-
2
-
-
0031095866
-
A comparison of production-line control mechanisms
-
Bonvik, A. M., Couch, C.E., & Gershwin, S.B. (1997). A comparison of production-line control mechanisms. International Journal of Production Research, 25, 789-804.
-
(1997)
International Journal of Production Research
, vol.25
, pp. 789-804
-
-
Bonvik, A.M.1
Couch, C.E.2
Gershwin, S.B.3
-
3
-
-
12244251452
-
A mixed integer programming model for a two line CONWIP-based production and assembly system
-
Cao, D., & Chen, M. (2005). A mixed integer programming model for a two line CONWIP-based production and assembly system. International Journal of Production Economics, 95, 317-326.
-
(2005)
International Journal of Production Economics
, vol.95
, pp. 317-326
-
-
Cao, D.1
Chen, M.2
-
5
-
-
0028457112
-
Estimating the throughput of a cyclic assembly system
-
Duenyas, I. (1994). Estimating the throughput of a cyclic assembly system. International Journal of Production Research, 32, 1403-1419.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 1403-1419
-
-
Duenyas, I.1
-
6
-
-
0033874529
-
Performance evaluation and design of a CONWIP system with inspections
-
Duri, C., Frein, Y., & Lee, H.-S. (2000). Performance evaluation and design of a CONWIP system with inspections. International Journal of Production Economics, 64, 219-229.
-
(2000)
International Journal of Production Economics
, vol.64
, pp. 219-229
-
-
Duri, C.1
Frein, Y.2
Lee, H.-S.3
-
7
-
-
0035883114
-
Sequencing CONWIP flow-shops: Analysis and heuristics
-
Framinan, J. M., Ruiz-Usano, R., & Leisten, R. (2001). Sequencing CONWIP flow-shops: analysis and heuristics. International Journal of Production Research, 39, 2735-2749.
-
(2001)
International Journal of Production Research
, vol.39
, pp. 2735-2749
-
-
Framinan, J.M.1
Ruiz-Usano, R.2
Leisten, R.3
-
8
-
-
10744220621
-
The CONWIP production control system: Review and research issues
-
Framinan, J.M., Gonzàlez, P.L., & Ruiz-Usano, R. (2003). The CONWIP production control system: review and research issues. Production Planning & Control, 14, 255-265.
-
(2003)
Production Planning & Control
, vol.14
, pp. 255-265
-
-
Framinan, J.M.1
Gonzàlez, P.L.2
Ruiz-Usano, R.3
-
9
-
-
27644567330
-
Dynamic card controlling in a Conwip system
-
Framinan, J.M., Gonzàlez, P.L., & Ruiz-Usano, R. (2006). Dynamic card controlling in a Conwip system. International Journal of Production Economics, 99, 102-116.
-
(2006)
International Journal of Production Economics
, vol.99
, pp. 102-116
-
-
Framinan, J.M.1
Gonzàlez, P.L.2
Ruiz-Usano, R.3
-
10
-
-
0031345119
-
Measurable improvements in cycle-timeconstrained capacity
-
San Francisco, USA
-
Fowler, J.W., Brown, S., Gold, H., & Schoemig A. (1997). Measurable improvements in cycle-timeconstrained capacity, Proceedings of the 6th International Symposium on Semiconductor Manufacturing (ISSM), San Francisco, USA.
-
(1997)
Proceedings of the 6th International Symposium On Semiconductor Manufacturing (ISSM)
-
-
Fowler, J.W.1
Brown, S.2
Gold, H.3
Schoemig, A.4
-
11
-
-
0033362571
-
Controlling shop floor operations in a multi-family, multicell manufacturing environment through constant work-in-process
-
Golany, B., Dar-El, E., & Zeev, N. (1999). Controlling shop floor operations in a multi-family, multicell manufacturing environment through constant work-in-process. IIE Transactions, 31, 771-781.
