-
1
-
-
70149084778
-
Dynamic scheduling of maintenance tasks in the petroleum industry: A Reinforcement Approach
-
Aissani N., Beldjilali B. and Trentesaux D., 2009. Dynamic Scheduling of Maintenance Tasks in the Petroleum Industry: a Reinforcement Approach. Engineering Applications of Artificial Intelligence, 22 (7), 1089-1103.
-
(2009)
Engineering Applications of Artificial Intelligence
, vol.22
, Issue.7
, pp. 1089-1103
-
-
Aissani, N.1
Beldjilali, B.2
Trentesaux, D.3
-
3
-
-
84929142044
-
A genetic algorithm to achieve scheduling flexibility for a single machine problem
-
Aloulou, M. and Portmann, M.C., 2002. A genetic algorithm to achieve scheduling flexibility for a single machine problem. RAIRO-operation research 19 p.
-
(2002)
RAIRO-operation Research
, pp. 19
-
-
Aloulou, M.1
Portmann, M.C.2
-
4
-
-
0034561509
-
A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes
-
Artigues, C. and Roubellat, F., 2000. A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes. European Journal of Operational Research, 127, 297-316.
-
(2000)
European Journal of Operational Research
, vol.127
, pp. 297-316
-
-
Artigues, C.1
Roubellat, F.2
-
5
-
-
0000229534
-
Match-up scheduling with multiple resources, release dates and disruptions
-
Bean, J. C., Birge, J. R., Mittenthal, J. and Noon, C. E., 1991. Match-up scheduling with multiple resources, release dates and disruptions. Operations Research, 39(3), 470-483.
-
(1991)
Operations Research
, vol.39
, Issue.3
, pp. 470-483
-
-
Bean, J.C.1
Birge, J.R.2
Mittenthal, J.3
Noon, C.E.4
-
6
-
-
0033093715
-
Production scheduling and rescheduling with genetic algorithms
-
Bierwirth, C. and Mattfeld, D.C., 1999. Production scheduling and rescheduling with genetic algorithms. Evolutionary computation, 7(1), 1-17.
-
(1999)
Evolutionary Computation
, vol.7
, Issue.1
, pp. 1-17
-
-
Bierwirth, C.1
Mattfeld, D.C.2
-
7
-
-
80052016926
-
2011. A genetic algorithm for robust hybrid flow shop scheduling
-
Chaari T., Chaabane S., Loukil T., Trentesaux D., 2011. A genetic algorithm for robust hybrid flow shop scheduling. International Journal of Computer Integrated Manufacturing, 24 (9), 821-833.
-
International Journal of Computer Integrated Manufacturing
, vol.24
, Issue.9
, pp. 821-833
-
-
Chaari, T.1
Chaabane, S.2
Loukil, T.3
Trentesaux, D.4
-
9
-
-
2442695353
-
Dynamic scheduling of steel casting and milling using multi-agents
-
Cowling, P., Ouelhadj, D. and Petrovic, S., 2004. Dynamic scheduling of steel casting and milling using multi-agents. Production Planning & Control, 15(2), 178-188.
-
(2004)
Production Planning & Control
, vol.15
, Issue.2
, pp. 178-188
-
-
Cowling, P.1
Ouelhadj, D.2
Petrovic, S.3
-
10
-
-
0031268742
-
β-Robust scheduling for single machine systems with uncertain processing times
-
Daniels, R.L. and Carrillo, J.E., 1997. β-Robust scheduling for single machine systems with uncertain processing times. IIE Transactions, 29, 977-985.
-
(1997)
IIE Transactions
, vol.29
, pp. 977-985
-
-
Daniels, R.L.1
Carrillo, J.E.2
-
12
-
-
1642263679
-
Slack-based techniques for robust schedules
-
Toledo, Spain
-
Davenport, A.J., Gefflot, C. and Beck, J.C., 2001. Slack-based Techniques for Robust Schedules. Sixth European Conference on Planning (ECP-2001). Toledo, Spain.
-
(2001)
Sixth European Conference on Planning (ECP-2001)
-
-
Davenport, A.J.1
Gefflot, C.2
Beck, J.C.3
-
13
-
-
0028608723
-
Just-in-case scheduling
-
Seattle, USA
-
Drummond, M., Bresina, J. and Swanson, K., 1994. Just-In-Case Scheduling. Twelfth National Conference on Artificial Intelligence. Seattle, USA.
