메뉴 건너뛰기




Volumn 51, Issue , 2015, Pages 100-114

Simulation optimization approach for hybrid flow shop scheduling problem in semiconductor back-end manufacturing

Author keywords

Genetic algorithm; Hybrid flow shop scheduling; Optimal computing budget allocation; Semiconductor back end manufacturing; Simulation optimization

Indexed keywords

BUDGET CONTROL; COMPUTER SIMULATION; GENETIC ALGORITHMS; MACHINE SHOP PRACTICE; MANUFACTURE; STOCHASTIC SYSTEMS;

EID: 84919643394     PISSN: 1569190X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.simpat.2014.10.008     Document Type: Article
Times cited : (108)

References (54)
  • 1
    • 84880916230 scopus 로고    scopus 로고
    • A metaheuristic optimization approach for a real-world stochastic flexible flow shop problem with limited buffer
    • C. Almeder, and R.F. Hartl A metaheuristic optimization approach for a real-world stochastic flexible flow shop problem with limited buffer Int. J. Prod. Econ. 145 1 2013 88 95
    • (2013) Int. J. Prod. Econ. , vol.145 , Issue.1 , pp. 88-95
    • Almeder, C.1    Hartl, R.F.2
  • 2
    • 24144434913 scopus 로고    scopus 로고
    • On-line scheduling to minimize max flow time: An optimal preemptive algorithm
    • C. Ambühl, and M. Mastrolilli On-line scheduling to minimize max flow time: an optimal preemptive algorithm Oper. Res. Lett. 33 6 2005 597 602
    • (2005) Oper. Res. Lett. , vol.33 , Issue.6 , pp. 597-602
    • Ambühl, C.1    Mastrolilli, M.2
  • 3
    • 79952698567 scopus 로고    scopus 로고
    • Evolutionary search for difficult problem instances to support the design of job shop dispatching rules
    • J. Branke, and C.W. Pickardt Evolutionary search for difficult problem instances to support the design of job shop dispatching rules Eur. J. Oper. Res. 212 1 2011 22 32
    • (2011) Eur. J. Oper. Res. , vol.212 , Issue.1 , pp. 22-32
    • Branke, J.1    Pickardt, C.W.2
  • 4
    • 27844476311 scopus 로고    scopus 로고
    • Anticipation and flexibility in dynamic scheduling
    • J. Branke, and D.C. Mattfeld Anticipation and flexibility in dynamic scheduling Int. J. Prod. Res. 43 15 2005 3103 3129
    • (2005) Int. J. Prod. Res. , vol.43 , Issue.15 , pp. 3103-3129
    • Branke, J.1    Mattfeld, D.C.2
  • 5
    • 38549097195 scopus 로고    scopus 로고
    • Selecting a selection procedure
    • J. Branke, S.E. Chick, and C. Schmidt Selecting a selection procedure Manage. Sci. 53 12 2007 1916 1932
    • (2007) Manage. Sci. , vol.53 , Issue.12 , pp. 1916-1932
    • Branke, J.1    Chick, S.E.2    Schmidt, C.3
  • 8
    • 79952443916 scopus 로고    scopus 로고
    • A genetic-based scheduler for multiproduct parallel machine sheet metal job shop
    • F.T.S. Chan, K.L. Choy, and Bibhushan A genetic-based scheduler for multiproduct parallel machine sheet metal job shop Expert Syst. Appl. 38 2011 8703 8715
    • (2011) Expert Syst. Appl. , vol.38 , pp. 8703-8715
    • Chan, F.T.S.1    Choy, K.L.2    Bibhushan3
  • 9
    • 67349093510 scopus 로고    scopus 로고
    • Minimizing total tardiness for the machine scheduling and worker assignment problems in identical parallel machines using genetic algorithms
    • I.A. Chaudhry, and P.R. Drake Minimizing total tardiness for the machine scheduling and worker assignment problems in identical parallel machines using genetic algorithms Int. J. Adv. Manuf. Technol. 42 2009 581 594
    • (2009) Int. J. Adv. Manuf. Technol. , vol.42 , pp. 581-594
    • Chaudhry, I.A.1    Drake, P.R.2
  • 10
    • 1642276895 scopus 로고    scopus 로고
    • Optimal computing budget allocation for Monte Carlo simulation with application to product design
