메뉴 건너뛰기




Volumn 25, Issue 11, 2005, Pages 1083-1100

Aggregate planning for seasonal demand: Reconciling theory with practice

Author keywords

Corporate strategy; Production planning; Productive capacity

Indexed keywords


EID: 27144435498     PISSN: 01443577     EISSN: None     Source Type: Journal    
DOI: 10.1108/01443570510626907     Document Type: Article
Times cited : (44)

References (30)
  • 1
    • 0022677840 scopus 로고
    • A new approach to aggregate production planning
    • Akinc, U. and Roodman, G.M. (1986), "A new approach to aggregate production planning", IIE Transactions, Vol. 18 No. 1, pp. 84-94.
    • (1986) IIE Transactions , vol.18 , Issue.1 , pp. 84-94
    • Akinc, U.1    Roodman, G.M.2
  • 2
    • 0028727415 scopus 로고
    • Practical production scheduling with capacity constraints and dynamic demand: Family planning and disaggregation
    • 4th Quarter
    • Allen, S.J. and Schuster, E.W. (1994), "Practical production scheduling with capacity constraints and dynamic demand: family planning and disaggregation", Production and Inventory Management Journal, Vol. 35, 4th Quarter, pp. 15-21.
    • (1994) Production and Inventory Management Journal , vol.35 , pp. 15-21
    • Allen, S.J.1    Schuster, E.W.2
  • 4
    • 0035841878 scopus 로고    scopus 로고
    • MOAPPS 1.0: Aggregate production planning using the multiple-objective tabu search
    • Baykasoglu, A. (2001), "MOAPPS 1.0: aggregate production planning using the multiple-objective tabu search", International Journal of Production Research, Vol. 39 No. 16, pp. 3685-702.
    • (2001) International Journal of Production Research , vol.39 , Issue.16 , pp. 3685-702
    • Baykasoglu, A.1
  • 5
    • 0020103083 scopus 로고
    • Hierarchical production planning; A two-stage system
    • Bitran, G.R., Haas, E.A. and Hax, A.C. (1982), "Hierarchical production planning; a two-stage system", Operations Research, Vol. 30 No. 2, pp. 232-51.
    • (1982) Operations Research , vol.30 , Issue.2 , pp. 232-51
    • Bitran, G.R.1    Haas, E.A.2    Hax, A.C.3
  • 6
    • 0001917102 scopus 로고
    • Production scheduling by the transportation method of LP
    • Bowman, E.H. (1956), "Production scheduling by the transportation method of LP", Operations Research, Vol. 4 No. 1, pp. 100-3.
    • (1956) Operations Research , vol.4 , Issue.1 , pp. 100-3
    • Bowman, E.H.1
  • 7
    • 0023360624 scopus 로고
    • Linking level requirements in production planning and scheduling
    • 2nd Quarter
    • Burch, E.E., Oliff, M.D. and Sumichrast, R.T. (1987), "Linking level requirements in production planning and scheduling", Production and Inventory Journal, Vol. 28, 2nd Quarter, pp. 123-31.
    • (1987) Production and Inventory Journal , vol.28 , pp. 123-31
    • Burch, E.E.1    Oliff, M.D.2    Sumichrast, R.T.3
  • 8
    • 0242364686 scopus 로고    scopus 로고
    • An investigation on selection of simplified aggregate planning strategies using MADM approaches
    • Chen, Y-K. and Liao, H-C. (2003), "An investigation on selection of simplified aggregate planning strategies using MADM approaches", International Journal of Production Research, Vol. 41 No. 14, pp. 3359-74.
    • (2003) International Journal of Production Research , vol.41 , Issue.14 , pp. 3359-74
    • Chen, Y.-K.1    Liao, H.-C.2
  • 9
    • 0037912815 scopus 로고
    • Interfacing aggregate plans and master production schedules via a rolling horizon feedback procedure
    • Chung, C.H. and Krajewski, L.J. (1987), "Interfacing aggregate plans and master production schedules via a rolling horizon feedback procedure", OMEGA International Journal of Management Science, Vol. 15 No. 5, pp. 401-9.
    • (1987) OMEGA International Journal of Management Science , vol.15 , Issue.5 , pp. 401-9
    • Chung, C.H.1    Krajewski, L.J.2
  • 10
    • 0021579962 scopus 로고
    • Goal programming approaches to solving linear decision rule based aggregate production planning models
    • Deckro, R.F. and Hebert, J.E. (1984), "Goal programming approaches to solving linear decision rule based aggregate production planning models", IIE Transactions, Vol. 16 No. 4, pp. 308-15.
    • (1984) IIE Transactions , vol.16 , Issue.4 , pp. 308-15
    • Deckro, R.F.1    Hebert, J.E.2
  • 12
    • 0021936466 scopus 로고
    • Blue Bell trims its inventory
    • Edwards, J.R., Wagner, H.M. and Wood, W.P. (1985), "Blue Bell trims its inventory", Interfaces, Vol. 15 No. 1, pp. 34-52.