-
(1994)
Twelfth National Conference on Artificial Intelligence
-
-
Drummond, M.1
Bresina, J.2
Swanson, K.3
-
15
-
-
13444269168
-
Project scheduling under uncertainty: Survey and research potentials
-
Herroelen, W. S. and Leus, R., 2005. Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research, 165(2), 289-306.
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.2
, pp. 289-306
-
-
Herroelen, W.S.1
Leus, R.2
-
16
-
-
1642270229
-
Improving Robustness and Flexibility of Tardiness and Total Flow-time Job Shops using Robustness Measures
-
Jensen. M. T., 2001. Improving Robustness and Flexibility of Tardiness and Total Flow-time Job Shops using Robustness Measures. Applied Soft Computing, 1(1), 35-52.
-
(2001)
Applied Soft Computing
, vol.1
, Issue.1
, pp. 35-52
-
-
Jensen, M.T.1
-
17
-
-
0032163477
-
A real-time scheduling mechanism for a flexible manufacturing system: Using simulation and dispatching rules
-
Jeong, K.C. and Kim, Y.D., 1998. A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules. International Journal of Production Research, 36(9), 2609-2626.
-
(1998)
International Journal of Production Research
, vol.36
, Issue.9
, pp. 2609-2626
-
-
Jeong, K.C.1
Kim, Y.D.2
-
18
-
-
84893618478
-
State of the art and future trends of optimality and adaptability articulated mechanisms for manufacturing control systems
-
Jimenez J.-F., Bekrar A., Trentesaux D., Montoya-Torres J., Leitao P. (2013). State of the Art and Future Trends of Optimality and Adaptability Articulated Mechanisms for Manufacturing Control Systems. IEEE SMC, Manchester, UK, pp. 1265-1270
-
(2013)
IEEE SMC, Manchester, UK
, pp. 1265-1270
-
-
Jimenez, J.-F.1
Bekrar, A.2
Trentesaux, D.3
Montoya-Torres, J.4
Leitao, P.5
-
19
-
-
3242661796
-
Stochastic optimal production control problem with corrective maintenance
-
Kenne, J.P. and Gharbib, A., 2004. Stochastic optimal production control problem with corrective maintenance. Computers and Industrial Engineering, 46, 865-875
-
(2004)
Computers and Industrial Engineering
, vol.46
, pp. 865-875
-
-
Kenne, J.P.1
Gharbib, A.2
-
21
-
-
0032784020
-
An analysis of heuristics in a dynamic job shop with weighted tardiness objectives
-
Kutanoglu, E. and Sabuncuoglu, I., 1999. An analysis of heuristics in a dynamic job shop with weighted tardiness objectives. International Journal of Production Research, 37(1), 165-187.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.1
, pp. 165-187
-
-
Kutanoglu, E.1
Sabuncuoglu, I.2
-
22
-
-
1942532282
-
A new robust optimization approach for scheduling under uncertainty i Bounded uncertainty
-
Lin X., Janak S. L., Floudas C. A., 2004. A new robust optimization approach for scheduling under uncertainty: I. Bounded uncertainty. Computers & Chemical Engineering, FOCAPO 2003 Special issue, 28 (6-7), 1069-1085.
-
(2004)
Computers & Chemical Engineering, FOCAPO 2003 Special Issue
, vol.28
, Issue.6-7
, pp. 1069-1085
-
-
Lin, X.1
Janak, S.L.2
Floudas, C.A.3
-
23
-
-
0002054180
-
Predictive scheduling of a single machine subject to breakdowns
-
Mehta, S.V. and Uzsoy, R.H., 1999. Predictive scheduling of a single machine subject to breakdowns. International Journal of Computer Integrated Manufacturing, 12(1), 15-38.
-
(1999)
International Journal of Computer Integrated Manufacturing
, vol.12
, Issue.1
, pp. 15-38
-
-
Mehta, S.V.1
Uzsoy, R.H.2
-
24
-
-
76549113337
-
Training a neural network to select dispatching rules in real time
-
Scheduling in Healthcare and Industrial Systems
-
Mouelhi, W. and Pierreval, H., 2010. Training a neural network to select dispatching rules in real time. Computers & Industrial Engineering, 58 (2), Scheduling in Healthcare and Industrial Systems, 249-256.
