-
1
-
-
0012035787
-
Simulation of construction processes: Traditional practices versus lean principles
-
International Groufor Lean Construction, Berkeley, CA
-
Al-Sudairi, A. A., Diekmann, J. E., Songer, A. D., and Brown, H. M. (1999). Simulation of construction processes: Traditional practices versus lean principles. IGLC-7, International Group for Lean Construction, Berkeley, CA, 39-50.
-
(1999)
IGLC-7
, pp. 39-50
-
-
Al-Sudairi, A.A.1
Diekmann, J.E.2
Songer, A.D.3
Brown, H.M.4
-
2
-
-
24944549574
-
Construction supply chain integration: An elusive goal?
-
DOI 10.1108/13598540510612794
-
Briscoe, G., and Dainty, A. (2005). Construction supply chain integration: An elusive goal? Supply Chain Manage. Int. J., 319-326. 0929-5593, 22 (3), 255-263. (Pubitemid 41314590)
-
(2005)
Supply Chain Management
, vol.10
, Issue.4
, pp. 319-326
-
-
Briscoe, G.1
Dainty, A.2
-
3
-
-
84900563995
-
Mitigating supply chain risk through improved confidence
-
Christopher, M., and Lee, H. (2004). Mitigating supply chain risk through improved confidence. International Journal of Physical Distribution and Logistics Management; Philosophical Transactions of the Royal Society, Series A (Physical Sciences and Engineering), 34 (5), 388-396.
-
(2004)
International Journal of Physical Distribution and Logistics Management; Philosophical Transactions of the Royal Society, Series A (Physical Sciences and Engineering)
, vol.34
, Issue.5
, pp. 388-396
-
-
Christopher, M.1
Lee, H.2
-
4
-
-
11644287412
-
-
Construction Industry Institute (CII). Univ. of Texas at Austin
-
Construction Industry Institute (CII). (1986). Costs and benefits of materials managment systems, Univ. of Texas at Austin.
-
(1986)
Costs and Benefits of Materials Managment Systems
-
-
-
7
-
-
77956304643
-
-
Thomas Telford, London
-
Cox, A., Ireland, P., and Townsend, M. (2006). Managing in construction supply chains and markets, Thomas Telford, London.
-
(2006)
Managing in Construction Supply Chains and Markets
-
-
Cox, A.1
Ireland, P.2
Townsend, M.3
-
8
-
-
33846270881
-
RFID for better supply-chain management through enhanced information visibility
-
Delen, D., Hardgrave, B. C., and Sharda, R. (2007). RFID for better supply-chain management through enhanced information visibility. Prod. Oper. Manag., 16 (5), 613-624.
-
(2007)
Prod. Oper. Manag.
, vol.16
, Issue.5
, pp. 613-624
-
-
Delen, D.1
Hardgrave, B.C.2
Sharda, R.3
-
9
-
-
33846821572
-
Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS
-
DOI 10.1016/j.autcon.2006.07.004, PII S0926580506000574
-
Ergen, E., Akinci, B., and Sacks, R. (2007). Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS. Autom. Constr., 16 (3), 354-367. 0926-5805 (Pubitemid 46205287)
-
(2007)
Automation in Construction
, vol.16
, Issue.3
, pp. 354-367
-
-
Ergen, E.1
Akinci, B.2
Sacks, R.3
-
10
-
-
33644672678
-
The application of active radio frequency identification technology for tool tracking on construction job sites
-
DOI 10.1016/j.autcon.2005.06.004, PII S0926580505000695
-
Goodrum, P. M., McLaren, M. A., and Durfee, A. (2006). The application of active radio frequency technology for tool tracking on construction job sites. Autom. Constr., 15 (3), 292-302. 0926-5805 (Pubitemid 43332713)
-
(2006)
Automation in Construction
, vol.15
, Issue.3
, pp. 292-302
-
-
Goodrum, P.M.1
McLaren, M.A.2
Durfee, A.3
-
11
-
-
0030559353
-
Supply chain management: Relationships, chains and networks
-
Harland, C. M. (1996). Supply chain management: Relationships, chains and networks. Br. J. Manage., 7, 63-80.
-
(1996)
Br. J. Manage.
, vol.7
, pp. 63-80
-
-
Harland, C.M.1
-
13
-
-
0004014571
-
-
5th Ed., Springer-Verlag, New York
-
Hofmann-Wellenhof, B., Lichtenegger, H., and Collins, J. (2001). GPS: Theory and practice, 5th Ed., Springer-Verlag, New York.
