-
1
-
-
0020194024
-
Computational complexity of the capacitated lot size problem
-
G. R. Bitran and H. H. Yanasse, "Computational complexity of the capacitated lot size problem," Management Science, vol. 28, no. 10, pp. 1174-1186, 1982.
-
(1982)
Management Science
, vol.28
, Issue.10
, pp. 1174-1186
-
-
Bitran, G.R.1
Yanasse, H.H.2
-
2
-
-
0002577952
-
Analysis of relaxations for the multi-item capacitated lot-sizing problem
-
W.-H. Chen and J.-M. Thizy, "Analysis of relaxations for the multi-item capacitated lot-sizing problem," Annals of Operations Research, vol. 26, no. 1-4, pp. 29-72, 1990.
-
(1990)
Annals of Operations Research
, vol.26
, Issue.1-4
, pp. 29-72
-
-
Chen, W.-H.1
Thizy, J.-M.2
-
3
-
-
0026185832
-
Multilevel capacitated lotsizing complexity and LP-based heuristics
-
J. Maes, J. O. McClain, and L. N. vanWassenhove, "Multilevel capacitated lotsizing complexity and LP-based heuristics," European Journal of Operational Research, vol. 53, no. 2, pp. 131-148, 1991.
-
(1991)
European Journal of Operational Research
, vol.53
, Issue.2
, pp. 131-148
-
-
Maes, J.1
McClain, J.O.2
Van Wassenhove, L.N.3
-
4
-
-
0033690423
-
Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities
-
K. Haase and A. Kimms, "Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities," International Journal of Production Economics, vol. 66, no. 2, pp. 159-169, 2000.
-
(2000)
International Journal of Production Economics
, vol.66
, Issue.2
, pp. 159-169
-
-
Haase, K.1
Kimms, A.2
-
5
-
-
68949192365
-
Combining process selection and lot sizing models for production scheduling of electrofused grains
-
J. R. D. Luche, R. Morabito, and V. Pureza, "Combining process selection and lot sizing models for production scheduling of electrofused grains," Asia-Pacific Journal of Operational Research, vol. 26, no. 3, pp. 421-443, 2009.
-
(2009)
Asia-Pacific Journal of Operational Research
, vol.26
, Issue.3
, pp. 421-443
-
-
Luche, J.R.D.1
Morabito, R.2
Pureza, V.3
-
6
-
-
77952430972
-
Production setupsequencing and lot-sizing at an animal nutrition plant through ATSP subtour elimination and patching
-
A. R. Clark, R. Morabito, and E. A. V. Toso, "Production setupsequencing and lot-sizing at an animal nutrition plant through ATSP subtour elimination and patching," Journal of Scheduling, vol. 13, no. 2, pp. 111-121, 2010.
-
(2010)
Journal of Scheduling
, vol.13
, Issue.2
, pp. 111-121
-
-
Clark, A.R.1
Morabito, R.2
Toso, E.A.V.3
-
7
-
-
22744442994
-
Metaheuristic approaches for themultilevel resource-constrained lot-sizing problem with setup and lead times
-
R. E. Berretta, P. M. França, and V. A. Armentano, "Metaheuristic approaches for themultilevel resource-constrained lot-sizing problem with setup and lead times," Asia-Pacific Journal of Operational Research, vol. 22, no. 2, pp. 261-286, 2005.
-
(2005)
Asia-Pacific Journal of Operational Research
, vol.22
, Issue.2
, pp. 261-286
-
-
Berretta, R.E.1
França, P.M.2
Armentano, V.A.3
-
8
-
-
79959695223
-
An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging
-
T. Wu, L. Shi, J. Geunes, and K. Akartunali, "An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging," European Journal of Operational Research, vol. 214, no. 2, pp. 428-441, 2011.
-
(2011)
European Journal of Operational Research
, vol.214
, Issue.2
, pp. 428-441
-
-
Wu, T.1
Shi, L.2
Geunes, J.3
Akartunali, K.4
-
9
-
-
84870952214
-
A hybrid multi-population genetic algorithm applied to solve the multi-level capacitated lot sizing problem with backlogging
-
C. F. M. Toledo, R. R. R. de Oliveira, and P. M. França, "A hybrid multi-population genetic algorithm applied to solve the multi-level capacitated lot sizing problem with backlogging," Computers and Operations Research, vol. 40, no. 4, pp. 910-919, 2013.
-
(2013)
Computers and Operations Research
, vol.40
, Issue.4
, pp. 910-919
-
-
Toledo, C.F.M.1
De Oliveira, R.R.R.2
França, P.M.3
-
10
-
-
84916629494
-
Lead time considerations for the multi-level capacitated lot-sizing problem
-
C. Almeder, D. Klabjan, R. Traxler, and B. Almada-Lobo, "Lead time considerations for the multi-level capacitated lot-sizing problem," European Journal of Operational Research, vol. 241, no. 3, pp. 727-738, 2015.