-
(1999)
IIE Transactions
, vol.31
, pp. 771-781
-
-
Golany, B.1
Dar-El, E.2
Zeev, N.3
-
12
-
-
0026119502
-
Throughput of a constant work in process manufacturing line subject to failures
-
Hopp, W. J., & Spearman, M. L. (1991). Throughput of a constant work in process manufacturing line subject to failures. International Journal of Production Research, 29, 635-655.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 635-655
-
-
Hopp, W.J.1
Spearman, M.L.2
-
13
-
-
0032046661
-
Setting WIP level with statistical throughput control (STC) in CONWIP production lines
-
Hopp, W.J., & Roof, M.L. (1998). Setting WIP level with statistical throughput control (STC) in CONWIP production lines. International Journal of Production Research, 36, 867-882.
-
(1998)
International Journal of Production Research
, vol.36
, pp. 867-882
-
-
Hopp, W.J.1
Roof, M.L.2
-
15
-
-
0032069604
-
Simulation study of CONWIP for a cold rolling plant
-
Huang, M., Wang, D., & Ip, W.H. (1998). Simulation study of CONWIP for a cold rolling plant. International Journal of Production Economics, 54, 257-266.
-
(1998)
International Journal of Production Economics
, vol.54
, pp. 257-266
-
-
Huang, M.1
Wang, D.2
Ip, W.H.3
-
16
-
-
74449083649
-
A comparative study of pull control mechanisms for unreliable homogenous transfer lines
-
Lavoie, P., Gharbi, A., & Kenné, J.-P. (2010). A comparative study of pull control mechanisms for unreliable homogenous transfer lines. International Journal of Production Economics, 124, 241-251.
-
(2010)
International Journal of Production Economics
, vol.124
, pp. 241-251
-
-
Lavoie, P.1
Gharbi, A.2
Kenné, J.-P.3
-
17
-
-
77955308469
-
Optimization of a multi-Constant Work-in-Process semiconductor assembly and test factory based on performance evaluation
-
Li, N., Yao, S., Liu, G., & Zhuang, C. (2010). Optimization of a multi-Constant Work-in-Process semiconductor assembly and test factory based on performance evaluation. Computers & Industrial Engineering, 59, 314-322.
-
(2010)
Computers & Industrial Engineering
, vol.59
, pp. 314-322
-
-
Li, N.1
Yao, S.2
Liu, G.3
Zhuang, C.4
-
18
-
-
0030655879
-
Near-optimal scheduling of manufacturing systems with presence of batch machines and setup requirements
-
Luhl, P.B., Wangl, J.H., Wangl, J.L., & Tomastikz, R.N. (1997). Near-optimal scheduling of manufacturing systems with presence of batch machines and setup requirements. Annals of the CIRP, 46, 397-402.
-
(1997)
Annals of the CIRP
, vol.46
, pp. 397-402
-
-
Luhl, P.B.1
Wangl, J.H.2
Wangl, J.L.3
Tomastikz, R.N.4
-
19
-
-
77953960509
-
An effective hybrid multi-objective genetic algorithm for bi-criteria scheduling on a single batch processing machine with non-identical job sizes
-
Kashan, A.H., Karimi, B., & Jolai, F. (2010). An effective hybrid multi-objective genetic algorithm for bi-criteria scheduling on a single batch processing machine with non-identical job sizes. Engineering Applications of Artificial Intelligence, 23, 911-922.
-
(2010)
Engineering Applications of Artificial Intelligence
, vol.23
, pp. 911-922
-
-
Kashan, A.H.1
Karimi, B.2
Jolai, F.3
-
20
-
-
0031705292
-
A simulation study on lot release control, mask scheduling, and batch scheduling in semiconductor wafer fabrication facilities
-
Kim, Y.D., Lee, D.H., Kim, J.U., & Roh, H.K. (1998). A simulation study on lot release control, mask scheduling, and batch scheduling in semiconductor wafer fabrication facilities. Journal of Manufacturing Systems, 17, 107-117.
