메뉴 건너뛰기




Volumn , Issue , 2014, Pages 229-234

Scheduling under uncertainty: Survey and research directions

Author keywords

predictive reactive scheduling; proactive scheduling; proactive reactive scheduling; reactive scheduling; scheduling; uncertainty

Indexed keywords

SCHEDULING ALGORITHMS; SURVEYS; UNCERTAINTY ANALYSIS;

EID: 84929144072     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICAdLT.2014.6866316     Document Type: Conference Paper
Times cited : (86)

References (52)
  • 1
    • 70149084778 scopus 로고    scopus 로고
    • Dynamic scheduling of maintenance tasks in the petroleum industry: A Reinforcement Approach
    • Aissani N., Beldjilali B. and Trentesaux D., 2009. Dynamic Scheduling of Maintenance Tasks in the Petroleum Industry: a Reinforcement Approach. Engineering Applications of Artificial Intelligence, 22 (7), 1089-1103.
    • (2009) Engineering Applications of Artificial Intelligence , vol.22 , Issue.7 , pp. 1089-1103
    • Aissani, N.1    Beldjilali, B.2    Trentesaux, D.3
  • 3
    • 84929142044 scopus 로고    scopus 로고
    • A genetic algorithm to achieve scheduling flexibility for a single machine problem
    • Aloulou, M. and Portmann, M.C., 2002. A genetic algorithm to achieve scheduling flexibility for a single machine problem. RAIRO-operation research 19 p.
    • (2002) RAIRO-operation Research , pp. 19
    • Aloulou, M.1    Portmann, M.C.2
  • 4
    • 0034561509 scopus 로고    scopus 로고
    • A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes
    • Artigues, C. and Roubellat, F., 2000. A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes. European Journal of Operational Research, 127, 297-316.
    • (2000) European Journal of Operational Research , vol.127 , pp. 297-316
    • Artigues, C.1    Roubellat, F.2
  • 5
    • 0000229534 scopus 로고
    • Match-up scheduling with multiple resources, release dates and disruptions
    • Bean, J. C., Birge, J. R., Mittenthal, J. and Noon, C. E., 1991. Match-up scheduling with multiple resources, release dates and disruptions. Operations Research, 39(3), 470-483.
    • (1991) Operations Research , vol.39 , Issue.3 , pp. 470-483
    • Bean, J.C.1    Birge, J.R.2    Mittenthal, J.3    Noon, C.E.4
  • 6
    • 0033093715 scopus 로고    scopus 로고
    • Production scheduling and rescheduling with genetic algorithms
    • Bierwirth, C. and Mattfeld, D.C., 1999. Production scheduling and rescheduling with genetic algorithms. Evolutionary computation, 7(1), 1-17.
    • (1999) Evolutionary Computation , vol.7 , Issue.1 , pp. 1-17
    • Bierwirth, C.1    Mattfeld, D.C.2
  • 9
    • 2442695353 scopus 로고    scopus 로고
    • Dynamic scheduling of steel casting and milling using multi-agents
    • Cowling, P., Ouelhadj, D. and Petrovic, S., 2004. Dynamic scheduling of steel casting and milling using multi-agents. Production Planning & Control, 15(2), 178-188.
    • (2004) Production Planning & Control , vol.15 , Issue.2 , pp. 178-188
    • Cowling, P.1    Ouelhadj, D.2    Petrovic, S.3
  • 10
    • 0031268742 scopus 로고    scopus 로고
    • β-Robust scheduling for single machine systems with uncertain processing times
    • Daniels, R.L. and Carrillo, J.E., 1997. β-Robust scheduling for single machine systems with uncertain processing times. IIE Transactions, 29, 977-985.
    • (1997) IIE Transactions , vol.29 , pp. 977-985
    • Daniels, R.L.1    Carrillo, J.E.2
  • 15
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty: Survey and research potentials
    • Herroelen, W. S. and Leus, R., 2005. Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research, 165(2), 289-306.
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 289-306
    • Herroelen, W.S.1    Leus, R.2
  • 16
    • 1642270229 scopus 로고    scopus 로고
    • Improving Robustness and Flexibility of Tardiness and Total Flow-time Job Shops using Robustness Measures
    • Jensen. M. T., 2001. Improving Robustness and Flexibility of Tardiness and Total Flow-time Job Shops using Robustness Measures. Applied Soft Computing, 1(1), 35-52.
