-
1
-
-
0022677840
-
A new approach to aggregate production planning
-
Akinc, U. and Roodman, G.M. (1986), "A new approach to aggregate production planning", IIE Transactions, Vol. 18 No. 1, pp. 84-94.
-
(1986)
IIE Transactions
, vol.18
, Issue.1
, pp. 84-94
-
-
Akinc, U.1
Roodman, G.M.2
-
2
-
-
0028727415
-
Practical production scheduling with capacity constraints and dynamic demand: Family planning and disaggregation
-
4th Quarter
-
Allen, S.J. and Schuster, E.W. (1994), "Practical production scheduling with capacity constraints and dynamic demand: family planning and disaggregation", Production and Inventory Management Journal, Vol. 35, 4th Quarter, pp. 15-21.
-
(1994)
Production and Inventory Management Journal
, vol.35
, pp. 15-21
-
-
Allen, S.J.1
Schuster, E.W.2
-
3
-
-
27144479036
-
Strategic outsourcing: An empirical study of decision making processes
-
Aalborg, September
-
Baines, T.S. and Kay, G. (2003), "Strategic outsourcing: an empirical study of decision making processes", Proceedings of the International Conference "Managing Innovative Manufacturing" 2003, Aalborg, September, pp. 233-41.
-
(2003)
Proceedings of the International Conference "Managing Innovative Manufacturing" 2003
, pp. 233-41
-
-
Baines, T.S.1
Kay, G.2
-
4
-
-
0035841878
-
MOAPPS 1.0: Aggregate production planning using the multiple-objective tabu search
-
Baykasoglu, A. (2001), "MOAPPS 1.0: aggregate production planning using the multiple-objective tabu search", International Journal of Production Research, Vol. 39 No. 16, pp. 3685-702.
-
(2001)
International Journal of Production Research
, vol.39
, Issue.16
, pp. 3685-702
-
-
Baykasoglu, A.1
-
5
-
-
0020103083
-
Hierarchical production planning; A two-stage system
-
Bitran, G.R., Haas, E.A. and Hax, A.C. (1982), "Hierarchical production planning; a two-stage system", Operations Research, Vol. 30 No. 2, pp. 232-51.
-
(1982)
Operations Research
, vol.30
, Issue.2
, pp. 232-51
-
-
Bitran, G.R.1
Haas, E.A.2
Hax, A.C.3
-
6
-
-
0001917102
-
Production scheduling by the transportation method of LP
-
Bowman, E.H. (1956), "Production scheduling by the transportation method of LP", Operations Research, Vol. 4 No. 1, pp. 100-3.
-
(1956)
Operations Research
, vol.4
, Issue.1
, pp. 100-3
-
-
Bowman, E.H.1
-
7
-
-
0023360624
-
Linking level requirements in production planning and scheduling
-
2nd Quarter
-
Burch, E.E., Oliff, M.D. and Sumichrast, R.T. (1987), "Linking level requirements in production planning and scheduling", Production and Inventory Journal, Vol. 28, 2nd Quarter, pp. 123-31.
-
(1987)
Production and Inventory Journal
, vol.28
, pp. 123-31
-
-
Burch, E.E.1
Oliff, M.D.2
Sumichrast, R.T.3
-
8
-
-
0242364686
-
An investigation on selection of simplified aggregate planning strategies using MADM approaches
-
Chen, Y-K. and Liao, H-C. (2003), "An investigation on selection of simplified aggregate planning strategies using MADM approaches", International Journal of Production Research, Vol. 41 No. 14, pp. 3359-74.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.14
, pp. 3359-74
-
-
Chen, Y.-K.1
Liao, H.-C.2
-
9
-
-
0037912815
-
Interfacing aggregate plans and master production schedules via a rolling horizon feedback procedure
-
Chung, C.H. and Krajewski, L.J. (1987), "Interfacing aggregate plans and master production schedules via a rolling horizon feedback procedure", OMEGA International Journal of Management Science, Vol. 15 No. 5, pp. 401-9.
