-
1
-
-
84880916230
-
A metaheuristic optimization approach for a real-world stochastic flexible flow shop problem with limited buffer
-
C. Almeder, and R.F. Hartl A metaheuristic optimization approach for a real-world stochastic flexible flow shop problem with limited buffer Int. J. Prod. Econ. 145 1 2013 88 95
-
(2013)
Int. J. Prod. Econ.
, vol.145
, Issue.1
, pp. 88-95
-
-
Almeder, C.1
Hartl, R.F.2
-
2
-
-
24144434913
-
On-line scheduling to minimize max flow time: An optimal preemptive algorithm
-
C. Ambühl, and M. Mastrolilli On-line scheduling to minimize max flow time: an optimal preemptive algorithm Oper. Res. Lett. 33 6 2005 597 602
-
(2005)
Oper. Res. Lett.
, vol.33
, Issue.6
, pp. 597-602
-
-
Ambühl, C.1
Mastrolilli, M.2
-
3
-
-
79952698567
-
Evolutionary search for difficult problem instances to support the design of job shop dispatching rules
-
J. Branke, and C.W. Pickardt Evolutionary search for difficult problem instances to support the design of job shop dispatching rules Eur. J. Oper. Res. 212 1 2011 22 32
-
(2011)
Eur. J. Oper. Res.
, vol.212
, Issue.1
, pp. 22-32
-
-
Branke, J.1
Pickardt, C.W.2
-
4
-
-
27844476311
-
Anticipation and flexibility in dynamic scheduling
-
J. Branke, and D.C. Mattfeld Anticipation and flexibility in dynamic scheduling Int. J. Prod. Res. 43 15 2005 3103 3129
-
(2005)
Int. J. Prod. Res.
, vol.43
, Issue.15
, pp. 3103-3129
-
-
Branke, J.1
Mattfeld, D.C.2
-
5
-
-
38549097195
-
Selecting a selection procedure
-
J. Branke, S.E. Chick, and C. Schmidt Selecting a selection procedure Manage. Sci. 53 12 2007 1916 1932
-
(2007)
Manage. Sci.
, vol.53
, Issue.12
, pp. 1916-1932
-
-
Branke, J.1
Chick, S.E.2
Schmidt, C.3
-
7
-
-
80052016926
-
A genetic algorithm for robust hybrid flow shop scheduling
-
T. Chaari, S. Chaabane, T. Loukil, and D. Trentesaux A genetic algorithm for robust hybrid flow shop scheduling Int. J. Comput. Integr. Manuf. 24 9 2011 821 833
-
(2011)
Int. J. Comput. Integr. Manuf.
, vol.24
, Issue.9
, pp. 821-833
-
-
Chaari, T.1
Chaabane, S.2
Loukil, T.3
Trentesaux, D.4
-
8
-
-
79952443916
-
A genetic-based scheduler for multiproduct parallel machine sheet metal job shop
-
F.T.S. Chan, K.L. Choy, and Bibhushan A genetic-based scheduler for multiproduct parallel machine sheet metal job shop Expert Syst. Appl. 38 2011 8703 8715
-
(2011)
Expert Syst. Appl.
, vol.38
, pp. 8703-8715
-
-
Chan, F.T.S.1
Choy, K.L.2
Bibhushan3
-
9
-
-
67349093510
-
Minimizing total tardiness for the machine scheduling and worker assignment problems in identical parallel machines using genetic algorithms
-
I.A. Chaudhry, and P.R. Drake Minimizing total tardiness for the machine scheduling and worker assignment problems in identical parallel machines using genetic algorithms Int. J. Adv. Manuf. Technol. 42 2009 581 594
-
(2009)
Int. J. Adv. Manuf. Technol.
, vol.42
, pp. 581-594
-
-
Chaudhry, I.A.1
Drake, P.R.2
-
10
-
-
1642276895
-
Optimal computing budget allocation for Monte Carlo simulation with application to product design
-
C.H. Chen, K. Donohue, E. Yucesan, and J. Lin Optimal computing budget allocation for Monte Carlo simulation with application to product design Simul. Model. Pract. Theory 11 2003 57 74
-
(2003)
Simul. Model. Pract. Theory
, vol.11
, pp. 57-74
-
-
Chen, C.H.1
Donohue, K.2
Yucesan, E.3
Lin, J.4
-
12
-
-
0034225544
-
Simulation budget allocation for further enhancing the efficiency of ordinal optimization
-
C.H. Chen, J. Lin, E. Yucesan, and S.E. Chick Simulation budget allocation for further enhancing the efficiency of ordinal optimization Discrete Event Dyn. Syst. 10 2000 251 270
-
(2000)
Discrete Event Dyn. Syst.
