-
1
-
-
79958830794
-
Current progress in evolutionary algorithm based multi-objective production scheduling
-
(in Chinese)
-
RF Shi 2008 Current progress in evolutionary algorithm based multi-objective production scheduling Journal of Jishou University (Natural Science Edition) 29 6 42 46 (in Chinese)
-
(2008)
Journal of Jishou University (Natural Science Edition)
, vol.29
, Issue.6
, pp. 42-46
-
-
Shi, R.F.1
-
2
-
-
0029254827
-
Mutiple and bi-criteria scheduling: A literature survey
-
0913.90178
-
A Nagar SS Heragu J Haddock 1995 Mutiple and bi-criteria scheduling: a literature survey Eur J Oper Res 81 88 104 0913.90178
-
(1995)
Eur J Oper Res
, vol.81
, pp. 88-104
-
-
Nagar, A.1
Heragu, S.S.2
Haddock, J.3
-
3
-
-
0035314562
-
Multicriteria scheduling problems: A survey
-
1868867 1014.90046
-
V T'kindt JC Billaut 2001 Multicriteria scheduling problems: a survey Rairo Oper Res 35 143 163 1868867 1014.90046
-
(2001)
Rairo Oper Res
, vol.35
, pp. 143-163
-
-
T'Kindt, V.1
Billaut, J.C.2
-
4
-
-
0037116761
-
Multiobjective metaheuristics: An overview of the current state-of-the-art
-
1002.90060
-
DF Jones SK Mirrazavi M Tamiz 2002 Multiobjective metaheuristics: an overview of the current state-of-the-art Eur J Oper Res 137 1 94 1002.90060
-
(2002)
Eur J Oper Res
, vol.137
, pp. 1-94
-
-
Jones, D.F.1
Mirrazavi, S.K.2
Tamiz, M.3
-
5
-
-
13544266187
-
Multicriteria scheduling
-
DOI 10.1016/j.ejor.2004.07.011, PII S0377221704004680, Multicriteria Scheduling
-
H Hoogeveen 2005 Multicriteria scheduling Eur J Oper Res 167 592 623 2157061 1154.90458 (Pubitemid 40220081)
-
(2005)
European Journal of Operational Research
, vol.167
, Issue.3
, pp. 592-623
-
-
Hoogeveen, H.1
-
6
-
-
61349108680
-
A review and evaluation of multiobjective algorithms for the flowshop scheduling problem
-
2437211
-
G Minella R Ruiz M Ciavotta 2008 A review and evaluation of multiobjective algorithms for the flowshop scheduling problem Informs J Comput 20 3 451 471 2437211
-
(2008)
Informs J Comput
, vol.20
, Issue.3
, pp. 451-471
-
-
Minella, G.1
Ruiz, R.2
Ciavotta, M.3
-
8
-
-
74849101820
-
Optimization and approximation in deterministic sequencing and scheduling: A survey
-
558574 0411.90044
-
RL Graham EL Lawler JK Lenstra AHG Rinnooy Kan 1979 Optimization and approximation in deterministic sequencing and scheduling: a survey Ann Discrete Math 5 287 326 558574 0411.90044
-
(1979)
Ann Discrete Math
, vol.5
, pp. 287-326
-
-
Graham, R.L.1
Lawler, E.L.2
Lenstra, J.K.3
Rinnooy Kan, A.H.G.4
-
9
-
-
0016952078
-
The complexity of flowshop and job shop scheduling
-
418895 0396.90041
-
MR Garey DS Johnson R Sethi 1976 The complexity of flowshop and job shop scheduling Math Oper Res 1 117 129 418895 0396.90041
-
(1976)
Math Oper Res
, vol.1
, pp. 117-129
-
-
Garey, M.R.1
Johnson, D.S.2
Sethi, R.3
-
10
-
-
0017918132
-
Flowshop and jobshop schedules: Complexity and approximation
-
T Gonzalez S Sahni 1978 Flowshop and jobshop schedules: complexity and approximation Oper Res 26 36 52 465149 0371.90061 (Pubitemid 8576420)
-
(1978)
Operations Research
, vol.26
, Issue.1
, pp. 36-52
