-
1
-
-
0036682097
-
A comparison of the performance of artificial intelligence techniques for optimizing the number of Kanbans
-
Alabas, C., Altiparmak, F., & Dengiz, B. (2002). A comparison of the performance of artificial intelligence techniques for optimizing the number of Kanbans. Journal of the Operational Research Society, 53(8), 907-914.
-
(2002)
Journal of the Operational Research Society
, vol.53
, Issue.8
, pp. 907-914
-
-
Alabas, C.1
Altiparmak, F.2
Dengiz, B.3
-
2
-
-
0008917934
-
Approximation approach for the performance analysis of production lines under a kanban discipline
-
Albino, V., Dassisti, M., & O Okogbaa, G. (1995). Approximation approach for the performance analysis of production lines under a kanban discipline. International journal of production economics, 40(2), 197-207.
-
(1995)
International Journal of Production Economics
, vol.40
, Issue.2
, pp. 197-207
-
-
Albino, V.1
Dassisti, M.2
O Okogbaa, G.3
-
3
-
-
0023330726
-
A mathematical programming approach to a deterministic kanban system
-
Bitran, G. R., & Chang, L. (1987). A mathematical programming approach to a deterministic kanban system. Management Science, 33(4), 427-441.
-
(1987)
Management Science
, vol.33
, Issue.4
, pp. 427-441
-
-
Bitran, G.R.1
Chang, L.2
-
4
-
-
84986958388
-
A review of the kanban production control research literature
-
Berkley, B. J. (1992). A review of the kanban production control research literature. Production and Operations Management, 1(4), 393-411.
-
(1992)
Production and Operations Management
, vol.1
, Issue.4
, pp. 393-411
-
-
Berkley, B.J.1
-
5
-
-
0037103553
-
The set of just-in-time management strategies: An assessment of their impact on plant-level productivity and input-factor substitutability using variable cost function estimates
-
Brox, J. A., & Fader, C. (2002). The set of just-in-time management strategies: an assessment of their impact on plant-level productivity and input-factor substitutability using variable cost function estimates. International Journal of Production Research, 40(12), 2705-2720.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.12
, pp. 2705-2720
-
-
Brox, J.A.1
Fader, C.2
-
6
-
-
1442305305
-
Flow-shop problems with intermediate buffers
-
Brucker, P., Heitmann, S., & Hurink, J. (2003). Flow-shop problems with intermediate buffers. OR Spectrum, 25(4), 549-574.
-
(2003)
OR Spectrum
, vol.25
, Issue.4
, pp. 549-574
-
-
Brucker, P.1
Heitmann, S.2
Hurink, J.3
-
7
-
-
0031142134
-
Overlapping factor in Toyota’s formula for computing the number of Kanbans
-
Co Henry, C., & Sharafali, M. (1997). Overlapping factor in Toyota’s formula for computing the number of Kanbans. IIE Trans, 29(5), 409-415.
-
(1997)
IIE Trans
, vol.29
, Issue.5
, pp. 409-415
-
-
Co Henry, C.1
Sharafali, M.2
-
9
-
-
0023345352
-
Configuring a kanban system using a discrete optimization of multiple stochastic responses
-
Davis, W. J., & STUBITZ, S. J. (1987). Configuring a kanban system using a discrete optimization of multiple stochastic responses. International Journal of Production Research, 25(5), 721-740.
-
(1987)
International Journal of Production Research
, vol.25
, Issue.5
, pp. 721-740
-
-
Davis, W.J.1
Stubitz, S.J.2
-
10
-
-
0042044389
-
Using simulation to evaluate the introduction of a Kanban subsystem within an MRP-controlled manufacturing environment
-
De Smet, R., & Gelders, L. (1998). Using simulation to evaluate the introduction of a Kanban subsystem within an MRP-controlled manufacturing environment. International journal of production economics, 56, 111-122.
-
(1998)
International Journal of Production Economics
, vol.56
, pp. 111-122
-
-
De Smet, R.1
Gelders, L.2
-
11
-
-
0000436165
-
Kanban controlled pull systems: An analytic approach
-
Deleersnyder, J. L., Hodgson, T. J., Muller-Malek, H., & O'Grady, P. J. (1989). Kanban controlled pull systems: an analytic approach. Management Science,35(9), 1079-1091.
-
(1989)
Management Science
, vol.35
, Issue.9
, pp. 1079-1091
-
-
Deleersnyder, J.L.1
Hodgson, T.J.2
Muller-Malek, H.3
O'grady, P.J.4
-
12
-
-
0035295083
-
Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints
-
Drexl, A., & Kimms, A. (2001). Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints. Management Science, 47(3), 480-491.
