메뉴 건너뛰기




Volumn 24, Issue 6, 2013, Pages 423-448

A simulation testing and analysis of aggregate production planning strategies

Author keywords

aggregate production planning; aggregate production planning strategies; discrete event simulation; level (stock) variables; rate (flow) variables; system dynamics

Indexed keywords

AGGREGATE PRODUCTION PLANNING; DEMAND MANAGEMENT STRATEGIES; LEVEL (STOCK) VARIABLES; MANUFACTURING COMPANIES; RATE (FLOW) VARIABLES; STRATEGIC DECISIONS; SYSTEM DYNAMICS; SYSTEM'S PERFORMANCE;

EID: 84877999570     PISSN: 09537287     EISSN: 13665871     Source Type: Journal    
DOI: 10.1080/09537287.2011.631595     Document Type: Article
Times cited : (37)

References (68)
  • 2
    • 0032673603 scopus 로고    scopus 로고
    • An opportunity for system dynamics in manufacturing system modeling
    • Baines, T.S. and Harrison, D.K., 1999. An opportunity for system dynamics in manufacturing system modeling. Production Planning and Control, 10 (6), 542-552.
    • (1999) Production Planning and Control , vol.10 , Issue.6 , pp. 542-552
    • Baines, T.S.1    Harrison, D.K.2
  • 4
    • 84986139336 scopus 로고    scopus 로고
    • Business-process modeling and simulation for manufacturing management: A practical way foreword
    • Barber, K.D., et al., 2003. Business-process modeling and simulation for manufacturing management: a practical way foreword. Business Process Management Journal, 9 (4), 527-542.
    • (2003) Business Process Management Journal , vol.9 , Issue.4 , pp. 527-542
    • Barber, K.D.1
  • 6
    • 39049192846 scopus 로고    scopus 로고
    • The challenges of shift work
    • Blachowicz, E. and Letizia, M., 2006. The challenges of shift work. MEDSURG Nursing, 15 (5), 274-280.
    • (2006) MEDSURG Nursing , vol.15 , Issue.5 , pp. 274-280
    • Blachowicz, E.1    Letizia, M.2
  • 7
    • 2442511221 scopus 로고    scopus 로고
    • A comparison of discrete event simulation and system dynamics for modeling healthcare systems
    • In: J. Riley, ed. Glasgow Caledonian University, Glasgow, Scotland. Operational research applied to health services(ORAHS)
    • Brailsford, S. and Hilton, N., 2001. A comparison of discrete event simulation and system dynamics for modeling healthcare systems. In: J. Riley, ed. Planning for the future: health service quality and emergency accessibility, Glasgow Caledonian University, Glasgow, Scotland. Operational research applied to health services(ORAHS), 1-17.
    • (2001) Planning for the Future: Health Service Quality and Emergency Accessibility , pp. 1-17
    • Brailsford, S.1    Hilton, N.2
  • 10
    • 27144435498 scopus 로고    scopus 로고
    • Aggregate planning for seasonal demand: Reconciling theory with practice
    • Buxey, G., 2005. Aggregate planning for seasonal demand: reconciling theory with practice. International Journal of Operations and Production Management, 25 (11), 1083-1100.
    • (2005) International Journal of Operations and Production Management , vol.25 , Issue.11 , pp. 1083-1100
    • Buxey, G.1
  • 11
    • 0002683967 scopus 로고
    • Best practices in white-collar downsizing: Managing contradictions
    • Cameron, K.S., Freeman, S.J., and Mishra, A.K., 1991. Best practices in white-collar downsizing: managing contradictions. Academy of Management Executive, 5 (3), 57-73.
    • (1991) Academy of Management Executive , vol.5 , Issue.3 , pp. 57-73
    • Cameron, K.S.1    Freeman, S.J.2    Mishra, A.K.3
  • 13
    • 0242364686 scopus 로고    scopus 로고
    • An investigation on selection of simplified aggregate production planning strategies using MADM approaches
    • Chen, Y.K. and Liao, H.C., 2003. An investigation on selection of simplified aggregate production planning strategies using MADM approaches. International Journal of Production Research, 41 (14), 3359-3374.
