Volumn 2, Issue 1, 2014, Pages 15-26

A state of art review on optimization techniques in just in time

Author keywords

CONWIP; Just in time; Kanban

Indexed keywords


EID: 85011075191     PISSN: 22916822     EISSN: 22916830     Source Type: Journal    
DOI: 10.5267/j.uscm.2013.10.006     Document Type: Review
Times cited : (14)

References (55)
  • 1
    • 0036682097 scopus 로고    scopus 로고
    • A comparison of the performance of artificial intelligence techniques for optimizing the number of Kanbans
    • Alabas, C., Altiparmak, F., & Dengiz, B. (2002). A comparison of the performance of artificial intelligence techniques for optimizing the number of Kanbans. Journal of the Operational Research Society, 53(8), 907-914.
    • (2002) Journal of the Operational Research Society , vol.53 , Issue.8 , pp. 907-914
    • Alabas, C.1    Altiparmak, F.2    Dengiz, B.3
  • 2
    • 0008917934 scopus 로고
    • Approximation approach for the performance analysis of production lines under a kanban discipline
    • Albino, V., Dassisti, M., & O Okogbaa, G. (1995). Approximation approach for the performance analysis of production lines under a kanban discipline. International journal of production economics, 40(2), 197-207.
    • (1995) International Journal of Production Economics , vol.40 , Issue.2 , pp. 197-207
    • Albino, V.1    Dassisti, M.2    O Okogbaa, G.3
  • 3
    • 0023330726 scopus 로고
    • A mathematical programming approach to a deterministic kanban system
    • Bitran, G. R., & Chang, L. (1987). A mathematical programming approach to a deterministic kanban system. Management Science, 33(4), 427-441.
    • (1987) Management Science , vol.33 , Issue.4 , pp. 427-441
    • Bitran, G.R.1    Chang, L.2
  • 4
    • 84986958388 scopus 로고
    • A review of the kanban production control research literature
    • Berkley, B. J. (1992). A review of the kanban production control research literature. Production and Operations Management, 1(4), 393-411.
    • (1992) Production and Operations Management , vol.1 , Issue.4 , pp. 393-411
    • Berkley, B.J.1
  • 5
    • 0037103553 scopus 로고    scopus 로고
    • The set of just-in-time management strategies: An assessment of their impact on plant-level productivity and input-factor substitutability using variable cost function estimates
    • Brox, J. A., & Fader, C. (2002). The set of just-in-time management strategies: an assessment of their impact on plant-level productivity and input-factor substitutability using variable cost function estimates. International Journal of Production Research, 40(12), 2705-2720.
    • (2002) International Journal of Production Research , vol.40 , Issue.12 , pp. 2705-2720
    • Brox, J.A.1    Fader, C.2
  • 6
    • 1442305305 scopus 로고    scopus 로고
    • Flow-shop problems with intermediate buffers
    • Brucker, P., Heitmann, S., & Hurink, J. (2003). Flow-shop problems with intermediate buffers. OR Spectrum, 25(4), 549-574.
    • (2003) OR Spectrum , vol.25 , Issue.4 , pp. 549-574
    • Brucker, P.1    Heitmann, S.2    Hurink, J.3
  • 7
    • 0031142134 scopus 로고    scopus 로고
    • Overlapping factor in Toyota’s formula for computing the number of Kanbans
    • Co Henry, C., & Sharafali, M. (1997). Overlapping factor in Toyota’s formula for computing the number of Kanbans. IIE Trans, 29(5), 409-415.
    • (1997) IIE Trans , vol.29 , Issue.5 , pp. 409-415
    • Co Henry, C.1    Sharafali, M.2
  • 9
    • 0023345352 scopus 로고
    • Configuring a kanban system using a discrete optimization of multiple stochastic responses
    • Davis, W. J., & STUBITZ, S. J. (1987). Configuring a kanban system using a discrete optimization of multiple stochastic responses. International Journal of Production Research, 25(5), 721-740.
    • (1987) International Journal of Production Research , vol.25 , Issue.5 , pp. 721-740
    • Davis, W.J.1    Stubitz, S.J.2
  • 10
    • 0042044389 scopus 로고    scopus 로고
    • Using simulation to evaluate the introduction of a Kanban subsystem within an MRP-controlled manufacturing environment
    • De Smet, R., & Gelders, L. (1998). Using simulation to evaluate the introduction of a Kanban subsystem within an MRP-controlled manufacturing environment. International journal of production economics, 56, 111-122.
