-
1
-
-
0024961857
-
Production planning systems and their applicability to make-to-order companies
-
Hendry L.C., Kingsman B.G. Production planning systems and their applicability to make-to-order companies. Eur. J. Oper. Res. 1989, 40:1-15.
-
(1989)
Eur. J. Oper. Res.
, vol.40
, pp. 1-15
-
-
Hendry, L.C.1
Kingsman, B.G.2
-
2
-
-
38249020565
-
Coping with the build-to-forecast environment
-
Raturi A.S., Meredith J.R., Mc Cutcheon D.M., Camm J.D. Coping with the build-to-forecast environment. J. Oper. Manage. 1990, 9:230-249.
-
(1990)
J. Oper. Manage.
, vol.9
, pp. 230-249
-
-
Raturi, A.S.1
Meredith, J.R.2
Mc Cutcheon, D.M.3
Camm, J.D.4
-
3
-
-
0030193969
-
Production strategies for a stochastic lot-sizing problem with constant capacity
-
Dellaert N.P., Melo M.T. Production strategies for a stochastic lot-sizing problem with constant capacity. Eur. J. Oper. Res. 1996, 92:281-301.
-
(1996)
Eur. J. Oper. Res.
, vol.92
, pp. 281-301
-
-
Dellaert, N.P.1
Melo, M.T.2
-
4
-
-
0037935712
-
Successful build-to-order strategies: start with the customer
-
Fall
-
Holweg M., Pil F.K. Successful build-to-order strategies: start with the customer. Sloan Manage. Rev. 2001, 42(Fall):74-83.
-
(2001)
Sloan Manage. Rev.
, vol.42
, pp. 74-83
-
-
Holweg, M.1
Pil, F.K.2
-
5
-
-
78549296450
-
-
Design of Hybrid Make-to-Stock (MTS)-Make-to-Order (MTO) Manufacturing System, M.Sc. Thesis, The University of Minnesota,
-
M. Yingdong, Design of Hybrid Make-to-Stock (MTS)-Make-to-Order (MTO) Manufacturing System, M.Sc. Thesis, The University of Minnesota, 2001.
-
(2001)
-
-
Yingdong, M.1
-
6
-
-
0030734685
-
Modeling the cost and benefit of delayed differentiation
-
Lee H.L., Tang C.S. Modeling the cost and benefit of delayed differentiation. Manage. Sci. 1997, 43:40-53.
-
(1997)
Manage. Sci.
, vol.43
, pp. 40-53
-
-
Lee, H.L.1
Tang, C.S.2
-
7
-
-
21844449924
-
Integrating production and engineering perspective on the customer order decoupling point
-
Wikner J., Rudberg M. Integrating production and engineering perspective on the customer order decoupling point. Int. J. Oper. Prod. Manage. 2005, 25(7):623-641.
-
(2005)
Int. J. Oper. Prod. Manage.
, vol.25
, Issue.7
, pp. 623-641
-
-
Wikner, J.1
Rudberg, M.2
-
8
-
-
2642516348
-
Combined make-to-order and make-to-stock in a food production system
-
Soman C.A., Van Donk D.P., Gaalman G. Combined make-to-order and make-to-stock in a food production system. Int. J. Prod. Econ. 2004, 90(2):223-235.
-
(2004)
Int. J. Prod. Econ.
, vol.90
, Issue.2
, pp. 223-235
-
-
Soman, C.A.1
Van Donk, D.P.2
Gaalman, G.3
-
9
-
-
37349082490
-
A new decision-making structure for the order entry stage in make-to-order environments
-
Ebadian M., Rabbani M., Jolai F., Torabi S.A., Tavakkoli-Moghaddam R. A new decision-making structure for the order entry stage in make-to-order environments. Int. J. Prod. Econ. 2008, 111(8):351-367.
-
(2008)
Int. J. Prod. Econ.
, vol.111
, Issue.8
, pp. 351-367
-
-
Ebadian, M.1
Rabbani, M.2
Jolai, F.3
Torabi, S.A.4
Tavakkoli-Moghaddam, R.5
-
10
-
-
0032157331
-
Managing capacity in tightly constrained systems
-
Sridharan S.V. Managing capacity in tightly constrained systems. Int. J. Prod. Econ. 1998, 56-57:601-610.