    • (2003) International Journal of Production Research , vol.41 , Issue.14 , pp. 3359-3374
    • Chen, Y.K.1    Liao, H.C.2
  • 14
    • 0022045345 scopus 로고
    • Representing discrete events in system dynamics models: A theoretical application to modeling coal production
    • Coyle, R.G., 1985. Representing discrete events in system dynamics models: a theoretical application to modeling coal production. Journal of the Operational Research Society, 36, 307-318.
    • (1985) Journal of the Operational Research Society , vol.36 , pp. 307-318
    • Coyle . R, G.1
  • 19
    • 20444464062 scopus 로고    scopus 로고
    • Using system dynamics in a discrete event simulation study of a manufacturing plant
    • Greasley, A., 2005. Using system dynamics in a discrete event simulation study of a manufacturing plant. International Journal of Operations and Production Management, 25 (6), 534-548.
    • (2005) International Journal of Operations and Production Management , vol.25 , Issue.6 , pp. 534-548
    • Greasley, A.1
  • 20
    • 2342590692 scopus 로고    scopus 로고
    • Unifying business objects and system dynamics as a paradigm for developing decision support systems
    • Gregoriades, A. and Karakostas, B., 2004. Unifying business objects and system dynamics as a paradigm for developing decision support systems. Decision Support Systems, 37, 307-311.
    • (2004) Decision Support Systems , vol.37 , pp. 307-311
    • Gregoriades, A.1    Karakostas, B.2
  • 21
    • 0024699478 scopus 로고
    • Modeling realism in aggregate planning: A goal-search approach
    • Gilgeous, V., 1989. Modeling realism in aggregate planning: a goal-search approach. International Journal of Production Research, 27 (7), 1179-1193.
    • (1989) International Journal of Production Research , vol.27 , Issue.7 , pp. 1179-1193
    • Gilgeous, V.1
  • 25
    • 55849131754 scopus 로고    scopus 로고
    • Impact of overtime on construction labor productivity
    • Hanna, A.S. and Sullivan, K.T., 2004. Impact of overtime on construction labor productivity. Cost Engineering, 46 (4), 20-27.
    • (2004) Cost Engineering , vol.46 , Issue.4 , pp. 20-27
    • Hanna, A.S.1    Sullivan, K.T.2
  • 26
    • 0022153679 scopus 로고
    • Explaining observed productivity differentials between plants: Implications for operations research
    • Hayes, R.H. and Clark, K.B., 1985. Explaining observed productivity differentials between plants: implications for operations research. Interfaces, 15, 3-14.
    • (1985) Interfaces , vol.15 , pp. 3-14
    • Hayes, R.H.1    Clark, K.B.2
  • 27
    • 0010912417 scopus 로고
    • Improving productivity and quality through workforce scheduling
    • Hung, R., 1992. Improving productivity and quality through workforce scheduling. Industrial Management, 34, 4-6.
    • (1992) Industrial Management , vol.34 , pp. 4-6
    • Hung, R.1
  • 28
    • 0010841642 scopus 로고    scopus 로고
    • The impact of human resource management practices on turnover, productivity, and corporate financial performance
    • In: C. Mabey, G. Salaman and J. Storey, eds. London: Sage
    • Huselin, M.A., 1998. The impact of human resource management practices on turnover, productivity, and corporate financial performance. In: C. Mabey, G. Salaman and J. Storey, eds. Strategic human resource management: a reader. London: Sage, 104-127.
    • (1998) Strategic Human Resource Management: A Reader , pp. 104-127
    • Huselin . M, A.1
  • 29
    • 70350571118 scopus 로고    scopus 로고
    • Simulation in manufacturing and business: A review
    • Jahangirian, M., et al., 2010. Simulation in manufacturing and business: a review. European Journal of Operational Research, 203, 1-13.
    • (2010) European Journal of Operational Research , vol.203 , pp. 1-13
    • Jahangirian, M.1
  • 30
    • 67349179470 scopus 로고    scopus 로고
    • A hybrid fuzzy goal programming approach with different goal priorities to aggregate production planning
    • Jamalnia, A. and Soukhakian, M.A., 2009. A hybrid fuzzy goal programming approach with different goal priorities to aggregate production planning. Computers and Industrial Engineering, 56, 1474-1487.