    • (2001) Applied Soft Computing , vol.1 , Issue.1 , pp. 35-52
    • Jensen, M.T.1
  • 17
    • 0032163477 scopus 로고    scopus 로고
    • A real-time scheduling mechanism for a flexible manufacturing system: Using simulation and dispatching rules
    • Jeong, K.C. and Kim, Y.D., 1998. A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules. International Journal of Production Research, 36(9), 2609-2626.
    • (1998) International Journal of Production Research , vol.36 , Issue.9 , pp. 2609-2626
    • Jeong, K.C.1    Kim, Y.D.2
  • 18
    • 84893618478 scopus 로고    scopus 로고
    • State of the art and future trends of optimality and adaptability articulated mechanisms for manufacturing control systems
    • Jimenez J.-F., Bekrar A., Trentesaux D., Montoya-Torres J., Leitao P. (2013). State of the Art and Future Trends of Optimality and Adaptability Articulated Mechanisms for Manufacturing Control Systems. IEEE SMC, Manchester, UK, pp. 1265-1270
    • (2013) IEEE SMC, Manchester, UK , pp. 1265-1270
    • Jimenez, J.-F.1    Bekrar, A.2    Trentesaux, D.3    Montoya-Torres, J.4    Leitao, P.5
  • 19
    • 3242661796 scopus 로고    scopus 로고
    • Stochastic optimal production control problem with corrective maintenance
    • Kenne, J.P. and Gharbib, A., 2004. Stochastic optimal production control problem with corrective maintenance. Computers and Industrial Engineering, 46, 865-875
    • (2004) Computers and Industrial Engineering , vol.46 , pp. 865-875
    • Kenne, J.P.1    Gharbib, A.2
  • 21
    • 0032784020 scopus 로고    scopus 로고
    • An analysis of heuristics in a dynamic job shop with weighted tardiness objectives
    • Kutanoglu, E. and Sabuncuoglu, I., 1999. An analysis of heuristics in a dynamic job shop with weighted tardiness objectives. International Journal of Production Research, 37(1), 165-187.
    • (1999) International Journal of Production Research , vol.37 , Issue.1 , pp. 165-187
    • Kutanoglu, E.1    Sabuncuoglu, I.2
  • 22
    • 1942532282 scopus 로고    scopus 로고
    • A new robust optimization approach for scheduling under uncertainty i Bounded uncertainty
    • Lin X., Janak S. L., Floudas C. A., 2004. A new robust optimization approach for scheduling under uncertainty: I. Bounded uncertainty. Computers & Chemical Engineering, FOCAPO 2003 Special issue, 28 (6-7), 1069-1085.
    • (2004) Computers & Chemical Engineering, FOCAPO 2003 Special Issue , vol.28 , Issue.6-7 , pp. 1069-1085
    • Lin, X.1    Janak, S.L.2    Floudas, C.A.3
  • 24
    • 76549113337 scopus 로고    scopus 로고
    • Training a neural network to select dispatching rules in real time
    • Scheduling in Healthcare and Industrial Systems
    • Mouelhi, W. and Pierreval, H., 2010. Training a neural network to select dispatching rules in real time. Computers & Industrial Engineering, 58 (2), Scheduling in Healthcare and Industrial Systems, 249-256.
    • (2010) Computers & Industrial Engineering , vol.58 , Issue.2 , pp. 249-256
    • Mouelhi, W.1    Pierreval, H.2
  • 25
    • 0033343706 scopus 로고    scopus 로고
    • Predictable scheduling of a single machine with breakdowns and sensitive jobs
    • O'Donovan, R., Uzsoy, R. and McKay, K. N., 1999. Predictable scheduling of a single machine with breakdowns and sensitive jobs. International Journal of Production Research, 37(18), 4217-4233.
    • (1999) International Journal of Production Research , vol.37 , Issue.18 , pp. 4217-4233
    • O'Donovan, R.1    Uzsoy, R.2    McKay, K.N.3
  • 26
    • 13844281795 scopus 로고    scopus 로고
    • Interagent cooperation and communication for agent-based robust dynamic scheduling in steel production
    • Ouelhadj, D., Petrovic, S., Cowling, P. and Meisels, A., 2005. Interagent cooperation and communication for agent-based robust dynamic scheduling in steel production. Advanced Engineering Informatics, 18(3), 161-172.
    • (2005) Advanced Engineering Informatics , vol.18 , Issue.3 , pp. 161-172
