-
3
-
-
0035400757
-
Cost minimization and workload balancing in printed circuit board assembly
-
HILLIER, M. S. and BRANDEAU, M. L., 2001, Cost minimization and workload balancing in printed circuit board assembly. IIE Transactions (Institute of Industrial Engineers), 33(7), 547-557.
-
(2001)
IIE Transactions (Institute of Industrial Engineers)
, vol.33
, Issue.7
, pp. 547-557
-
-
Hillier, M.S.1
Brandeau, M.L.2
-
4
-
-
0031621321
-
Genetic algorithm for scheduling flexible manufacturing systems
-
JAWAHAR, N., ARAVINDAN, P. and PONNAMBAIAM, S. G., 1999, Genetic algorithm for scheduling flexible manufacturing systems. International Journal of Advanced Manufacturing Technology, 14(8), 588-607.
-
(1999)
International Journal of Advanced Manufacturing Technology
, vol.14
, Issue.8
, pp. 588-607
-
-
Jawahar, N.1
Aravindan, P.2
Ponnambaiam, S.G.3
-
5
-
-
0033899254
-
A prototype genetic algorithm-enhanced multi-objective dynamic Scheduler for manufacturing systems
-
KHOO, L. P., LEE, S. G. and YIN, X. F., 2000, A prototype genetic algorithm-enhanced multi-objective dynamic Scheduler for manufacturing systems. International Journal of Advanced Manufacturing Technology, 16(2), 131-138.
-
(2000)
International Journal of Advanced Manufacturing Technology
, vol.16
, Issue.2
, pp. 131-138
-
-
Khoo, L.P.1
Lee, S.G.2
Yin, X.F.3
-
6
-
-
0031069104
-
Using multi-agent architecture in FMS for dynamic scheduling
-
KOUISS, K., PIERREVAL, H. and MEBARKI, N., 1997, Using multi-agent architecture in FMS for dynamic scheduling. Journal of Intelligent Manufacturing, 8, 41-47.
-
(1997)
Journal of Intelligent Manufacturing
, vol.8
, pp. 41-47
-
-
Kouiss, K.1
Pierreval, H.2
Mebarki, N.3
-
7
-
-
0032784020
-
Analysis of heuristics in a dynamic job shop with weighted tardiness objectives
-
KUTANOGLU, F,. and SABUNCUOGLU, I., 1999, Analysis of heuristics in a dynamic job shop with weighted tardiness objectives. International Journal of Production Research, 37(1), 165-187.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.1
, pp. 165-187
-
-
Kutanoglu, F.1
Sabuncuoglu, I.2
-
8
-
-
0033887808
-
Optimising an assembly line through simulation augmented by genetic algorithms
-
LEE, S. G., KHOO, L. P. and YIN, X. F., 2000, Optimising an assembly line through simulation augmented by genetic algorithms. International Journal of Advanced Manufacturing Technology, 16(3), 220-228.
-
(2000)
International Journal of Advanced Manufacturing Technology
, vol.16
, Issue.3
, pp. 220-228
-
-
Lee, S.G.1
Khoo, L.P.2
Yin, X.F.3
-
9
-
-
0035519388
-
Parallel machine scheduling problems: A survey
-
MOKOTOFF, E., 2001, Parallel machine scheduling problems: a survey. Asia-pacific Journal of Operational Research, 18(2). 193-242.
-
(2001)
Asia-pacific Journal of Operational Research
, vol.18
, Issue.2
, pp. 193-242
-
-
Mokotoff, E.1
-
11
-
-
0030241443
-
Genetic algorithms for flowshop scheduling problems
-
MURATA, T., ISHIBUCHI, H. and TANAKA, H., 1996, Genetic algorithms for flowshop scheduling problems. Computers & Industrial Engineering, 30(4), 1061-1071.
-
(1996)
Computers & Industrial Engineering
, vol.30
, Issue.4
, pp. 1061-1071
-
-
Murata, T.1
Ishibuchi, H.2
Tanaka, H.3
-
13
-
-
0023437076
-
Comparative analysis of the CONVERT job sequencing rule using various shop performance measures
-
RUSSELL, R. S., DAR-EL, E. M. and TAYLOR, B. W., III, 1987, Comparative analysis of the CONVERT job sequencing rule using various shop performance measures. International Journal of Production Research, 25(10), 1523-1528.
-
(1987)
International Journal of Production Research
, vol.25
, Issue.10
, pp. 1523-1528
-
-
Russell, R.S.1
Dar-El, E.M.2
Taylor III, B.W.3
-
14
-
-
1042303029
-
Use of flowlines to simplify routing complexity in two-stage flowshops
-
VAIRAKTARAKIS, G. and ELHAFSI, M., 2000, Use of flowlines to simplify routing complexity in two-stage flowshops. IIE Transactions (Institute of Industrial Engineers), 32(8), 687-699.
-
(2000)
IIE Transactions (Institute of Industrial Engineers)
, vol.32
, Issue.8
, pp. 687-699
-
-
Vairaktarakis, G.1
Elhafsi, M.2
|