-
(1998)
Int. J. Prod. Econ.
, vol.56-57
, pp. 601-610
-
-
Sridharan, S.V.1
-
12
-
-
33748757057
-
A capacity-driven approach to establish reliable due dates in a MTO environment
-
Corti D., Pozzetti A., Zorzini M. A capacity-driven approach to establish reliable due dates in a MTO environment. Int. J. Prod. Econ. 2006, 104:536-554.
-
(2006)
Int. J. Prod. Econ.
, vol.104
, pp. 536-554
-
-
Corti, D.1
Pozzetti, A.2
Zorzini, M.3
-
13
-
-
0002274219
-
Input-output control: a real handle on lead times
-
Wight O. Input-output control: a real handle on lead times. Prod. Invent. Manage. 1970, (3rd Qtr.):9-31.
-
(1970)
Prod. Invent. Manage.
, Issue.3
, pp. 9-31
-
-
Wight, O.1
-
14
-
-
0027147723
-
Customer enquiry management: part of a hierarchical system to control lead times in make-to-order companies
-
Hendry L.C., Kingsman B.G. Customer enquiry management: part of a hierarchical system to control lead times in make-to-order companies. J. Oper. Res. Soc. 1993, 44:61-70.
-
(1993)
J. Oper. Res. Soc.
, vol.44
, pp. 61-70
-
-
Hendry, L.C.1
Kingsman, B.G.2
-
15
-
-
78549260762
-
-
Production Control and Information Systems for Component-Manufacturing Shops, Dissertation, Elsevier, Amsterdam,
-
J.W.M. Bertand, J.C. Wortmann, Production Control and Information Systems for Component-Manufacturing Shops, Dissertation, Elsevier, Amsterdam, 1981.
-
(1981)
-
-
Bertand, J.W.M.1
Wortmann, J.C.2
-
16
-
-
0023979312
-
Theory and practice of load-oriented manufacturing control
-
Bechte W. Theory and practice of load-oriented manufacturing control. Int. J. Prod. Res. 1988, 26(3):375-395.
-
(1988)
Int. J. Prod. Res.
, vol.26
, Issue.3
, pp. 375-395
-
-
Bechte, W.1
-
17
-
-
0024664777
-
A structural methodology for managing manufacturing lead times in make-to-order companies
-
Kingsman B.G., Tatsiopoulos I.P., Hendry L.C. A structural methodology for managing manufacturing lead times in make-to-order companies. Eur. J. Oper. Res. 1989, 40:196-209.
-
(1989)
Eur. J. Oper. Res.
, vol.40
, pp. 196-209
-
-
Kingsman, B.G.1
Tatsiopoulos, I.P.2
Hendry, L.C.3
-
18
-
-
0032210055
-
Price, delivery time guarantees and capacity selection
-
So K.C., Song J.S. Price, delivery time guarantees and capacity selection. Eur. J. Oper. Res. 1998, 111:28-49.
-
(1998)
Eur. J. Oper. Res.
, vol.111
, pp. 28-49
-
-
So, K.C.1
Song, J.S.2
-
19
-
-
0032628965
-
Pricing and lead time decision for make-to-order firms with contingent orders
-
Easton F.F., Moodie D.R. Pricing and lead time decision for make-to-order firms with contingent orders. Eur. J. Oper. Res. 1999, 16:305-318.
-
(1999)
Eur. J. Oper. Res.
, vol.16
, pp. 305-318
-
-
Easton, F.F.1
Moodie, D.R.2
-
20
-
-
0026880663
-
Order acceptance strategies in a production-to-order environment with setup times and due-dates
-
Wester F.A.W., Wijngaard J., Zijm W.H.M. Order acceptance strategies in a production-to-order environment with setup times and due-dates. Int. J. Prod. Res. 1992, 30(6):1313-1326.
-
(1992)
Int. J. Prod. Res.
, vol.30
, Issue.6
, pp. 1313-1326
-
-
Wester, F.A.W.1
Wijngaard, J.2
Zijm, W.H.M.3
-
21
-
-
0035494078
-
Order selection optimization in hybrid make-to-order and make-to-stock markets
-
Ashayeri J., Selen W.J. Order selection optimization in hybrid make-to-order and make-to-stock markets. J. Oper. Res. Soc. 2001, 52:1098-1106.