    • (2009) Computers and Industrial Engineering , vol.56 , pp. 1474-1487
    • Jamalnia, A.1    Soukhakian, M.A.2
  • 31
    • 0002647751 scopus 로고    scopus 로고
    • Downsizing and the impact on survivors-A matter of justice
    • James, T.A.W. and Tang, T.L.P., 1996. Downsizing and the impact on survivors-a matter of justice. Employment Relations Today, 23 (2), 33-41.
    • (1996) Employment Relations Today , vol.23 , Issue.2 , pp. 33-41
    • James, T.A.W.1    Tang, T.L.P.2
  • 32
    • 0032163477 scopus 로고    scopus 로고
    • A real-time scheduling mechanism for a flexible manufacturing system: Using simulation and dispatching rules
    • Jeong, K.C. and Kim, Y.D., 1998. A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules. International Journal of Production Research, 36, 2609-2626.
    • (1998) International Journal of Production Research , vol.36 , pp. 2609-2626
    • Jeong, K.C.1    Kim, Y.D.2
  • 33
    • 0344286064 scopus 로고    scopus 로고
    • Modeling simultaneous worker learning and forgetting in dual recourse constrained systems
    • Kher, H.V., et al., 1999. Modeling simultaneous worker learning and forgetting in dual recourse constrained systems. European Journal of Operational Research, 115, 158-172.
    • (1999) European Journal of Operational Research , vol.115 , pp. 158-172
    • Kher, H.V.1
  • 34
    • 0031705292 scopus 로고    scopus 로고
    • A simulation study on lot release control, mask scheduling, batch scheduling in semiconductor wafer fabrication facilities
    • Kim, Y., et al., 1998. A simulation study on lot release control, mask scheduling, batch scheduling in semiconductor wafer fabrication facilities. Journal of Manufacturing Systems, 17, 107-117.
    • (1998) Journal of Manufacturing Systems , vol.17 , pp. 107-117
    • Kim, Y.1
  • 36
    • 0036587860 scopus 로고    scopus 로고
    • A discretecontinuous combined modeling approach for supply chain simulation
    • Lee, Y.H., Cho, M.K., and Kim, Y.B., 2002b. A discretecontinuous combined modeling approach for supply chain simulation. Simulation, 78 (5), 321-329.
    • (2002) Simulation , vol.78 , Issue.5 , pp. 321-329
    • Lee, Y.H.1    Cho, M.K.2    Kim, Y.B.3
  • 37
    • 0036642827 scopus 로고    scopus 로고
    • Supply chain simulation with discrete-continuous combined modeling
    • Lee, Y.H., et al., 2002a. Supply chain simulation with discrete-continuous combined modeling. Computers and Industrial Engineering, 43, 375-392.
    • (2002) Computers and Industrial Engineering , vol.43 , pp. 375-392
    • Lee, Y.H.1
  • 40
    • 0035872172 scopus 로고    scopus 로고
    • Simulation analysis of dispatching rules for an automated interbay material handling system in wafer FAB
    • Lin, J.T., Wang, F., and Yen, P., 2001. Simulation analysis of dispatching rules for an automated interbay material handling system in wafer FAB. International Journal of Production Research, 39, 1221-1238.
    • (2001) International Journal of Production Research , vol.39 , pp. 1221-1238
    • Lin, J.T.1    Wang, F.2    Yen, P.3
  • 41
    • 0034761893 scopus 로고    scopus 로고
    • Application of a hybrid process simulation model to a software development project
    • Martin, R. and Raffo, D., 2001. Application of a hybrid process simulation model to a software development project. Journal of Systems and Software, 59 (3), 237-246.
    • (2001) Journal of Systems and Software , vol.59 , Issue.3 , pp. 237-246
    • Martin, R.1    Raffo, D.2
  • 42
    • 84877996246 scopus 로고    scopus 로고
    • Development of a real-time multi-objective scheduler for semiconductor fabrication systems
    • Thesis (PhD). Purdue University, IN. O'Reilly, J. and Lilegdon, W.R., 1999. Introduction to FACTOR/AIM. In:, 5-8 December 1999 Phoenix, AZ. Piscataway, NJ: Institute of Electrical and Electronics Engineers
    • Min, H.S., 2002. Development of a real-time multi-objective scheduler for semiconductor fabrication systems. Thesis (PhD). Purdue University, IN. O'Reilly, J. and Lilegdon, W.R., 1999. Introduction to FACTOR/AIM. In: Proceedings of 1999 winter simulation conference, 5-8 December 1999 Phoenix, AZ. Piscataway, NJ: Institute of Electrical and Electronics Engineers, 201-207.