    • (1998) International Journal of Production Economics , vol.56 , pp. 111-122
    • De Smet, R.1    Gelders, L.2
  • 12
    • 0035295083 scopus 로고    scopus 로고
    • Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints
    • Drexl, A., & Kimms, A. (2001). Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints. Management Science, 47(3), 480-491.
    • (2001) Management Science , vol.47 , Issue.3 , pp. 480-491
    • Drexl, A.1    Kimms, A.2
  • 13
    • 0001907055 scopus 로고
    • Japanese management techniques in small manufacturing companies: A strategy for implementation
    • Finch, B. (1986). Japanese management techniques in small manufacturing companies: a strategy for implementation. Production and inventory management, 27(3), 30-38.
    • (1986) Production and Inventory Management , vol.27 , Issue.3 , pp. 30-38
    • Finch, B.1
  • 14
    • 21844504189 scopus 로고
    • Relationship between JIT and TQM: Practices and performance
    • Flynn, B. B., Sakakibara, S., & Schroeder, R. G. (1995). Relationship between JIT and TQM: practices and performance. Academy of management Journal,38(5), 1325-1360.
    • (1995) Academy of Management Journal , vol.38 , Issue.5 , pp. 1325-1360
    • Flynn, B.B.1    Sakakibara, S.2    Schroeder, R.G.3
  • 15
    • 0036837161 scopus 로고    scopus 로고
    • The role of performance measures and incentive systems in relation to the degree of JIT implementation
    • Fullerton, R. R., & McWatters, C. S. (2002). The role of performance measures and incentive systems in relation to the degree of JIT implementation. Accounting, Organizations and Society, 27(8), 711-735.
    • (2002) Accounting, Organizations and Society , vol.27 , Issue.8 , pp. 711-735
    • Fullerton, R.R.1    McWatters, C.S.2
  • 17
    • 0034691907 scopus 로고    scopus 로고
    • Determination of the number of containers, production Kanbans and withdrawal Kanbans; and scheduling in kanban flowshops-Part 2
    • Hemamalini, B., & Rajendran, C. (2000). Determination of the number of containers, production Kanbans and withdrawal Kanbans; and scheduling in kanban flowshops-Part 2. International Journal of Production Research, 38(11), 2549-2572.
    • (2000) International Journal of Production Research , vol.38 , Issue.11 , pp. 2549-2572
    • Hemamalini, B.1    Rajendran, C.2
  • 18
    • 0033904015 scopus 로고    scopus 로고
    • The Kanban assignment problem–A non-integral approach
    • Herer, Y. T., & Shalom, L. (2000). The Kanban assignment problem–A non-integral approach. European Journal of Operational Research, 120(2), 260-276.
    • (2000) European Journal of Operational Research , vol.120 , Issue.2 , pp. 260-276
    • Herer, Y.T.1    Shalom, L.2
  • 20
    • 84989486136 scopus 로고
    • A simulation analysis of Japanese Just In Time technique with Kanban for multi line multi stage production system
    • Huang, P. Y., Rees, L. P., & Taylor, B. W. (1983) A simulation analysis of Japanese Just In Time technique with Kanban for multi line multi stage production system. Decision Sciences, 14(3), 326-344.
    • (1983) Decision Sciences , vol.14 , Issue.3 , pp. 326-344
    • Huang, P.Y.1    Rees, L.P.2    Taylor, B.W.3
  • 21
    • 0031284208 scopus 로고    scopus 로고
    • An example of simulation optimisation using a neural network metamodel: Finding the optimum number of Kanbans in a manufacturing system
    • Hurrion, R. D. (1997). An example of simulation optimisation using a neural network metamodel: finding the optimum number of Kanbans in a manufacturing system. Journal of the Operational Research Society, 48(11), 1105-1112.
    • (1997) Journal of the Operational Research Society , vol.48 , Issue.11 , pp. 1105-1112
    • Hurrion, R.D.1
  • 23
    • 0037061513 scopus 로고    scopus 로고
    • An optimal batch size for a JIT manufacturing system
    • Khan, L. R., & Sarker, R. A. (2002). An optimal batch size for a JIT manufacturing system. Computers & Industrial Engineering, 42(2), 127-136.
    • (2002) Computers & Industrial Engineering , vol.42 , Issue.2 , pp. 127-136
    • Khan, L.R.1    Sarker, R.A.2
  • 24
    • 84952179325 scopus 로고
    • Desiǵn and analysis of Pull System, a method of multi-staǵe production control
    • Kimura, O., & Terada, H. (1981). Desiǵn and analysis of Pull System, a method of multi-staǵe production control. The International Journal Of Production Research, 19(3), 241-253.