-
(2001)
J. Oper. Res. Soc.
, vol.52
, pp. 1098-1106
-
-
Ashayeri, J.1
Selen, W.J.2
-
22
-
-
33847678988
-
Thomas order acceptance with weighted tardiness
-
Slotnick S.A., Morton E. Thomas order acceptance with weighted tardiness. Comput. Oper. Res. 2007, 34(10):3029-3042.
-
(2007)
Comput. Oper. Res.
, vol.34
, Issue.10
, pp. 3029-3042
-
-
Slotnick, S.A.1
Morton, E.2
-
23
-
-
34548524876
-
Judicious order acceptance and order release in make-to-order manufacturing systems
-
Rogers P., Nandi A. Judicious order acceptance and order release in make-to-order manufacturing systems. Prod. Plan. Control 2007, 18(7):610-625.
-
(2007)
Prod. Plan. Control
, vol.18
, Issue.7
, pp. 610-625
-
-
Rogers, P.1
Nandi, A.2
-
27
-
-
0033439536
-
Whence customer loyalty
-
Oliver R.L. Whence customer loyalty. J. Market. 1997, 63:33-44.
-
(1997)
J. Market.
, vol.63
, pp. 33-44
-
-
Oliver, R.L.1
-
28
-
-
0033096959
-
Due date demand management: negotiating the trade-off between price and delivery
-
Moodie D.R., Bobrowski P.M. Due date demand management: negotiating the trade-off between price and delivery. Int. J. Prod. Res. 1999, 37(5):997-1021.
-
(1999)
Int. J. Prod. Res.
, vol.37
, Issue.5
, pp. 997-1021
-
-
Moodie, D.R.1
Bobrowski, P.M.2
-
29
-
-
0037144830
-
Model for negotiating the price and due date for a single order with multiple suppliers in a make-to-order environment
-
Cakravista A., Nakamura N. Model for negotiating the price and due date for a single order with multiple suppliers in a make-to-order environment. Int. J. Prod. Res. 2002, 40(14):3425-3440.
-
(2002)
Int. J. Prod. Res.
, vol.40
, Issue.14
, pp. 3425-3440
-
-
Cakravista, A.1
Nakamura, N.2
-
30
-
-
0034675404
-
An operational decision model for lead-time and price quotation in congested manufacturing systems
-
ElHafsi M. An operational decision model for lead-time and price quotation in congested manufacturing systems. Eur. J. Oper. Res. 2000, 126:355-370.
-
(2000)
Eur. J. Oper. Res.
, vol.126
, pp. 355-370
-
-
ElHafsi, M.1
-
31
-
-
39649122099
-
Due date (DD) quotation and capacity planning in make-to order companies: results from an empirical analysis
-
Zorzini M., Corti D., Pozzetti A. Due date (DD) quotation and capacity planning in make-to order companies: results from an empirical analysis. Int. J. Prod. Econ. 2008, 112(2):919-933.
-
(2008)
Int. J. Prod. Econ.
, vol.112
, Issue.2
, pp. 919-933
-
-
Zorzini, M.1
Corti, D.2
Pozzetti, A.3
-
32
-
-
0000216104
-
Negotiating due-dates between customers and producers
-
Lawrence S.R. Negotiating due-dates between customers and producers. Int. J. Prod. Econ. 1994, 37:127-138.
-
(1994)
Int. J. Prod. Econ.
, vol.37
, pp. 127-138
-
-
Lawrence, S.R.1
-
33
-
-
13544273855
-
Simultaneous price and due date settings for multiple customer classes
-
351-36
-
Watanapa B., Techanitisawad A. Simultaneous price and due date settings for multiple customer classes. Eur. J. Oper. Res. 2005, 166. 351-36.
-
(2005)
Eur. J. Oper. Res.
, vol.166
-
-
Watanapa, B.1
Techanitisawad, A.2
-
34
-
-
21544451655
-
Bravery the key to job scheduling
-
Merit D. Bravery the key to job scheduling. Am. Printer 1990, 205:126.
-
(1990)
Am. Printer
, vol.205
, pp. 126
-
-
Merit, D.1
|