-
(2001)
GPS: Theory and Practice
-
-
Hofmann-Wellenhof, B.1
Lichtenegger, H.2
Collins, J.3
-
15
-
-
0011513664
-
Radio-frequency identification applications in construction industry
-
0733-9364
-
Jaselskis, E. F., Anderson, M. R., Jahren, C. T., Rodriguez, Y., and Njos, S. (1995). Radio-frequency identification applications in construction industry. J. Constr. Eng. Manage. 0733-9364, 121 (2), 189-196.
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.2
, pp. 189-196
-
-
Jaselskis, E.F.1
Anderson, M.R.2
Jahren, C.T.3
Rodriguez, Y.4
Njos, S.5
-
16
-
-
13944281379
-
Implementing radio frequency identification in the construction process
-
DOI 10.1061/(ASCE)0733-9364(2003)129:6(680)
-
Jaselskis, E. J., and El-Misalami, T. (2003). Implementing radio frequency identification in the construction process. J. Constr. Eng. Manage., 129 (6), 680-688. 0733-9364 (Pubitemid 40265428)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.6
, pp. 680-688
-
-
Jaselskis, E.J.1
El-Misalami, T.2
-
17
-
-
0032664468
-
Materials management: The key to successful project management
-
0742-597X
-
Kini, D. (1999). Materials management: The key to successful project management. J. Manage. Eng. 0742-597X, 30-34.
-
(1999)
J. Manage. Eng.
, pp. 30-34
-
-
Kini, D.1
-
20
-
-
0001963352
-
Theoretical supply chain network modelling in the building industry
-
Univ. of Reading, Reading, UK
-
London, K., Kenley, R., and Agapiou, A. (1998). Theoretical supply chain network modelling in the building industry. 14th Annual Association of Research in Construction Management, Univ. of Reading, Reading, UK.
-
(1998)
14th Annual Association of Research in Construction Management
-
-
London, K.1
Kenley, R.2
Agapiou, A.3
-
21
-
-
0032272973
-
EZStrobe-General-purpose simulation system based on activity cycle diagrams
-
B. A. Peters, J. S. Smith, D. J. Medeiros, and M. W. Rohrer, eds., Arlington, VA
-
Martinez, J. C. (2001). EZStrobe-General-purpose simulation system based on activity cycle diagrams. B. A. Peters, J. S. Smith, D. J. Medeiros, and, M. W. Rohrer, eds., 2001 Winter Simulation Conf., Arlington, VA.
-
(2001)
2001 Winter Simulation Conf.
-
-
Martinez, J.C.1
-
22
-
-
0002324929
-
-
L. Alarcon, ed., A.A. Balkema, Rotterdam, Netherlands
-
O'Brien, W. J. (1997). Construction supply-chains: Case study, integrated cost and performance analysis, L. Alarcon, ed., A.A. Balkema, Rotterdam, Netherlands.
-
(1997)
Construction Supply-chains: Case Study, Integrated Cost and Performance Analysis
-
-
O'Brien, W.J.1
-
23
-
-
0029411391
-
Measuring effectiveness of materials management process
-
0742-597X
-
Plemmons, J. K., and Bell, L. C. (1995). Measuring effectiveness of materials management process. J. Manage. Eng., 11, 26-32. 0742-597X
-
(1995)
J. Manage. Eng.
, vol.11
, pp. 26-32
-
-
Plemmons, J.K.1
Bell, L.C.2
-
24
-
-
63049083431
-
Field trial of automated material tracking in construction
-
Quebec City, QC, Canada
-
Razavi, S. N., (2008). Field trial of automated material tracking in construction. CSCE 2008 Annual Conf., Quebec City, QC, Canada.
-
(2008)
CSCE 2008 Annual Conf.
-
-
Razavi, S.N.1
-
25
-
-
33748795375
-
Lean construction: From theory to implementation
-
DOI 10.1061/(ASCE)0742-597X(2006)22:4(168)
-
Salem, O., Salomon, J., Genaidy, A., and Minkarah, I. (2006). Lean construction: From theory to implementation. J. Manage. Eng. 0742-597X, 22 (4), 168-175. (Pubitemid 44410243)
-
(2006)
Journal of Management in Engineering
, vol.22
, Issue.4
, pp. 168-175
-
-
Salem, O.1
Solomon, J.2
Genaidy, A.3
Minkarah, I.4
-
26
-
-
0024662458
-
Materials management in large-scale construction projects: Some concerns and research issues
-
0167-188X
-
Silver, E. (1988). Materials management in large-scale construction projects: Some concerns and research issues. Eng. Cost. Prod. Econ., 15, 223-229. 0167-188X
-
(1988)
Eng. Cost. Prod. Econ.
