메뉴 건너뛰기




Volumn 35, Issue 3, 2011, Pages 1363-1377

A decision support system for order acceptance/rejection in hybrid MTS/MTO production systems

Author keywords

Customer prioritization; Decision support system; Hybrid MTS MTO systems; Mathematical programming model; Order acceptance rejection decision; Price and due date negotiation

Indexed keywords

ACCEPTANCE/REJECTION; DUE DATES; MATHEMATICAL PROGRAMMING MODEL; MTS/MTO; PRIORITIZATION;

EID: 78549271643     PISSN: 0307904X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.apm.2010.09.015     Document Type: Article
Times cited : (72)

References (34)
  • 1
    • 0024961857 scopus 로고
    • Production planning systems and their applicability to make-to-order companies
    • Hendry L.C., Kingsman B.G. Production planning systems and their applicability to make-to-order companies. Eur. J. Oper. Res. 1989, 40:1-15.
    • (1989) Eur. J. Oper. Res. , vol.40 , pp. 1-15
    • Hendry, L.C.1    Kingsman, B.G.2
  • 3
    • 0030193969 scopus 로고    scopus 로고
    • Production strategies for a stochastic lot-sizing problem with constant capacity
    • Dellaert N.P., Melo M.T. Production strategies for a stochastic lot-sizing problem with constant capacity. Eur. J. Oper. Res. 1996, 92:281-301.
    • (1996) Eur. J. Oper. Res. , vol.92 , pp. 281-301
    • Dellaert, N.P.1    Melo, M.T.2
  • 4
    • 0037935712 scopus 로고    scopus 로고
    • Successful build-to-order strategies: start with the customer
    • Fall
    • Holweg M., Pil F.K. Successful build-to-order strategies: start with the customer. Sloan Manage. Rev. 2001, 42(Fall):74-83.
    • (2001) Sloan Manage. Rev. , vol.42 , pp. 74-83
    • Holweg, M.1    Pil, F.K.2
  • 5
    • 78549296450 scopus 로고    scopus 로고
    • Design of Hybrid Make-to-Stock (MTS)-Make-to-Order (MTO) Manufacturing System, M.Sc. Thesis, The University of Minnesota,
    • M. Yingdong, Design of Hybrid Make-to-Stock (MTS)-Make-to-Order (MTO) Manufacturing System, M.Sc. Thesis, The University of Minnesota, 2001.
    • (2001)
    • Yingdong, M.1
  • 6
    • 0030734685 scopus 로고    scopus 로고
    • Modeling the cost and benefit of delayed differentiation
    • Lee H.L., Tang C.S. Modeling the cost and benefit of delayed differentiation. Manage. Sci. 1997, 43:40-53.
    • (1997) Manage. Sci. , vol.43 , pp. 40-53
    • Lee, H.L.1    Tang, C.S.2
  • 7
    • 21844449924 scopus 로고    scopus 로고
    • Integrating production and engineering perspective on the customer order decoupling point
    • Wikner J., Rudberg M. Integrating production and engineering perspective on the customer order decoupling point. Int. J. Oper. Prod. Manage. 2005, 25(7):623-641.
    • (2005) Int. J. Oper. Prod. Manage. , vol.25 , Issue.7 , pp. 623-641
    • Wikner, J.1    Rudberg, M.2
  • 8
    • 2642516348 scopus 로고    scopus 로고
    • Combined make-to-order and make-to-stock in a food production system
    • Soman C.A., Van Donk D.P., Gaalman G. Combined make-to-order and make-to-stock in a food production system. Int. J. Prod. Econ. 2004, 90(2):223-235.
    • (2004) Int. J. Prod. Econ. , vol.90 , Issue.2 , pp. 223-235
    • Soman, C.A.1    Van Donk, D.P.2    Gaalman, G.3
  • 9
    • 37349082490 scopus 로고    scopus 로고
    • A new decision-making structure for the order entry stage in make-to-order environments
    • Ebadian M., Rabbani M., Jolai F., Torabi S.A., Tavakkoli-Moghaddam R. A new decision-making structure for the order entry stage in make-to-order environments. Int. J. Prod. Econ. 2008, 111(8):351-367.
    • (2008) Int. J. Prod. Econ. , vol.111 , Issue.8 , pp. 351-367
    • Ebadian, M.1    Rabbani, M.2    Jolai, F.3    Torabi, S.A.4    Tavakkoli-Moghaddam, R.5
  • 10
    • 0032157331 scopus 로고    scopus 로고
    • Managing capacity in tightly constrained systems
    • Sridharan S.V. Managing capacity in tightly constrained systems. Int. J. Prod. Econ. 1998, 56-57:601-610.
    • (1998) Int. J. Prod. Econ. , vol.56-57 , pp. 601-610
    • Sridharan, S.V.1
  • 11
  • 12
    • 33748757057 scopus 로고    scopus 로고