-
(2010)
Computers & Industrial Engineering
, vol.58
, Issue.2
, pp. 249-256
-
-
Mouelhi, W.1
Pierreval, H.2
-
25
-
-
0033343706
-
Predictable scheduling of a single machine with breakdowns and sensitive jobs
-
O'Donovan, R., Uzsoy, R. and McKay, K. N., 1999. Predictable scheduling of a single machine with breakdowns and sensitive jobs. International Journal of Production Research, 37(18), 4217-4233.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.18
, pp. 4217-4233
-
-
O'Donovan, R.1
Uzsoy, R.2
McKay, K.N.3
-
26
-
-
13844281795
-
Interagent cooperation and communication for agent-based robust dynamic scheduling in steel production
-
Ouelhadj, D., Petrovic, S., Cowling, P. and Meisels, A., 2005. Interagent cooperation and communication for agent-based robust dynamic scheduling in steel production. Advanced Engineering Informatics, 18(3), 161-172.
-
(2005)
Advanced Engineering Informatics
, vol.18
, Issue.3
, pp. 161-172
-
-
Ouelhadj, D.1
Petrovic, S.2
Cowling, P.3
Meisels, A.4
-
27
-
-
0031165072
-
Dynamic selection of dispatching rules for manufacturing system scheduling
-
Pierreval H. and Mebarki N., 1997. Dynamic selection of dispatching rules for manufacturing system scheduling. International Journal of Production Research, 35 (6), 1575-1591.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.6
, pp. 1575-1591
-
-
Pierreval, H.1
Mebarki, N.2
-
28
-
-
0032649737
-
A comparative study of dispatching rules in dynamic flow shops and job shops
-
Rajendran, C. and Holthaus, O, 1999. A comparative study of dispatching rules in dynamic flow shops and job shops. European Journal of Operational Research, 116(1), 156-170.
-
(1999)
European Journal of Operational Research
, vol.116
, Issue.1
, pp. 156-170
-
-
Rajendran, C.1
Holthaus, O.2
-
29
-
-
1442285828
-
Dynamic rescheduling that simultaneously considers efficiency and stability
-
Rangsaritratsamee, R., Ferrell, Jr.W.G. and Kurz, M.B. 2004. Dynamic rescheduling that simultaneously considers efficiency and stability. Computers and Industrial Engineering, 46, 1-15.
-
(2004)
Computers and Industrial Engineering
, vol.46
, pp. 1-15
-
-
Rangsaritratsamee, R.1
Ferrell Jr., W.G.2
Kurz, M.B.3
-
30
-
-
77951555000
-
Job shop scheduling by pheromone approach in a dynamic environment
-
Renna P., 2010. Job shop scheduling by pheromone approach in a dynamic environment. International Journal of Computer Integrated Manufacturing , 23(5), 412-424
-
(2010)
International Journal of Computer Integrated Manufacturing
, vol.23
, Issue.5
, pp. 412-424
-
-
Renna, P.1
-
31
-
-
34047122539
-
Considering scheduling and preventive maintenance in the flowshop sequencing problem
-
Ruiz, R., García-Díaz, J.C. and Maroto, C., 2005. Considering scheduling and preventive maintenance in the flowshop sequencing problem. Computers and Operations Research, 34(11), 3314-3330.
-
(2005)
Computers and Operations Research
, vol.34
, Issue.11
, pp. 3314-3330
-
-
Ruiz, R.1
García-Díaz, J.C.2
Maroto, C.3
-
32
-
-
60749122333
-
Hedging production schedules against uncertainty in manufacturing environment with a review of robustness and stability research
-
Sabuncuoglu, I. and Goren, S., 2009. Hedging production schedules against uncertainty in manufacturing environment with a review of robustness and stability research. International Journal of Computer Integrated Manufacturing, 22(2), 138-157.
-
(2009)
International Journal of Computer Integrated Manufacturing
, vol.22
, Issue.2
, pp. 138-157
-
-
Sabuncuoglu, I.1
Goren, S.2
-
33
-
-
0032000897
-
A study of scheduling rules of flexible manufacturing systems: A simulation approach
-
Sabuncuoglu, I., 1998. A study of scheduling rules of flexible manufacturing systems: a simulation approach. International Journal of Operational Research, 36(2), 527-546.