, vol.10
, pp. 251-270
-
-
Chen, C.H.1
Lin, J.2
Yucesan, E.3
Chick, S.E.4
-
13
-
-
77955583778
-
Infinite capacity planning for IC packaging plants
-
J.C. Chen, L. Su, C. Sun, and M. Hsu Infinite capacity planning for IC packaging plants Int. J. Prod. Res. 48 19 2010 5729 5748
-
(2010)
Int. J. Prod. Res.
, vol.48
, Issue.19
, pp. 5729-5748
-
-
Chen, J.C.1
Su, L.2
Sun, C.3
Hsu, M.4
-
15
-
-
33846829848
-
An intelligent multi-constraint finite capacity-based lot release system for semiconductor backend assembly environment
-
T.J. Chua, M. Liu, F. Wang, W. Yan, and T. Cai An intelligent multi-constraint finite capacity-based lot release system for semiconductor backend assembly environment Robot. Comput.-Integrated Manuf. 23 2007 326 338
-
(2007)
Robot. Comput.-Integrated Manuf.
, vol.23
, pp. 326-338
-
-
Chua, T.J.1
Liu, M.2
Wang, F.3
Yan, W.4
Cai, T.5
-
17
-
-
79955653428
-
Batch production scheduling for semiconductor back-end operations
-
M. Fu, R. Askin, J. Fowler, M. Haghnevis, N. Keng, J.S. Pettinato, and M. Zhang Batch production scheduling for semiconductor back-end operations IEEE Trans. Semicond. Manuf. 24 2 2011 249 260
-
(2011)
IEEE Trans. Semicond. Manuf.
, vol.24
, Issue.2
, pp. 249-260
-
-
Fu, M.1
Askin, R.2
Fowler, J.3
Haghnevis, M.4
Keng, N.5
Pettinato, J.S.6
Zhang, M.7
-
20
-
-
60749130231
-
Framework for execution level capacity allocation decisions for assembly - Test facility using integrated optimization - Simulation models
-
S. Jarugumilli, N. Keng, C. Dejong, R. Askin, J. Fowler, Framework for execution level capacity allocation decisions for assembly - test facility using integrated optimization - simulation models, in: Proceedings of the 2008 Winter Simulation Conference, 2008, pp. 2292-2297.
-
(2008)
Proceedings of the 2008 Winter Simulation Conference
, pp. 2292-2297
-
-
Jarugumilli, S.1
Keng, N.2
Dejong, C.3
Askin, R.4
Fowler, J.5
-
21
-
-
4944259808
-
A framework for reducing manufacturing throughput time
-
D.J. Johnson A framework for reducing manufacturing throughput time J. Manuf. Syst. 22 4 2003 283 298
-
(2003)
J. Manuf. Syst.
, vol.22
, Issue.4
, pp. 283-298
-
-
Johnson, D.J.1
-
22
-
-
84858040856
-
An optimization approach for parallel machine problems with dedication constraints: Combining simulation and capacity planning
-
A. Klemmt, G. Weigert, An optimization approach for parallel machine problems with dedication constraints: combining simulation and capacity planning, in: Proceedings of the Winter Simulation Conference. Winter Simulation Conference, 2011, pp. 1986-1998.
-
(2011)
Proceedings of the Winter Simulation Conference. Winter Simulation Conference
, pp. 1986-1998
-
-
Klemmt, A.1
Weigert, G.2
-
23
-
-
0035975715
-
A heuristic algorithm for minimizing mean flow time with unit setups
-
S.A. Kravchenko, and F. Werner A heuristic algorithm for minimizing mean flow time with unit setups Inform. Process. Lett. 79 6 2011 291 296
-
(2011)
Inform. Process. Lett.
, vol.79
, Issue.6
, pp. 291-296
-
-
Kravchenko, S.A.1
Werner, F.2
-
24
-
-
84877983594
-
A review of optimal computing budget allocation algorithms for simulation optimization problem
-
L.H. Lee, C.H. Chen, E.P. Chew, J. Li, and N.A. Pujowidianto A review of optimal computing budget allocation algorithms for simulation optimization problem Int. J. Oper. Res. 7 2 2010 19 31
-
(2010)
Int. J. Oper. Res.