-
(2001)
Management Science
, vol.47
, Issue.3
, pp. 480-491
-
-
Drexl, A.1
Kimms, A.2
-
13
-
-
0001907055
-
Japanese management techniques in small manufacturing companies: A strategy for implementation
-
Finch, B. (1986). Japanese management techniques in small manufacturing companies: a strategy for implementation. Production and inventory management, 27(3), 30-38.
-
(1986)
Production and Inventory Management
, vol.27
, Issue.3
, pp. 30-38
-
-
Finch, B.1
-
14
-
-
21844504189
-
Relationship between JIT and TQM: Practices and performance
-
Flynn, B. B., Sakakibara, S., & Schroeder, R. G. (1995). Relationship between JIT and TQM: practices and performance. Academy of management Journal,38(5), 1325-1360.
-
(1995)
Academy of Management Journal
, vol.38
, Issue.5
, pp. 1325-1360
-
-
Flynn, B.B.1
Sakakibara, S.2
Schroeder, R.G.3
-
15
-
-
0036837161
-
The role of performance measures and incentive systems in relation to the degree of JIT implementation
-
Fullerton, R. R., & McWatters, C. S. (2002). The role of performance measures and incentive systems in relation to the degree of JIT implementation. Accounting, Organizations and Society, 27(8), 711-735.
-
(2002)
Accounting, Organizations and Society
, vol.27
, Issue.8
, pp. 711-735
-
-
Fullerton, R.R.1
McWatters, C.S.2
-
16
-
-
0026137976
-
The just-in-time philosophy: A literature review
-
Golhar, D. Y., & Stamm, C. L. (1991). The just-in-time philosophy: a literature review. The International Journal of Production Research, 29(4), 657-676.
-
(1991)
The International Journal of Production Research
, vol.29
, Issue.4
, pp. 657-676
-
-
Golhar, D.Y.1
Stamm, C.L.2
-
17
-
-
0034691907
-
Determination of the number of containers, production Kanbans and withdrawal Kanbans; and scheduling in kanban flowshops-Part 2
-
Hemamalini, B., & Rajendran, C. (2000). Determination of the number of containers, production Kanbans and withdrawal Kanbans; and scheduling in kanban flowshops-Part 2. International Journal of Production Research, 38(11), 2549-2572.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.11
, pp. 2549-2572
-
-
Hemamalini, B.1
Rajendran, C.2
-
18
-
-
0033904015
-
The Kanban assignment problem–A non-integral approach
-
Herer, Y. T., & Shalom, L. (2000). The Kanban assignment problem–A non-integral approach. European Journal of Operational Research, 120(2), 260-276.
-
(2000)
European Journal of Operational Research
, vol.120
, Issue.2
, pp. 260-276
-
-
Herer, Y.T.1
Shalom, L.2
-
20
-
-
84989486136
-
A simulation analysis of Japanese Just In Time technique with Kanban for multi line multi stage production system
-
Huang, P. Y., Rees, L. P., & Taylor, B. W. (1983) A simulation analysis of Japanese Just In Time technique with Kanban for multi line multi stage production system. Decision Sciences, 14(3), 326-344.
-
(1983)
Decision Sciences
, vol.14
, Issue.3
, pp. 326-344
-
-
Huang, P.Y.1
Rees, L.P.2
Taylor, B.W.3
-
21
-
-
0031284208
-
An example of simulation optimisation using a neural network metamodel: Finding the optimum number of Kanbans in a manufacturing system
-
Hurrion, R. D. (1997). An example of simulation optimisation using a neural network metamodel: finding the optimum number of Kanbans in a manufacturing system. Journal of the Operational Research Society, 48(11), 1105-1112.
-
(1997)
Journal of the Operational Research Society
, vol.48
, Issue.11
, pp. 1105-1112
-
-
Hurrion, R.D.1
-
22
-
-
0024883395
-
Batching policy in kanban systems
-
Karmarkar, U. S., & Kekre, S. (1989). Batching policy in kanban systems. Journal of Manufacturing Systems, 8(4), 317-328.
-
(1989)
Journal of Manufacturing Systems
, vol.8
, Issue.4
, pp. 317-328
-
-
Karmarkar, U.S.1
Kekre, S.2
-
23
-
-
0037061513
-
An optimal batch size for a JIT manufacturing system
-
Khan, L. R., & Sarker, R. A. (2002). An optimal batch size for a JIT manufacturing system. Computers & Industrial Engineering, 42(2), 127-136.