-
(1998)
International Journal of Operational Research
, vol.36
, Issue.2
, pp. 527-546
-
-
Sabuncuoglu, I.1
-
34
-
-
84891655644
-
A genetic algorithm for robust schedules in a just-in-time environment with ready times and due dates
-
Sevaux M. and K. Sörensen, 2004. A genetic algorithm for robust schedules in a just-in-time environment with ready times and due dates. 4OR-Quarterly journal of the Belgian, French and Italian Operations Research Societies, 2(2), 129-147.
-
(2004)
4OR-Quarterly Journal of the Belgian, French and Italian Operations Research Societies
, vol.2
, Issue.2
, pp. 129-147
-
-
Sevaux, M.1
Sörensen, K.2
-
35
-
-
0003347730
-
Reactive scheduling systems
-
Brown D. and Scherer, W. T. (Eds.) Kluwer Academic Publisher
-
Smith, S.F., 1994. Reactive scheduling systems. In Brown, D. and Scherer, W. T. (Eds.), Intelligent Scheduling Systems (155-192). Kluwer Academic Publisher.
-
(1994)
Intelligent Scheduling Systems
, pp. 155-192
-
-
Smith, S.F.1
-
36
-
-
27844610521
-
Anticipation optimization in dynamic job shops
-
San Francisco, USA
-
Snoek, M., 2001. Anticipation Optimization in Dynamic Job Shops. Genetic and Evolutionary, Computation Conference (GECCO-2001), San Francisco, USA, 43-46.
-
(2001)
Genetic and Evolutionary, Computation Conference (GECCO-2001)
, pp. 43-46
-
-
Snoek, M.1
-
37
-
-
0010680207
-
Convex programming with set-inclusive constraints and applications to inexact linear programming
-
Soyster, A. 1973. Convex programming with set-inclusive constraints and applications to inexact linear programming. Operations Research, 21, 1154-1157.
-
(1973)
Operations Research
, vol.21
, pp. 1154-1157
-
-
Soyster, A.1
-
38
-
-
27844533529
-
Reactive repair tool for job shop schedules
-
Subramaniam, V., Raheja, A. S. And Rama Bhupal Reddy, K., 2005. Reactive repair tool for job shop schedules. International Journal of Production Research, 43(1), 1-23.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.1
, pp. 1-23
-
-
Subramaniam, V.1
Raheja, A.S.2
Rama, B.R.K.3
-
39
-
-
0028317755
-
A study of heuristics for bidirectional multi-hoist production scheduling systems
-
Sun, T.C., Lai, K.K., Lam, K. and So, K.P., 1994. A study of heuristics for bidirectional multi-hoist production scheduling systems. International Journal of Production Economics, 33, 207-214.
-
(1994)
International Journal of Production Economics
, vol.33
, pp. 207-214
-
-
Sun, T.C.1
Lai, K.K.2
Lam, K.3
So, K.P.4
-
40
-
-
0027640745
-
Dynamic scheduling-A survey of research
-
Suresh, V. and Chaudhuri, D., 1993. Dynamic scheduling-a survey of research. International Journal of Production Economics, 32(1), 53-63.
-
(1993)
International Journal of Production Economics
, vol.32
, Issue.1
, pp. 53-63
-
-
Suresh, V.1
Chaudhuri, D.2
-
41
-
-
0002646899
-
Knowledge-based reactive scheduling
-
Szelke, E. and Kerr, R., 1994. Knowledge-based reactive scheduling. Production Planning & Control, 5(2), 124.
-
(1994)
Production Planning & Control
, vol.5
, Issue.2
, pp. 124
-
-
Szelke, E.1
Kerr, R.2
-
43
-
-
84879820648
-
Benchmarking flexible job-shop scheduling and control systems
-
Trentesaux D., Pach C., Bekrar A., Sallez Y., Berger T., Bonte T., Leitao P., Barbosa J. (2013). Benchmarking Flexible Job-Shop Scheduling and Control Systems. Control Engineering Practice, 21(9), pp. 1204-1225.