, vol.7
, Issue.2
, pp. 19-31
-
-
Lee, L.H.1
Chen, C.H.2
Chew, E.P.3
Li, J.4
Pujowidianto, N.A.5
-
25
-
-
84883474716
-
Advances in simulation optimization and its applications
-
L.H. Lee, E.P. Chew, P.I. Frazier, Q.S. Jia, and C.H. Chen Advances in simulation optimization and its applications IIE Trans. 45 7 2013 683 684
-
(2013)
IIE Trans.
, vol.45
, Issue.7
, pp. 683-684
-
-
Lee, L.H.1
Chew, E.P.2
Frazier, P.I.3
Jia, Q.S.4
Chen, C.H.5
-
26
-
-
39649089567
-
Multi-objective simulation-based evolutionary algorithm for an aircraft spare parts allocation problem
-
L.H. Lee, E.P. Chew, S. Teng, and Y. Chen Multi-objective simulation-based evolutionary algorithm for an aircraft spare parts allocation problem Eur. J. Oper. Res. 189 2008 476 491
-
(2008)
Eur. J. Oper. Res.
, vol.189
, pp. 476-491
-
-
Lee, L.H.1
Chew, E.P.2
Teng, S.3
Chen, Y.4
-
27
-
-
72349093641
-
Simulation-based discrete optimization of stochastic discrete event systems subject to non closed-form constraints
-
J. Li, A. Sava, and X. Xie Simulation-based discrete optimization of stochastic discrete event systems subject to non closed-form constraints IEEE Trans. Autom. Control 54 12 2009 2900 2904
-
(2009)
IEEE Trans. Autom. Control
, vol.54
, Issue.12
, pp. 2900-2904
-
-
Li, J.1
Sava, A.2
Xie, X.3
-
28
-
-
84871765496
-
Multi-objective simulation optimization using data envelopment analysis and genetic algorithm: Specific application to determining optimal resource levels in surgical services
-
R.C. Lin, Y. Mustafa, and K.S. Pasupathy Multi-objective simulation optimization using data envelopment analysis and genetic algorithm: specific application to determining optimal resource levels in surgical services Omega 41 5 2013 881 892
-
(2013)
Omega
, vol.41
, Issue.5
, pp. 881-892
-
-
Lin, R.C.1
Mustafa, Y.2
Pasupathy, K.S.3
-
29
-
-
32144460524
-
Practical lot release methodology for semiconductor back-end manufacturing
-
W. Liu, T.J. Chua, T. Cai, and F.Y. Wang Practical lot release methodology for semiconductor back-end manufacturing Prod. Plan. Control 16 3 2005 297 308
-
(2005)
Prod. Plan. Control
, vol.16
, Issue.3
, pp. 297-308
-
-
Liu, W.1
Chua, T.J.2
Cai, T.3
Wang, F.Y.4
-
30
-
-
84855921402
-
A survey of problem, solution, and future challenges in scheduling semiconductor manufacturing operations
-
L. Monch, J.W. Fowler, S. Dauzere-Peres, S.J. Mason, and O. Rose A survey of problem, solution, and future challenges in scheduling semiconductor manufacturing operations J. Sched. 14 2011 583 599
-
(2011)
J. Sched.
, vol.14
, pp. 583-599
-
-
Monch, L.1
Fowler, J.W.2
Dauzere-Peres, S.3
Mason, S.J.4
Rose, O.5
-
31
-
-
27644553525
-
A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times
-
D. Nait Tahar, F. Yalaoui, C. Chu, and L. Amodeo A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times Int. J. Prod. Econ. 99 1 2006 63 73
-
(2006)
Int. J. Prod. Econ.
, vol.99
, Issue.1
, pp. 63-73
-
-
Nait Tahar, D.1
Yalaoui, F.2
Chu, C.3
Amodeo, L.4
-
33
-
-
33846337097
-
A multi-objective flow time control problem in multi-stage assembly systems using genetic algorithms
-
C. Perkgoz, A. Azaron, H. Katagiri, K. Kato, and M. Sakawa A multi-objective flow time control problem in multi-stage assembly systems using genetic algorithms Eur. J. Oper. Res. 180 2007 292 308
-
(2007)
Eur. J. Oper. Res.
, vol.180
, pp. 292-308
-
-
Perkgoz, C.1
Azaron, A.2
Katagiri, H.3
Kato, K.4
Sakawa, M.5
-
34
-
-
84880918018
-
Evolutionary generation of dispatching rule sets for complex dynamic scheduling problems
-
C.W. Pickardt, T. Hildebrandt, J. Branke, J. Heger, and B. Scholz-Reiter Evolutionary generation of dispatching rule sets for complex dynamic scheduling problems Int. J. Prod. Econ. 145 1 2013 67 77
-
(2013)
Int. J. Prod. Econ.
