonmez, R.1    Bettemir, Ö.H.2
  • 40
    • 0036024939 scopus 로고    scopus 로고
    • Application of genetic algorithms to construction scheduling with or without resource constraints
    • Toklu, Y. C. (2002). " Application of genetic algorithms to construction scheduling with or without resource constraints." Can. J. Civ. Eng., 29 (3), 421-429. 10.1139/l02-034 CJCEB8 0315-1468
    • (2002) Can. J. Civ. Eng. , vol.29 , Issue.3 , pp. 421-429
    • Toklu, Y.C.1
  • 41
    • 0035617605 scopus 로고    scopus 로고
    • A competitive heuristic solution technique for resource-constrained project scheduling
    • Tormos, P., and, Lova, A. (2001). " A competitive heuristic solution technique for resource-constrained project scheduling." Ann. Oper. Res., 102 (1/4), 65-81. 10.1023/A:1010997814183 AOREEV 0254-5330
    • (2001) Ann. Oper. Res. , vol.102 , Issue.14 , pp. 65-81
    • Tormos, P.1    Lova, A.2
  • 42
    • 13444257593 scopus 로고    scopus 로고
    • Justification and RCPSP: A technique that pays
    • Valls, V., Ballestin, F., and, Quintanilla, M. S. (2005). " Justification and RCPSP: A technique that pays." Eur. J. Oper. Res., 165 (2), 375-386. 10.1016/j.ejor.2004.04.008 EJORDT 0377-2217
    • (2005) Eur. J. Oper. Res. , vol.165 , Issue.2 , pp. 375-386
    • Valls, V.1    Ballestin, F.2    Quintanilla, M.S.3
  • 43
    • 0035324670 scopus 로고    scopus 로고
    • An effective hybrid optimization strategy for job-shop scheduling problems
    • Wang, L., and, Zheng, D. Z. (2001). " An effective hybrid optimization strategy for job-shop scheduling problems." Comput. Oper. Res., 28 (6), 585-596. 10.1016/S0305-0548(99)00137-9 CMORAP 0305-0548
    • (2001) Comput. Oper. Res. , vol.28 , Issue.6 , pp. 585-596
    • Wang, L.1    Zheng, D.Z.2
  • 44
    • 84891375701 scopus 로고    scopus 로고
    • Improved particle swarm optimization for RCP scheduling problem
    • Wang, Q., and, Qi, J. (2009). " Improved particle swarm optimization for RCP scheduling problem." Adv. Intell. Soft Comput., 56, 49-57. 10.1007/978-3-642-01216-7
    • (2009) Adv. Intell. Soft Comput. , vol.56 , pp. 49-57
    • Wang, Q.1    Qi, J.2
  • 45
    • 84870712321 scopus 로고    scopus 로고
    • Ant colony optimization for multimode resource-constrained project scheduling
    • Zhang, H. (2012). " Ant colony optimization for multimode resource-constrained project scheduling." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000089, 150-159. JMENEA 0742-597X
    • (2012) J. Manage. Eng. , pp. 150-159
    • Zhang, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.