-
-
Gonzalez Teofilo1
Sahni Sartaj2
-
11
-
-
0000474126
-
Minimizing total tardiness on one machine is NP-hard
-
1064213 0714.90052
-
J Du JYT Leung 1990 Minimizing total tardiness on one machine is NP-hard Math Oper Res 15 483 495 1064213 0714.90052
-
(1990)
Math Oper Res
, vol.15
, pp. 483-495
-
-
Du, J.1
Leung, J.Y.T.2
-
13
-
-
47249109476
-
-
2nd edn Springer, New York
-
Carlos Coello, Gary Lamont, David Veldhuizen (2007) Evolutionary algorithms for solving multi-objective problems, 2nd edn, vol 2. Springer, New York, pp 5-60
-
(2007)
Evolutionary Algorithms for Solving Multi-objective Problems
, vol.2
, pp. 5-60
-
-
Coello, C.1
Lamont, G.2
Veldhuizen, D.3
-
15
-
-
0346668239
-
Two-machine flowshop scheduling with a secondary criterion
-
DOI 10.1016/S0305-0548(02)00021-7, PII S0305054802000217
-
V T'kindt JND Gupta JC Billaut 2003 Two-machine flowshop scheduling with a secondary criterion Comput Oper Res 30 505 526 1026.90044 (Pubitemid 36022248)
-
(2003)
Computers and Operations Research
, vol.30
, Issue.4
, pp. 505-526
-
-
T'kindt, V.1
Gupta, J.N.D.2
Billaut, J.-C.3
-
17
-
-
33750743054
-
An exact parallel method for a bi-objective permutation flowshop problem
-
DOI 10.1016/j.ejor.2005.10.011, PII S0377221705006478
-
J Lemesre C Dhaenens EG Talbi 2007 An exact parallel method for a biobjective permutation flowshop problem Eur J Oper Res 177 1641 1655 2271414 1102.90049 (Pubitemid 44709442)
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 1641-1655
-
-
Lemesre, J.1
Dhaenens, C.2
Talbi, E.G.3
-
18
-
-
64449085610
-
An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness
-
B Naderi M Zandieh AKG Balagh V Roshanaei 2009 An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness Expert Syst Appl 36 9625 9633
-
(2009)
Expert Syst Appl
, vol.36
, pp. 9625-9633
-
-
Naderi, B.1
Zandieh, M.2
Balagh, A.K.G.3
Roshanaei, V.4
-
19
-
-
33845804392
-
A bicriteria flowshop scheduling problem with setup times
-
DOI 10.1016/j.amc.2006.05.160, PII S009630030600676X
-
T Eren E Güner 2006 A bi-criteria flowshop scheduling problem with setup time Appl Math Comput 183 1292 1300 2294088 1112.90021 (Pubitemid 46014676)
-
(2006)
Applied Mathematics and Computation
, vol.183
, Issue.2
, pp. 1292-1300
-
-
Eren, T.1
Guner, E.2
-
20
-
-
0037120688
-
An Ant Colony Optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem
-
DOI 10.1016/S0377-2217(02)00265-5, PII S0377221702002655
-
V T'kindt N Monmarche F Tercinet D Laugt 2002 An ant colony optimization algorithm to solve a 2-machine bi-criteria flowshop scheduling problem Eur J Oper Res 142 250 257 1922580 1082.90592 (Pubitemid 34803131)
-
(2002)
European Journal of Operational Research
, vol.142
, Issue.2
, pp. 250-257
-
-
T'kindt, V.1
Monmarche, N.2
Tercinet, F.3
Laugt, D.4
-
21
-
-
43849110246
-
A discrete particle swarm optimization for lot-streaming flowshop scheduling problem
-
1149.90064
-
CT Tseng CJ Liao 2008 A discrete particle swarm optimization for lot-streaming flowshop scheduling problem Eur J Oper Res 191 360 373 1149.90064
-
(2008)
Eur J Oper Res
, vol.191
, pp. 360-373
-
-
