-
1
-
-
35248840078
-
A note on "the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times"
-
Almada-Lobo B.; Carravilla M.; and OliveiraJ. A note on "The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times" Computers & Operations Research 35 2008 1374 1376
-
(2008)
Computers & Operations Research
, vol.35
, pp. 1374-1376
-
-
Almada-Lobo, B.1
Carravilla, M.2
Oliveiraj3
-
3
-
-
69249213631
-
A hybrid optimization approach for multi-level capacitated lot-sizing problems
-
Almeder C. A hybrid optimization approach for multi-level capacitated lot-sizing problems European Journal of Operational Research 200 2010 599 606
-
(2010)
European Journal of Operational Research
, vol.200
, pp. 599-606
-
-
Almeder, C.1
-
4
-
-
84855790162
-
Synchronization of scarce resources for a parallel machine lotsizing problem
-
Almeder C.; and Almada-Lobo B. Synchronization of scarce resources for a parallel machine lotsizing problem International Journal of Production Research 49 24 2011 7315 7335
-
(2011)
International Journal of Production Research
, vol.49
, Issue.24
, pp. 7315-7335
-
-
Almeder, C.1
Almada-Lobo, B.2
-
5
-
-
0035410522
-
Modelling practical lot-sizing problems as mixed-integer programs
-
Belvaux G.; and Wolsey L. Modelling practical lot-sizing problems as mixed-integer programs Management Science 47 2001 993 1007
-
(2001)
Management Science
, vol.47
, pp. 993-1007
-
-
Belvaux, G.1
Wolsey, L.2
-
6
-
-
22744442994
-
Metaheuristic approaches for the multilevel resource-constraint lot-sizing problem with setup and lead times
-
Berretta R.; Franca P.; and Armentano V. Metaheuristic approaches for the multilevel resource-constraint lot-sizing problem with setup and lead times Asia-Pacific Journal of Operational Research 22 2 2005 261 286
-
(2005)
Asia-Pacific Journal of Operational Research
, vol.22
, Issue.2
, pp. 261-286
-
-
Berretta, R.1
Franca, P.2
Armentano, V.3
-
8
-
-
0020832935
-
Mathematical programming approach to capacity-constrained MRP systems: Review, formulation and problem reduction
-
Billington P.; McClain J.; and Thomas L. Mathematical programming approach to capacity-constrained MRP systems: Review, formulation and problem reduction Management Science 29 1983 1126 1141
-
(1983)
Management Science
, vol.29
, pp. 1126-1141
-
-
Billington, P.1
McClain, J.2
Thomas, L.3
-
9
-
-
0020194024
-
Computational complexity of the capacitated lot size problem
-
Bitran G.; and Yanasse H. Computational complexity of the capacitated lot size problem Management Science 28 1982 1174 1186
-
(1982)
Management Science
, vol.28
, pp. 1174-1186
-
-
Bitran, G.1
Yanasse, H.2
-
10
-
-
77349118693
-
Dynamic capacitated lot-sizing problems: A classification and review of solution approaches
-
Buschkühl L.; Sahling F.; Helber S.; and Tempelmeier H. Dynamic capacitated lot-sizing problems: a classification and review of solution approaches OR Spectrum 32 2010 231 261
-
(2010)
OR Spectrum
, vol.32
, pp. 231-261
-
-
Buschkühl, L.1
Sahling, F.2
Helber, S.3
Tempelmeier, H.4
-
12
-
-
0029357754
-
The application of valid inequalities to the multi-stage lot-sizing problem
-
Clark A.; and Armentano V. The application of valid inequalities to the multi-stage lot-sizing problem Computers & Operations Research 22 1995 669 680
-
(1995)
Computers & Operations Research
, vol.22
, pp. 669-680
-
-
Clark, A.1
Armentano, V.2
-
14
-
-
33748884885
-
Simultaneous lot sizing and scheduling for multi-product multi-level production
-
Fandel G.; and Stammen-Hegene C. Simultaneous lot sizing and scheduling for multi-product multi-level production International Journal of Production Economics 194 2006 308 316
-
(2006)
International Journal of Production Economics
, vol.194
, pp. 308-316
-
-
Fandel, G.1
Stammen-Hegene, C.2
-
16
-
-
5644274147
-
The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
-
Gupta D.; and Magnusson T. The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times Computers & Operations Research 32 2005 727 747
-
(2005)
Computers & Operations Research
, vol.32
, pp. 727-747
-
-
Gupta, D.1
Magnusson, T.2
-
17
-
-
0010775487
-
Capacitated lot-sizing with sequence dependent setup costs
-
Haase K. Capacitated lot-sizing with sequence dependent setup costs Operations Research Spektrum 18 1996 51 59
-
(1996)
Operations Research Spektrum
, vol.18
, pp. 51-59
-
-
Haase, K.1
-
18
-
-
84881228205
-
Multi-level lot sizing and job shop scheduling with compressible process times: A cutting plane approach
-
Karimi-Nasab M.; and Seyedhoseini S.M. Multi-level lot sizing and job shop scheduling with compressible process times: A cutting plane approach European Journal of Operational Research 231 2013 598 616
-
(2013)
European Journal of Operational Research
, vol.231
, pp. 598-616
-
-
Karimi-Nasab, M.1
Seyedhoseini, S.M.2
-
20
-
-
53849091132
-
Simultane Losgrößen- und Reihenfolgeplanung bei mehrstufiger kontinuierlicher Fertigung
-