-
(2002)
Computers & Industrial Engineering
, vol.42
, Issue.2
, pp. 127-136
-
-
Khan, L.R.1
Sarker, R.A.2
-
24
-
-
84952179325
-
Desiǵn and analysis of Pull System, a method of multi-staǵe production control
-
Kimura, O., & Terada, H. (1981). Desiǵn and analysis of Pull System, a method of multi-staǵe production control. The International Journal Of Production Research, 19(3), 241-253.
-
(1981)
The International Journal of Production Research
, vol.19
, Issue.3
, pp. 241-253
-
-
Kimura, O.1
Terada, H.2
-
25
-
-
0036643308
-
A decomposition method for multi-product kanban systems with setup times and lost sales
-
Krieg, G. N., & Kuhn, H. (2002). A decomposition method for multi-product kanban systems with setup times and lost sales. IIE Transactions, 34(7), 613-625.
-
(2002)
IIE Transactions
, vol.34
, Issue.7
, pp. 613-625
-
-
Krieg, G.N.1
Kuhn, H.2
-
26
-
-
0037804756
-
A study of system dynamics in just-in-time logistics
-
Lai, C. L., Lee, W. B., & Ip, W. H. (2003). A study of system dynamics in just-in-time logistics. Journal of Materials Processing Technology, 138(1), 265-269.
-
(2003)
Journal of Materials Processing Technology
, vol.138
, Issue.1
, pp. 265-269
-
-
Lai, C.L.1
Lee, W.B.2
Ip, W.H.3
-
27
-
-
0032156317
-
A rule induction approach for determining the number of Kanbans in a just-in-time production system
-
Markham, I. S., Mathieu, R. G., & Wray, B. A. (1998). A rule induction approach for determining the number of Kanbans in a just-in-time production system. Computers & industrial engineering, 34(4), 717-727.
-
(1998)
Computers & Industrial Engineering
, vol.34
, Issue.4
, pp. 717-727
-
-
Markham, I.S.1
Mathieu, R.G.2
Wray, B.A.3
-
28
-
-
18344412081
-
Multiple-supplier inventory models in supply chain management: A review
-
Minner, S. (2003). Multiple-supplier inventory models in supply chain management: A review. International Journal of Production Economics, 81, 265-279.
-
(2003)
International Journal of Production Economics
, vol.81
, pp. 265-279
-
-
Minner, S.1
-
30
-
-
0031641970
-
Optimum number of Kanbans between two adjacent stations
-
Nori, V. S., & Sarker, B. R. (1998). Optimum number of Kanbans between two adjacent stations. Production Planning & Control, 9(1), 60-65.
-
(1998)
Production Planning & Control
, vol.9
, Issue.1
, pp. 60-65
-
-
Nori, V.S.1
Sarker, B.R.2
-
31
-
-
0000939673
-
Optimal numbers of two kinds of Kanbans in a JIT production system
-
Ohno, K., Nakashima, K., & Kojima, M. (1995). Optimal numbers of two kinds of Kanbans in a JIT production system. International Journal of Production Research, 33(5), 1387–1401
-
(1995)
International Journal of Production Research
, vol.33
, Issue.5
, pp. 1387-1401
-
-
Ohno, K.1
Nakashima, K.2
Kojima, M.3
-
32
-
-
0037431950
-
Exploring the utilization of a CONWIP system for supply chain management. A comparison with fully integrated supply chains
-
Ovalle, O. R., & Marquez, A. C. (2003). Exploring the utilization of a CONWIP system for supply chain management. A comparison with fully integrated supply chains. International Journal of Production Economics, 83(2), 195-215.
-
(2003)
International Journal of Production Economics
, vol.83
, Issue.2
, pp. 195-215
-
-
Ovalle, O.R.1
Marquez, A.C.2
-
34
-
-
0023310442
-
An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with Kanbans
-
Philipoom, P. R., Rees, L. P., TAYLOR III, B. W., & Huang, P. Y. (1987). An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with Kanbans. International Journal of Production Research, 25(3), 457-472.
