|
Volumn 2, Issue , 2002, Pages 1857-1861
|
Using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility
|
Author keywords
[No Author keywords available]
|
Indexed keywords
COMPUTER SIMULATION;
CONTROL SYSTEM ANALYSIS;
PRODUCT DEVELOPMENT;
SCHEDULING;
WIRE-BOND MACHINES;
SEMICONDUCTOR DEVICE MANUFACTURE;
|
EID: 0036923814
PISSN: 02750708
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (39)
|
References (4)
|