-
1
-
-
0035480431
-
Greedy solutions of selection and ordering problems
-
DOI 10.1016/S0377-2217(00)00252-6, PII S0377221700002526
-
Alidaee, B., Kochenberger, G.A., and Amini, M.M., 2001. Greedy solutions of selection and ordering problems. European Journal of Operational Research, 134 (1), 203-215. (Pubitemid 32639099)
-
(2001)
European Journal of Operational Research
, vol.134
, Issue.1
, pp. 203-215
-
-
Alidaee, B.1
Kochenberger, G.A.2
Amini, M.M.3
-
2
-
-
0035494078
-
Order selection optimization in hybrid make-to-order and make-to-stock markets
-
Ashayeri, J. and Selen, W.J., 2001. Order selection optimisation in hybrid make-to-order and maketo- stock markets. Journal of the Operational Research Society, 52 (10), 1098-1106. (Pubitemid 34191540)
-
(2001)
Journal of the Operational Research Society
, vol.52
, Issue.10
, pp. 1098-1106
-
-
Ashayeri, J.1
Selen, W.J.2
-
3
-
-
0030485965
-
Rationing Capacity between Two Product Classes
-
Balakrishnan, N., Patterson, J., and Sridharan, V., 1996. Rationing capacity between two product classes. Decision Science, 27 (2), 185-214. (Pubitemid 126111394)
-
(1996)
Decision Sciences
, vol.27
, Issue.2
, pp. 185-214
-
-
Balakrishnan, N.1
Sridharan, S.V.2
Patterson, J.W.3
-
4
-
-
33750381578
-
Optimal acceptance of job orders
-
Balachandran, K.R. and Schaefer, M.E., 1981. Optimal acceptance of job orders. International Journal of Production Research, 19 (2), 195-200.
-
(1981)
International Journal of Production Research
, vol.19
, Issue.2
, pp. 195-200
-
-
Balachandran, K.R.1
Schaefer, M.E.2
-
5
-
-
84987028582
-
The prize collecting traveling salesman problem
-
Balas, E., 1989. The prize collecting traveling salesman problem. Networks, 19 (6), 621-636.
-
(1989)
Networks
, vol.19
, Issue.6
, pp. 621-636
-
-
Balas, E.1
-
6
-
-
3242717874
-
Negotiation support for make-to-order operations in business-to-business electronic commerce
-
Calosso, T., Cantamessa, M., and Gualano, M., 2004. Negotiation support for make-to-order operations in business-to-business electronic commerce. Robotics and Computer-Integrated Manufacturing, 20 (5), 405-416.
-
(2004)
Robotics and Computer-Integrated Manufacturing
, vol.20
, Issue.5
, pp. 405-416
-
-
Calosso, T.1
Cantamessa, M.2
Gualano, M.3
-
7
-
-
0034262569
-
Optimal admission control and sequencing in a make-to-stock/make-to-order production system
-
Carr, S. and Duenyas, I., 2000. Optimal admission control and sequencing in a make-to-stock/maketo- order production system. Operations Research, 48 (5), 709-720. (Pubitemid 32069959)
-
(2000)
Operations Research
, vol.48
, Issue.5
, pp. 709-720
-
-
Carr, S.1
Duenyas, I.2
-
8
-
-
2942640054
-
Order selection and scheduling with lead-time flexibility
-
Charnsirisakskul, K., Griffin, P.M., and Keskinocak, P., 2004. Order selection and scheduling with lead-time flexibility. IIE Transactions, 36 (7), 697-707.
-
(2004)
IIE Transactions
, vol.36
, Issue.7
, pp. 697-707
-
-
Charnsirisakskul, K.1
Griffin, P.M.2
Keskinocak, P.3
-
9
-
-
28044434431
-
Pricing and scheduling decisions with leadtime flexibility
-
DOI 10.1016/j.ejor.2004.07.062, PII S0377221704005752
-
Charnsirisakskul, K., Griffin, P.M., and Keskinocak, P., 2006. Pricing and scheduling decisions with leadtime flexibility. European Journal of Operational Research, 171 (1), 153-169. (Pubitemid 41690033)
-
(2006)
European Journal of Operational Research
, vol.171
, Issue.1
, pp. 153-169
-
-
Charnsirisakskul, K.1
Griffin, P.M.2
Keskinocak, P.3
-
10
-
-
10444247618
-
Delivery guarantees and the interdependence of marketing and operations
-
Chatterjee, S., Slotnick, S.A., and Sobel, M.J., 2002. Delivery guarantees and the interdependence of marketing and operations. Production and Operations Management, 11 (3), 393-410.