    • Ouelhadj, D.1    Petrovic, S.2    Cowling, P.3    Meisels, A.4
  • 27
    • 0031165072 scopus 로고    scopus 로고
    • Dynamic selection of dispatching rules for manufacturing system scheduling
    • Pierreval H. and Mebarki N., 1997. Dynamic selection of dispatching rules for manufacturing system scheduling. International Journal of Production Research, 35 (6), 1575-1591.
    • (1997) International Journal of Production Research , vol.35 , Issue.6 , pp. 1575-1591
    • Pierreval, H.1    Mebarki, N.2
  • 28
    • 0032649737 scopus 로고    scopus 로고
    • A comparative study of dispatching rules in dynamic flow shops and job shops
    • Rajendran, C. and Holthaus, O, 1999. A comparative study of dispatching rules in dynamic flow shops and job shops. European Journal of Operational Research, 116(1), 156-170.
    • (1999) European Journal of Operational Research , vol.116 , Issue.1 , pp. 156-170
    • Rajendran, C.1    Holthaus, O.2
  • 30
    • 77951555000 scopus 로고    scopus 로고
    • Job shop scheduling by pheromone approach in a dynamic environment
    • Renna P., 2010. Job shop scheduling by pheromone approach in a dynamic environment. International Journal of Computer Integrated Manufacturing , 23(5), 412-424
    • (2010) International Journal of Computer Integrated Manufacturing , vol.23 , Issue.5 , pp. 412-424
    • Renna, P.1
  • 31
    • 34047122539 scopus 로고    scopus 로고
    • Considering scheduling and preventive maintenance in the flowshop sequencing problem
    • Ruiz, R., García-Díaz, J.C. and Maroto, C., 2005. Considering scheduling and preventive maintenance in the flowshop sequencing problem. Computers and Operations Research, 34(11), 3314-3330.
    • (2005) Computers and Operations Research , vol.34 , Issue.11 , pp. 3314-3330
    • Ruiz, R.1    García-Díaz, J.C.2    Maroto, C.3
  • 32
    • 60749122333 scopus 로고    scopus 로고
    • Hedging production schedules against uncertainty in manufacturing environment with a review of robustness and stability research
    • Sabuncuoglu, I. and Goren, S., 2009. Hedging production schedules against uncertainty in manufacturing environment with a review of robustness and stability research. International Journal of Computer Integrated Manufacturing, 22(2), 138-157.
    • (2009) International Journal of Computer Integrated Manufacturing , vol.22 , Issue.2 , pp. 138-157
    • Sabuncuoglu, I.1    Goren, S.2
  • 33
    • 0032000897 scopus 로고    scopus 로고
    • A study of scheduling rules of flexible manufacturing systems: A simulation approach
    • Sabuncuoglu, I., 1998. A study of scheduling rules of flexible manufacturing systems: a simulation approach. International Journal of Operational Research, 36(2), 527-546.
    • (1998) International Journal of Operational Research , vol.36 , Issue.2 , pp. 527-546
    • Sabuncuoglu, I.1
  • 35
    • 0003347730 scopus 로고
    • Reactive scheduling systems
    • Brown D. and Scherer, W. T. (Eds.) Kluwer Academic Publisher
    • Smith, S.F., 1994. Reactive scheduling systems. In Brown, D. and Scherer, W. T. (Eds.), Intelligent Scheduling Systems (155-192). Kluwer Academic Publisher.
    • (1994) Intelligent Scheduling Systems , pp. 155-192
    • Smith, S.F.1
  • 37
    • 0010680207 scopus 로고
    • Convex programming with set-inclusive constraints and applications to inexact linear programming
    • Soyster, A. 1973. Convex programming with set-inclusive constraints and applications to inexact linear programming. Operations Research, 21, 1154-1157.
    • (1973) Operations Research , vol.21 , pp. 1154-1157
    • Soyster, A.1
  • 39
    • 0028317755 scopus 로고
    • A study of heuristics for bidirectional multi-hoist production scheduling systems
    • Sun, T.C., Lai, K.K., Lam, K. and So, K.P., 1994. A study of heuristics for bidirectional multi-hoist production scheduling systems. International Journal of Production Economics, 33, 207-214.
    • (1994) International Journal of Production Economics , vol.33 , pp. 207-214