, vol.145
, Issue.1
, pp. 67-77
-
-
Pickardt, C.W.1
Hildebrandt, T.2
Branke, J.3
Heger, J.4
Scholz-Reiter, B.5
-
36
-
-
0036923814
-
Using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility
-
J. Potoradi, O.S. Boon, S.J. Mason, Using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility, in: Proceedings of 2002 Winter Simulation Conference, 2002, pp. 1857-1861.
-
(2002)
Proceedings of 2002 Winter Simulation Conference
, pp. 1857-1861
-
-
Potoradi, J.1
Boon, O.S.2
Mason, S.J.3
-
38
-
-
73449099561
-
Review and classification of hybrid flow shop scheduling problems from production system and a solutions procedure perspective
-
I. Ribas, R. Leisten, and J.M. Framinan Review and classification of hybrid flow shop scheduling problems from production system and a solutions procedure perspective Comput. Oper. Res. 37 2010 1439 1454
-
(2010)
Comput. Oper. Res.
, vol.37
, pp. 1439-1454
-
-
Ribas, I.1
Leisten, R.2
Framinan, J.M.3
-
39
-
-
34548625026
-
Modeling realistic hybrid flexible flowshop scheduling problems
-
R. Ruiz, F.S. Şerifoʇlu, and T. Urlings Modeling realistic hybrid flexible flowshop scheduling problems Comput. Oper. Res. 35 4 2008 1151 1175
-
(2008)
Comput. Oper. Res.
, vol.35
, Issue.4
, pp. 1151-1175
-
-
Ruiz, R.1
Şerifoʇlu, F.S.2
Urlings, T.3
-
41
-
-
33745783272
-
Integrating techniques from statistical ranking into evolutionary algorithms
-
Springer Berlin Heidelberg
-
C. Schmidt, J. Branke, and S.E. Chick Integrating techniques from statistical ranking into evolutionary algorithms Applications of Evolutionary Computing 2006 Springer Berlin Heidelberg 752 763
-
(2006)
Applications of Evolutionary Computing
, pp. 752-763
-
-
Schmidt, C.1
Branke, J.2
Chick, S.E.3
-
42
-
-
0012258315
-
Multiobjective dynamic scheduling using discrete event simulation
-
A.I. Sivakumar Multiobjective dynamic scheduling using discrete event simulation Int. J. Comput. Integrated Manuf. 14 2 2001 154 167
-
(2001)
Int. J. Comput. Integrated Manuf.
, vol.14
, Issue.2
, pp. 154-167
-
-
Sivakumar, A.I.1
-
43
-
-
33744470862
-
Online multiobjective Pareto optimal dynamic scheduling of semiconductor back-end using conjunctive simulated scheduling
-
A.I. Sivakumar, and A.K. Gupta Online multiobjective Pareto optimal dynamic scheduling of semiconductor back-end using conjunctive simulated scheduling IEEE Trans. Electron. Packaging Manuf. 29 2 2006 99 109
-
(2006)
IEEE Trans. Electron. Packaging Manuf.
, vol.29
, Issue.2
, pp. 99-109
-
-
Sivakumar, A.I.1
Gupta, A.K.2
-
44
-
-
79958810237
-
Multi-objective optimization algorithms for flow shop scheduling problem: A review and prospects
-
Y. Sun, C. Zhang, L. Gao, and X. Wang Multi-objective optimization algorithms for flow shop scheduling problem: a review and prospects Int. J. Adv. Manuf. Technol. 55 2011 723 739
-
(2011)
Int. J. Adv. Manuf. Technol.
, vol.55
, pp. 723-739
-
-
Sun, Y.1
Zhang, C.2
Gao, L.3
Wang, X.4
-
45
-
-
45149098339
-
Multi-factory capacity planning in semiconductor assembly and test manufacturing with multiple-chip products
-
S. Sweat, S. Niu, M.T. Zhang, Z. Zhang, L. Zhang, Multi-factory capacity planning in semiconductor assembly and test manufacturing with multiple-chip products, in: IEEE International Conference on Automation Science and Engineering, 2006, pp. 247-252.
-
(2006)
IEEE International Conference on Automation Science and Engineering
, pp. 247-252
-
-
Sweat, S.1
Niu, S.2
Zhang, M.T.3
Zhang, Z.4
Zhang, L.5
-
46
-
-
0042386739
-
Virtual production line design for back-end semiconductor manufacturing system
-
Y. Tang, M. Zhou, and R.G. Qiu Virtual production line design for back-end semiconductor manufacturing system IEEE Trans. Semicond. Manuf. 16 3 2003 543 550
-
(2003)
IEEE Trans. Semicond. Manuf.