-
(1987)
OMEGA International Journal of Management Science
, vol.15
, Issue.5
, pp. 401-9
-
-
Chung, C.H.1
Krajewski, L.J.2
-
10
-
-
0021579962
-
Goal programming approaches to solving linear decision rule based aggregate production planning models
-
Deckro, R.F. and Hebert, J.E. (1984), "Goal programming approaches to solving linear decision rule based aggregate production planning models", IIE Transactions, Vol. 16 No. 4, pp. 308-15.
-
(1984)
IIE Transactions
, vol.16
, Issue.4
, pp. 308-15
-
-
Deckro, R.F.1
Hebert, J.E.2
-
11
-
-
0038250327
-
Aggregate production planning in practice
-
3rd Quarter
-
Dubois, F.L. and Oliff, M.D. (1991), "Aggregate production planning in practice", Production and Inventory Management Journal, Vol. 32, 3rd Quarter, pp. 26-30.
-
(1991)
Production and Inventory Management Journal
, vol.32
, pp. 26-30
-
-
Dubois, F.L.1
Oliff, M.D.2
-
12
-
-
0021936466
-
Blue Bell trims its inventory
-
Edwards, J.R., Wagner, H.M. and Wood, W.P. (1985), "Blue Bell trims its inventory", Interfaces, Vol. 15 No. 1, pp. 34-52.
-
(1985)
Interfaces
, vol.15
, Issue.1
, pp. 34-52
-
-
Edwards, J.R.1
Wagner, H.M.2
Wood, W.P.3
-
13
-
-
0001073758
-
Building theories from case study research
-
Eisenhardt, K. (1989), "Building theories from case study research", Academy of Management Review, Vol. 14 No. 4, pp. 532-50.
-
(1989)
Academy of Management Review
, vol.14
, Issue.4
, pp. 532-50
-
-
Eisenhardt, K.1
-
14
-
-
0016126083
-
A new approach to production smoothing
-
Elmaleh, J. and Eilon, S. (1974), "A new approach to production smoothing", International Journal of Production Research, Vol. 12 No. 6, pp. 673-81.
-
(1974)
International Journal of Production Research
, vol.12
, Issue.6
, pp. 673-81
-
-
Elmaleh, J.1
Eilon, S.2
-
16
-
-
0024699478
-
Modelling realism in aggregate planning: A goal-search approach
-
Gilgeous, V. (1989), "Modelling realism in aggregate planning: a goal-search approach", International Journal of Production Research, Vol. 27 No. 7, pp. 1179-94.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.7
, pp. 1179-94
-
-
Gilgeous, V.1
-
17
-
-
0038250324
-
-
Brandimarte, P. Villa, A. Springer-Verlag Berlin
-
Hennet, J-C. (1999), "From the aggregate plan to lot-sizing in multi-level production planning", in Brandimarte, P. and Villa, A. (Eds), Springer-Verlag, Berlin, pp. 5-23.
-
(1999)
From the Aggregate Plan to Lot-sizing in Multi-level Production Planning
, pp. 5-23
-
-
Hennet, J.-C.1
-
18
-
-
0005142414
-
A linear decision rule for production and employment scheduling
-
Holt, C.C., Modigliani, F. and Simon, H.A. (1955), "A linear decision rule for production and employment scheduling", Management Science, Vol. 2 No. 1, pp. 1-30.
-
(1955)
Management Science
, vol.2
, Issue.1
, pp. 1-30
-
-
Holt, C.C.1
Modigliani, F.2
Simon, H.A.3
-
19
-
-
0032624548
-
Scheduling a workforce under annualized hours
-
Hung, R. (1999), "Scheduling a workforce under annualized hours", International Journal of Production Research, Vol. 37 No. 11, pp. 2419-27.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.11
, pp. 2419-27
-
-
Hung, R.1
-
20
-
-
0010841212
-
An improved version of the production switching heuristic for the aggregate production planning problem
-
Hwang, H. and Cha, C.N. (1995), "An improved version of the production switching heuristic for the aggregate production planning problem", International Journal of Production Research, Vol. 33 No. 9, pp. 2567-77.