-
(2002)
Production and Operations Management
, vol.11
, Issue.3
, pp. 393-410
-
-
Chatterjee, S.1
Slotnick, S.A.2
Sobel, M.J.3
-
11
-
-
1242287854
-
An agent for selecting optimal order set in EC marketplace
-
Choi, H.R., et al., 2004. An agent for selecting optimal order set in EC marketplace. Decision Support Systems, 36 (4), 371-383.
-
(2004)
Decision Support Systems
, vol.36
, Issue.4
, pp. 371-383
-
-
Choi, H.R.1
-
12
-
-
0027906667
-
Job selection and sequencing on a single machine in a random environment
-
De, P., Ghosh, J.B., and Wells, C.E., 1993. Job selection and sequencing on a single machine in a random environment. European Journal of Operational Research, 70 (3), 425-431.
-
(1993)
European Journal of Operational Research
, vol.70
, Issue.3
, pp. 425-431
-
-
De, P.1
Ghosh, J.B.2
Wells, C.E.3
-
13
-
-
33750326269
-
Revenue management for a make-to-order company with limited inventory capacity
-
DOI 10.1007/s00291-005-0016-1
-
Defregger, F. and Kuhn, H., 2007. Revenue management for a make-to-order company with limited inventory capacity. OR Spectrum, 29 (1), 137-156. (Pubitemid 44631963)
-
(2007)
OR Spectrum
, vol.29
, Issue.1
, pp. 137-156
-
-
Defregger, F.1
Kuhn, H.2
-
14
-
-
0042770133
-
On prize-collecting tours and the asymmetric traveling salesman problem
-
Dell'Amico, M., Maffioli, F., and Väbrand, P., 1995. On prize-collecting tours and the asymmetric traveling salesman problem. International Transactions in Operations Research, 2 (3), 297-308.
-
(1995)
International Transactions in Operations Research
, vol.2
, Issue.3
, pp. 297-308
-
-
Dell'Amico, M.1
Maffioli, F.2
Väbrand, P.3
-
15
-
-
15244355696
-
Workload based order acceptance in job shop environments
-
DOI 10.1007/s00291-004-0171-9
-
Ebben, M.J.R., Hans, E.W., and Olde Weghuis, F.M., 2005. Workload based order acceptance in job shop environments. OR Spectrum, 27 (1), 107-122. (Pubitemid 40389674)
-
(2005)
OR Spectrum
, vol.27
, Issue.1
, pp. 107-122
-
-
Ebben, M.J.R.1
Hans, E.W.2
Olde Weghuis, F.M.3
-
16
-
-
0028199456
-
The Steiner polytope and related polyhedra
-
Goemans, M.X., 1994. The Steiner polytope and related polyhedra. Mathematical Programming, 63 (1-3), 157-182.
-
(1994)
Mathematical Programming
, vol.63
, Issue.1-3
, pp. 157-182
-
-
Goemans, M.X.1
-
17
-
-
0037118177
-
A survey of the state-of-the-art of common due-date assignment and scheduling research
-
Gordon, V., Proth, J., and Chu, C., 2001. A survey of the state-of-the-art of common due-date assignment and scheduling research. European Journal of Operational Research, 139 (1), 1-25.
-
(2001)
European Journal of Operational Research
, vol.139
, Issue.1
, pp. 1-25
-
-
Gordon, V.1
Proth, J.2
Chu, C.3
-
18
-
-
0031075465
-
Job selection in a heavily loaded shop
-
Ghosh, J.B., 1997. Job selection in a heavily loaded shop. Computers and Operations Research, 24 (2), 141-145.
-
(1997)
Computers and Operations Research
, vol.24
, Issue.2
, pp. 141-145
-
-
Ghosh, J.B.1
-
19
-
-
19844377525
-
Build-to-order supply chain management: A literature review and framework for development
-
DOI 10.1016/j.jom.2004.10.005, PII S0272696304001184, The Build to Order Chain (BOSC) A Competitive Strategy for the 21st Century
-
Gunasekaran, A. and Ngai, E.W.T., 2005. Build-to-order supply chain management. A literature review and framework for development. Journal of Operations Management, 23 (5), 423-451. (Pubitemid 40761046)
-
(2005)
Journal of Operations Management
, vol.23
, Issue.5
, pp. 423-451
-
-
Gunasekaran, A.1
Ngai, E.W.T.2
-
20
-
-
0029534676
-
A revenue management approach to demand management and order booking in assemble-to-order manufacturing
-
Harris, F. and Pinder, J.P., 1995. A revenue management approach to demand management and order booking in assemble-to-order manufacturing. Journal of Operations Management, 13 (4), 299-309.