-
(1987)
International Journal of Production Research
, vol.25
, Issue.3
, pp. 457-472
-
-
Philipoom, P.R.1
Rees, L.P.2
Taylor Iii, B.W.3
Huang, P.Y.4
-
35
-
-
0033099220
-
Formations and heuristics for scheduling in kanban flow shop to minimize the sum of weighted flowtime, weighted tardiness and weighted earliness of containers
-
Rajendran, C. (1999). Formations and heuristics for scheduling in kanban flow shop to minimize the sum of weighted flowtime, weighted tardiness and weighted earliness of containers. International Journal of Production Research, 37(5), 1137–1158
-
(1999)
International Journal of Production Research
, vol.37
, Issue.5
, pp. 1137-1158
-
-
Rajendran, C.1
-
36
-
-
0030269796
-
Operations planning for Kanbans between two adjacent workstations
-
Sarker, B. R., & Balan, C. V. (1996). Operations planning for Kanbans between two adjacent workstations. Computers & industrial engineering, 31(1), 221-224.
-
(1996)
Computers & Industrial Engineering
, vol.31
, Issue.1
, pp. 221-224
-
-
Sarker, B.R.1
Balan, C.V.2
-
37
-
-
0032708083
-
Operations planning for a multi-stage kanban system
-
Sarker, B. R., & Balan, C. V. (1999). Operations planning for a multi-stage kanban system. European Journal of Operational Research, 112(2), 284-303.
-
(1999)
European Journal of Operational Research
, vol.112
, Issue.2
, pp. 284-303
-
-
Sarker, B.R.1
Balan, C.V.2
-
38
-
-
0002336648
-
Simulation analysis of just-in-time production systems
-
Savsar, M., & Al-Jawini, A. (1995). Simulation analysis of just-in-time production systems. International Journal of Production Economics, 42(1), 67-78.
-
(1995)
International Journal of Production Economics
, vol.42
, Issue.1
, pp. 67-78
-
-
Savsar, M.1
Al-Jawini, A.2
-
39
-
-
0031332898
-
Heuristics for scheduling in a Kanban system with dual blocking mechanisms
-
Sharadapriyadarshini, B., & Rajendran, C. (1997). Heuristics for scheduling in a Kanban system with dual blocking mechanisms. European journal of operational research, 103(3), 439-452.
-
(1997)
European Journal of Operational Research
, vol.103
, Issue.3
, pp. 439-452
-
-
Sharadapriyadarshini, B.1
Rajendran, C.2
-
40
-
-
0002256871
-
A review of literature relating to lIT
-
Sohal, A. S., Keller, A. Z., & Fouad, R. H. (1988). A review of literature relating to lIT. International Journal of Operations and Production Management (UK), 9, 15-25.
-
(1988)
International Journal of Operations and Production Management (UK)
, vol.9
, pp. 15-25
-
-
Sohal, A.S.1
Keller, A.Z.2
Fouad, R.H.3
-
41
-
-
0025430443
-
CONWIP: A pull alternative to kanban
-
Spearman, M. L., Woodruff, D. L., & Hopp, W. J. (1990). CONWIP: a pull alternative to kanban. The International Journal of Production Research. 28(5), 879-894.
-
(1990)
The International Journal of Production Research
, vol.28
, Issue.5
, pp. 879-894
-
-
Spearman, M.L.1
Woodruff, D.L.2
Hopp, W.J.3
-
42
-
-
0030869876
-
Optimal buffer allocation strategy for minimizing work-in-process inventory in unpaced production lines
-
So, K. C. (1997). Optimal buffer allocation strategy for minimizing work-in-process inventory in unpaced production lines. IIE transactions, 29(1), 81-88.
-
(1997)
IIE Transactions
, vol.29
, Issue.1
, pp. 81-88
-
-
So, K.C.1
-
43
-
-
0017557653
-
Toyota production system and kanban system materialization of just-in-time and respect-for-human system
-
Sugimori, Y., Kusunoki, K., Cho, F., & Uchikawa, S. (1977). Toyota production system and kanban system materialization of just-in-time and respect-for-human system. The International Journal of Production Research, 15(6), 553-564.
-
(1977)
The International Journal of Production Research
, vol.15
, Issue.6
, pp. 553-564
-
-
Sugimori, Y.1
Kusunoki, K.2
Cho, F.3
Uchikawa, S.4
-
44
-
-
0036604840
-
Decentralized reactive Kanban system
-
Takahashi, K., & Nakamura, N. (2002). Decentralized reactive Kanban system. European Journal of Operational Research, 139(2), 262-276.
-
(2002)
European Journal of Operational Research
, vol.139
, Issue.2
, pp. 262-276
-
-
Takahashi, K.1
Nakamura, N.2
-
45
-
-
0035898986
-
An adaptive approach to controlling kanban systems
-
Tardif, V., & Maaseidvaag, L. (2001). An adaptive approach to controlling kanban systems. European Journal of Operational Research, 132(2), 411-424.