    • Sun, T.C.1    Lai, K.K.2    Lam, K.3    So, K.P.4
  • 41
    • 0002646899 scopus 로고
    • Knowledge-based reactive scheduling
    • Szelke, E. and Kerr, R., 1994. Knowledge-based reactive scheduling. Production Planning & Control, 5(2), 124.
    • (1994) Production Planning & Control , vol.5 , Issue.2 , pp. 124
    • Szelke, E.1    Kerr, R.2
  • 44
    • 0034690558 scopus 로고    scopus 로고
    • Analytical models to predict the performance of single-machine system under periodic and event-driven rescheduling strategies
    • Vieira, G.E, Herrmann, J.W. and Lin, E., 2000a. Analytical models to predict the performance of single-machine system under periodic and event-driven rescheduling strategies. International journal of production research, 38(8), 1899-1915.
    • (2000) International Journal of Production Research , vol.38 , Issue.8 , pp. 1899-1915
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 45
    • 0040518040 scopus 로고    scopus 로고
    • Predicting the performance of rescheduling strategies for parallel machines systems
    • Vieira, G.E., Herrmann, J.W. and Lin, E., 2000b. Predicting the performance of rescheduling strategies for parallel machines systems. Journal of Manufacturing Systems, 19, 256-266.
    • (2000) Journal of Manufacturing Systems , vol.19 , pp. 256-266
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 46
    • 58549094698 scopus 로고    scopus 로고
    • Scheduling with uncertain durations: Modeling Beta-robust scheduling with constraints
    • Wu, C.W., Brown, K.N. and Beck, J.C., 2009. Scheduling with uncertain durations: Modeling Beta-robust scheduling with constraints. Computers and Operations Research, 36, 2348-2356.
    • (2009) Computers and Operations Research , vol.36 , pp. 2348-2356
    • Wu, C.W.1    Brown, K.N.2    Beck, J.C.3
  • 47
    • 70449579020 scopus 로고    scopus 로고
    • The research on proactive-reactive scheduling framework based on real-time Manufacturing Information
    • Wu, L.H., Chen, Xin., Chen, X.D. and Chen, Q.X., 2009 b. The Research on Proactive-Reactive Scheduling Framework Based on Real-Time Manufacturing Information. Materials Science Forum (626-627).
    • (2009) Materials Science Forum , pp. 626-627
    • Wu, L.H.1    Chen, Xin.2    Chen, X.D.3    Chen, Q.X.4
  • 48
    • 0027224847 scopus 로고
    • One-machine rescheduling heuristics with efficiency and stability as criteria
    • Wu, S.D., Storer, R.H. and Chang, P.C., 1993. One-machine rescheduling heuristics with efficiency and stability as criteria. Computers and operations research, 20, 1-14.
    • (1993) Computers and Operations Research , vol.20 , pp. 1-14
    • Wu, S.D.1    Storer, R.H.2    Chang, P.C.3
  • 49
    • 84869492892 scopus 로고    scopus 로고
    • Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns
    • Xiong.J, Xing.L , Chen.Y(2013): Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns, Int. J. Production Economics, vol(141), pp 112-126.
    • (2013) Int. J. Production Economics , vol.141 , pp. 112-126
    • Xiong, J.1    Xing, L.2    Chen, Y.3
  • 50
  • 51
    • 84859794422 scopus 로고    scopus 로고
    • Heterarchical production control in manufacturing systems using the potential fields concept
    • Zbib N., Pach C., Sallez Y., Trentesaux D. (2012). Heterarchical Production Control in Manufacturing Systems Using the Potential Fields Concept. Journal of Intelligent Manufacturing, 23(5), pp. 1649-1670.
    • (2012) Journal of Intelligent Manufacturing , vol.23 , Issue.5 , pp. 1649-1670
    • Zbib, N.1    Pach, C.2    Sallez, Y.3    Trentesaux, D.4
  • 52
    • 67650945001 scopus 로고    scopus 로고
    • A robust scheduling method based on a multi-objective immune algorithm
    • Zuo, X., Mo, H. and Wu, J., 2009. A robust scheduling method based on a multi-objective immune algorithm. Information Sciences, 179, 3359-3369.
    • (2009) Information Sciences , vol.179 , pp. 3359-3369
    • Zuo, X.1    Mo, H.2    Wu, J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.