    • C.H. Chen, K. Donohue, E. Yucesan, and J. Lin Optimal computing budget allocation for Monte Carlo simulation with application to product design Simul. Model. Pract. Theory 11 2003 57 74
    • (2003) Simul. Model. Pract. Theory , vol.11 , pp. 57-74
    • Chen, C.H.1    Donohue, K.2    Yucesan, E.3    Lin, J.4
  • 12
    • 0034225544 scopus 로고    scopus 로고
    • Simulation budget allocation for further enhancing the efficiency of ordinal optimization
    • C.H. Chen, J. Lin, E. Yucesan, and S.E. Chick Simulation budget allocation for further enhancing the efficiency of ordinal optimization Discrete Event Dyn. Syst. 10 2000 251 270
    • (2000) Discrete Event Dyn. Syst. , vol.10 , pp. 251-270
    • Chen, C.H.1    Lin, J.2    Yucesan, E.3    Chick, S.E.4
  • 13
    • 77955583778 scopus 로고    scopus 로고
    • Infinite capacity planning for IC packaging plants
    • J.C. Chen, L. Su, C. Sun, and M. Hsu Infinite capacity planning for IC packaging plants Int. J. Prod. Res. 48 19 2010 5729 5748
    • (2010) Int. J. Prod. Res. , vol.48 , Issue.19 , pp. 5729-5748
    • Chen, J.C.1    Su, L.2    Sun, C.3    Hsu, M.4
  • 15
    • 33846829848 scopus 로고    scopus 로고
    • An intelligent multi-constraint finite capacity-based lot release system for semiconductor backend assembly environment
    • T.J. Chua, M. Liu, F. Wang, W. Yan, and T. Cai An intelligent multi-constraint finite capacity-based lot release system for semiconductor backend assembly environment Robot. Comput.-Integrated Manuf. 23 2007 326 338
    • (2007) Robot. Comput.-Integrated Manuf. , vol.23 , pp. 326-338
    • Chua, T.J.1    Liu, M.2    Wang, F.3    Yan, W.4    Cai, T.5
  • 19
  • 20
    • 60749130231 scopus 로고    scopus 로고
    • Framework for execution level capacity allocation decisions for assembly - Test facility using integrated optimization - Simulation models
    • S. Jarugumilli, N. Keng, C. Dejong, R. Askin, J. Fowler, Framework for execution level capacity allocation decisions for assembly - test facility using integrated optimization - simulation models, in: Proceedings of the 2008 Winter Simulation Conference, 2008, pp. 2292-2297.
    • (2008) Proceedings of the 2008 Winter Simulation Conference , pp. 2292-2297
    • Jarugumilli, S.1    Keng, N.2    Dejong, C.3    Askin, R.4    Fowler, J.5
  • 21
    • 4944259808 scopus 로고    scopus 로고
    • A framework for reducing manufacturing throughput time
    • D.J. Johnson A framework for reducing manufacturing throughput time J. Manuf. Syst. 22 4 2003 283 298
    • (2003) J. Manuf. Syst. , vol.22 , Issue.4 , pp. 283-298
    • Johnson, D.J.1
  • 22
    • 84858040856 scopus 로고    scopus 로고
    • An optimization approach for parallel machine problems with dedication constraints: Combining simulation and capacity planning
    • A. Klemmt, G. Weigert, An optimization approach for parallel machine problems with dedication constraints: combining simulation and capacity planning, in: Proceedings of the Winter Simulation Conference. Winter Simulation Conference, 2011, pp. 1986-1998.
    • (2011) Proceedings of the Winter Simulation Conference. Winter Simulation Conference , pp. 1986-1998
    • Klemmt, A.1    Weigert, G.2
  • 23
    • 0035975715 scopus 로고    scopus 로고
    • A heuristic algorithm for minimizing mean flow time with unit setups
    • S.A. Kravchenko, and F. Werner A heuristic algorithm for minimizing mean flow time with unit setups Inform. Process. Lett. 79 6 2011 291 296
    • (2011) Inform. Process. Lett. , vol.79 , Issue.6 , pp. 291-296
    • Kravchenko, S.A.1    Werner, F.2
  • 24
    • 84877983594 scopus 로고    scopus 로고
    • A review of optimal computing budget allocation algorithms for simulation optimization problem