    • (1981) The International Journal of Production Research , vol.19 , Issue.3 , pp. 241-253
    • Kimura, O.1    Terada, H.2
  • 25
    • 0036643308 scopus 로고    scopus 로고
    • A decomposition method for multi-product kanban systems with setup times and lost sales
    • Krieg, G. N., & Kuhn, H. (2002). A decomposition method for multi-product kanban systems with setup times and lost sales. IIE Transactions, 34(7), 613-625.
    • (2002) IIE Transactions , vol.34 , Issue.7 , pp. 613-625
    • Krieg, G.N.1    Kuhn, H.2
  • 27
    • 0032156317 scopus 로고    scopus 로고
    • A rule induction approach for determining the number of Kanbans in a just-in-time production system
    • Markham, I. S., Mathieu, R. G., & Wray, B. A. (1998). A rule induction approach for determining the number of Kanbans in a just-in-time production system. Computers & industrial engineering, 34(4), 717-727.
    • (1998) Computers & Industrial Engineering , vol.34 , Issue.4 , pp. 717-727
    • Markham, I.S.1    Mathieu, R.G.2    Wray, B.A.3
  • 28
    • 18344412081 scopus 로고    scopus 로고
    • Multiple-supplier inventory models in supply chain management: A review
    • Minner, S. (2003). Multiple-supplier inventory models in supply chain management: A review. International Journal of Production Economics, 81, 265-279.
    • (2003) International Journal of Production Economics , vol.81 , pp. 265-279
    • Minner, S.1
  • 30
    • 0031641970 scopus 로고    scopus 로고
    • Optimum number of Kanbans between two adjacent stations
    • Nori, V. S., & Sarker, B. R. (1998). Optimum number of Kanbans between two adjacent stations. Production Planning & Control, 9(1), 60-65.
    • (1998) Production Planning & Control , vol.9 , Issue.1 , pp. 60-65
    • Nori, V.S.1    Sarker, B.R.2
  • 31
  • 32
    • 0037431950 scopus 로고    scopus 로고
    • Exploring the utilization of a CONWIP system for supply chain management. A comparison with fully integrated supply chains
    • Ovalle, O. R., & Marquez, A. C. (2003). Exploring the utilization of a CONWIP system for supply chain management. A comparison with fully integrated supply chains. International Journal of Production Economics, 83(2), 195-215.
    • (2003) International Journal of Production Economics , vol.83 , Issue.2 , pp. 195-215
    • Ovalle, O.R.1    Marquez, A.C.2
  • 34
    • 0023310442 scopus 로고
    • An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with Kanbans
    • Philipoom, P. R., Rees, L. P., TAYLOR III, B. W., & Huang, P. Y. (1987). An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with Kanbans. International Journal of Production Research, 25(3), 457-472.
    • (1987) International Journal of Production Research , vol.25 , Issue.3 , pp. 457-472
    • Philipoom, P.R.1    Rees, L.P.2    Taylor Iii, B.W.3    Huang, P.Y.4
  • 35
    • 0033099220 scopus 로고    scopus 로고
    • Formations and heuristics for scheduling in kanban flow shop to minimize the sum of weighted flowtime, weighted tardiness and weighted earliness of containers
    • Rajendran, C. (1999). Formations and heuristics for scheduling in kanban flow shop to minimize the sum of weighted flowtime, weighted tardiness and weighted earliness of containers. International Journal of Production Research, 37(5), 1137–1158
    • (1999) International Journal of Production Research , vol.37 , Issue.5 , pp. 1137-1158
    • Rajendran, C.1
  • 36
    • 0030269796 scopus 로고    scopus 로고
    • Operations planning for Kanbans between two adjacent workstations
    • Sarker, B. R., & Balan, C. V. (1996). Operations planning for Kanbans between two adjacent workstations. Computers & industrial engineering, 31(1), 221-224.
    • (1996) Computers & Industrial Engineering , vol.31 , Issue.1 , pp. 221-224
    • Sarker, B.R.1    Balan, C.V.2
  • 37
  • 39
    • 0031332898 scopus 로고    scopus 로고
    • Heuristics for scheduling in a Kanban system with dual blocking mechanisms
    • Sharadapriyadarshini, B., & Rajendran, C. (1997). Heuristics for scheduling in a Kanban system with dual blocking mechanisms. European journal of operational research, 103(3), 439-452.