Meyr H. Simultane Losgrößen- und Reihenfolgeplanung bei mehrstufiger kontinuierlicher Fertigung Zeitschrift für Betriebswirtschaft 74 2004 585 610
-
(2004)
Zeitschrift für Betriebswirtschaft
, vol.74
, pp. 585-610
-
-
Meyr, H.1
-
22
-
-
84871978684
-
Multi-stage simultaneous lot-sizing and scheduling for flow line production
-
Seeanner F.; and Meyr H. Multi-stage simultaneous lot-sizing and scheduling for flow line production OR Spectrum 35 2013 33 73
-
(2013)
OR Spectrum
, vol.35
, pp. 33-73
-
-
Seeanner, F.1
Meyr, H.2
-
23
-
-
29344475492
-
Multilevel capacitated lot-sizing and resource-constrained project scheduling: An integrated perspective
-
Stadtler H. Multilevel capacitated lot-sizing and resource-constrained project scheduling: an integrated perspective International Journal of Production Research 43 2005 5253 5270
-
(2005)
International Journal of Production Research
, vol.43
, pp. 5253-5270
-
-
Stadtler, H.1
-
24
-
-
78649635846
-
Multi-level single machine lot-sizing and scheduling with zero lead times
-
Stadtler H. Multi-level single machine lot-sizing and scheduling with zero lead times European Journal of Operational Research 209 2011 241 252
-
(2011)
European Journal of Operational Research
, vol.209
, pp. 241-252
-
-
Stadtler, H.1
-
25
-
-
41549111411
-
Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource
-
Tempelmeier H.; and Buschkühl L. Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource International Journal of Production Economics 113 2008 401 412
-
(2008)
International Journal of Production Economics
, vol.113
, pp. 401-412
-
-
Tempelmeier, H.1
Buschkühl, L.2
-
26
-
-
59549097415
-
A heuristic for the dynamic multi-level capacitated lotsizing problem with linked lotsizes for general product structures
-
Tempelmeier H.; and Buschkühl L. A heuristic for the dynamic multi-level capacitated lotsizing problem with linked lotsizes for general product structures OR Spectrum 31 2009 385 404
-
(2009)
OR Spectrum
, vol.31
, pp. 385-404
-
-
Tempelmeier, H.1
Buschkühl, L.2
-
27
-
-
0000857408
-
A Lagrangean-based heuristic for dynamic multilevel multi-item constrained lotsizing with setup times
-
Tempelmeier H.; and Derstroff M. A Lagrangean-based heuristic for dynamic multilevel multi-item constrained lotsizing with setup times Management Science 42 1996 738 757
-
(1996)
Management Science
, vol.42
, pp. 738-757
-
-
Tempelmeier, H.1
Derstroff, M.2
-
28
-
-
84870952214
-
A hybrid multi-population genetic algorithm applied to solve the multi-level capacitated lot sizing problem with backlogging
-
Toledo C.F.M.; de Oliveira R.R.R.; and Morelato Franca P. A hybrid multi-population genetic algorithm applied to solve the multi-level capacitated lot sizing problem with backlogging Computers & Operations Research 40 2013 910 919
-
(2013)
Computers & Operations Research
, vol.40
, pp. 910-919
-
-
Toledo, C.F.M.1
De Oliveira, R.R.R.2
Morelato Franca, P.3
-
30
-
-
0001962762
-
Dynamic version of the economic lot size model
-
Wagner H.; and Within T. Dynamic version of the economic lot size model Management Science 5 1958 89 96
-
(1958)
Management Science
, vol.5
, pp. 89-96
-
-
Wagner, H.1
Within, T.2
-
31
-
-
0036968625
-
Solving multi-item lot-sizing problems with an MIP solver using classification and reformulation
-
Wolsey L. Solving multi-item lot-sizing problems with an MIP solver using classification and reformulation Management Science 48 2002 1587 1602
-
(2002)
Management Science
, vol.48
, pp. 1587-1602
-
-
Wolsey, L.1
-
32
-
-
79959695223
-
An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging
-
Wu T.; Shi L.; Geunes J.; and Akartunali K. An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging European Journal of Operational Research 214 2 2011 428 441
-
(2011)
European Journal of Operational Research
, vol.214
, Issue.2
, pp. 428-441
-
-
Wu, T.1
Shi, L.2
Geunes, J.3
Akartunali, K.4
-
33
-
-
84863721244
-
On the equivalence of strong formulations for capacitated multi-level lot sizing problems with setup times
-
Wu T.; Shi L.; Geunes J.; and Akartunali K. On the equivalence of strong formulations for capacitated multi-level lot sizing problems with setup times Journal of Global Optimization 53 2012 615 639
-
(2012)
Journal of Global Optimization
, vol.53
, pp. 615-639
-
-
Wu, T.1
Shi, L.2
Geunes, J.3
Akartunali, K.4
-
34
-
-
0036631210
-
Heuristic genetic algorithms for general capacitated lot-sizing problems
-
Xie J.; and Dong J. Heuristic genetic algorithms for general capacitated lot-sizing problems Computers and Mathematics with Applications 44 2002 263 276
-
(2002)
Computers and Mathematics with Applications
, vol.44
, pp. 263-276
-
-
Xie, J.1
Dong, J.2
-
35
-
-
33748492325
-
Scheduling and lot sizing with sequence-dependent setup: A literature review
-
Zhu X.; and Wilhelm W. Scheduling and lot sizing with sequence-dependent setup: A literature review IIE Transactions 38 2006 987 1007
-
(2006)
IIE Transactions
, vol.38
, pp. 987-1007
-
-
Zhu, X.1
Wilhelm, W.2
|