-
1
-
-
84923583367
-
An integrated utilisation, scheduling and lot-sizing algorithm for pull production, International Journal of Industrial Engineering: Theory
-
Adetunji, O.A.B. & Yadavalli, S.V. (2012). An integrated utilisation, scheduling and lot-sizing algorithm for pull production, International Journal of Industrial Engineering: Theory, Applications and Practice, 19(3).
-
(2012)
Applications and Practice
, vol.19
, Issue.3
-
-
Adetunji, O.A.B.1
Yadavalli, S.V.2
-
2
-
-
0037211465
-
Managing multi-project environments through constant workinprocess
-
Anavi-Isakow, S. & Golany, B. (2003). Managing multi-project environments through constant workinprocess, International Journal of Project Management, 21(1), 9-18.
-
(2003)
International Journal of Project Management
, vol.21
, Issue.1
, pp. 9-18
-
-
Anavi-Isakow, S.1
Golany, B.2
-
3
-
-
0032209962
-
Manufacturing Planning and Control: The evolution of MRP and JIT integration
-
Benton, W.C. & Shin, H. (1998). Manufacturing Planning and Control: The evolution of MRP and JIT integration, European Journal Of Operational Research, 110(3), 411-440.
-
(1998)
European Journal Of Operational Research
, vol.110
, Issue.3
, pp. 411-440
-
-
Benton, W.C.1
Shin, H.2
-
4
-
-
84884587285
-
Extending value stream mapping: The synchro-MRP case
-
Bertolini, M., Braglia, M., Romagnoli, G. & Zammori, F. (2013). Extending value stream mapping: the synchro-MRP case, International Journal of Production Research, 51(18), 5499-5519.
-
(2013)
International Journal of Production Research
, vol.51
, Issue.18
, pp. 5499-5519
-
-
Bertolini, M.1
Braglia, M.2
Romagnoli, G.3
Zammori, F.4
-
5
-
-
84898815454
-
-
16-18 October 2013, Hong Kong, China
-
Bertolini, M. & Romagnoli, G. (2013). Design and simulation of multi-CONWIP into a Make-ToOrder firm with General Job Shop configuration, Proceedings of the 43rd International Conference on Computers and Industrial Engineering (CIE43), 16-18 October 2013, Hong Kong, China.
-
(2013)
Design and simulation of multi-CONWIP into a Make-ToOrder firm with General Job Shop configuration, Proceedings of the 43rd International Conference on Computers and Industrial Engineering (CIE43)
-
-
Bertolini, M.1
Romagnoli, G.2
-
6
-
-
0031095866
-
A comparison of production-line control mechanisms
-
Bonvik, A.M., Couch, C.E. & Gershwin, S.B. (1997). A comparison of production-line control mechanisms, International Journal of Production Research, 35(3), 789-804.
-
(1997)
International Journal of Production Research
, vol.35
, Issue.3
, pp. 789-804
-
-
Bonvik, A.M.1
Couch, C.E.2
Gershwin, S.B.3
-
7
-
-
84871271761
-
CONWIP card setting in a flow-shop system with a batch production machine
-
Braglia, M., Frosolini, M., Gabbrielli, R. & Zammori, F. (2011). CONWIP card setting in a flow-shop system with a batch production machine, International Journal of Industrial Engineering Computations, 2(1), 1-18.
-
(2011)
International Journal of Industrial Engineering Computations
, vol.2
, Issue.1
, pp. 1-18
-
-
Braglia, M.1
Frosolini, M.2
Gabbrielli, R.3
Zammori, F.4
-
8
-
-
85128800256
-
Parallel Kanban-ConWIP system for batch production in electronics assembly, International Journal of Industrial Engineering: Theory
-
Chong, M.Y., Prakash, J., Ng, S.L., Ramli, R. & Chin, J.F. (2013). Parallel Kanban-ConWIP system for batch production in electronics assembly, International Journal of Industrial Engineering: Theory, Applications and Practice, 20(7-8)
-
(2013)
Applications and Practice
, vol.20
, Issue.7-8
-
-
Chong, M.Y.1
Prakash, J.2
Ng, S.L.3
Ramli, R.4
Chin, J.F.5
-
9
-
-
0033874529
-
Performance evaluation and design of a CONWIP system with inspections
-
Duri, C., Frein, Y. & Lee, H.-S. (2000). Performance evaluation and design of a CONWIP system with inspections, International Journal of Production Economics, 64(1), 219-229.