-
(2015)
European Journal of Operational Research
, vol.241
, Issue.3
, pp. 727-738
-
-
Almeder, C.1
Klabjan, D.2
Traxler, R.3
Almada-Lobo, B.4
-
11
-
-
0031161917
-
Demand shuffle - A method for multilevel proportional lot sizing and scheduling
-
A. Kimms, "Demand shuffle - a method for multilevel proportional lot sizing and scheduling," Naval Research Logistics, vol. 44, no. 4, pp. 319-340, 1997.
-
(1997)
Naval Research Logistics
, vol.44
, Issue.4
, pp. 319-340
-
-
Kimms, A.1
-
12
-
-
0003478471
-
-
Physica, Heidelberg, Germany
-
A. Kimms, Multi-Level Lot Sizing and Scheduling: Methods for Capacitated, Dynamic, and Deterministic Models, Physica, Heidelberg, Germany, 1997.
-
(1997)
Multi-Level Lot Sizing and Scheduling: Methods for Capacitated, Dynamic, and Deterministic Models
-
-
Kimms, A.1
-
13
-
-
0029392094
-
The performance of rolling production schedules in a process industry
-
R. de Matta and M. Guignard, "The performance of rolling production schedules in a process industry," IIE Transactions, vol. 27, pp. 564-573, 1995.
-
(1995)
IIE Transactions
, vol.27
, pp. 564-573
-
-
De Matta, R.1
Guignard, M.2
-
14
-
-
0032652235
-
Lotsizing and scheduling on parallel machines with sequence-dependent setup costs
-
S. Kang, K. Malik, and L. J. Thomas, "Lotsizing and scheduling on parallel machines with sequence-dependent setup costs," Management Science, vol. 45, no. 2, pp. 273-289, 1999.
-
(1999)
Management Science
, vol.45
, Issue.2
, pp. 273-289
-
-
Kang, S.1
Malik, K.2
Thomas, L.J.3
-
15
-
-
34547490878
-
Lot sizing and scheduling in semiconductor assembly - A hierarchical planning approach
-
G. T. Mackulak, J. W. Fowler, and A. Schömig, Eds., Tempe, Ariz, USA
-
H. Kuhn and D. Quadt, "Lot sizing and scheduling in semiconductor assembly - a hierarchical planning approach," in Proceedings of the International Conference on Modeling and Analysis of Semiconductor Manufacturing (MASM '02), G. T. Mackulak, J. W. Fowler, and A. Schömig, Eds., pp. 211-216, Tempe, Ariz, USA, 2002.
-
(2002)
Proceedings of the International Conference on Modeling and Analysis of Semiconductor Manufacturing (MASM '02)
, pp. 211-216
-
-
Kuhn, H.1
Quadt, D.2
-
16
-
-
33751423820
-
-
Working Paper, Catholic University of Eichstätt, Ingolstadt, Germany
-
D. Quadt and H. Kuhn, "Production planning in semiconductor assembly," Working Paper, Catholic University of Eichstätt, Ingolstadt, Germany, 2003.
-
(2003)
Production Planning in Semiconductor Assembly
-
-
Quadt, D.1
Kuhn, H.2
-
17
-
-
69749098362
-
GRASP heuristic with path-relinking for the multi-plant capacitated lot sizing problem
-
M. C. V. Nascimento, M. G. C. Resende, and F. M. B. Toledo, "GRASP heuristic with path-relinking for the multi-plant capacitated lot sizing problem," European Journal ofOperational Research, vol. 200, no. 3, pp. 747-754, 2010.
-
(2010)
European Journal OfOperational Research
, vol.200
, Issue.3
, pp. 747-754
-
-
Nascimento, M.C.V.1
Resende, M.G.C.2
Toledo, F.M.B.3
-
18
-
-
0034631279
-
Rolling-horizon lot-sizing when set-up times are sequence-dependent
-
A. R. Clark and S. J. Clark, "Rolling-horizon lot-sizing when set-up times are sequence-dependent," International Journal of Production Research, vol. 38, no. 10, pp. 2287-2307, 2000.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.10
, pp. 2287-2307
-
-
Clark, A.R.1
Clark, S.J.2
-
19
-
-
0036968625
-
Solving multi-item lot-sizing problems with an MIP solver using classification and reformulation
-
L. A. Wolsey, "Solving multi-item lot-sizing problems with an MIP solver using classification and reformulation," Management Science, vol. 48, no. 12, pp. 1587-1602, 2002.
-
(2002)
Management Science
, vol.48
, Issue.12
, pp. 1587-1602
-
-
Wolsey, L.A.1
-
20
-
-
0346724484
-
Hybrid heuristics for planning lot setups and sizes
-
A.R. Clark, "Hybrid heuristics for planning lot setups and sizes," Computers & Industrial Engineering, vol. 45, no. 4, pp. 545-562, 2003.