, vol.15
, pp. 223-229
-
-
Silver, E.1
-
27
-
-
33747373317
-
Tracking the location of materials on construction job sites
-
0733-9364
-
Song, J., Haas, C. T., and Caldas, C. (2006). Tracking the location of materials on construction job sites. J. Constr. Eng. Manage., 132 (9), 911-918. 0733-9364
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.9
, pp. 911-918
-
-
Song, J.1
Haas, C.T.2
Caldas, C.3
-
28
-
-
29144515805
-
Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects
-
DOI 10.1016/j.autcon.2005.03.001, PII S0926580505000567
-
Song, J., Haas, C. T., Caldas, C., Ergen, E., and Akinci, B. (2006). Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial porjects. Autom. Constr., 15 (2), 166-177. 0926-5805 (Pubitemid 41817145)
-
(2006)
Automation in Construction
, vol.15
, Issue.2
, pp. 166-177
-
-
Song, J.1
Haas, C.T.2
Caldas, C.3
Ergen, E.4
Akinci, B.5
-
29
-
-
13244251277
-
Towards an agent-based construction supply network modelling and simulation platform
-
DOI 10.1016/j.autcon.2004.08.003, PII S0926580504001086, International Conference for Construction Information Technology
-
Tah, J. H. (2005). Toward an agent-based construction supply network modelling and simulation platform. Autom. Constr., 14, 353-359. 0926-5805 (Pubitemid 40183426)
-
(2005)
Automation in Construction
, vol.14
, Issue.3
, pp. 353-359
-
-
Tah, J.H.M.1
-
30
-
-
23044463065
-
Fundamental principles of site material management
-
DOI 10.1061/(ASCE)0733-9364(2005)131:7(808)
-
Thomas, H. R., Riley, D. R., and Messner, J. I. (2005). Fundamental principles of site material management. J. Constr. Eng. Manage., 131 (7), 808-815. 0733-9364 (Pubitemid 41068302)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.7
, pp. 808-815
-
-
Thomas, H.R.1
Riley, D.R.2
Messner, J.I.3
-
31
-
-
0000012732
-
Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
-
Tommelein, I. D. (1998). Pull-driven scheduling for pipe spool installation: Simulation of lean construction technique. J. Constr. Eng. Manage. 0733-9364, 124 (4), 279-288. (Pubitemid 128588950)
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.4
, pp. 279-288
-
-
Tommelein, I.D.1
-
32
-
-
78649327916
-
Field experiments of an automated materials identification and localization model
-
L. Soibelman and B. Akinci, eds., ASCE, Pittsburgh
-
Torrent, D. G., and Caldas, C. H. (2007). Field experiments of an automated materials identification and localization model. ASCE Int. Workshop on Computing in Civil Engineering, L. Soibelman, and, B. Akinci, eds., ASCE, Pittsburgh.
-
(2007)
ASCE Int. Workshop on Computing in Civil Engineering
-
-
Torrent, D.G.1
Caldas, C.H.2
-
33
-
-
0034391514
-
The four roles of supply chain management in construction
-
0969-7012
-
Vrijhoef, R., and Koskela, L. (2000). The four roles of supply chain management in construction. Eur. J. Purch. Supply Manage. 0969-7012, 6, 169-178.
-
(2000)
Eur. J. Purch. Supply Manage.
, vol.6
, pp. 169-178
-
-
Vrijhoef, R.1
Koskela, L.2
-
34
-
-
83755204538
-
-
M.S. thesis. Dept. of Civil and Environmental Engineering, Univ. of Waterloo, Waterloo, ON, Canada
-
Young, D. A. (2009). Modeling the impact of automated materials locating and tracking technology on the construction supply network. M.S. thesis. Dept. of Civil and Environmental Engineering, Univ. of Waterloo, Waterloo, ON, Canada.
-
(2009)
Modeling the Impact of Automated Materials Locating and Tracking Technology on the Construction Supply Network
-
-
Young, D.A.1
|