, vol.16
, Issue.3
, pp. 543-550
-
-
Tang, Y.1
Zhou, M.2
Qiu, R.G.3
-
47
-
-
4744362915
-
Simulation optimization: A comprehensive review on theory and applications
-
E. Tekin, and I. Sabuncuoglu Simulation optimization: a comprehensive review on theory and applications IIE Trans. 36 2004 1067 1081
-
(2004)
IIE Trans.
, vol.36
, pp. 1067-1081
-
-
Tekin, E.1
Sabuncuoglu, I.2
-
48
-
-
79952187971
-
A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times
-
E. Vallada, and R. Ruiz A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times Eur. J. Oper. Res. 211 3 2011 612 622
-
(2011)
Eur. J. Oper. Res.
, vol.211
, Issue.3
, pp. 612-622
-
-
Vallada, E.1
Ruiz, R.2
-
49
-
-
84888643125
-
A new genetic algorithm for lot-streaming flow shop scheduling with limited capacity buffers
-
J.A. Ventura, and S.H. Yoon A new genetic algorithm for lot-streaming flow shop scheduling with limited capacity buffers J. Intell. Manuf. 24 6 2013 1185 1196
-
(2013)
J. Intell. Manuf.
, vol.24
, Issue.6
, pp. 1185-1196
-
-
Ventura, J.A.1
Yoon, S.H.2
-
50
-
-
27844540569
-
An integrated modeling framework for capacity planning and production scheduling
-
F.Y. Wang, T.J. Chua, W. Liu, T. Cai, An integrated modeling framework for capacity planning and production scheduling, in: International Conference on Control and Automation, 2005, pp. 1137-1162.
-
(2005)
International Conference on Control and Automation
, pp. 1137-1162
-
-
Wang, F.Y.1
Chua, T.J.2
Liu, W.3
Cai, T.4
-
51
-
-
66149083523
-
Design and validation of heuristic algorithms for simulation-based scheduling of a semiconductor Backend facility
-
G. Weigert, A. Klemmt, and S. Horn Design and validation of heuristic algorithms for simulation-based scheduling of a semiconductor Backend facility Int. J. Prod. Res. 47 8 2009 2165 2184
-
(2009)
Int. J. Prod. Res.
, vol.47
, Issue.8
, pp. 2165-2184
-
-
Weigert, G.1
Klemmt, A.2
Horn, S.3
-
52
-
-
84855924199
-
Heuristic algorithms for a practical-size dynamic parallel-machine scheduling problem: Integrated-circuit wire bonding
-
T. Yang, and Y.A. Shen Heuristic algorithms for a practical-size dynamic parallel-machine scheduling problem: integrated-circuit wire bonding Prod. Plan. Control 23 1 2012 67 78
-
(2012)
Prod. Plan. Control
, vol.23
, Issue.1
, pp. 67-78
-
-
Yang, T.1
Shen, Y.A.2
-
53
-
-
9244239714
-
A rule base heuristic finite capacity scheduling system for semiconductor backend assembly
-
X.F. Yin, T.J. Chun, F.Y. Wang, M.W. Lin, T. Cai, W. Yang, C. Chong, J. Zhu, and M. Lam A rule base heuristic finite capacity scheduling system for semiconductor backend assembly Int. J. Comput. Integr. Manuf. 17 8 2004 733 749
-
(2004)
Int. J. Comput. Integr. Manuf.
, vol.17
, Issue.8
, pp. 733-749
-
-
Yin, X.F.1
Chun, T.J.2
Wang, F.Y.3
Lin, M.W.4
Cai, T.5
Yang, W.6
Chong, C.7
Zhu, J.8
Lam, M.9
-
54
-
-
35348924466
-
Hierarchical capacity planning with reconfigurable kits in global semiconductor assembly and test manufacturing
-
M.T. Zhang, S. Niu, S. Deng, Z. Zhang, Q. Li, and L. Zheng Hierarchical capacity planning with reconfigurable kits in global semiconductor assembly and test manufacturing IEEE Trans. Autom. Sci. Eng. 4 4 2007 543 552
-
(2007)
IEEE Trans. Autom. Sci. Eng.
, vol.4
, Issue.4
, pp. 543-552
-
-
Zhang, M.T.1
Niu, S.2
Deng, S.3
Zhang, Z.4
Li, Q.5
Zheng, L.6
|