-
1
-
-
79954584606
-
Artificial bee colony for resource constrained project scheduling problem
-
Akbari, R., Zeighami, V., and, Ziarati, K. (2011). " Artificial bee colony for resource constrained project scheduling problem." Int. J. Ind. Eng. Comput., 2 (1), 45-60.
-
(2011)
Int. J. Ind. Eng. Comput.
, vol.2
, Issue.1
, pp. 45-60
-
-
Akbari, R.1
Zeighami, V.2
Ziarati, K.3
-
4
-
-
0019342681
-
Scheduling subject to resource constraints: Classification and complexity
-
Blazewicz, J., Lenstra, J., and, Rinnooy Kan, A. H. G. (1983). " Scheduling subject to resource constraints: Classification and complexity." Discrete Appl. Math., 5 (1), 11-24. 10.1016/0166-218X(83)90012-4 DAMADU 0166-218X
-
(1983)
Discrete Appl. Math.
, vol.5
, Issue.1
, pp. 11-24
-
-
Blazewicz, J.1
Lenstra, J.2
Rinnooy Kan, A.H.G.3
-
5
-
-
46949084708
-
Hybrid metaheuristics: An introduction
-
Blum, C., and, Roli, A. (2008). " Hybrid metaheuristics: An introduction." Stud. Comput. Intell., 114, 1-30. 10.1007/978-3-540-78295-7
-
(2008)
Stud. Comput. Intell.
, vol.114
, pp. 1-30
-
-
Blum, C.1
Roli, A.2
-
6
-
-
0037508562
-
A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple modes version
-
Bouleimen, K., and, Lecocq, H. (2003). " A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple modes version." Eur. J. Oper. Res., 149 (2), 268-281. 10.1016/S0377-2217(02)00761-0 EJORDT 0377-2217
-
(2003)
Eur. J. Oper. Res.
, vol.149
, Issue.2
, pp. 268-281
-
-
Bouleimen, K.1
Lecocq, H.2
-
7
-
-
77956717086
-
Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources
-
Bozorg Haddad, O., Mirmomeni, M., Zarezadeh Mehrizi, M., and, Mariño, M. A. (2010). " Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources." Comput. Optim. Appl., 47 (1), 97-128. 10.1007/s10589-008-9210-9 CPPPEF 0926-6003
-
(2010)
Comput. Optim. Appl.
, vol.47
, Issue.1
, pp. 97-128
-
-
Bozorg Haddad, O.1
Mirmomeni, M.2
Zarezadeh Mehrizi, M.3
Mariño, M.A.4
-
8
-
-
0021819411
-
A thermodynamical approach to the travelling salesman problem: An efficient simulation algorithm
-
Cerny, V. (1985). " A thermodynamical approach to the travelling salesman problem: An efficient simulation algorithm." J. Optim. Theor. Appl., 45 (1), 41-51. 10.1007/BF00940812 JOTABN 0022-3239
-
(1985)
J. Optim. Theor. Appl.
, vol.45
, Issue.1
, pp. 41-51
-
-
Cerny, V.1
-
9
-
-
33845257993
-
Hybrid genetic algorithm and simulated annealing (HGASA) in global function optimization
-
Chen, D., Lee, C. Y., and, Park, C. H. (2005). " Hybrid genetic algorithm and simulated annealing (HGASA) in global function optimization." Proc., 17th IEEE Int. Conf. on Tools with Artificial Intelligence, IEEE Computer Society, Washington, DC, 129-133.
-
(2005)
Proc. 17th IEEE Int. Conf. on Tools with Artificial Intelligence, IEEE Computer Society, Washington, DC.
, pp. 129-133
-
-
Chen, D.1
Lee, C.Y.2
Park, C.H.3
-
10
-
-
63549149518
-
Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints
-
Chen, P. H., and, Shahandashti, S. M. (2009). " Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints." Autom. Constr., 18 (4), 434-443. 10.1016/j.autcon.2008.10.007 AUCOES 0926-5805
-
(2009)
Autom. Constr.