-
(1995)
International Journal of Production Research
, vol.33
, Issue.9
, pp. 2567-77
-
-
Hwang, H.1
Cha, C.N.2
-
21
-
-
0037574743
-
Parametric production planning
-
Jones, C.H. (1967), "Parametric production planning", Management Science, Vol. 13 No. 11, pp. 843-66.
-
(1967)
Management Science
, vol.13
, Issue.11
, pp. 843-66
-
-
Jones, C.H.1
-
22
-
-
19944405561
-
-
7th ed. Pearson Prentice-Hall Upper Saddle River, NJ
-
Krajewski, L. and Ritzman, L. (2005), Operations Management: Processes and Value Chains, 7th ed., Pearson Prentice-Hall, Upper Saddle River, NJ.
-
(2005)
Operations Management: Processes and Value Chains
-
-
Krajewski, L.1
Ritzman, L.2
-
23
-
-
0018001157
-
Production switching heuristics for the aggregate planning problem
-
Mellichamp, J.M. and Love, R.M. (1978), "Production switching heuristics for the aggregate planning problem", Management Science, Vol. 24 No. 12, pp. 1242-51.
-
(1978)
Management Science
, vol.24
, Issue.12
, pp. 1242-51
-
-
Mellichamp, J.M.1
Love, R.M.2
-
24
-
-
0026928408
-
Aggregate production planning - A survey of models and methodologies
-
Nam, S. and Logendran, R. (1992), "Aggregate production planning - a survey of models and methodologies", European Journal of Operational Research, Vol. 61, pp. 255-72.
-
(1992)
European Journal of Operational Research
, vol.61
, pp. 255-72
-
-
Nam, S.1
Logendran, R.2
-
25
-
-
0030243954
-
Heuristic family disaggregation techniques for hierarchical production planning systems
-
Ozdamar, L., Atli, A.O. and Bozyel, M.A. (1996), "Heuristic family disaggregation techniques for hierarchical production planning systems", International Journal of Production Research, Vol. 34 No. 9, pp. 2613-28.
-
(1996)
International Journal of Production Research
, vol.34
, Issue.9
, pp. 2613-28
-
-
Ozdamar, L.1
Atli, A.O.2
Bozyel, M.A.3
-
26
-
-
0034659589
-
A labour-constrained model for aggregate production planning
-
Silva, J.P., Lisboa, J. and Huang, P. (2000), "A labour-constrained model for aggregate production planning", International Journal of Production Research, Vol. 38 No. 9, pp. 2143-52.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.9
, pp. 2143-52
-
-
Silva, J.P.1
Lisboa, J.2
Huang, P.3
-
27
-
-
0004066771
-
-
2nd ed. Pitman London
-
Slack, N., Chambers, S., Harland, C., Harrison, A. and Johnston, R. (1998), Operations Management, 2nd ed., Pitman, London.
-
(1998)
Operations Management
-
-
Slack, N.1
Chambers, S.2
Harland, C.3
Harrison, A.4
Johnston, R.5
-
28
-
-
0004066771
-
-
3rd ed. Prentice-Hall Harlow
-
Slack, N., Chambers, S. and Johnston, R. (2001), Operations Management, 3rd ed., Prentice-Hall, Harlow.
-
(2001)
Operations Management
-
-
Slack, N.1
Chambers, S.2
Johnston, R.3
-
29
-
-
0010769934
-
A search decision rule for the aggregate scheduling problem
-
Taubert, W.H. (1968), "A search decision rule for the aggregate scheduling problem", Management Science, Vol. 14 No. 6, pp. 343-59.
-
(1968)
Management Science
, vol.14
, Issue.6
, pp. 343-59
-
-
Taubert, W.H.1
-
30
-
-
0030165639
-
Disaggregation to a rolling horizon master production schedule with minimum batch-size production restrictions
-
Venkataraman, R. and Smith, S.B. (1996), "Disaggregation to a rolling horizon master production schedule with minimum batch-size production restrictions", International Journal of Production Research, Vol. 34 No. 6, pp. 1517-37.
-
(1996)
International Journal of Production Research
, vol.34
, Issue.6
, pp. 1517-37
-
-
Venkataraman, R.1
Smith, S.B.2
|