    • L.H. Lee, C.H. Chen, E.P. Chew, J. Li, and N.A. Pujowidianto A review of optimal computing budget allocation algorithms for simulation optimization problem Int. J. Oper. Res. 7 2 2010 19 31
    • (2010) Int. J. Oper. Res. , vol.7 , Issue.2 , pp. 19-31
    • Lee, L.H.1    Chen, C.H.2    Chew, E.P.3    Li, J.4    Pujowidianto, N.A.5
  • 25
    • 84883474716 scopus 로고    scopus 로고
    • Advances in simulation optimization and its applications
    • L.H. Lee, E.P. Chew, P.I. Frazier, Q.S. Jia, and C.H. Chen Advances in simulation optimization and its applications IIE Trans. 45 7 2013 683 684
    • (2013) IIE Trans. , vol.45 , Issue.7 , pp. 683-684
    • Lee, L.H.1    Chew, E.P.2    Frazier, P.I.3    Jia, Q.S.4    Chen, C.H.5
  • 26
    • 39649089567 scopus 로고    scopus 로고
    • Multi-objective simulation-based evolutionary algorithm for an aircraft spare parts allocation problem
    • L.H. Lee, E.P. Chew, S. Teng, and Y. Chen Multi-objective simulation-based evolutionary algorithm for an aircraft spare parts allocation problem Eur. J. Oper. Res. 189 2008 476 491
    • (2008) Eur. J. Oper. Res. , vol.189 , pp. 476-491
    • Lee, L.H.1    Chew, E.P.2    Teng, S.3    Chen, Y.4
  • 27
    • 72349093641 scopus 로고    scopus 로고
    • Simulation-based discrete optimization of stochastic discrete event systems subject to non closed-form constraints
    • J. Li, A. Sava, and X. Xie Simulation-based discrete optimization of stochastic discrete event systems subject to non closed-form constraints IEEE Trans. Autom. Control 54 12 2009 2900 2904
    • (2009) IEEE Trans. Autom. Control , vol.54 , Issue.12 , pp. 2900-2904
    • Li, J.1    Sava, A.2    Xie, X.3
  • 28
    • 84871765496 scopus 로고    scopus 로고
    • Multi-objective simulation optimization using data envelopment analysis and genetic algorithm: Specific application to determining optimal resource levels in surgical services
    • R.C. Lin, Y. Mustafa, and K.S. Pasupathy Multi-objective simulation optimization using data envelopment analysis and genetic algorithm: specific application to determining optimal resource levels in surgical services Omega 41 5 2013 881 892
    • (2013) Omega , vol.41 , Issue.5 , pp. 881-892
    • Lin, R.C.1    Mustafa, Y.2    Pasupathy, K.S.3
  • 29
    • 32144460524 scopus 로고    scopus 로고
    • Practical lot release methodology for semiconductor back-end manufacturing
    • W. Liu, T.J. Chua, T. Cai, and F.Y. Wang Practical lot release methodology for semiconductor back-end manufacturing Prod. Plan. Control 16 3 2005 297 308
    • (2005) Prod. Plan. Control , vol.16 , Issue.3 , pp. 297-308
    • Liu, W.1    Chua, T.J.2    Cai, T.3    Wang, F.Y.4
  • 30
    • 84855921402 scopus 로고    scopus 로고
    • A survey of problem, solution, and future challenges in scheduling semiconductor manufacturing operations
    • L. Monch, J.W. Fowler, S. Dauzere-Peres, S.J. Mason, and O. Rose A survey of problem, solution, and future challenges in scheduling semiconductor manufacturing operations J. Sched. 14 2011 583 599
    • (2011) J. Sched. , vol.14 , pp. 583-599
    • Monch, L.1    Fowler, J.W.2    Dauzere-Peres, S.3    Mason, S.J.4    Rose, O.5
  • 31
    • 27644553525 scopus 로고    scopus 로고
    • A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times
    • D. Nait Tahar, F. Yalaoui, C. Chu, and L. Amodeo A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times Int. J. Prod. Econ. 99 1 2006 63 73
    • (2006) Int. J. Prod. Econ. , vol.99 , Issue.1 , pp. 63-73
    • Nait Tahar, D.1    Yalaoui, F.2    Chu, C.3    Amodeo, L.4
  • 32
    • 65249132296 scopus 로고    scopus 로고
    • Scheduling integrated circuit assembly operations on die bonder