    • A capacity-driven approach to establish reliable due dates in a MTO environment
    • Corti D., Pozzetti A., Zorzini M. A capacity-driven approach to establish reliable due dates in a MTO environment. Int. J. Prod. Econ. 2006, 104:536-554.
    • (2006) Int. J. Prod. Econ. , vol.104 , pp. 536-554
    • Corti, D.1    Pozzetti, A.2    Zorzini, M.3
  • 13
    • 0002274219 scopus 로고
    • Input-output control: a real handle on lead times
    • Wight O. Input-output control: a real handle on lead times. Prod. Invent. Manage. 1970, (3rd Qtr.):9-31.
    • (1970) Prod. Invent. Manage. , Issue.3 , pp. 9-31
    • Wight, O.1
  • 14
    • 0027147723 scopus 로고
    • Customer enquiry management: part of a hierarchical system to control lead times in make-to-order companies
    • Hendry L.C., Kingsman B.G. Customer enquiry management: part of a hierarchical system to control lead times in make-to-order companies. J. Oper. Res. Soc. 1993, 44:61-70.
    • (1993) J. Oper. Res. Soc. , vol.44 , pp. 61-70
    • Hendry, L.C.1    Kingsman, B.G.2
  • 15
    • 78549260762 scopus 로고
    • Production Control and Information Systems for Component-Manufacturing Shops, Dissertation, Elsevier, Amsterdam,
    • J.W.M. Bertand, J.C. Wortmann, Production Control and Information Systems for Component-Manufacturing Shops, Dissertation, Elsevier, Amsterdam, 1981.
    • (1981)
    • Bertand, J.W.M.1    Wortmann, J.C.2
  • 16
    • 0023979312 scopus 로고
    • Theory and practice of load-oriented manufacturing control
    • Bechte W. Theory and practice of load-oriented manufacturing control. Int. J. Prod. Res. 1988, 26(3):375-395.
    • (1988) Int. J. Prod. Res. , vol.26 , Issue.3 , pp. 375-395
    • Bechte, W.1
  • 17
    • 0024664777 scopus 로고
    • A structural methodology for managing manufacturing lead times in make-to-order companies
    • Kingsman B.G., Tatsiopoulos I.P., Hendry L.C. A structural methodology for managing manufacturing lead times in make-to-order companies. Eur. J. Oper. Res. 1989, 40:196-209.
    • (1989) Eur. J. Oper. Res. , vol.40 , pp. 196-209
    • Kingsman, B.G.1    Tatsiopoulos, I.P.2    Hendry, L.C.3
  • 18
    • 0032210055 scopus 로고    scopus 로고
    • Price, delivery time guarantees and capacity selection
    • So K.C., Song J.S. Price, delivery time guarantees and capacity selection. Eur. J. Oper. Res. 1998, 111:28-49.
    • (1998) Eur. J. Oper. Res. , vol.111 , pp. 28-49
    • So, K.C.1    Song, J.S.2
  • 19
    • 0032628965 scopus 로고    scopus 로고
    • Pricing and lead time decision for make-to-order firms with contingent orders
    • Easton F.F., Moodie D.R. Pricing and lead time decision for make-to-order firms with contingent orders. Eur. J. Oper. Res. 1999, 16:305-318.
    • (1999) Eur. J. Oper. Res. , vol.16 , pp. 305-318
    • Easton, F.F.1    Moodie, D.R.2
  • 20
    • 0026880663 scopus 로고
    • Order acceptance strategies in a production-to-order environment with setup times and due-dates
    • Wester F.A.W., Wijngaard J., Zijm W.H.M. Order acceptance strategies in a production-to-order environment with setup times and due-dates. Int. J. Prod. Res. 1992, 30(6):1313-1326.
    • (1992) Int. J. Prod. Res. , vol.30 , Issue.6 , pp. 1313-1326
    • Wester, F.A.W.1    Wijngaard, J.2    Zijm, W.H.M.3
  • 21
    • 0035494078 scopus 로고    scopus 로고
    • Order selection optimization in hybrid make-to-order and make-to-stock markets
    • Ashayeri J., Selen W.J. Order selection optimization in hybrid make-to-order and make-to-stock markets. J. Oper. Res. Soc. 2001, 52:1098-1106.
    • (2001) J. Oper. Res. Soc. , vol.52 , pp. 1098-1106
    • Ashayeri, J.1    Selen, W.J.2
  • 22
    • 33847678988 scopus 로고    scopus 로고
    • Thomas order acceptance with weighted tardiness
    • Slotnick S.A., Morton E. Thomas order acceptance with weighted tardiness. Comput. Oper. Res. 2007, 34(10):3029-3042.
    • (2007) Comput. Oper. Res. , vol.34 , Issue.10 , pp. 3029-3042
    • Slotnick, S.A.1    Morton, E.2
  • 23
    • 34548524876 scopus 로고    scopus 로고