    • (1985) Interfaces , vol.15 , Issue.1 , pp. 34-52
    • Edwards, J.R.1    Wagner, H.M.2    Wood, W.P.3
  • 13
    • 0001073758 scopus 로고
    • Building theories from case study research
    • Eisenhardt, K. (1989), "Building theories from case study research", Academy of Management Review, Vol. 14 No. 4, pp. 532-50.
    • (1989) Academy of Management Review , vol.14 , Issue.4 , pp. 532-50
    • Eisenhardt, K.1
  • 16
    • 0024699478 scopus 로고
    • Modelling realism in aggregate planning: A goal-search approach
    • Gilgeous, V. (1989), "Modelling realism in aggregate planning: a goal-search approach", International Journal of Production Research, Vol. 27 No. 7, pp. 1179-94.
    • (1989) International Journal of Production Research , vol.27 , Issue.7 , pp. 1179-94
    • Gilgeous, V.1
  • 18
    • 0005142414 scopus 로고
    • A linear decision rule for production and employment scheduling
    • Holt, C.C., Modigliani, F. and Simon, H.A. (1955), "A linear decision rule for production and employment scheduling", Management Science, Vol. 2 No. 1, pp. 1-30.
    • (1955) Management Science , vol.2 , Issue.1 , pp. 1-30
    • Holt, C.C.1    Modigliani, F.2    Simon, H.A.3
  • 19
    • 0032624548 scopus 로고    scopus 로고
    • Scheduling a workforce under annualized hours
    • Hung, R. (1999), "Scheduling a workforce under annualized hours", International Journal of Production Research, Vol. 37 No. 11, pp. 2419-27.
    • (1999) International Journal of Production Research , vol.37 , Issue.11 , pp. 2419-27
    • Hung, R.1
  • 20
    • 0010841212 scopus 로고
    • An improved version of the production switching heuristic for the aggregate production planning problem
    • Hwang, H. and Cha, C.N. (1995), "An improved version of the production switching heuristic for the aggregate production planning problem", International Journal of Production Research, Vol. 33 No. 9, pp. 2567-77.
    • (1995) International Journal of Production Research , vol.33 , Issue.9 , pp. 2567-77
    • Hwang, H.1    Cha, C.N.2
  • 21
    • 0037574743 scopus 로고
    • Parametric production planning
    • Jones, C.H. (1967), "Parametric production planning", Management Science, Vol. 13 No. 11, pp. 843-66.
    • (1967) Management Science , vol.13 , Issue.11 , pp. 843-66
    • Jones, C.H.1
  • 23
    • 0018001157 scopus 로고
    • Production switching heuristics for the aggregate planning problem
    • Mellichamp, J.M. and Love, R.M. (1978), "Production switching heuristics for the aggregate planning problem", Management Science, Vol. 24 No. 12, pp. 1242-51.
    • (1978) Management Science , vol.24 , Issue.12 , pp. 1242-51
    • Mellichamp, J.M.1    Love, R.M.2
  • 24
    • 0026928408 scopus 로고
    • Aggregate production planning - A survey of models and methodologies
    • Nam, S. and Logendran, R. (1992), "Aggregate production planning - a survey of models and methodologies", European Journal of Operational Research, Vol. 61, pp. 255-72.
    • (1992) European Journal of Operational Research , vol.61 , pp. 255-72
    • Nam, S.1    Logendran, R.2
  • 25
    • 0030243954 scopus 로고    scopus 로고
    • Heuristic family disaggregation techniques for hierarchical production planning systems
    • Ozdamar, L., Atli, A.O. and Bozyel, M.A. (1996), "Heuristic family disaggregation techniques for hierarchical production planning systems", International Journal of Production Research, Vol. 34 No. 9, pp. 2613-28.
    • (1996) International Journal of Production Research , vol.34 , Issue.9 , pp. 2613-28
    • Ozdamar, L.1    Atli, A.O.2    Bozyel, M.A.3
  • 26
  • 29
    • 0010769934 scopus 로고
    • A search decision rule for the aggregate scheduling problem
    • Taubert, W.H. (1968), "A search decision rule for the aggregate scheduling problem", Management Science, Vol. 14 No. 6, pp. 343-59.
    • (1968) Management Science , vol.14 , Issue.6 , pp. 343-59
    • Taubert, W.H.1
  • 30
    • 0030165639 scopus 로고    scopus 로고
    • Disaggregation to a rolling horizon master production schedule with minimum batch-size production restrictions
    • Venkataraman, R. and Smith, S.B. (1996), "Disaggregation to a rolling horizon master production schedule with minimum batch-size production restrictions", International Journal of Production Research, Vol. 34 No. 6, pp. 1517-37.
    • (1996) International Journal of Production Research , vol.34 , Issue.6 , pp. 1517-37
    • Venkataraman, R.1    Smith, S.B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.