메뉴 건너뛰기




Volumn 39, Issue 9, 2012, Pages 2100-2110

Analytical study on multi-product production planning with outsourcing

Author keywords

Capacitated production planning; Dynamic programming; Multi period; Multi product; Outsourcing; Stochastic demand

Indexed keywords

ANALYTICAL APPROACH; CAPACITY CONSTRAINTS; DECISION MODELS; INHOUSE MANUFACTURING; MULTI-PERIOD; MULTI-PRODUCTS; MULTIPLE PRODUCTS; NUMERICAL EXPERIMENTS; OPTIMAL DECISIONS; OUTSOURCE; PLANNING PERIOD; PRODUCTION PLANNING; STOCHASTIC DEMAND;

EID: 84855543932     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2011.10.015     Document Type: Article
Times cited : (15)

References (36)
  • 1
    • 20344396908 scopus 로고    scopus 로고
    • An analysis of the multi-product newsboy problem with a budget constraint
    • DOI 10.1016/j.ijpe.2004.08.008, PII S0925527304003214
    • L.L. Abdel-Malek, and R. Montanari An analysis of the multi-product newsboy problem with a budget constraint International Journal of Production Economics 97 2005 296 307 (Pubitemid 40788675)
    • (2005) International Journal of Production Economics , vol.97 , Issue.3 , pp. 296-307
    • Abdel-Malek, L.L.1    Montanari, R.2
  • 3
    • 38349016573 scopus 로고    scopus 로고
    • Stability and optimality of a multi-product production and storage system under demand uncertainty
    • E.F. Arruda, and J.B.R. do Val Stability and optimality of a multi-product production and storage system under demand uncertainty European Journal of Operational Research 188 2008 406 427
    • (2008) European Journal of Operational Research , vol.188 , pp. 406-427
    • Arruda, E.F.1    Do Val, J.B.R.2
  • 4
    • 0032496485 scopus 로고    scopus 로고
    • Stochastic linear optimisation of an MPMP production planning model
    • PII S0925527398000607
    • M.A. Bakir, and M.D. Byrne Stochastic linear optimization of an MPMP production planning model International Journal of Production Economics 55 1998 87 96 (Pubitemid 128417434)
    • (1998) International Journal of Production Economics , vol.55 , Issue.1 , pp. 87-96
    • Bakir, M.A.1    Byrne, M.D.2
  • 5
    • 77950807082 scopus 로고    scopus 로고
    • Optimal control of a production-inventory system with both backorders and lost sales
    • S. Benjaafar, M. ElHafsi, and T.L. Huang Optimal control of a production-inventory system with both backorders and lost sales Naval Research Logistics 57 2010 252 265
    • (2010) Naval Research Logistics , vol.57 , pp. 252-265
    • Benjaafar, S.1    Elhafsi, M.2    Huang, T.L.3
  • 6
    • 77955306012 scopus 로고    scopus 로고
    • Optimal control of a production-inventory system with customer impatience
    • S. Benjaafar, J.P. Gayon, and S. Tepe Optimal control of a production-inventory system with customer impatience Operations Research Letters 38 2010 267 272
    • (2010) Operations Research Letters , vol.38 , pp. 267-272
    • Benjaafar, S.1    Gayon, J.P.2    Tepe, S.3
  • 8
    • 34547373834 scopus 로고    scopus 로고
    • Hierarchical production planning for multi-product lines in the beverage industry
    • DOI 10.1080/09537280701340631, PII 779865385
    • I.T. Christou, A.G. Lagodimos, and D. Lycopoulou Hierarchical production planning for multi-product lines in the beverage industry Production Planning and Control 18 2007 367 376 (Pubitemid 47150173)
    • (2007) Production Planning and Control , vol.18 , Issue.5 , pp. 367-376
    • Christou, I.T.1    Lagodimos, A.G.2    Lycopoulou, D.3
  • 9
    • 0034630799 scopus 로고    scopus 로고
    • Production outsourcing: A linear programming model for the theory-of-constraints
    • DOI 10.1080/002075400188762
    • A. Coman, and B. Ronen Production outsourcing: a linear programming model for the theory-of-constraints International Journal of Production Reserarch 38 2000 1631 1639 (Pubitemid 35395508)
    • (2000) International Journal of Production Research , vol.38 , Issue.7 , pp. 1631-1639
    • Coman, A.1    Ronen, B.2
  • 10
    • 46449106330 scopus 로고    scopus 로고
    • Optimal control of price and production in an assemble-to-order system
    • Y.Y. Feng, J.H. Ou, and Z. Pang Optimal control of price and production in an assemble-to-order system Operational Research Letters 36 2008 506 512
    • (2008) Operational Research Letters , vol.36 , pp. 506-512