, vol.18
, Issue.4
, pp. 434-443
-
-
Chen, P.H.1
Shahandashti, S.M.2
-
11
-
-
79951581770
-
Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem
-
Chen, R.-M. (2011). " Particle swarm optimization with justification and designed mechanisms for resource-constrained project scheduling problem." Expert Syst. Appl., 38 (6), 7102-7111. 10.1016/j.eswa.2010.12.059 ESAPEH 0957-4174
-
(2011)
Expert Syst. Appl.
, vol.38
, Issue.6
, pp. 7102-7111
-
-
Chen, R.-M.1
-
12
-
-
79955395629
-
RESCON: Educational project scheduling software
-
Deblaere, F., Demeulemeester, E., and, Herroelen, W. (2011). " RESCON: Educational project scheduling software." Comput. Appl. Eng. Educ., 19 (2), 327-336. 10.1002/cae.v19.2 CAPEED
-
(2011)
Comput. Appl. Eng. Educ.
, vol.19
, Issue.2
, pp. 327-336
-
-
Deblaere, F.1
Demeulemeester, E.2
Herroelen, W.3
-
13
-
-
84861086619
-
Delays, what delays? A critical review of the literature on delays in construction
-
Eizakshiri, F., Chan, P. W. C., and, Emsley, M. W. (2011). " Delays, what delays? A critical review of the literature on delays in construction." Proc., Twenty-Seventh Annual ARCOM Conf., Association of Researchers in Construction Management (ARCOM), 839-848.
-
(2011)
Proc. Twenty-Seventh Annual ARCOM Conf. Association of Researchers in Construction Management (ARCOM).
, pp. 839-848
-
-
Eizakshiri, F.1
Chan, P.W.C.2
Emsley, M.W.3
-
14
-
-
34547273498
-
-
9th Int. Conf. on Control Automation Robotics and Vision, IEEE, Piscataway, NJ.
-
Han, M., Li, P., and, Sun, J. (2006). " The algorithm for berth scheduling problem by the hybrid optimization strategy GASA." 9th Int. Conf. on Control Automation Robotics and Vision, IEEE, Piscataway, NJ, 1-4.
-
(2006)
The Algorithm for Berth Scheduling Problem by the Hybrid Optimization Strategy GASA
, pp. 1-4
-
-
Han, M.1
Li, P.2
Sun, J.3
-
15
-
-
0034321183
-
Algorithm for scheduling with multiskilled constrained resources
-
Hegazy, T., Shabeeb, A. K., Elbeltagi, E., and, Cheema, T. (2000). " Algorithm for scheduling with multiskilled constrained resources." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2000)126:6(414), 414-421. JCEMD4 0733-9364
-
(2000)
J. Constr. Eng. Manage.
, pp. 414-421
-
-
Hegazy, T.1
Shabeeb, A.K.2
Elbeltagi, E.3
Cheema, T.4
-
17
-
-
12144278410
-
Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment
-
Herroelen, W., and, Leus, R. (2005). " Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment." J. Oper. Res. Soc., 56 (1), 102-109. 10.1057/palgrave.jors.2601813 JORSDZ
-
(2005)
J. Oper. Res. Soc.
, vol.56
, Issue.1
, pp. 102-109
-
-
Herroelen, W.1
Leus, R.2
-
19
-
-
33644910198
-
Improving real-parameter genetic algorithm with simulated annealing for engineering problems
-
Hwang, S. F., and, He, R. S. (2006). " Improving real-parameter genetic algorithm with simulated annealing for engineering problems." Adv. Eng. Software, 37 (6), 406-418. 10.1016/j.advengsoft.2005.08.002
-
(2006)
Adv. Eng. Software
, vol.37
, Issue.6
, pp. 406-418
-
-
Hwang, S.F.1
He, R.S.2
-
20
-
-
36749094527
-
A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
-
Jarboui, B., Damak, N., Siarry, P., and, Rebai, A. (2008). " A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems." Appl. Math. Comput., 195 (1), 299-308. 10.1016/j.amc.2007.04.096 AMHCBQ 0096-3003
-
(2008)
Appl. Math. Comput.