    • (1997) European Journal of Operational Research , vol.103 , Issue.3 , pp. 439-452
    • Sharadapriyadarshini, B.1    Rajendran, C.2
  • 42
    • 0030869876 scopus 로고    scopus 로고
    • Optimal buffer allocation strategy for minimizing work-in-process inventory in unpaced production lines
    • So, K. C. (1997). Optimal buffer allocation strategy for minimizing work-in-process inventory in unpaced production lines. IIE transactions, 29(1), 81-88.
    • (1997) IIE Transactions , vol.29 , Issue.1 , pp. 81-88
    • So, K.C.1
  • 43
    • 0017557653 scopus 로고
    • Toyota production system and kanban system materialization of just-in-time and respect-for-human system
    • Sugimori, Y., Kusunoki, K., Cho, F., & Uchikawa, S. (1977). Toyota production system and kanban system materialization of just-in-time and respect-for-human system. The International Journal of Production Research, 15(6), 553-564.
    • (1977) The International Journal of Production Research , vol.15 , Issue.6 , pp. 553-564
    • Sugimori, Y.1    Kusunoki, K.2    Cho, F.3    Uchikawa, S.4
  • 46
    • 0034135524 scopus 로고    scopus 로고
    • Pull type manufacturing system with multiple product types
    • Tayfur A., & Goang, A. S. (2000) Pull type manufacturing system with multiple product types. IIE Trans, 32, 115–124.
    • (2000) IIE Trans , vol.32 , pp. 115-124
    • Tayfur, A.1    Goang, A.S.2
  • 47
    • 0024731874 scopus 로고
    • A review of the dual resource constrained system research
    • Treleven, M. (1989). A review of the dual resource constrained system research. IIE Transactions, 21(3), 279-287.
    • (1989) IIE Transactions , vol.21 , Issue.3 , pp. 279-287
    • Treleven, M.1
  • 48
    • 0036721778 scopus 로고    scopus 로고
    • An evolutionary algorithm for optimizing material flow in supply chains
    • Vergara, F. E., Khouja, M., & Michalewicz, Z. (2002). An evolutionary algorithm for optimizing material flow in supply chains. Computers & Industrial Engineering, 43(3), 407-421.
    • (2002) Computers & Industrial Engineering , vol.43 , Issue.3 , pp. 407-421
    • Vergara, F.E.1    Khouja, M.2    Michalewicz, Z.3
  • 49
    • 0024108248 scopus 로고
    • Increasing the production rate of a just-in-time production system with variable operation times
    • Villeda, R., Dudek, R., & Smith, M. L. (1988). Increasing the production rate of a just-in-time production system with variable operation times. The International Journal Of Production Research, 26(11), 1749-1768.
    • (1988) The International Journal of Production Research , vol.26 , Issue.11 , pp. 1749-1768
    • Villeda, R.1    Dudek, R.2    Smith, M.L.3
  • 52
    • 0030818944 scopus 로고    scopus 로고
    • Algorithms for sequencing mixed models on an assembly line in a JIT production system
    • Xiaobo, Z., & Ohno, K. (1997). Algorithms for sequencing mixed models on an assembly line in a JIT production system. Computers & Industrial Engineering,32(1), 47-56.
    • (1997) Computers & Industrial Engineering , vol.32 , Issue.1 , pp. 47-56
    • Xiaobo, Z.1    Ohno, K.2
  • 53
    • 0012706318 scopus 로고    scopus 로고
    • Managing a flow line with single-Kanban, dual-Kanban or Conwip
    • Yang, K.K. (2000) Managing a flow line with single-Kanban, dual-Kanban or Conwip. Production and Operations Management, 9(4), 349-366.
    • (2000) Production and Operations Management , vol.9 , Issue.4 , pp. 349-366
    • Yang, K.K.1
  • 54
    • 0001071723 scopus 로고
    • A kanban-based simulation study of a mixed model just-in-time manufacturing line
    • Yavuz, I. H., & Satir, A. (1995). A kanban-based simulation study of a mixed model just-in-time manufacturing line. International Journal of Production Research, 33(4), 1027–1048
    • (1995) International Journal of Production Research , vol.33 , Issue.4 , pp. 1027-1048
    • Yavuz, I.H.1    Satir, A.2
  • 55
    • 0032675529 scopus 로고    scopus 로고
    • Transient behavior of single stage kanban system based on the queuing model
    • Yoichi, S., & Naoto, H. (1999). Transient behavior of single stage kanban system based on the queuing model. International Journal of Production Economics, 60-61, 369–374.
    • (1999) International Journal of Production Economics , vol.60-61 , pp. 369-374
    • Yoichi, S.1    Naoto, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.