-
(2000)
International Journal of Production Economics
, vol.64
, Issue.1
, pp. 219-229
-
-
Duri, C.1
Frein, Y.2
Lee, H.-S.3
-
10
-
-
0002992336
-
An economic approach to job shop performance analysis
-
Enns, S.T. (1995). An economic approach to job shop performance analysis, International Journal of Production Economics, 38(2-3), 117-131.
-
(1995)
International Journal of Production Economics
, vol.38
, Issue.2-3
, pp. 117-131
-
-
Enns, S.T.1
-
11
-
-
0026112946
-
Embedding JIT into MRP
-
Flapper, S.D.P., Miltenburg, G.J. & Wijugard, J. (1991). Embedding JIT into MRP, International Journal of Production Research, 29(2), 329-341.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.2
, pp. 329-341
-
-
Flapper, S.D.P.1
Miltenburg, G.J.2
Wijugard, J.3
-
12
-
-
10744220621
-
The CONWIP production control system: Review and research issues
-
Framinan, J.M., González, P.L. & Ruiz-Usano, R. (2003). The CONWIP production control system: review and research issues, Production Planning & Control, 14(3), 255-265.
-
(2003)
Production Planning & Control
, vol.14
, Issue.3
, pp. 255-265
-
-
Framinan, J.M.1
González, P.L.2
Ruiz-Usano, R.3
-
13
-
-
27644567330
-
Dynamic card controlling in a CONWIP system
-
Framinan, J.M., González, P.L. & Ruiz-Usano, R. (2006). Dynamic card controlling in a CONWIP system, International Journal of Production Economics, 99(1-2), 102-116.
-
(2006)
International Journal of Production Economics
, vol.99
, Issue.1-2
, pp. 102-116
-
-
Framinan, J.M.1
González, P.L.2
Ruiz-Usano, R.3
-
14
-
-
3242726703
-
A comparison of Hybrid Push/Pull and CONWIP/Pull production inventory control policies
-
Geraghty, J. & Heavey, C. (2004). A comparison of Hybrid Push/Pull and CONWIP/Pull production inventory control policies, International Journal of Production Economics, 91(1), 75-90.
-
(2004)
International Journal of Production Economics
, vol.91
, Issue.1
, pp. 75-90
-
-
Geraghty, J.1
Heavey, C.2
-
17
-
-
0026187108
-
Optimal hybrid push/pull control strategies for a parallel multistage system: Part I
-
Hodgson, T.J. & Wang, D. (1991). Optimal hybrid push/pull control strategies for a parallel multistage system: Part I, International Journal of Production Research, 29(6), 1279-1287.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.6
, pp. 1279-1287
-
-
Hodgson, T.J.1
Wang, D.2
-
19
-
-
0032069604
-
Simulation study of CONWIP for a cold rolling plant
-
Huang, M., Wang, D. & Ip, W.H. (1998). Simulation study of CONWIP for a cold rolling plant, International Journal of Production Economics, 54(3), 257-266.
-
(1998)
International Journal of Production Economics
, vol.54
, Issue.3
, pp. 257-266
-
-
Huang, M.1
Wang, D.2
Ip, W.H.3
-
20
-
-
77951135443
-
Simulation optimisation of pull control policies for serial manufacturing lines and assembly manufacturing systems using genetic algorithms
-
Koulouriotis, D.E., Xanthopuolos, A.S. & Tourassis V.D. (2010). Simulation optimisation of pull control policies for serial manufacturing lines and assembly manufacturing systems using genetic algorithms, International Journal of Production Research, 48(10), 2887-2912.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.10
, pp. 2887-2912
-
-
Koulouriotis, D.E.1
Xanthopuolos, A.S.2
Tourassis, V.D.3
-
21
-
-
0024142562
-
JIT and constraint theory: The issue of bottleneck management
-
Lambrecht, M.R. & Decaluwe, L. (1988). JIT and constraint theory: the issue of bottleneck management, Production and Inventory Management Journal, 29(3), 61-65.