-
(2003)
Computers & Industrial Engineering
, vol.45
, Issue.4
, pp. 545-562
-
-
Clark, A.R.1
-
21
-
-
5644274147
-
The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
-
D. Gupta and T. Magnusson, "The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times," Computers & Operations Research, vol. 32, no. 4, pp. 727-747, 2005.
-
(2005)
Computers & Operations Research
, vol.32
, Issue.4
, pp. 727-747
-
-
Gupta, D.1
Magnusson, T.2
-
22
-
-
34548460398
-
Single machine multi-product capacitated lot sizing with sequence-dependent setups
-
B. Almada-Lobo, D. Klabjan, M. A. Carravilla, and J. F. Oliveira, "Single machine multi-product capacitated lot sizing with sequence-dependent setups," International Journal of Production Research, vol. 45, no. 20, pp. 4873-4894, 2007.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.20
, pp. 4873-4894
-
-
Almada-Lobo, B.1
Klabjan, D.2
Carravilla, M.A.3
Oliveira, J.F.4
-
23
-
-
45449120446
-
Production planning and scheduling in the glass container industry: A VNS approach
-
B. Almada-Lobo, J. F. Oliveira, and M. A. Carravilla, "Production planning and scheduling in the glass container industry: a VNS approach," International Journal of Production Economics, vol. 114, no. 1, pp. 363-375, 2008.
-
(2008)
International Journal of Production Economics
, vol.114
, Issue.1
, pp. 363-375
-
-
Almada-Lobo, B.1
Oliveira, J.F.2
Carravilla, M.A.3
-
24
-
-
84881223802
-
Glass container production scheduling through hybrid multi-population based evolutionary algorithm
-
C. F. M. Toledo, M. Da Silva Arantes, R. R. R. De Oliveira, and B. Almada-Lobo, "Glass container production scheduling through hybrid multi-population based evolutionary algorithm," Applied Soft Computing Journal, vol. 13, no. 3, pp. 1352-1364, 2013.
-
(2013)
Applied Soft Computing Journal
, vol.13
, Issue.3
, pp. 1352-1364
-
-
Toledo, C.F.M.1
Da Silva Arantes, M.2
De Oliveira, R.R.R.3
Almada-Lobo, B.4
-
25
-
-
84897389950
-
An optimization approach for the lot sizing and scheduling problem in the brewery industry
-
T. A. Baldo, M. O. Santos, B. Almada-Lobo, and R. Morabito, "An optimization approach for the lot sizing and scheduling problem in the brewery industry," Computers and Industrial Engineering, vol. 72, no. 1, pp. 58-71, 2014.
-
(2014)
Computers and Industrial Engineering
, vol.72
, Issue.1
, pp. 58-71
-
-
Baldo, T.A.1
Santos, M.O.2
Almada-Lobo, B.3
Morabito, R.4
-
26
-
-
0031170482
-
Lot sizing and scheduling - Survey and extensions
-
A. Drexl and A. Kimms, "Lot sizing and scheduling - survey and extensions," European Journal of Operational Research, vol. 99, no. 2, pp. 221-235, 1997.
-
(1997)
European Journal of Operational Research
, vol.99
, Issue.2
, pp. 221-235
-
-
Drexl, A.1
Kimms, A.2
-
27
-
-
0041511823
-
The capacitated lot sizing problem: A review of models and algorithms
-
B. Karimi, S.M. T. Fatemi Ghomi, and J.M. Wilson, "The capacitated lot sizing problem: a review of models and algorithms," Omega, vol. 31, no. 5, pp. 365-378, 2003.
-
(2003)
Omega
, vol.31
, Issue.5
, pp. 365-378
-
-
Karimi, B.1
Fatemi Ghomi, S.M.T.2
Wilson, J.M.3
-
28
-
-
33750728882
-
Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches
-
R. Jans and Z. Degraeve, "Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches," European Journal of Operational Research, vol. 177, no. 3, pp. 1855-1875, 2007.
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 1855-1875
-
-
Jans, R.1
Degraeve, Z.2
-
29
-
-
36448995797
-
Modeling industrial lot sizing problems: A review
-
R. Jans and Z. Degraeve, "Modeling industrial lot sizing problems: a review," International Journal of Production Research, vol. 46, no. 6, pp. 1619-1643, 2008.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.6
, pp. 1619-1643
-
-
Jans, R.1
Degraeve, Z.2
-
30
-
-
84875260385
-
MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints
-
R. Ramezanian, M. Saidi-Mehrabad, and P. Fattahi, "MIP formulation and heuristics for multi-stage capacitated lot-sizing and scheduling problem with availability constraints," Journal of Manufacturing Systems, vol. 32, no. 2, pp. 392-401, 2013.