    • W.L. Pearn, S.H. Chung, and C.M. Lai Scheduling integrated circuit assembly operations on die bonder IEEE Trans. Electron. Packag. Manuf. 30 2 2007 97 105
    • (2007) IEEE Trans. Electron. Packag. Manuf. , vol.30 , Issue.2 , pp. 97-105
    • Pearn, W.L.1    Chung, S.H.2    Lai, C.M.3
  • 33
    • 33846337097 scopus 로고    scopus 로고
    • A multi-objective flow time control problem in multi-stage assembly systems using genetic algorithms
    • C. Perkgoz, A. Azaron, H. Katagiri, K. Kato, and M. Sakawa A multi-objective flow time control problem in multi-stage assembly systems using genetic algorithms Eur. J. Oper. Res. 180 2007 292 308
    • (2007) Eur. J. Oper. Res. , vol.180 , pp. 292-308
    • Perkgoz, C.1    Azaron, A.2    Katagiri, H.3    Kato, K.4    Sakawa, M.5
  • 34
    • 84880918018 scopus 로고    scopus 로고
    • Evolutionary generation of dispatching rule sets for complex dynamic scheduling problems
    • C.W. Pickardt, T. Hildebrandt, J. Branke, J. Heger, and B. Scholz-Reiter Evolutionary generation of dispatching rule sets for complex dynamic scheduling problems Int. J. Prod. Econ. 145 1 2013 67 77
    • (2013) Int. J. Prod. Econ. , vol.145 , Issue.1 , pp. 67-77
    • Pickardt, C.W.1    Hildebrandt, T.2    Branke, J.3    Heger, J.4    Scholz-Reiter, B.5
  • 36
    • 0036923814 scopus 로고    scopus 로고
    • Using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility
    • J. Potoradi, O.S. Boon, S.J. Mason, Using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility, in: Proceedings of 2002 Winter Simulation Conference, 2002, pp. 1857-1861.
    • (2002) Proceedings of 2002 Winter Simulation Conference , pp. 1857-1861
    • Potoradi, J.1    Boon, O.S.2    Mason, S.J.3
  • 38
    • 73449099561 scopus 로고    scopus 로고
    • Review and classification of hybrid flow shop scheduling problems from production system and a solutions procedure perspective
    • I. Ribas, R. Leisten, and J.M. Framinan Review and classification of hybrid flow shop scheduling problems from production system and a solutions procedure perspective Comput. Oper. Res. 37 2010 1439 1454
    • (2010) Comput. Oper. Res. , vol.37 , pp. 1439-1454
    • Ribas, I.1    Leisten, R.2    Framinan, J.M.3
  • 39
    • 34548625026 scopus 로고    scopus 로고
    • Modeling realistic hybrid flexible flowshop scheduling problems
    • R. Ruiz, F.S. Şerifoʇlu, and T. Urlings Modeling realistic hybrid flexible flowshop scheduling problems Comput. Oper. Res. 35 4 2008 1151 1175
    • (2008) Comput. Oper. Res. , vol.35 , Issue.4 , pp. 1151-1175
    • Ruiz, R.1    Şerifoʇlu, F.S.2    Urlings, T.3
  • 41
    • 33745783272 scopus 로고    scopus 로고
    • Integrating techniques from statistical ranking into evolutionary algorithms
    • Springer Berlin Heidelberg
    • C. Schmidt, J. Branke, and S.E. Chick Integrating techniques from statistical ranking into evolutionary algorithms Applications of Evolutionary Computing 2006 Springer Berlin Heidelberg 752 763
    • (2006) Applications of Evolutionary Computing , pp. 752-763
    • Schmidt, C.1    Branke, J.2    Chick, S.E.3
  • 42
    • 0012258315 scopus 로고    scopus 로고
    • Multiobjective dynamic scheduling using discrete event simulation
    • A.I. Sivakumar Multiobjective dynamic scheduling using discrete event simulation Int. J. Comput. Integrated Manuf. 14 2 2001 154 167
    • (2001) Int. J. Comput. Integrated Manuf. , vol.14 , Issue.2 , pp. 154-167
    • Sivakumar, A.I.1
  • 43
    • 33744470862 scopus 로고    scopus 로고
    • Online multiobjective Pareto optimal dynamic scheduling of semiconductor back-end using conjunctive simulated scheduling
    • A.I. Sivakumar, and A.K. Gupta Online multiobjective Pareto optimal dynamic scheduling of semiconductor back-end using conjunctive simulated scheduling IEEE Trans. Electron. Packaging Manuf. 29 2 2006 99 109