-
(2001)
European Journal of Operational Research
, vol.132
, Issue.2
, pp. 411-424
-
-
Tardif, V.1
Maaseidvaag, L.2
-
46
-
-
0034135524
-
Pull type manufacturing system with multiple product types
-
Tayfur A., & Goang, A. S. (2000) Pull type manufacturing system with multiple product types. IIE Trans, 32, 115–124.
-
(2000)
IIE Trans
, vol.32
, pp. 115-124
-
-
Tayfur, A.1
Goang, A.S.2
-
47
-
-
0024731874
-
A review of the dual resource constrained system research
-
Treleven, M. (1989). A review of the dual resource constrained system research. IIE Transactions, 21(3), 279-287.
-
(1989)
IIE Transactions
, vol.21
, Issue.3
, pp. 279-287
-
-
Treleven, M.1
-
48
-
-
0036721778
-
An evolutionary algorithm for optimizing material flow in supply chains
-
Vergara, F. E., Khouja, M., & Michalewicz, Z. (2002). An evolutionary algorithm for optimizing material flow in supply chains. Computers & Industrial Engineering, 43(3), 407-421.
-
(2002)
Computers & Industrial Engineering
, vol.43
, Issue.3
, pp. 407-421
-
-
Vergara, F.E.1
Khouja, M.2
Michalewicz, Z.3
-
49
-
-
0024108248
-
Increasing the production rate of a just-in-time production system with variable operation times
-
Villeda, R., Dudek, R., & Smith, M. L. (1988). Increasing the production rate of a just-in-time production system with variable operation times. The International Journal Of Production Research, 26(11), 1749-1768.
-
(1988)
The International Journal of Production Research
, vol.26
, Issue.11
, pp. 1749-1768
-
-
Villeda, R.1
Dudek, R.2
Smith, M.L.3
-
50
-
-
0002547037
-
Application of just-in-time manufacturing techniques in the United Kingdom
-
Voss, C. A., & Robinson, S. J. (1987). Application of just-in-time manufacturing techniques in the United Kingdom. International Journal of Operations & Production Management, 7(4), 46-52.
-
(1987)
International Journal of Operations & Production Management
, vol.7
, Issue.4
, pp. 46-52
-
-
Voss, C.A.1
Robinson, S.J.2
-
51
-
-
0033100380
-
A closed-form solution to a kanban sizing problem
-
Woolsey, R. E., Bowden, R. O., Hall, J. D., & Hadley, W. H. (1999). A closed-form solution to a kanban sizing problem. Production and Inventory Management Journal, 40, 1-3.
-
(1999)
Production and Inventory Management Journal
, vol.40
, pp. 1-3
-
-
Woolsey, R.E.1
Bowden, R.O.2
Hall, J.D.3
Hadley, W.H.4
-
52
-
-
0030818944
-
Algorithms for sequencing mixed models on an assembly line in a JIT production system
-
Xiaobo, Z., & Ohno, K. (1997). Algorithms for sequencing mixed models on an assembly line in a JIT production system. Computers & Industrial Engineering,32(1), 47-56.
-
(1997)
Computers & Industrial Engineering
, vol.32
, Issue.1
, pp. 47-56
-
-
Xiaobo, Z.1
Ohno, K.2
-
53
-
-
0012706318
-
Managing a flow line with single-Kanban, dual-Kanban or Conwip
-
Yang, K.K. (2000) Managing a flow line with single-Kanban, dual-Kanban or Conwip. Production and Operations Management, 9(4), 349-366.
-
(2000)
Production and Operations Management
, vol.9
, Issue.4
, pp. 349-366
-
-
Yang, K.K.1
-
54
-
-
0001071723
-
A kanban-based simulation study of a mixed model just-in-time manufacturing line
-
Yavuz, I. H., & Satir, A. (1995). A kanban-based simulation study of a mixed model just-in-time manufacturing line. International Journal of Production Research, 33(4), 1027–1048
-
(1995)
International Journal of Production Research
, vol.33
, Issue.4
, pp. 1027-1048
-
-
Yavuz, I.H.1
Satir, A.2
-
55
-
-
0032675529
-
Transient behavior of single stage kanban system based on the queuing model
-
Yoichi, S., & Naoto, H. (1999). Transient behavior of single stage kanban system based on the queuing model. International Journal of Production Economics, 60-61, 369–374.
-
(1999)
International Journal of Production Economics
, vol.60-61
, pp. 369-374
-
-
Yoichi, S.1
Naoto, H.2
|