    • (2002) Proceedings of 1999 Winter Simulation Conference , pp. 201-207
    • Min . H, S.1
  • 43
    • 84877933825 scopus 로고    scopus 로고
    • The costs of overtime
    • O'Rourke, M., 2004. The costs of overtime. Risk Management Magazine, 51 (3), 44-45.
    • (2004) Risk Management Magazine , vol.51 , Issue.3 , pp. 44-45
    • O'rourke, M.1
  • 44
    • 84877939919 scopus 로고    scopus 로고
    • Discrete versus continuous simulation: When does it matter
    • 26-30 July 2009, Albuquerque, NM, USA Albany, NY: System Dynamics Society, 1-22
    • zgu n, O. and Barlas, Y., 2009. Discrete versus continuous simulation: when does it matter? In: Proceedings of the 27th international conference of the system dynamics society, 26-30 July 2009, Albuquerque, NM, USA. Albany, NY: System Dynamics Society, 1-22.
    • (2009) Proceedings of the 27th International Conference of the System Dynamics Society
    • Zgu, N.O.1    Barlas, Y.2
  • 45
    • 0031996565 scopus 로고    scopus 로고
    • A hierarchical decision support system for production planning (with case study)
    • Ozdamar, L., Bozyel, M.A., and Birbil, S.L., 1998. A hierarchical decision support system for production planning (with case study). European Journal of Operational Research, 104, 403-422.
    • (1998) European Journal of Operational Research , vol.104 , pp. 403-422
    • Ozdamar, L.1    Bozyel, M.A.2    Birbil, S.L.3
  • 46
    • 0033285722 scopus 로고    scopus 로고
    • Operations management research: An update for the (1990s)
    • Pannirselvam, G.P., et al., 1999. Operations management research: an update for the (1990s). Journal of Operations Management, 18, 95-112.
    • (1999) Journal of Operations Management , vol.18 , pp. 95-112
    • Pannirselvam, G.P.1
  • 47
    • 84877985586 scopus 로고    scopus 로고
    • SD-DES model: A new approach for implementing an e-supply chain
    • Pereira, J.V., 2009. SD-DES model: a new approach for implementing an e-supply chain. Journal of Modelling in Management, 4 (2), 134-148.
    • (2009) Journal of Modelling in Management , vol.4 , Issue.2 , pp. 134-148
    • Pereira . J, V.1
  • 49
    • 0035923927 scopus 로고    scopus 로고
    • Accounting for productivity losses in aggregate planning
    • Piper, C.J. and Vachon, S., 2001. Accounting for productivity losses in aggregate planning. International Journal of Production Research, 39 (17), 4001-4012.
    • (2001) International Journal of Production Research , vol.39 , Issue.17 , pp. 4001-4012
    • Piper, C.J.1    Vachon, S.2
  • 52
    • 0032663934 scopus 로고    scopus 로고
    • Software process simulation for reliability management
    • Rus, L., Collofello, J., and Lakey, P., 1999. Software process simulation for reliability management. Journal of Systems and Software, 46 (2-3), 173-182.
    • (1999) Journal of Systems and Software , vol.46 , Issue.2-3 , pp. 173-182
    • Rus, L.1    Collofello, J.2    Lakey, P.3
  • 54
    • 0041494973 scopus 로고    scopus 로고
    • Optimal trade-offs of aggregate production planning with multiple objective and multicapacity demand levels
    • Shi, Y. and Haase, C., 1996. Optimal trade-offs of aggregate production planning with multiple objective and multicapacity demand levels. International Journal of Operations and Quantitative Management, 2 (2), 127-143.
    • (1996) International Journal of Operations and Quantitative Management , vol.2 , Issue.2 , pp. 127-143
    • Shi, Y.1    Haase, C.2
  • 59
    • 60749111294 scopus 로고    scopus 로고
    • Comparing discreteevent simulation and system dynamics: Users' perceptions
    • Tako, A.A. and Robinson, S., 2009. Comparing discreteevent simulation and system dynamics: users' perceptions. Journal of the Operational Research Society, 60 (3), 296-312.