, vol.195
, Issue.1
, pp. 299-308
-
-
Jarboui, B.1
Damak, N.2
Siarry, P.3
Rebai, A.4
-
21
-
-
54249088030
-
Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling
-
Kim, J. L., and, Ellis, R. D. (2008). " Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2008)134:11(904), 904-913. JCEMD4 0733-9364
-
(2008)
J. Constr. Eng. Manage.
, pp. 904-913
-
-
Kim, J.L.1
Ellis, R.D.2
-
22
-
-
26444479778
-
Optimization by simulated annealing
-
Kirkpatrick, S., Gelatt, C. D., and, Vecchi, M. P. (1983). " Optimization by simulated annealing." Science, 220 (4598), 671-680. 10.1126/science.220.4598.671 SCIEAS 0036-8075
-
(1983)
Science
, vol.220
, Issue.4598
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatt, C.D.2
Vecchi, M.P.3
-
23
-
-
0030788844
-
PSPLIB - A project scheduling library
-
Kolisch, R., and, Sprecher, A. (1997). " PSPLIB-A project scheduling library." Eur. J. Oper. Res., 96 (1), 205-216. 10.1016/S0377-2217(96)00170-1 EJORDT 0377-2217
-
(1997)
Eur. J. Oper. Res.
, vol.96
, Issue.1
, pp. 205-216
-
-
Kolisch, R.1
Sprecher, A.2
-
24
-
-
0000698758
-
Characterization and generation of a general class of resource-constrained project scheduling problems
-
Kolisch, R., Sprecher, A., and, Drexl, A. (1995). " Characterization and generation of a general class of resource-constrained project scheduling problems." Manage. Sci., 41 (10), 1693-1703. 10.1287/mnsc.41.10.1693 MSCIAM 0025-1909
-
(1995)
Manage. Sci.
, vol.41
, Issue.10
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
25
-
-
33845270624
-
Experimental investigation of heuristics for resource-constrained project scheduling: An update
-
Kolisch, R., and, Hartmann, S. (2006). " Experimental investigation of heuristics for resource-constrained project scheduling: An update." Eur. J. Oper. Res., 174 (1) 23-37. 10.1016/j.ejor.2005.01.065 EJORDT 0377-2217
-
(2006)
Eur. J. Oper. Res.
, vol.174
, Issue.1
, pp. 23-37
-
-
Kolisch, R.1
Hartmann, S.2
-
26
-
-
0020087944
-
Multi-project scheduling: Categorization of heuristic rules performance
-
Kurtulus, I., and, Davis, E. W. (1982). " Multi-project scheduling: Categorization of heuristic rules performance." Manage. Sci., 28 (2), 161-172. 10.1287/mnsc.28.2.161 MSCIAM 0025-1909
-
(1982)
Manage. Sci.
, vol.28
, Issue.2
, pp. 161-172
-
-
Kurtulus, I.1
Davis, E.W.2
-
27
-
-
0030151930
-
Search heuristics for resource constrained project scheduling
-
Lee, J. K., and, Kim, Y. D. (1996). " Search heuristics for resource constrained project scheduling." J. Oper. Res. Soc., 47 (5), 678-689. 10.1057/jors.1996.79 JORSDZ
-
(1996)
J. Oper. Res. Soc.
, vol.47
, Issue.5
, pp. 678-689
-
-
Lee, J.K.1
Kim, Y.D.2
-
28
-
-
2342418329
-
A GA-based model for maximizing precast plant production under resource constraints
-
Leu, S. S., and, Hwang, S. T. (2001). " A GA-based model for maximizing precast plant production under resource constraints." Eng. Optim., 33 (5), 619-642. 10.1080/03052150108940936 EGOPAX 0305-215X
-
(2001)
Eng. Optim.