-
(1998)
Journal of Manufacturing Systems
, vol.17
, pp. 107-117
-
-
Kim, Y.D.1
Lee, D.H.2
Kim, J.U.3
Roh, H.K.4
-
21
-
-
31744446040
-
Machine learning techniques for scheduling jobs with incompatible families and unequal ready times on parallel batch machines
-
Monch, L., Zimmermann, J., & Otto, P. (2006). Machine learning techniques for scheduling jobs with incompatible families and unequal ready times on parallel batch machines. Engineering Applications of Artificial Intelligence, 19, 235-245.
-
(2006)
Engineering Applications of Artificial Intelligence
, vol.19
, pp. 235-245
-
-
Monch, L.1
Zimmermann, J.2
Otto, P.3
-
22
-
-
13844256873
-
Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times
-
Monch, L., Balasubramanian, H., Fowler, J.W., & Pfund, M.E. (2005). Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times. Computers & Operations Research, 32, 2731-2750.
-
(2005)
Computers & Operations Research
, vol.32
, pp. 2731-2750
-
-
Monch, L.1
Balasubramanian, H.2
Fowler, J.W.3
Pfund, M.E.4
-
23
-
-
0034311102
-
Control of manufacturing networks which contain a batch processing machine
-
Neale, J.J., & Duenyas, I. (2000). Control of manufacturing networks which contain a batch processing machine. IIE Transactions, 32, 1027-1041.
-
(2000)
IIE Transactions
, vol.32
, pp. 1027-1041
-
-
Neale, J.J.1
Duenyas, I.2
-
24
-
-
0034135515
-
Determining inventory levels in a CONWIP controlled job shop
-
Ryan, M., Baynat, B., & Choodineh, F. (2000). Determining inventory levels in a CONWIP controlled job shop. IIE Transactions, 32, 105-114.
-
(2000)
IIE Transactions
, vol.32
, pp. 105-114
-
-
Ryan, M.1
Baynat, B.2
Choodineh, F.3
-
25
-
-
56049116738
-
Selection of a pull production control policy under different demand situations for a manufacturing system by AHP-algorithm
-
Sharmaa, S., & Agrawalb, N. (2009). Selection of a pull production control policy under different demand situations for a manufacturing system by AHP-algorithm. Computers & Operations Research, 36, 1622-1632.
-
(2009)
Computers & Operations Research
, vol.36
, pp. 1622-1632
-
-
Sharmaa, S.1
Agrawalb, N.2
-
26
-
-
0025430443
-
CONWIP: A pull alternative to kanban
-
Spearman, M. L., Woodruff, D. L., & Hopp, W. J. (1990). CONWIP: A pull alternative to kanban. International Journal of Production Research, 28, 879-894.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 879-894
-
-
Spearman, M.L.1
Woodruff, D.L.2
Hopp, W.J.3
-
28
-
-
0040675382
-
Production Scheduling of a MEMS Manufacturing System with a Wafer Bonding Process
-
Tay, F., Lee, L.H., & Wang, L. (2002). Production Scheduling of a MEMS Manufacturing System with a Wafer Bonding Process. Journal of Manufacturing Systems, 21, 287-301.
-
(2002)
Journal of Manufacturing Systems
, vol.21
, pp. 287-301
-
-
Tay, F.1
Lee, L.H.2
Wang, L.3
-
29
-
-
33846932977
-
An evolutionary-simulation approachfor the optimization of multi-constant work-in-process strategy-A case study
-
Yang, T., Fub, H.P., & Yang, K.Y. (2007). An evolutionary-simulation approachfor the optimization of multi-constant work-in-process strategy-A case study. International Journal of Production Economics, 107, 104-114.
-
(2007)
International Journal of Production Economics
, vol.107
, pp. 104-114
-
-
Yang, T.1
Fub, H.P.2
Yang, K.Y.3
|