    • (2009) Journal of the Operational Research Society , vol.60 , Issue.3 , pp. 296-312
    • Tako, A.A.1    Robinson, S.2
  • 60
    • 77957059535 scopus 로고
    • An overview of production planning
    • In: S.G. Grave, A.H.G. Rinnooy Kan and P.H. Zipkin, eds. North-Holland: Amsterdam
    • Thomas, L.J. and McClain, J.O., 1993. An overview of production planning. In: S.G. Grave, A.H.G. Rinnooy Kan and P.H. Zipkin, eds. Logistics of production and inventory. North-Holland: Amsterdam, 333-370.
    • (1993) Logistics of Production and Inventory , pp. 333-370
    • Thomas, L.J.1    McClain, J.O.2
  • 61
    • 0027640711 scopus 로고
    • A comparative study of aggregate production planning strategies under conditions of uncertainty and cyclic product demands
    • Thompson, S.D., Wantanabe, D.T., and Davis, W.J., 1993. A comparative study of aggregate production planning strategies under conditions of uncertainty and cyclic product demands. International Journal of Production Research, 31 (8), 1957-1979.
    • (1993) International Journal of Production Research , vol.31 , Issue.8 , pp. 1957-1979
    • Thompson, S.D.1    Wantanabe, D.T.2    Davis, W.J.3
  • 62
    • 37549056205 scopus 로고    scopus 로고
    • Supply-chain simulation integrated discrete-event modeling with system dynamics modeling
    • In: J. Olhager and F. Persson, eds. Boston, MA: Springer
    • Umeda, S., 2007. Supply-chain simulation integrated discrete-event modeling with system dynamics modeling. In: J. Olhager and F. Persson, eds. Advances in production management systems. Boston, MA: Springer, 329-336.
    • (2007) Advances in Production Management Systems , pp. 329-336
    • Umeda, S.1
  • 63
    • 0032279420 scopus 로고    scopus 로고
    • Application of discrete event simulation in production scheduling
    • 13-16 December 1998, Washington, DC. Piscataway, NJ: Institute of Electrical and Electronics Engineers, 965-971
    • Vaidyanathan, B. and Miller, D.M., 1998. Application of discrete event simulation in production scheduling. In: Proceedings of the 1998 winter simulation conference, 13-16 December 1998, Washington, DC. Piscataway, NJ: Institute of Electrical and Electronics Engineers, 965-971.
    • (1998) Proceedings of the 1998 Winter Simulation Conference
    • Vaidyanathan, B.1    Miller, D.M.2
  • 65
    • 31744447420 scopus 로고    scopus 로고
    • Hybrid system dynamic-discrete event simulation-based architecture for hierarchical production planning
    • Venkateswaran, J. and Son, Y.-J., 2005. Hybrid system dynamic-discrete event simulation-based architecture for hierarchical production planning. International Journal of Production Research, 43 (20), 4397-4429.
    • (2005) International Journal of Production Research , vol.43 , Issue.20 , pp. 4397-4429
    • Venkateswaran, J.1    Son, Y.-J.2
  • 66
    • 17744393084 scopus 로고    scopus 로고
    • Hierarchical production planning using a hybrid system dynamics-discrete event simulation architecture
    • 5-7 January 2004 Washington, DC. Piscataway, NJ: Institute of Electrical and Electronics Engineers 1094-1102
    • Venkateswaran, J., Son, Y.-J., and Jones, A., 2004. Hierarchical production planning using a hybrid system dynamics-discrete event simulation architecture. In: Proceedings of 2004 winter simulation conference, 5-7 January 2004 Washington, DC. Piscataway, NJ: Institute of Electrical and Electronics Engineers 1094-1102.
    • (2004) Proceedings of 2004 Winter Simulation Conference
    • Venkateswaran, J.1    Son, Y.-J.2    Jones, A.3
  • 68
    • 3042687535 scopus 로고
    • Modeling discrete events in system dynamic models: A case study
    • Wolstenholme, E.F. and Coyle, R.G., 1980. Modeling discrete events in system dynamic models: a case study. Dynamica, 6 (1), 21-28.
    • (1980) Dynamica , vol.6 , Issue.1 , pp. 21-28
    • Wolstenholme, E.F.1    Coyle, R.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.