Tseng, C.T.1
Liao, C.J.2
-
23
-
-
0030241820
-
Multi-objective genetic algorithm and its applications to flowshop scheduling
-
DOI 10.1016/0360-8352(96)00045-9
-
T Murata H Ishibuchi H Tanaka 1996 Multiobjective genetic algorithm and its applications to flowshop scheduling Comput Ind Eng 30 957 968 (Pubitemid 126375906)
-
(1996)
Computers and Industrial Engineering
, vol.30
, Issue.4
, pp. 957-968
-
-
Murata, T.1
Ishibuchi, H.2
Tanaka, H.3
-
24
-
-
0029322972
-
A branch-and-bound approach for a two-machine flowshop scheduling problem
-
0832.90058
-
A Nagar SS Heragu J Haddock 1995 A branch-and-bound approach for a two-machine flowshop scheduling problem J Oper Res Soc 46 721 734 0832.90058
-
(1995)
J Oper Res Soc
, vol.46
, pp. 721-734
-
-
Nagar, A.1
Heragu, S.S.2
Haddock, J.3
-
26
-
-
33748858298
-
Multi-objective flow shop scheduling using differential evolution
-
DOI 10.1007/11816515-146, Intelligent Computing in Signal Processing and Pattern Recognition: International Conference on Intelligent Computing, ICIC 2006
-
B Qian L Wang DX Huang X Wang 2006 Multi-objective flow shop scheduling using differential evolution Lect Notes Control Inf 345 1125 1136 (Pubitemid 44421696)
-
(2006)
Lecture Notes in Control and Information Sciences
, vol.345
, pp. 1125-1136
-
-
Qian, B.1
Wang, L.2
Huang, D.-X.3
Wang, X.4
-
27
-
-
34548237317
-
A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: Weighted mean completion time and weighted mean tardiness
-
DOI 10.1016/j.ins.2007.06.001, PII S0020025507002861
-
R Tavakkoli-Moghaddam A Rahimi-Vahed AH Mirzaei 2007 A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: weighted mean completion time and weighted mean tardiness Inf Sci 177 5072 5090 2362813 1121.90340 (Pubitemid 47331458)
-
(2007)
Information Sciences
, vol.177
, Issue.22
, pp. 5072-5090
-
-
Tavakkoli-Moghaddam, R.1
Rahimi-Vahed, A.2
Mirzaei, A.H.3
-
28
-
-
79958830794
-
Current progress in evolutionary algorithm based multi-objective production scheduling
-
(in Chinese)
-
RF Shi 2006 Current progress in evolutionary algorithm based multi-objective production scheduling Journal of Jishou University (Natural Science Edition) 29 6 42 46 (in Chinese)
-
(2006)
Journal of Jishou University (Natural Science Edition)
, vol.29
, Issue.6
, pp. 42-46
-
-
Shi, R.F.1
-
29
-
-
33847108964
-
An interactive genetic algorithm-based framework for handling qualitative criteria in design optimization
-
DOI 10.1016/j.compind.2006.06.004, PII S016636150600159X
-
AM Brintrup J Ramsden A Tiwari 2007 An interactive genetic algorithm-based framework for handling qualitative criteria in design optimization Comput Ind 58 279 291 (Pubitemid 46283009)
-
(2007)
Computers in Industry
, vol.58
, Issue.3
, pp. 279-291
-
-
Brintrup, A.M.1
Ramsden, J.2
Tiwari, A.3
-
31
-
-
61649105812
-
Capacitor placement and scheduling using interactive bi-objective programming with valuable trade off approach
-
CC Kuo 2009 Capacitor placement and scheduling using interactive bi-objective programming with valuable trade off approach Energ Convers Manage 50 995 1003
-
(2009)
Energ Convers Manage