    • Feng, Y.Y.1    Ou, J.H.2    Pang, Z.3
  • 12
    • 0041417619 scopus 로고    scopus 로고
    • Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems
    • A. Gharbi, and J.P. Kenne Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems IIE Transactions 35 2003 941 952
    • (2003) IIE Transactions , vol.35 , pp. 941-952
    • Gharbi, A.1    Kenne, J.P.2
  • 13
    • 0036475577 scopus 로고    scopus 로고
    • Optimal control approach to production systems with inventory-level- dependent demand
    • DOI 10.1109/9.983360, PII S0018928602020676
    • E. Khmelnitsky, and Y. Gerchak Optimal control approach to production systems with inventory-level-dependent demand IEEE Transactions on Automatic Control 47 2002 289 292 (Pubitemid 34291542)
    • (2002) IEEE Transactions on Automatic Control , vol.47 , Issue.2 , pp. 289-292
    • Khmelnitsky, E.1    Gerchak, Y.2
  • 14
    • 0001552617 scopus 로고    scopus 로고
    • The single-period (news-vendor) problem: Literature review and suggestions for future research
    • M. Khouja The single-period (news-vendor) problem: literature review and suggestions for future research Omega 27 1999 537 553
    • (1999) Omega , vol.27 , pp. 537-553
    • Khouja, M.1
  • 15
    • 0030269813 scopus 로고    scopus 로고
    • The newsstand problem: A capacitated multiple-product single-period inventory problem
    • H.S. Lau, and A.H.L. Lau The newsstand problem: a capacitated multiple-product single-period inventory problem European Journal of Operational Research 94 1996 29 42
    • (1996) European Journal of Operational Research , vol.94 , pp. 29-42
    • Lau, H.S.1    Lau, A.H.L.2
  • 16
    • 65249176906 scopus 로고    scopus 로고
    • Capacitated production planning with outsourcing in an OKP company
    • X. Liu, and Y.L. Tu Capacitated production planning with outsourcing in an OKP company International Journal of Production Reserarch 46 2008 5781 5795
    • (2008) International Journal of Production Reserarch , vol.46 , pp. 5781-5795
    • Liu, X.1    Tu, Y.L.2
  • 17
    • 51749107932 scopus 로고    scopus 로고
    • A genetic algorithm heuristic approach to general outsourcing capacitated production planning problems
    • X. Liu, Y.L. Tu, J. Zhang, and L.G. Watson A genetic algorithm heuristic approach to general outsourcing capacitated production planning problems International Journal of Production Reserarch 46 2008 5059 5074
    • (2008) International Journal of Production Reserarch , vol.46 , pp. 5059-5074
    • Liu, X.1    Tu, Y.L.2    Zhang, J.3    Watson, L.G.4
  • 18
    • 0035929278 scopus 로고    scopus 로고
    • Extended model for a hybrid production planning approach
    • DOI 10.1016/S0925-5273(00)00172-9, PII S0925527300001729
    • B. Kim, and S. Kim Extended model for a hybrid production planning approach International Journal of Production Economics 73 2001 165 173 (Pubitemid 32903551)
    • (2001) International Journal of Production Economics , vol.73 , Issue.2 , pp. 165-173
    • Kim, B.1    Kim, S.2
  • 19
    • 0000149356 scopus 로고    scopus 로고
    • An optimal control model for continuous time production and setup scheduling
    • K. Kogan, and E. Khmelnitsky An optimal control model for continuous time production and setup scheduling International Journal of Production Reserarch 34 1996 715 725 (Pubitemid 126580967)
    • (1996) International Journal of Production Research , vol.34 , Issue.3 , pp. 715-725
    • Kogan, K.1    Khmelnitsky, E.2
  • 20
    • 0036532877 scopus 로고    scopus 로고
    • Optimal production control: Analytical solution for the limit cycles
    • K. Kogan, and S.X.C. Lou Optimal production control: analytical solution for the limit cycles IIE Transactions 34 2001 363 374
    • (2001) IIE Transactions , vol.34 , pp. 363-374
    • Kogan, K.1    Lou, S.X.C.2
  • 24
    • 33847038040 scopus 로고    scopus 로고
    • Hierarchical production planning and scheduling in a multi-product, batch process environment
    • M.K. Omar, and S.C. Teo Hierarchical production planning and scheduling in a multi-product, batch process environment International Journal of Production Reserarch 45 2007 1029 1047
    • (2007) International Journal of Production Reserarch , vol.45 , pp. 1029-1047
    • Omar, M.K.1    Teo, S.C.2
  • 26
    • 38149033826 scopus 로고    scopus 로고
