Staffing a multi-skilled work-force with varying levels of productivity: An analysis of cross-training policies
-
Brusco, M. J., and Johns, T. R. (1998). "Staffing a multi-skilled work-force with varying levels of productivity: An analysis of cross-training policies." Decision Sci. J., 29(2), 499-516.
-
(1998)
Decision Sci. J.
, vol.29
, Issue.2
, pp. 499-516
-
-
Brusco, M.J.1
Johns, T.R.2
-
2
-
-
0032207685
-
Multiskilled labor utilization strategies in construction
-
Burleson, R. C., Hass, C. T., Tucker, R. L., and Stanley, A. (1998). "Multiskilled labor utilization strategies in construction." J. Constr. Engrg. and Mgmt., ASCE, 124(6), 480-489.
-
(1998)
J. Constr. Engrg. and Mgmt., ASCE
, vol.124
, Issue.6
, pp. 480-489
-
-
Burleson, R.C.1
Hass, C.T.2
Tucker, R.L.3
Stanley, A.4
-
3
-
-
0027079581
-
Labor productivity impact of varying crew levels
-
Cass, D. J. (1992). "Labor productivity impact of varying crew levels." Trans. AACE, C2.1-C2.9.
-
(1992)
Trans. AACE
-
-
Cass, D.J.1
-
4
-
-
57449088424
-
-
Master's Report, Civ. Engrg., University of Waterloo, Waterloo, Ont., Canada
-
Cheema, T. (1998). "Improving resource-allocation heuristics using multiple resource skills." Master's Report, Civ. Engrg., University of Waterloo, Waterloo, Ont., Canada.
-
(1998)
Improving Resource-Allocation Heuristics Using Multiple Resource Skills
-
-
Cheema, T.1
-
5
-
-
0343918516
-
Resource-based project scheduling: Which rules perform best?
-
Davis, E. W., and Patterson, J. H. (1975). "Resource-based project scheduling: Which rules perform best?" Proj. Mgmt. Quarterly, 6(4), 25-31.
-
(1975)
Proj. Mgmt. Quarterly
, vol.6
, Issue.4
, pp. 25-31
-
-
Davis, E.W.1
Patterson, J.H.2
-
7
-
-
0029407665
-
Multi-skilled work teams
-
Nallikari, M. (1995). "Multi-skilled work teams." J. Ship Production, 11(4), 239-244.
-
(1995)
J. Ship Production
, vol.11
, Issue.4
, pp. 239-244
-
-
Nallikari, M.1
-
8
-
-
0006138586
-
Current float techniques for resources scheduling
-
Shanmuganayagam, V. (1989). "Current float techniques for resources scheduling." J. Constr. Engrg. and Mgmt, ASCE, 115(3), 401-411.
-
(1989)
J. Constr. Engrg. and Mgmt, ASCE
, vol.115
, Issue.3
, pp. 401-411
-
-
Shanmuganayagam, V.1
-
9
-
-
0343918512
-
Optimal methods for scheduling projects under resource constraints
-
Talbot, F., and Patterson, J. H. (1979). "Optimal methods for scheduling projects under resource constraints." Proj. Mgmt. Quarterly, 10(4), 26-33.
-
(1979)
Proj. Mgmt. Quarterly
, vol.10
, Issue.4
, pp. 26-33
-
-
Talbot, F.1
Patterson, J.H.2
-
10
-
-
0026220131
-
Labor productivity and work sampling: The bottom line
-
Thomas, R. H. (1991). "Labor productivity and work sampling: The bottom line." J. Constr. Engrg. and Mgmt., ASCE, 117(3), 423-444.
-
(1991)
J. Constr. Engrg. and Mgmt., ASCE
, vol.117
, Issue.3
, pp. 423-444
-
-
Thomas, R.H.1
-
11
-
-
0006139116
-
Discussion of 'Current float techniques for resources scheduling,' by V. Shanmuganayagam
-
Touran, A. (1991). "Discussion of 'Current float techniques for resources scheduling,' by V. Shanmuganayagam." J. Constr. Engrg. and Mgmt., ASCE, 117(3), 574-575.
-
(1991)
J. Constr. Engrg. and Mgmt., ASCE
, vol.117
, Issue.3
, pp. 574-575
-
-
Touran, A.1
|