, vol.50
, pp. 995-1003
-
-
Kuo, C.C.1
-
32
-
-
0001173632
-
An automatic method for solving discrete programming problems
-
115825 0101.37004
-
AH Land AG Doig 1960 An automatic method for solving discrete programming problems The Econometric Society 28 3 497 520 115825 0101.37004
-
(1960)
The Econometric Society
, vol.28
, Issue.3
, pp. 497-520
-
-
Land, A.H.1
Doig, A.G.2
-
33
-
-
0031238029
-
Bicriterion scheduling in the two-machine flowshop
-
0892.90106
-
CJ Liao WC Yu CB Joe 1997 Bicriterion scheduling in the two-machine flowshop J Oper Res Soc 48 929 935 0892.90106
-
(1997)
J Oper Res Soc
, vol.48
, pp. 929-935
-
-
Liao, C.J.1
Yu, W.C.2
Joe, C.B.3
-
35
-
-
0033102018
-
A bicriteria approach to the two machine flow shop scheduling problem
-
0957.90064
-
S SayIn S KarabatI 1999 A bicriteria approach to the two machine flow shop scheduling problem Eur J Oper Res 113 435 449 0957.90064
-
(1999)
Eur J Oper Res
, vol.113
, pp. 435-449
-
-
Sayin, S.1
Karabati, S.2
-
36
-
-
0033230551
-
max flowshop scheduling problem
-
1713253 0967.90052
-
max flowshop scheduling problem Comput Oper Res 26 1293 1310 1713253 0967.90052
-
(1999)
Comput Oper Res
, vol.26
, pp. 1293-1310
-
-
Yeh, W.C.1
-
37
-
-
0035296721
-
Minimizing the total flow time and the tardiness in a two-machine flow shop
-
1961313 1005.90037
-
WC Lee CC Wu 2001 Minimizing the total flow time and the tardiness in a two-machine flow shop Int J Syst Sci 32 365 373 1961313 1005.90037
-
(2001)
Int J Syst Sci
, vol.32
, pp. 365-373
-
-
Lee, W.C.1
Wu, C.C.2
-
38
-
-
0001229050
-
An efficient branch-and-bound algorithm for the two-machine bi-criteria flowshop scheduling problem
-
WC Yeh 2001 An efficient branch-and-bound algorithm for the two-machine bi-criteria flowshop scheduling problem J Manuf Syst 20 113 123
-
(2001)
J Manuf Syst
, vol.20
, pp. 113-123
-
-
Yeh, W.C.1
-
39
-
-
85015929648
-
Bi-criteria scheduling in a two-machine permutation flowshop
-
2230445
-
BMT Lin JM Wu 2006 Bi-criteria scheduling in a two-machine permutation flowshop Int J Prod Res 44 2299 2312 2230445
-
(2006)
Int J Prod Res
, vol.44
, pp. 2299-2312
-
-
Lin, B.M.T.1
Wu, J.M.2
-
41
-
-
26444479778
-
Optimization by simulated annealing
-
702485
-
S Kirkpatrick C Gelatt P Vecchi 1983 Optimization by simulated annealing Science 220 671 679 702485
-
(1983)
Science
, vol.220
, pp. 671-679
-
-
Kirkpatrick, S.1
Gelatt, C.2
Vecchi, P.3
-
42
-
-
0021819411
-
Thermodynamics approach to the traveling salesman problem: An efficient simulation algorithm
-
V Cerny 1985 Thermodynamics approach to the traveling salesman problem: an efficient simulation algorithm J Optimiz Theory App 45 41 51 778156 0534.90091 (Pubitemid 15462741)
-
(1985)
Journal of Optimization Theory and Applications
, vol.45
, Issue.1
, pp. 41-51
-
-
Cerny, V.1
-
44
-
-
5144232432
-
Solving multiobjective production scheduling problems using metaheuristics
-
2095871 1065.90040
-
T Loukil J Teghem D Tuyttens 2005 Solving multiobjective production scheduling problems using metaheuristics Eur J Oper Res 161 42 61 2095871 1065.90040
-
(2005)
Eur J Oper Res