    • Judicious order acceptance and order release in make-to-order manufacturing systems
    • Rogers P., Nandi A. Judicious order acceptance and order release in make-to-order manufacturing systems. Prod. Plan. Control 2007, 18(7):610-625.
    • (2007) Prod. Plan. Control , vol.18 , Issue.7 , pp. 610-625
    • Rogers, P.1    Nandi, A.2
  • 25
    • 33750479859 scopus 로고    scopus 로고
    • Extension of the TOPSIS method for decision-making problems with fuzzy data
    • Jahanshahloo G.R., Hosseinzadeh Lotfi F., Izadikhah M. Extension of the TOPSIS method for decision-making problems with fuzzy data. Appl. Math. Comput. 2006, 181:1544-1551.
    • (2006) Appl. Math. Comput. , vol.181 , pp. 1544-1551
    • Jahanshahloo, G.R.1    Hosseinzadeh Lotfi, F.2    Izadikhah, M.3
  • 26
    • 0038457182 scopus 로고    scopus 로고
    • Customer loyalty and customer loyalty programs
    • Uncles M.D., Dowling G.R., Hammond K. Customer loyalty and customer loyalty programs. J. Consumer Market. 2003, 20(4):294-316.
    • (2003) J. Consumer Market. , vol.20 , Issue.4 , pp. 294-316
    • Uncles, M.D.1    Dowling, G.R.2    Hammond, K.3
  • 27
    • 0033439536 scopus 로고    scopus 로고
    • Whence customer loyalty
    • Oliver R.L. Whence customer loyalty. J. Market. 1997, 63:33-44.
    • (1997) J. Market. , vol.63 , pp. 33-44
    • Oliver, R.L.1
  • 28
    • 0033096959 scopus 로고    scopus 로고
    • Due date demand management: negotiating the trade-off between price and delivery
    • Moodie D.R., Bobrowski P.M. Due date demand management: negotiating the trade-off between price and delivery. Int. J. Prod. Res. 1999, 37(5):997-1021.
    • (1999) Int. J. Prod. Res. , vol.37 , Issue.5 , pp. 997-1021
    • Moodie, D.R.1    Bobrowski, P.M.2
  • 29
    • 0037144830 scopus 로고    scopus 로고
    • Model for negotiating the price and due date for a single order with multiple suppliers in a make-to-order environment
    • Cakravista A., Nakamura N. Model for negotiating the price and due date for a single order with multiple suppliers in a make-to-order environment. Int. J. Prod. Res. 2002, 40(14):3425-3440.
    • (2002) Int. J. Prod. Res. , vol.40 , Issue.14 , pp. 3425-3440
    • Cakravista, A.1    Nakamura, N.2
  • 30
    • 0034675404 scopus 로고    scopus 로고
    • An operational decision model for lead-time and price quotation in congested manufacturing systems
    • ElHafsi M. An operational decision model for lead-time and price quotation in congested manufacturing systems. Eur. J. Oper. Res. 2000, 126:355-370.
    • (2000) Eur. J. Oper. Res. , vol.126 , pp. 355-370
    • ElHafsi, M.1
  • 31
    • 39649122099 scopus 로고    scopus 로고
    • Due date (DD) quotation and capacity planning in make-to order companies: results from an empirical analysis
    • Zorzini M., Corti D., Pozzetti A. Due date (DD) quotation and capacity planning in make-to order companies: results from an empirical analysis. Int. J. Prod. Econ. 2008, 112(2):919-933.
    • (2008) Int. J. Prod. Econ. , vol.112 , Issue.2 , pp. 919-933
    • Zorzini, M.1    Corti, D.2    Pozzetti, A.3
  • 32
    • 0000216104 scopus 로고
    • Negotiating due-dates between customers and producers
    • Lawrence S.R. Negotiating due-dates between customers and producers. Int. J. Prod. Econ. 1994, 37:127-138.
    • (1994) Int. J. Prod. Econ. , vol.37 , pp. 127-138
    • Lawrence, S.R.1
  • 33
    • 13544273855 scopus 로고    scopus 로고
    • Simultaneous price and due date settings for multiple customer classes
    • 351-36
    • Watanapa B., Techanitisawad A. Simultaneous price and due date settings for multiple customer classes. Eur. J. Oper. Res. 2005, 166. 351-36.
    • (2005) Eur. J. Oper. Res. , vol.166
    • Watanapa, B.1    Techanitisawad, A.2
  • 34
    • 21544451655 scopus 로고
    • Bravery the key to job scheduling
    • Merit D. Bravery the key to job scheduling. Am. Printer 1990, 205:126.
    • (1990) Am. Printer , vol.205 , pp. 126
    • Merit, D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.