-
(1988)
Production and Inventory Management Journal
, vol.29
, Issue.3
, pp. 61-65
-
-
Lambrecht, M.R.1
Decaluwe, L.2
-
22
-
-
0011757454
-
Criteria for selecting a production control philosophy
-
Larsen, N.E. & Alting, L. (1993). Criteria for selecting a production control philosophy, Production Planning and Control, 4(1), 54-68.
-
(1993)
Production Planning and Control
, vol.4
, Issue.1
, pp. 54-68
-
-
Larsen, N.E.1
Alting, L.2
-
23
-
-
0038581751
-
Scheduling for on-time completion in job-shops using feasibility function
-
Lengyel, A., Hatono, I. & Ueda, K. (2003). Scheduling for on-time completion in job-shops using feasibility function, Computers & Industrial Engineering, 45(1), 215-229.
-
(2003)
Computers & Industrial Engineering
, vol.45
, Issue.1
, pp. 215-229
-
-
Lengyel, A.1
Hatono, I.2
Ueda, K.3
-
24
-
-
74549141767
-
Simulation study of coordinating layout change and quality improvement for adapting job shop manufacturing to CONWIP control
-
Li, G.-W. (2010). Simulation study of coordinating layout change and quality improvement for adapting job shop manufacturing to CONWIP control, International Journal of Production Research, 48(3), 879-900.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.3
, pp. 879-900
-
-
Li, G.-W.1
-
25
-
-
77950298803
-
Development of a simulation-based decision support system for controlling stochastic flexible job shop manufacturing systems
-
Mahdavi, I., Shirazi, B. & Solimanpur, M. (2010). Development of a simulation-based decision support system for controlling stochastic flexible job shop manufacturing systems, Simulation Modelling Practice and Theory, 18(6), 768-786.
-
(2010)
Simulation Modelling Practice and Theory
, vol.18
, Issue.6
, pp. 768-786
-
-
Mahdavi, I.1
Shirazi, B.2
Solimanpur, M.3
-
29
-
-
33746832038
-
A flexible and adaptable planning and control system for an MTO supply chain system
-
Özbayrak, M., Papadopoulou, T.C. & Samaras, E. (2006). A flexible and adaptable planning and control system for an MTO supply chain system, Robotics and Computer-Integrated Manufacturing, 22(5-6), 557-565.
-
(2006)
Robotics and Computer-Integrated Manufacturing
, vol.22
, Issue.5-6
, pp. 557-565
-
-
Özbayrak, M.1
Papadopoulou, T.C.2
Samaras, E.3
-
30
-
-
61449145606
-
Restricted work-in-process: A study of differences between Kanban and CONWIP
-
Pettersen, J.A. & Segerstedt, A. (2009). Restricted work-in-process: A study of differences between Kanban and CONWIP, International Journal of Production Economics, 118(1), 199-207.
-
(2009)
International Journal of Production Economics
, vol.118
, Issue.1
, pp. 199-207
-
-
Pettersen, J.A.1
Segerstedt, A.2
-
32
-
-
0010843780
-
Push, pull and squeeze shop floor control with computer simulation
-
Ramsay, M.L., Brown, S. & Tabibzade, K. (1990). Push, pull and squeeze shop floor control with computer simulation, Industrial Engineering, 22(2), 39-45
-
(1990)
Industrial Engineering
, vol.22
, Issue.2
, pp. 39-45
-
-
Ramsay, M.L.1
Brown, S.2
Tabibzade, K.3
-
33
-
-
84887094655
-
Dynamic control card in a production system controlled by CONWIP approach
-
Renna, P. (2010). Dynamic control card in a production system controlled by CONWIP approach, Jordan Journal of Mechanical and Industrial Engineering, 4(4), 425-432.
-
(2010)
Jordan Journal of Mechanical and Industrial Engineering
, vol.4
, Issue.4
, pp. 425-432
-
-
Renna, P.1
-
34
-
-
0028419453
-
A simulation study of CONWIP versus MRP at Westinghouse
-
Roderick, L.M., Toland, J. & Rodriguez, F.P. (1994). A simulation study of CONWIP versus MRP at Westinghouse, Computer & Industrial Engineering, 26(2), 237-242.
