메뉴 건너뛰기




Volumn 51, Issue 18, 2013, Pages 5499-5519

Extending value stream mapping: The synchro-MRP case

Author keywords

hybrid push pull systems; lean manufacturing; synchro MRP; value stream mapping

Indexed keywords

HYBRID PUSH/PULL; INDUSTRIAL SETTINGS; LEAN MANUFACTURING; MATHEMATICAL FORMULAS; OPERATING GUIDELINES; PULL SYSTEMS; SYNCHRO-MRP; VALUE STREAM MAPPING;

EID: 84884587285     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2013.784415     Document Type: Article
Times cited : (36)

References (42)
  • 1
    • 84867969715 scopus 로고    scopus 로고
    • Value network mapping (VNM): Visualization and analysis of multiple flows in value stream maps
    • St. Louis, MO, USA
    • Abbas, Z., N. Khaswala, and S. Irani. 2001. "Value Network Mapping (VNM): Visualization and Analysis of Multiple Flows in Value Stream Maps." Lean Management Solutions Conference, St. Louis, MO, USA
    • (2001) Lean Management Solutions Conference
    • Abbas, Z.1    Khaswala, N.2    Irani, S.3
  • 2
    • 84884592311 scopus 로고    scopus 로고
    • Review on just in time techniques in manufacturing systems
    • Agrawal, N. 2010. "Review on Just in Time Techniques in Manufacturing Systems." Advances in Production Engineering & Management 5 (2): 101-110
    • (2010) Advances in Production Engineering & Management , vol.5 , Issue.2 , pp. 101-110
    • Agrawal, N.1
  • 3
    • 0034211910 scopus 로고    scopus 로고
    • A hybrid push/pull control algorithm for multi-stage, multi-line production systems
    • Beamon, B., and J. Bermudo. 2000. "A Hybrid Push/Pull Control Algorithm for Multi-stage, Multi-line Production Systems." Production Planning & Control 11 (4): 349-356
    • (2000) Production Planning & Control , vol.11 , Issue.4 , pp. 349-356
    • Beamon, B.1    Bermudo, J.2
  • 4
    • 84865577127 scopus 로고    scopus 로고
    • Service value stream management (svsm): Developing lean thinking in the service industry
    • Bonaccorsi, A., G. Carmignani, and F. Zammori. 2011. "Service Value Stream Management (SVSM): Developing Lean Thinking in the Service Industry." Journal of Service Science and Management 4 (4): 428-439
    • (2011) Journal of Service Science and Management , vol.4 , Issue.4 , pp. 428-439
    • Bonaccorsi, A.1    Carmignani, G.2    Zammori, F.3
  • 9
    • 0002082384 scopus 로고
    • Integrating kanban type pull systems and mrp type push systems: Insights from a markovian model
    • Deleersnyder, J. L., T. J. Hodgson, R. E. King, P. J. O'Grady, and A. Savva. 1992. "Integrating Kanban Type Pull Systems and MRP Type Push Systems: Insights from a Markovian Model." IIE Transactions 24 (3): 43-56
    • (1992) IIE Transactions , vol.24 , Issue.3 , pp. 43-56
    • Deleersnyder, J.L.1    Hodgson, T.J.2    King, R.E.3    O'Grady, P.J.4    Savva, A.5
  • 10
    • 84986100066 scopus 로고    scopus 로고
    • Cracking the code of business
    • Emiliani, M. 2000. "Cracking the Code of Business." Management Decision 38 (2): 60-79
    • (2000) Management Decision , vol.38 , Issue.2 , pp. 60-79
    • Emiliani, M.1
  • 13
    • 4243759695 scopus 로고    scopus 로고
    • Cardiff, UK: Lean Enterprise Research Centre
    • Hines, P., and D. Taylor. 2000. Going Lean. Cardiff, UK: Lean Enterprise Research Centre
    • (2000) Going Lean
    • Hines, P.1    Taylor, D.2
  • 15
    • 0026187108 scopus 로고
    • Optimal hybrid push/pull control strategies for a parallel multistage system: Part i
    • Hodgson, T. J., and D. Wang. 1991a. "Optimal Hybrid Push/Pull Control Strategies for a Parallel Multistage System: Part I." International Journal of Production Research 29 (6): 1279-1287
    • (1991) International Journal of Production Research , vol.29 , Issue.6 , pp. 1279-1287
    • Hodgson, T.J.1    Wang, D.2
  • 16
    • 0026187108 scopus 로고
    • Optimal hybrid push/pull control strategies for a parallel multistage system: Part II