, vol.33
, Issue.5
, pp. 619-642
-
-
Leu, S.S.1
Hwang, S.T.2
-
29
-
-
0031236881
-
Degree of population diversity - A perspective on premature convergence in genetic algorithms and its Markov-chain analysis
-
Leung, Y., Gao, Y., and, Xu, Z. B. (1997). " Degree of population diversity-A perspective on premature convergence in genetic algorithms and its Markov-chain analysis." IEEE Trans. Neural Networks, 8 (5), 1165-1176. 10.1109/72.623217 ITNNEP 1045-9227
-
(1997)
IEEE Trans. Neural Networks
, vol.8
, Issue.5
, pp. 1165-1176
-
-
Leung, Y.1
Gao, Y.2
Xu, Z.B.3
-
30
-
-
0035279805
-
Project management in construction: Software use and research directions
-
Liberatore, M. J., Pollack-Johnson, B., and, Smith, C. A. (2001). " Project management in construction: Software use and research directions." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2001)127:2(101), 101-107. JCEMD4 0733-9364
-
(2001)
J. Constr. Eng. Manage.
, pp. 101-107
-
-
Liberatore, M.J.1
Pollack-Johnson, B.2
Smith, C.A.3
-
31
-
-
84875218491
-
Multi-level genetic algorithm for the resource-constrained re-entrant scheduling problem in the flow shop
-
Lin, D., Lee, C. K. M., and, Ho, W. (2013). " Multi-level genetic algorithm for the resource-constrained re-entrant scheduling problem in the flow shop." Eng. Appl. Artif. Intell., 26 (4), 1282-1290. 10.1016/j.engappai.2012.10.006 EAAIE6 0952-1976
-
(2013)
Eng. Appl. Artif. Intell.
, vol.26
, Issue.4
, pp. 1282-1290
-
-
Lin, D.1
Lee, C.K.M.2
Ho, W.3
-
32
-
-
0034559445
-
A multicriteria heuristic method to improve resource allocation in multiproject scheduling
-
Lova, A., Maroto, C., and, Tormos, P. (2000). " A multicriteria heuristic method to improve resource allocation in multiproject scheduling." Eur. J. Oper. Res., 127 (2), 408-424. 10.1016/S0377-2217(99)00490-7 EJORDT 0377-2217
-
(2000)
Eur. J. Oper. Res.
, vol.127
, Issue.2
, pp. 408-424
-
-
Lova, A.1
Maroto, C.2
Tormos, P.3
-
33
-
-
0442280309
-
Resource allocation with project management software
-
Mellentien, C., and, Trautmann, N. (2001). " Resource allocation with project management software." OR Spektrum, 23 (3), 383-394. 10.1007/PL00013358 ORSPD5 1436-6304
-
(2001)
OR Spektrum
, vol.23
, Issue.3
, pp. 383-394
-
-
Mellentien, C.1
Trautmann, N.2
-
34
-
-
0036672003
-
Ant colony optimization for resource-constrained project scheduling
-
Merkle, D., Middendorf, M., and, Schmeck, H. (2002). " Ant colony optimization for resource-constrained project scheduling." IEEE Trans. Evol. Comput., 6 (4), 333-346. 10.1109/TEVC.2002.802450 1089-778X
-
(2002)
IEEE Trans. Evol. Comput.
, vol.6
, Issue.4
, pp. 333-346
-
-
Merkle, D.1
Middendorf, M.2
Schmeck, H.3
-
35
-
-
84891473432
-
Extraction of decision alternatives in project management: Application of hybrid PSO-SFLA
-
Orouji, H., Bozorg Haddad, O., Fallah-Mehdipour, E., and, Mariño, M. A. (2013). " Extraction of decision alternatives in project management: Application of hybrid PSO-SFLA." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000186, 50-59. JMENEA 0742-597X
-
(2013)
J. Manage. Eng.
, pp. 50-59
-
-
Orouji, H.1
Bozorg Haddad, O.2
Fallah-Mehdipour, E.3
Mariño, M.A.4
-
36
-
-
73649133832
-
-
6th Ed. Brooks/Cole, Belmont, CA.
-
Ott, L. R., and, Longnecker, M. (2010). An introduction to statistical methods and data analysis, 6th Ed., Brooks/Cole, Belmont, CA, 317-318.
-
(2010)
An Introduction to Statistical Methods and Data Analysis
, pp. 317-318
-
-
Ott, L.R.1
Longnecker, M.2
-
37
-
-
0009627197
-
A local constraint based analysis approach to project scheduling under general resource constraints
-
Özdamar, L., and, Ulusoy, G. (1994). " A local constraint based analysis approach to project scheduling under general resource constraints." Eur. J. Oper. Res., 79 (2), 287-298. 10.1016/0377-2217(94)90359-X EJORDT 0377-2217
-
(1994)
Eur. J. Oper. Res.