    • Coordinated logistics scheduling for in-house production and outsourcing
    • X.T. Qi Coordinated logistics scheduling for in-house production and outsourcing IEEE Transactions on Automation Science and Engineering 5 2008 188 192
    • (2008) IEEE Transactions on Automation Science and Engineering , vol.5 , pp. 188-192
    • Qi, X.T.1
  • 28
    • 0025399203 scopus 로고
    • Master production scheduling make-to-stock products. A framework for analysis
    • V. Sridharan, and W.L. Berry Master production scheduling make-to-stock products, a framework for analysis International Journal of Production Reserarch 28 1990 541 558 (Pubitemid 20658894)
    • (1990) International Journal of Production Research , vol.28 , Issue.3 , pp. 541-558
    • Sridharan, V.1    Berry William, L.2
  • 29
    • 0037859397 scopus 로고
    • Research portfolio for inventory management and production planning systems
    • H.M. Wagner Research portfolio for inventory management and production planning systems Operations Research 28 1980 445 475
    • (1980) Operations Research , vol.28 , pp. 445-475
    • Wagner, H.M.1
  • 30
    • 26444454462 scopus 로고    scopus 로고
    • Applying possibilistic linear programming to aggregate production planning
    • R.C. Wang, and T.F. Liang Applying possibilistic linear programming to aggregate production planning International Journal of Production Economics 98 2005 328 341
    • (2005) International Journal of Production Economics , vol.98 , pp. 328-341
    • Wang, R.C.1    Liang, T.F.2
  • 31
    • 1442334789 scopus 로고    scopus 로고
    • Application of fuzzy multi-objective linear programming to aggregate production planning
    • R.C. Wang, and T.F. Liang Application of fuzzy multi-objective linear programming to aggregate production planning Computers and Industrial Engineering 46 2004 17 41
    • (2004) Computers and Industrial Engineering , vol.46 , pp. 17-41
    • Wang, R.C.1    Liang, T.F.2
  • 32
    • 0043234613 scopus 로고    scopus 로고
    • Modeling and analysis for multi-period, multi-product and multi-resource production scheduling
    • H.F. Wang, and K.Y. Wu Modeling and analysis for multi-period, multi-product and multi-resource production scheduling Journal of Intelligent Manufacturing 14 2003 297 309
    • (2003) Journal of Intelligent Manufacturing , vol.14 , pp. 297-309
    • Wang, H.F.1    Wu, K.Y.2
  • 33
    • 77955605562 scopus 로고    scopus 로고
    • Optimal control and equilibrium behavior of production-inventory systems
    • O.Q. Wu, and H. Chen Optimal control and equilibrium behavior of production-inventory systems Management Science 56 2010 1362 1379
    • (2010) Management Science , vol.56 , pp. 1362-1379
    • Wu, O.Q.1    Chen, H.2
  • 34
    • 70349445326 scopus 로고    scopus 로고
    • Robust production planning in a manufacturing environment with random yield: A case in sawmill production planning
    • M.K. Zanjani, D. Ait-Kadi, and M. Nourelfath Robust production planning in a manufacturing environment with random yield: a case in sawmill production planning European Journal of Operational Research 201 2010 882 891
    • (2010) European Journal of Operational Research , vol.201 , pp. 882-891
    • Zanjani, M.K.1    Ait-Kadi, D.2    Nourelfath, M.3
  • 35
    • 77953646191 scopus 로고    scopus 로고
    • A multi-stage stochastic programming approach for production planning with uncertainty in the quality of raw materials and demand
    • M.K. Zanjani, M. Nourelfath, and D. Ait-Kadi A multi-stage stochastic programming approach for production planning with uncertainty in the quality of raw materials and demand International Journal of Production Research 48 2010 4701 4723
    • (2010) International Journal of Production Research , vol.48 , pp. 4701-4723
    • Zanjani, M.K.1    Nourelfath, M.2    Ait-Kadi, D.3
  • 36
    • 58049192829 scopus 로고    scopus 로고
    • A binary solution method for the multi-product newsboy problem with budget constraint
    • B. Zhang, X. Xu, and Z. Hua A binary solution method for the multi-product newsboy problem with budget constraint International Journal of Production Economics 117 2009 136 141
    • (2009) International Journal of Production Economics , vol.117 , pp. 136-141
    • Zhang, B.1    Xu, X.2    Hua, Z.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.