-
(2013)
Journal of Manufacturing Systems
, vol.32
, Issue.2
, pp. 392-401
-
-
Ramezanian, R.1
Saidi-Mehrabad, M.2
Fattahi, P.3
-
31
-
-
0036604813
-
Simultaneous lotsizing and scheduling on parallel machines
-
H. Meyr, "Simultaneous lotsizing and scheduling on parallel machines," European Journal of Operational Research, vol. 139, no. 2, pp. 277-292, 2002.
-
(2002)
European Journal of Operational Research
, vol.139
, Issue.2
, pp. 277-292
-
-
Meyr, H.1
-
32
-
-
0033903519
-
Simultaneous lotsizing and scheduling by combining local search with dual reoptimization
-
H. Meyr, "Simultaneous lotsizing and scheduling by combining local search with dual reoptimization," European Journal of Operational Research, vol. 120, no. 2, pp. 311-326, 2000.
-
(2000)
European Journal of Operational Research
, vol.120
, Issue.2
, pp. 311-326
-
-
Meyr, H.1
-
33
-
-
84934990622
-
Batch delivery scheduling with multiple decentralized manufacturers
-
S. Li, X. Zhong, and H. Li, "Batch delivery scheduling with multiple decentralized manufacturers," Mathematical Problems in Engineering, vol. 2014, Article ID 321513, 7 pages, 2014.
-
(2014)
Mathematical Problems in Engineering
, vol.2014
-
-
Li, S.1
Zhong, X.2
Li, H.3
-
34
-
-
41549111411
-
Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource
-
H. Tempelmeier and L. Buschkühl, "Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource," International Journal of Production Economics, vol. 113, no. 1, pp. 401-412, 2008.
-
(2008)
International Journal of Production Economics
, vol.113
, Issue.1
, pp. 401-412
-
-
Tempelmeier, H.1
Buschkühl, L.2
-
35
-
-
58149250389
-
Solution approaches for the soft drink integrated production lot sizing and scheduling problem
-
D. Ferreira, R. Morabito, and S. Rangel, "Solution approaches for the soft drink integrated production lot sizing and scheduling problem," European Journal of Operational Research, vol. 196, no. 2, pp. 697-706, 2009.
-
(2009)
European Journal of Operational Research
, vol.196
, Issue.2
, pp. 697-706
-
-
Ferreira, D.1
Morabito, R.2
Rangel, S.3
-
36
-
-
84857456910
-
Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production
-
D. Ferreira, A. R. Clark, B. Almada-Lobo, and R. Morabito, "Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production," International Journal of Production Economics, vol. 136, no. 2, pp. 255-265, 2012.
-
(2012)
International Journal of Production Economics
, vol.136
, Issue.2
, pp. 255-265
-
-
Ferreira, D.1
Clark, A.R.2
Almada-Lobo, B.3
Morabito, R.4
-
37
-
-
84897522711
-
A genetic algorithm/mathematical programming approach to solve a two-level soft drink production problem
-
C. F. M. Toledo, L. De Oliveira, R. De Freitas Pereira, P. M. França, and R. Morabito, "A genetic algorithm/mathematical programming approach to solve a two-level soft drink production problem," Computers & Operations Research, vol. 48, pp. 40-52, 2014.
-
(2014)
Computers & Operations Research
, vol.48
, pp. 40-52
-
-
Toledo, C.F.M.1
De Oliveira, L.2
De Pereira Freitas, R.3
França, P.M.4
Morabito, R.5
-
38
-
-
34547445625
-
Um modelo de otimização para o problema integrado de dimensionamento de lotes e programação da produção em fábricas de refrigerantes
-
C. F. M. Toledo, P.M. França, R. Morabito, and A. Kimms, "Um modelo de otimização para o problema integrado de dimensionamento de lotes e programação da produção em fábricas de refrigerantes," Pesquisa Operacional, vol. 27, no. 1, pp. 155-186, 2007.
-
(2007)
Pesquisa Operacional
, vol.27
, Issue.1
, pp. 155-186
-
-
Toledo, C.F.M.1
França, P.M.2
Morabito, R.3
Kimms, A.4
-
39
-
-
68949180552
-
Multi-population genetic algorithm to solve the synchronized and integrated two-level lot sizing and scheduling problem
-
C. F. M. Toledo, P. M. França, R. Morabito, and A. Kimms, "Multi-population genetic algorithm to solve the synchronized and integrated two-level lot sizing and scheduling problem," International Journal of Production Research, vol. 47, no. 11, pp. 3097-3119, 2009.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.11
, pp. 3097-3119
-
-
Toledo, C.F.M.1
França, P.M.2
Morabito, R.3
Kimms, A.4
|