메뉴 건너뛰기




Volumn 56, Issue 1, 2005, Pages 102-109

Identification and illumination of popular misconceptions about project scheduling and time buffering in a resource-constrained environment

Author keywords

Buffer management; Critical chain; Critical sequence; Project management; Resource constraints; Scheduling

Indexed keywords

COMPUTER AIDED SOFTWARE ENGINEERING; CONSTRAINT THEORY; OPERATIONS RESEARCH; RANDOM PROCESSES; RISK ASSESSMENT; SCHEDULING; STRATEGIC PLANNING;

EID: 12144278410     PISSN: 01605682     EISSN: None     Source Type: Journal    
DOI: 10.1057/palgrave.jors.2601813     Document Type: Article
Times cited : (32)

References (37)
  • 1
    • 0025701918 scopus 로고
    • An evaluation of microcomputer-based software packages for project management
    • De Wit J and Herroelen W (1990). An evaluation of microcomputer-based software packages for project management. Eur J Opt Res 49: 102-139.
    • (1990) Eur J Opt Res , vol.49 , pp. 102-139
    • De Wit, J.1    Herroelen, W.2
  • 2
    • 0038937965 scopus 로고    scopus 로고
    • Resource allocation capabilities of commercial project management software packages
    • Kolisch R (1999). Resource allocation capabilities of commercial project management software packages. Interfaces 29: 19-31.
    • (1999) Interfaces , vol.29 , pp. 19-31
    • Kolisch, R.1
  • 3
    • 0001787824 scopus 로고    scopus 로고
    • The evolution of software quality in project scheduling
    • Weglarz J (ed). Kluwer Academic Publishers: Boston, MA Chapter 11
    • Maroto C. Tormos P and Lova A (1998). The evolution of software quality in project scheduling. In: Weglarz J (ed). Project Scheduling-Recent Models, Algorithms and Applications. Kluwer Academic Publishers: Boston, MA Chapter 11, pp 239-259.
    • (1998) Project Scheduling-recent Models, Algorithms and Applications , pp. 239-259
    • Maroto, C.1    Tormos, P.2    Lova, A.3
  • 4
    • 0032736579 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: Notation, classification, models and methods
    • Brucker P, Drexl A, Möhring R, Neumann K and Pesch E (1999). Resource-constrained project scheduling: notation, classification, models and methods. Eur J Opl Res 112: 3-41.
    • (1999) Eur J Opl Res , vol.112 , pp. 3-41
    • Brucker, P.1    Drexl, A.2    Möhring, R.3    Neumann, K.4    Pesch, E.5
  • 5
    • 0012814054 scopus 로고    scopus 로고
    • International Series in Operations Research and Management Science, Kluwer Academic Publishers: Boston, MA
    • Demeulemeester E and Herroelen W (2002). Project Scheduling-A Research Handbook. International Series in Operations Research and Management Science, Vol 49. Kluwer Academic Publishers: Boston, MA.
    • (2002) Project Scheduling-a Research Handbook , vol.49
    • Demeulemeester, E.1    Herroelen, W.2
  • 6
    • 0032042933 scopus 로고    scopus 로고
    • Resource-constrained project scheduling-a survey of recent developments
    • Herroelen W, De Reyck B and Demeulemeester E (1998). Resource-constrained project scheduling-a survey of recent developments. Comput Opns Res 25: 279-302.
    • (1998) Comput Opns Res , vol.25 , pp. 279-302
    • Herroelen, W.1    De Reyck, B.2    Demeulemeester, E.3
  • 7
    • 0000801563 scopus 로고    scopus 로고
    • An integrated survey of deterministic project scheduling
    • Kolisch R and Padman R (2001). An integrated survey of deterministic project scheduling. Omega 49: 249-272.
    • (2001) Omega , vol.49 , pp. 249-272
    • Kolisch, R.1    Padman, R.2
  • 8
    • 0029393209 scopus 로고
    • A survey on the resource-constrained project scheduling problem
    • Özdamar L and Ulusoy G (1995). A survey on the resource-constrained project scheduling problem. IIE Trans 27: 574-586.