    • Hodgson, T. J., and D. Wang. 1991b. "Optimal Hybrid Push/Pull Control Strategies for a Parallel Multistage System: Part II." International Journal of Production Research 29 (7): 1453-1460
    • (1991) International Journal of Production Research , vol.29 , Issue.7 , pp. 1453-1460
    • Hodgson, T.J.1    Wang, D.2
  • 20
    • 34249027911 scopus 로고    scopus 로고
    • Analysing the effects of lean manufacturing using a value stream mapping-based simulation generator
    • Lian, Y.-H., and H. Van Landeghem. 2007. "Analysing the Effects of Lean Manufacturing Using a Value Stream Mapping-Based Simulation Generator." International Journal of Production Research 45 (13): 3037-3058
    • (2007) International Journal of Production Research , vol.45 , Issue.13 , pp. 3037-3058
    • Lian, Y.-H.1    Van Landeghem, H.2
  • 26
    • 57049101493 scopus 로고    scopus 로고
    • Using the when/where rules in dual resource constrained systems for a hybrid push-pull control
    • Salum, L., and Ö. U. Araz. 2009. "Using the When/Where Rules in Dual Resource Constrained Systems for a Hybrid Push-Pull Control." International Journal of Production Research 47 (6): 1661-1677
    • (2009) International Journal of Production Research , vol.47 , Issue.6 , pp. 1661-1677
    • Salum, L.1    Araz, O.U.2
  • 27
    • 0020796417 scopus 로고
    • Applications of single-card and dual-card kanban
    • Schonberger, R. J. 1983. "Applications of Single-Card and Dual-Card Kanban." Interfaces 13 (4): 56-67
    • (1983) Interfaces , vol.13 , Issue.4 , pp. 56-67
    • Schonberger, R.J.1
  • 29
  • 30
    • 34248550363 scopus 로고    scopus 로고
    • Defining and developing measures of lean production
    • Shah, R., and P. T. Ward. 2007. "Defining and Developing Measures of Lean Production." Journal of Operations Management 25 (4): 785-805
    • (2007) Journal of Operations Management , vol.25 , Issue.4 , pp. 785-805
    • Shah, R.1    Ward, P.T.2
  • 32
    • 0026859945 scopus 로고
    • Push and pull production systems: Issues and comparisons
    • Spearman, M. L., and M. A. Zazanis. 1992. "Push and Pull Production Systems: Issues and Comparisons." Operations Research 40 (3): 521-532
    • (1992) Operations Research , vol.40 , Issue.3 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.A.2
  • 35
    • 27744563510 scopus 로고    scopus 로고
    • A review of production planning and control: The applicability of key concepts to make-to-order industry
    • Stevenson, M., L. C. Hendry, and B. G. Kingsman. 2005. "A Review of Production Planning and Control: The Applicability of Key Concepts to Make-to-Order Industry." International Journal of Production Research 43 (5): 869-898
    • (2005) International Journal of Production Research , vol.43 , Issue.5 , pp. 869-898
    • Stevenson, M.1    Hendry, L.C.2    Kingsman, B.G.3
  • 37
    • 77956640085 scopus 로고    scopus 로고
    • Application of value stream mapping in an indian camshaft manufacturing organisation
    • Vinodh, S., K. R. Arvind, and M. Somanaathan. 2010. "Application of Value Stream Mapping in an Indian Camshaft Manufacturing Organisation." Journal of Manufacturing Technology Management 21 (7): 888-900
    • (2010) Journal of Manufacturing Technology Management , vol.21 , Issue.7 , pp. 888-900
    • Vinodh, S.1    Arvind, K.R.2    Somanaathan, M.3
  • 42
    • 0035883116 scopus 로고    scopus 로고
    • A mathematical programming model for production planning using CONWIP
    • Zhang, W., and M. Chen. 2001. "A Mathematical Programming Model for Production Planning Using CONWIP." International Journal of Production Research 39 (12): 2723-2734
    • (2001) International Journal of Production Research , vol.39 , Issue.12 , pp. 2723-2734
    • Zhang, W.1    Chen, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.