-
(2013)
Control Engineering Practice
, vol.21
, Issue.9
, pp. 1204-1225
-
-
Trentesaux, D.1
Pach, C.2
Bekrar, A.3
Sallez, Y.4
Berger, T.5
Bonte, T.6
Leitao, P.7
Barbosa, J.8
-
44
-
-
0034690558
-
Analytical models to predict the performance of single-machine system under periodic and event-driven rescheduling strategies
-
Vieira, G.E, Herrmann, J.W. and Lin, E., 2000a. Analytical models to predict the performance of single-machine system under periodic and event-driven rescheduling strategies. International journal of production research, 38(8), 1899-1915.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.8
, pp. 1899-1915
-
-
Vieira, G.E.1
Herrmann, J.W.2
Lin, E.3
-
45
-
-
0040518040
-
Predicting the performance of rescheduling strategies for parallel machines systems
-
Vieira, G.E., Herrmann, J.W. and Lin, E., 2000b. Predicting the performance of rescheduling strategies for parallel machines systems. Journal of Manufacturing Systems, 19, 256-266.
-
(2000)
Journal of Manufacturing Systems
, vol.19
, pp. 256-266
-
-
Vieira, G.E.1
Herrmann, J.W.2
Lin, E.3
-
46
-
-
58549094698
-
Scheduling with uncertain durations: Modeling Beta-robust scheduling with constraints
-
Wu, C.W., Brown, K.N. and Beck, J.C., 2009. Scheduling with uncertain durations: Modeling Beta-robust scheduling with constraints. Computers and Operations Research, 36, 2348-2356.
-
(2009)
Computers and Operations Research
, vol.36
, pp. 2348-2356
-
-
Wu, C.W.1
Brown, K.N.2
Beck, J.C.3
-
47
-
-
70449579020
-
The research on proactive-reactive scheduling framework based on real-time Manufacturing Information
-
Wu, L.H., Chen, Xin., Chen, X.D. and Chen, Q.X., 2009 b. The Research on Proactive-Reactive Scheduling Framework Based on Real-Time Manufacturing Information. Materials Science Forum (626-627).
-
(2009)
Materials Science Forum
, pp. 626-627
-
-
Wu, L.H.1
Chen, Xin.2
Chen, X.D.3
Chen, Q.X.4
-
48
-
-
0027224847
-
One-machine rescheduling heuristics with efficiency and stability as criteria
-
Wu, S.D., Storer, R.H. and Chang, P.C., 1993. One-machine rescheduling heuristics with efficiency and stability as criteria. Computers and operations research, 20, 1-14.
-
(1993)
Computers and Operations Research
, vol.20
, pp. 1-14
-
-
Wu, S.D.1
Storer, R.H.2
Chang, P.C.3
-
49
-
-
84869492892
-
Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns
-
Xiong.J, Xing.L , Chen.Y(2013): Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns, Int. J. Production Economics, vol(141), pp 112-126.
-
(2013)
Int. J. Production Economics
, vol.141
, pp. 112-126
-
-
Xiong, J.1
Xing, L.2
Chen, Y.3
-
50
-
-
0026254010
-
Semi-markov decision models for real time scheduling
-
Yih, Y. and Thesen, A., 1991. Semi-markov decision models for real time scheduling. International Journal of Production Research, 29(2), 26-33.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.2
, pp. 26-33
-
-
Yih, Y.1
Thesen, A.2
-
51
-
-
84859794422
-
Heterarchical production control in manufacturing systems using the potential fields concept
-
Zbib N., Pach C., Sallez Y., Trentesaux D. (2012). Heterarchical Production Control in Manufacturing Systems Using the Potential Fields Concept. Journal of Intelligent Manufacturing, 23(5), pp. 1649-1670.
-
(2012)
Journal of Intelligent Manufacturing
, vol.23
, Issue.5
, pp. 1649-1670
-
-
Zbib, N.1
Pach, C.2
Sallez, Y.3
Trentesaux, D.4
-
52
-
-
67650945001
-
A robust scheduling method based on a multi-objective immune algorithm
-
Zuo, X., Mo, H. and Wu, J., 2009. A robust scheduling method based on a multi-objective immune algorithm. Information Sciences, 179, 3359-3369.
-
(2009)
Information Sciences
, vol.179
, pp. 3359-3369
-
-
Zuo, X.1
Mo, H.2
Wu, J.3
|