    • (1995) IIE Trans , vol.27 , pp. 574-586
    • Özdamar, L.1    Ulusoy, G.2
  • 9
    • 0002846126 scopus 로고
    • The Standish Group International, Inc. (accessed 25 September 2003)
    • Standish Group (1994). The Chaos Report. The Standish Group International, Inc. (available at http://www.pm2go.com/sample_research/ chaos_1994_1.asp accessed 25 September 2003)
    • (1994) The Chaos Report
  • 11
    • 0003898887 scopus 로고    scopus 로고
    • Project Management Institute: Newton Square
    • R Guide). Project Management Institute: Newton Square.
    • (2000) R Guide)
  • 12
    • 0001303226 scopus 로고
    • Some properties of schedules for large projects with limited resources
    • Wiest JD (1964). Some properties of schedules for large projects with limited resources. Ops Res 12: 395-418.
    • (1964) Ops Res , vol.12 , pp. 395-418
    • Wiest, J.D.1
  • 13
    • 5244364936 scopus 로고
    • Bias in PERT project completion time calculations for a real network
    • Klingel Jr AR (1966). Bias in PERT project completion time calculations for a real network. Mng Sci 13: B194-B201.
    • (1966) Mng Sci , vol.13
    • Klingel Jr., A.R.1
  • 14
    • 0038654496 scopus 로고
    • Why projects are always late: A rationale based on manual simulation of a PERT/CPM network
    • Schonberger R (1981). Why projects are always late: a rationale based on manual simulation of a PERT/CPM network. Interfaces 11: 66-70.
    • (1981) Interfaces , vol.11 , pp. 66-70
    • Schonberger, R.1
  • 15
    • 0029220230 scopus 로고
    • Criticality in resource constrained networks
    • Bowers JA (1995). Criticality in resource constrained networks. J Opl Res Soc 46: 80-91.
    • (1995) J Opl Res Soc , vol.46 , pp. 80-91
    • Bowers, J.A.1
  • 16
    • 0030216997 scopus 로고    scopus 로고
    • Effect of resource constraints on float calculations in project networks
    • Raz T and Marshall B (1996). Effect of resource constraints on float calculations in project networks. Int J Proj Mngt 14: 241-248.
    • (1996) Int J Proj Mngt , vol.14 , pp. 241-248
    • Raz, T.1    Marshall, B.2
  • 17
    • 0035392810 scopus 로고    scopus 로고
    • Tools for resource-constrained project scheduling and control: Forward and backward slack analysis
    • Tormos P and Lova A (2001). Tools for resource-constrained project scheduling and control: forward and backward slack analysis. J Opl Res Soc 52: 779-788.
    • (2001) J Opl Res Soc , vol.52 , pp. 779-788
    • Tormos, P.1    Lova, A.2
  • 18
    • 0026854670 scopus 로고
    • Criticality in stochastic networks
    • Williams TM (1992). Criticality in stochastic networks. J Opl Res Soc 43: 353-357.
    • (1992) J Opl Res Soc , vol.43 , pp. 353-357
    • Williams, T.M.1
  • 19
    • 38249030739 scopus 로고
    • Identifying the critical sequence in a resource-constrained project
    • Woodworth BM and Shanahan S (1988). Identifying the critical sequence in a resource-constrained project. Int J Proj Mngt 6: 89-96.
    • (1988) Int J Proj Mngt , vol.6 , pp. 89-96
    • Woodworth, B.M.1    Shanahan, S.2
  • 20
    • 0003926816 scopus 로고    scopus 로고
    • The North River Press Publishing Corporation: Great Barrington
    • Goldratt E (1997). Critical Chain. The North River Press Publishing Corporation: Great Barrington.
    • (1997) Critical Chain
    • Goldratt, E.1
  • 22
    • 0038937965 scopus 로고    scopus 로고
    • Resource allocation capabilities of commercial project management software packages
    • Kolisch R (1999). Resource allocation capabilities of commercial project management software packages. Interfaces 29: 19-31.
    • (1999) Interfaces , vol.29 , pp. 19-31