, vol.79
, Issue.2
, pp. 287-298
-
-
Özdamar, L.1
Ulusoy, G.2
-
38
-
-
0028203106
-
Convergence properties of canonical genetic algorithms
-
Rudolph, G. (1994). " Convergence properties of canonical genetic algorithms." IEEE Trans. Neural Networks, 5 (1), 96-101. 10.1109/72.265964 ITNNEP 1045-9227
-
(1994)
IEEE Trans. Neural Networks
, vol.5
, Issue.1
, pp. 96-101
-
-
Rudolph, G.1
-
39
-
-
84861348428
-
A hybrid genetic algorithm for the discrete time-cost trade-off problem
-
Sonmez, R., and, Bettemir, Ö. H. (2012). " A hybrid genetic algorithm for the discrete time-cost trade-off problem." Expert Syst. Appl., 39 (13), 11428-11434. 10.1016/j.eswa.2012.04.019 ESAPEH 0957-4174
-
(2012)
Expert Syst. Appl.
, vol.39
, Issue.13
, pp. 11428-11434
-
-
Sonmez, R.1
Bettemir, Ö.H.2
-
40
-
-
0036024939
-
Application of genetic algorithms to construction scheduling with or without resource constraints
-
Toklu, Y. C. (2002). " Application of genetic algorithms to construction scheduling with or without resource constraints." Can. J. Civ. Eng., 29 (3), 421-429. 10.1139/l02-034 CJCEB8 0315-1468
-
(2002)
Can. J. Civ. Eng.
, vol.29
, Issue.3
, pp. 421-429
-
-
Toklu, Y.C.1
-
41
-
-
0035617605
-
A competitive heuristic solution technique for resource-constrained project scheduling
-
Tormos, P., and, Lova, A. (2001). " A competitive heuristic solution technique for resource-constrained project scheduling." Ann. Oper. Res., 102 (1/4), 65-81. 10.1023/A:1010997814183 AOREEV 0254-5330
-
(2001)
Ann. Oper. Res.
, vol.102
, Issue.14
, pp. 65-81
-
-
Tormos, P.1
Lova, A.2
-
42
-
-
13444257593
-
Justification and RCPSP: A technique that pays
-
Valls, V., Ballestin, F., and, Quintanilla, M. S. (2005). " Justification and RCPSP: A technique that pays." Eur. J. Oper. Res., 165 (2), 375-386. 10.1016/j.ejor.2004.04.008 EJORDT 0377-2217
-
(2005)
Eur. J. Oper. Res.
, vol.165
, Issue.2
, pp. 375-386
-
-
Valls, V.1
Ballestin, F.2
Quintanilla, M.S.3
-
43
-
-
0035324670
-
An effective hybrid optimization strategy for job-shop scheduling problems
-
Wang, L., and, Zheng, D. Z. (2001). " An effective hybrid optimization strategy for job-shop scheduling problems." Comput. Oper. Res., 28 (6), 585-596. 10.1016/S0305-0548(99)00137-9 CMORAP 0305-0548
-
(2001)
Comput. Oper. Res.
, vol.28
, Issue.6
, pp. 585-596
-
-
Wang, L.1
Zheng, D.Z.2
-
44
-
-
84891375701
-
Improved particle swarm optimization for RCP scheduling problem
-
Wang, Q., and, Qi, J. (2009). " Improved particle swarm optimization for RCP scheduling problem." Adv. Intell. Soft Comput., 56, 49-57. 10.1007/978-3-642-01216-7
-
(2009)
Adv. Intell. Soft Comput.
, vol.56
, pp. 49-57
-
-
Wang, Q.1
Qi, J.2
-
45
-
-
84870712321
-
Ant colony optimization for multimode resource-constrained project scheduling
-
Zhang, H. (2012). " Ant colony optimization for multimode resource-constrained project scheduling." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000089, 150-159. JMENEA 0742-597X
-
(2012)
J. Manage. Eng.
, pp. 150-159
-
-
Zhang, H.1
|