-
(1995)
Journal of Operations Management
, vol.13
, Issue.4
, pp. 299-309
-
-
Harris, F.1
Pinder, J.P.2
-
22
-
-
4544273778
-
-
Berlin: Springer
-
Kellerer, H., Pferschy, U., and Pisinger, D., 2004. Knapsack problems. Berlin: Springer, 285-342.
-
(2004)
Knapsack Problems
, pp. 285-342
-
-
Kellerer, H.1
Pferschy, U.2
Pisinger, D.3
-
23
-
-
0027628217
-
Integrating marketing and production planning in make-to-order companies
-
DOI 10.1016/0925-5273(93)90081-U
-
Kingsman, B.G., Worden, L., and Hendry, L., 1993. Integrating marketing and production planning in make-to-order companies. International Journal of Production Economics, 30/31, 53-66. (Pubitemid 23715806)
-
(1993)
International Journal of Production Economics
, vol.30-31
, pp. 53-66
-
-
Brian, K.1
Lee, W.2
Linda, H.3
Alan, M.4
Elaine, W.5
-
24
-
-
0036643151
-
Multi-period job selection: Planning work loads to maximize profit
-
DOI 10.1016/S0305-0548(00)00105-2, PII S0305054800001052
-
Lewis, H.F. and Slotnick, S.A., 2002. Multi-period job selection, planning work loads to maximise profit. Computers & Operations Research, 28 (1), 1081-1098. (Pubitemid 34196082)
-
(2002)
Computers and Operations Research
, vol.29
, Issue.8
, pp. 1081-1098
-
-
Lewis, H.F.1
Slotnick, S.A.2
-
25
-
-
0023420330
-
The product matrix traveling salesman problem. An application and solution heuristic
-
Plante, R.D., Lowe, T.J., and Chandrasekaran, R., 1987. The product matrix traveling salesman problem. An application and solution heuristic. Operations Research, 35 (5), 772-783. (Pubitemid 18580409)
-
(1987)
Operations Research
, vol.35
, Issue.5
, pp. 772-783
-
-
Plante, R.D.1
Lowe, T.J.2
Chandrasekaran, R.3
-
26
-
-
56549109952
-
Order acceptance using genetic algorithms
-
Rom, W.O. and Slotnick, S.A., 2009. Order acceptance using genetic algorithms. Computers and Operations Research, 36 (6), 1758-1767.
-
(2009)
Computers and Operations Research
, vol.36
, Issue.6
, pp. 1758-1767
-
-
Rom, W.O.1
Slotnick, S.A.2
-
27
-
-
28144437544
-
Capacity driven acceptance of customer orders for a multi-stage batch manufacturing system, models and algorithms
-
Roundy, R., et al., 2005. Capacity driven acceptance of customer orders for a multi-stage batch manufacturing system, models and algorithms. IIE Transactions, 37 (12), 1093-1106.
-
(2005)
IIE Transactions
, vol.37
, Issue.12
, pp. 1093-1106
-
-
Roundy, R.1
-
28
-
-
0030084767
-
Selecting jobs for a heavily loaded shop with lateness penalties
-
Slotnick, S.A. and Morton, T.E., 1996. Selecting jobs for a heavily loaded shop with lateness penalties. Computers and Operations Research, 23 (2), 131-140.
-
(1996)
Computers and Operations Research
, vol.23
, Issue.2
, pp. 131-140
-
-
Slotnick, S.A.1
Morton, T.E.2
-
29
-
-
33847678988
-
Order acceptance with weighted tardiness
-
DOI 10.1016/j.cor.2005.11.012, PII S030505480500359X
-
Slotnick, S.A. and Morton, T.E., 2007. Order acceptance with weighted tardiness. Computers and Operations Research, 34 (10), 3029-3042. (Pubitemid 46356735)
-
(2007)
Computers and Operations Research
, vol.34
, Issue.10
, pp. 3029-3042
-
-
Slotnick, S.A.1
Morton, T.E.2
-
30
-
-
10444270224
-
Manufacturing lead-time rules, customer retention vs. tardiness costs
-
Slotnick, S.A. and Sobel, M.J., 2005. Manufacturing lead-time rules, customer retention vs. tardiness costs. European Journal of Operational Research, 163 (3), 825-856.
-
(2005)
European Journal of Operational Research
, vol.163
, Issue.3
, pp. 825-856
-
-
Slotnick, S.A.1
Sobel, M.J.2
-
32
-
-
0026880663
-
Order acceptance strategies in a production-to-order environment with setup times and due-dates
-
Wester, F.A.W., Wijngaard, J., and Zijm, W.H.M., 1992. Order acceptance strategies in a production-to-order environment with setup times and due-dates. International Journal of Production Research, 30 (6), 1313-1326.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.6
, pp. 1313-1326
-
-
Wester, F.A.W.1
Wijngaard, J.2
Zijm, W.H.M.3
|