    • Kolisch, R.1
  • 24
    • 0003562997 scopus 로고    scopus 로고
    • Artech House Professional Development Library: Boston, MA
    • Leach LP (2000). Critical Chain Project Management. Artech House Professional Development Library: Boston, MA.
    • (2000) Critical Chain Project Management
    • Leach, L.P.1
  • 25
    • 0039599042 scopus 로고    scopus 로고
    • Manage your projects for success: An application of the theory of constraints
    • Umble M and Umble E (2000). Manage your projects for success: An application of the theory of constraints. Prod Inv Mngt J 41: 27-32.
    • (2000) Prod Inv Mngt J , vol.41 , pp. 27-32
    • Umble, M.1    Umble, E.2
  • 26
    • 0004254702 scopus 로고    scopus 로고
    • Prentice-Hall, Inc: Englewood Cliffs, NJ
    • Yourdon E (2003). Death March. 2nd edn. Prentice-Hall, Inc: Englewood Cliffs, NJ.
    • (2003) Death March. 2nd Edn.
    • Yourdon, E.1
  • 27
    • 0001831632 scopus 로고    scopus 로고
    • Managing project uncertainty: From variation to chaos
    • De Meyer A. Loch CH and Pich MT (2002). Managing project uncertainty: from variation to chaos. MIT Sloun Mngt Rev Winter: 60-67.
    • (2002) MIT Sloun Mngt Rev , Issue.WINTER , pp. 60-67
    • De Meyer, A.1    Loch, C.H.2    Pich, M.T.3
  • 31
    • 1542526702 scopus 로고    scopus 로고
    • Project scheduling under uncertainty - Survey and research potentials
    • in press
    • Herroelen W and Leus R (2004). Project scheduling under uncertainty - survey and research potentials. Ear J Opl Res (in press).
    • (2004) Ear J Opl Res
    • Herroelen, W.1    Leus, R.2
  • 32
    • 0032097829 scopus 로고    scopus 로고
    • Predictable scheduling of a job shop subject to breakdowns
    • Mehta SV and Uzsoy RM (1998). Predictable scheduling of a job shop subject to breakdowns. IEEE Trans Rob Autom 14: 365-378.
    • (1998) IEEE Trans Rob Autom , vol.14 , pp. 365-378
    • Mehta, S.V.1    Uzsoy, R.M.2
  • 33
    • 0027224847 scopus 로고
    • One-machine rescheduling heuristics with efficiency and stability as criteria
    • Wu SD, Storer HS and Chang P-C (1993). One-machine rescheduling heuristics with efficiency and stability as criteria. Comput Opns Res 20: 1-14.
    • (1993) Comput Opns Res , vol.20 , pp. 1-14
    • Wu, S.D.1    Storer, H.S.2    Chang, P.-C.3
  • 34
    • 0037846110 scopus 로고    scopus 로고
    • Gantt charts: A centenary appreciation
    • Wilson JM (2003). Gantt charts: a centenary appreciation. Eur J Opl Res 149: 430-437.
    • (2003) Eur J Opl Res , vol.149 , pp. 430-437
    • Wilson, J.M.1
  • 35
    • 0022107667 scopus 로고
    • Critical path analysis and resource constrained project scheduling-theory and practice
    • Willis RJ (1985). Critical path analysis and resource constrained project scheduling-theory and practice. Eur J Opl Res 21: 149-155.
    • (1985) Eur J Opl Res , vol.21 , pp. 149-155
    • Willis, R.J.1
  • 36
    • 0027147257 scopus 로고
    • Resource constrained project scheduling within fixed project durations
    • Li RK-Y and Willis RJ (1993). Resource constrained project scheduling within fixed project durations. J Opl Res Soc 44: 71-80.
    • (1993) J Opl Res Soc , vol.44 , pp. 71-80
    • Li, R.K.-Y.1    Willis, R.J.2
  • 37
    • 0029636114 scopus 로고
    • Semi-active, active and non-delay schedules for the resource-constrained project scheduling problem
    • Sprecher A, Kolisch R and Drexl A (1995). Semi-active, active and non-delay schedules for the resource-constrained project scheduling problem. Eur J Opl Res 80: 94-102.
    • (1995) Eur J Opl Res , vol.80 , pp. 94-102
    • Sprecher, A.1    Kolisch, R.2    Drexl, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.