    • (2006) IEEE Trans. Electron. Packaging Manuf. , vol.29 , Issue.2 , pp. 99-109
    • Sivakumar, A.I.1    Gupta, A.K.2
  • 44
    • 79958810237 scopus 로고    scopus 로고
    • Multi-objective optimization algorithms for flow shop scheduling problem: A review and prospects
    • Y. Sun, C. Zhang, L. Gao, and X. Wang Multi-objective optimization algorithms for flow shop scheduling problem: a review and prospects Int. J. Adv. Manuf. Technol. 55 2011 723 739
    • (2011) Int. J. Adv. Manuf. Technol. , vol.55 , pp. 723-739
    • Sun, Y.1    Zhang, C.2    Gao, L.3    Wang, X.4
  • 46
    • 0042386739 scopus 로고    scopus 로고
    • Virtual production line design for back-end semiconductor manufacturing system
    • Y. Tang, M. Zhou, and R.G. Qiu Virtual production line design for back-end semiconductor manufacturing system IEEE Trans. Semicond. Manuf. 16 3 2003 543 550
    • (2003) IEEE Trans. Semicond. Manuf. , vol.16 , Issue.3 , pp. 543-550
    • Tang, Y.1    Zhou, M.2    Qiu, R.G.3
  • 47
    • 4744362915 scopus 로고    scopus 로고
    • Simulation optimization: A comprehensive review on theory and applications
    • E. Tekin, and I. Sabuncuoglu Simulation optimization: a comprehensive review on theory and applications IIE Trans. 36 2004 1067 1081
    • (2004) IIE Trans. , vol.36 , pp. 1067-1081
    • Tekin, E.1    Sabuncuoglu, I.2
  • 48
    • 79952187971 scopus 로고    scopus 로고
    • A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times
    • E. Vallada, and R. Ruiz A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times Eur. J. Oper. Res. 211 3 2011 612 622
    • (2011) Eur. J. Oper. Res. , vol.211 , Issue.3 , pp. 612-622
    • Vallada, E.1    Ruiz, R.2
  • 49
    • 84888643125 scopus 로고    scopus 로고
    • A new genetic algorithm for lot-streaming flow shop scheduling with limited capacity buffers
    • J.A. Ventura, and S.H. Yoon A new genetic algorithm for lot-streaming flow shop scheduling with limited capacity buffers J. Intell. Manuf. 24 6 2013 1185 1196
    • (2013) J. Intell. Manuf. , vol.24 , Issue.6 , pp. 1185-1196
    • Ventura, J.A.1    Yoon, S.H.2
  • 51
    • 66149083523 scopus 로고    scopus 로고
    • Design and validation of heuristic algorithms for simulation-based scheduling of a semiconductor Backend facility
    • G. Weigert, A. Klemmt, and S. Horn Design and validation of heuristic algorithms for simulation-based scheduling of a semiconductor Backend facility Int. J. Prod. Res. 47 8 2009 2165 2184
    • (2009) Int. J. Prod. Res. , vol.47 , Issue.8 , pp. 2165-2184
    • Weigert, G.1    Klemmt, A.2    Horn, S.3
  • 52
    • 84855924199 scopus 로고    scopus 로고
    • Heuristic algorithms for a practical-size dynamic parallel-machine scheduling problem: Integrated-circuit wire bonding
    • T. Yang, and Y.A. Shen Heuristic algorithms for a practical-size dynamic parallel-machine scheduling problem: integrated-circuit wire bonding Prod. Plan. Control 23 1 2012 67 78
    • (2012) Prod. Plan. Control , vol.23 , Issue.1 , pp. 67-78
    • Yang, T.1    Shen, Y.A.2
  • 54
    • 35348924466 scopus 로고    scopus 로고
    • Hierarchical capacity planning with reconfigurable kits in global semiconductor assembly and test manufacturing
    • M.T. Zhang, S. Niu, S. Deng, Z. Zhang, Q. Li, and L. Zheng Hierarchical capacity planning with reconfigurable kits in global semiconductor assembly and test manufacturing IEEE Trans. Autom. Sci. Eng. 4 4 2007 543 552
    • (2007) IEEE Trans. Autom. Sci. Eng. , vol.4 , Issue.4 , pp. 543-552
    • Zhang, M.T.1    Niu, S.2    Deng, S.3    Zhang, Z.4    Li, Q.5    Zheng, L.6


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.