-
(1994)
Computer & Industrial Engineering
, vol.26
, Issue.2
, pp. 237-242
-
-
Roderick, L.M.1
Toland, J.2
Rodriguez, F.P.3
-
35
-
-
0037431950
-
Exploring the utilization of a CONWIP system for supply chain management. A comparison with fully integrated supply chains
-
Rubiano Ovalle, O. & Crespo Marquez, A. (2003). Exploring the utilization of a CONWIP system for supply chain management. A comparison with fully integrated supply chains. International Journal of Production Economics, 83(2), 195-215.
-
(2003)
International Journal of Production Economics
, vol.83
, Issue.2
, pp. 195-215
-
-
Rubiano Ovalle, O.1
Crespo Marquez, A.2
-
37
-
-
56049116738
-
Selection of a pull production control policy under different demand situations for a manufacturing system by AHP-algorithm
-
Sharma, S. & Agrawal, N. (2009). Selection of a pull production control policy under different demand situations for a manufacturing system by AHP-algorithm, Computer & Operations Research, 36(5), 1622-1632.
-
(2009)
Computer & Operations Research
, vol.36
, Issue.5
, pp. 1622-1632
-
-
Sharma, S.1
Agrawal, N.2
-
38
-
-
0025430443
-
CONWIP: A pull alternative to kanban
-
Spearman, M. L., Woodruff, D. L. & Hopp, W. J. (1990). CONWIP: a pull alternative to kanban, International Journal Of Production Research, 28(5), 879-894.
-
(1990)
International Journal Of Production Research
, vol.28
, Issue.5
, pp. 879-894
-
-
Spearman, M.L.1
Woodruff, D.L.2
Hopp, W.J.3
-
39
-
-
27744563510
-
A review of production planning and control: The applicability of key concepts to the make-to-order industry
-
Stevenson, M., Hendry, L.C. & Kingsman, B.G. (2005). A review of production planning and control: the applicability of key concepts to the make-to-order industry, International Journal of Production Research, 43(5), 869-898.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.5
, pp. 869-898
-
-
Stevenson, M.1
Hendry, L.C.2
Kingsman, B.G.3
-
40
-
-
85011075191
-
A state of art review on optimization techniques in just in time
-
Sultana, I & Ahmed, I. (2014). A state of art review on optimization techniques in just in time. Uncertain Supply Chain Management, 2(1), 15-26.
-
(2014)
Uncertain Supply Chain Management
, vol.2
, Issue.1
, pp. 15-26
-
-
Sultana, I.1
Ahmed, I.2
-
41
-
-
28044452691
-
Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs
-
Thiagarajan, S. & Rajendran, C. (2005). Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flowtime of jobs, Computers & Industrial Engineering, 49(4), 463-503.
-
(2005)
Computers & Industrial Engineering
, vol.49
, Issue.4
, pp. 463-503
-
-
Thiagarajan, S.1
Rajendran, C.2
-
42
-
-
0012331409
-
Production management: Beyond the dichotomy between push and pull
-
Villa, A. & Watanabe, T. (1993). Production management: beyond the dichotomy between push and pull, Computer Integrated Manufacturing Systems, 6(1), 53-63.
-
(1993)
Computer Integrated Manufacturing Systems
, vol.6
, Issue.1
, pp. 53-63
-
-
Villa, A.1
Watanabe, T.2
-
43
-
-
0003929853
-
-
4th ed., New York, New York: McGraw-Hill
-
Vollmann, T.E., Berry, W.L. & Whybarck, D.C. (1997). Manufacturing planning and control systems, 4th ed., New York, New York: McGraw-Hill.
-
(1997)
Manufacturing planning and control systems
-
-
Vollmann, T.E.1
Berry, W.L.2
Whybarck, D.C.3
-
44
-
-
33846932977
-
An evolutionary-simulation approach for the optimization of multi-constant work-in-process strategy – A case study
-
Yang, T., Fu, H.P. & Yang, K.Y. (2007). An evolutionary-simulation approach for the optimization of multi-constant work-in-process strategy – A case study, International Journal of Production Economics, 107(1), 104-114.
-
(2007)
International Journal of Production Economics
, vol.107
, Issue.1
, pp. 104-114
-
-
Yang, T.1
Fu, H.P.2
Yang, K.Y.3
|