, vol.161
, pp. 42-61
-
-
Loukil, T.1
Teghem, J.2
Tuyttens, D.3
-
45
-
-
13544263208
-
A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs
-
DOI 10.1016/j.ejor.2004.07.020, PII S0377221704004771, Multicriteria Scheduling
-
TK Varadharajan C Rajendran 2005 A multiobjective simulated annealing algorithm for scheduling in flowshops to minimize the makespan and total flow time of jobs Eur J Oper Res 167 772 795 2157070 1154.90499 (Pubitemid 40220090)
-
(2005)
European Journal of Operational Research
, vol.167
, Issue.3
, pp. 772-795
-
-
Varadharajan, T.K.1
Rajendran, C.2
-
47
-
-
0022865373
-
Future paths for integer programming and links to artificial intelligence
-
DOI 10.1016/0305-0548(86)90048-1
-
F Glover 1986 Future paths for integer programming and links to artificial intelligence Comput Oper 13 5 533 549 868908 0615.90083 (Pubitemid 17480188)
-
(1986)
Computers and Operations Research
, vol.13
, Issue.5
, pp. 533-549
-
-
Glover Fred1
-
48
-
-
0346109676
-
Solving multiobjective production scheduling problems with tabu search
-
1835144 0992.90074
-
T Loukil J Teghem P Fortemps 2000 Solving multiobjective production scheduling problems with tabu search Control Cybern 29 3 819 828 1835144 0992.90074
-
(2000)
Control Cybern
, vol.29
, Issue.3
, pp. 819-828
-
-
Loukil, T.1
Teghem, J.2
Fortemps, P.3
-
49
-
-
6944244339
-
An application of a multiobjective tabu search algorithm to a bi-criteria flowshop problem
-
1062.90057
-
VA Armentano JEC Arroyo 2004 An application of a multiobjective tabu search algorithm to a bi-criteria flowshop problem J Heuristics 10 463 481 1062.90057
-
(2004)
J Heuristics
, vol.10
, pp. 463-481
-
-
Armentano, V.A.1
Arroyo, J.E.C.2
-
50
-
-
43949118118
-
A bicriteria flowshop scheduling with a learning effect
-
DOI 10.1016/j.apm.2007.06.009, PII S0307904X07001333
-
T Eren E Güner 2008 A bi-criteria flowshop scheduling with a learning effect Appl Math Comput 32 9 1719 1733 1145.90382 (Pubitemid 351699637)
-
(2008)
Applied Mathematical Modelling
, vol.32
, Issue.9
, pp. 1719-1733
-
-
Eren, T.1
Guner, E.2
-
51
-
-
43449107101
-
The triceiteria flowshop scheduling problem
-
T Eren E Güner 2008 The triceiteria flowshop scheduling problem Int J Adv Manuf Technol 36 1210 1220
-
(2008)
Int J Adv Manuf Technol
, vol.36
, pp. 1210-1220
-
-
Eren, T.1
Güner, E.2
-
54
-
-
84931338189
-
Specification of Genetic Search Directions in Cellular Multi-objective Genetic Algorithms
-
Evolutionary Multi-Criterion Optimization
-
Murata T, Ishibuchi H, Gen M (2001) Specification of genetic search directions in cellular multiobjective genetic algorithms. In: Zitzler E, Deb K, Thiele L, Coello Coello CA, Corne D (eds) First International Conference on Evolutionary Multi-Criterion Optimization. Springer, Lecture Notes in Computer Science No. 1993, pp 82-95 (Pubitemid 33241380)
-
(2001)
Lecture Notes in Computer Science
, Issue.1993
, pp. 82-95
-
-
Murata, T.1
Ishibuchi, H.2
Gen, M.3
-
55
-
-
84931310003
-
Pareto-Optimal Solutions for Multi-objective Production Scheduling Problems
-
Evolutionary Multi-Criterion Optimization
-
Bagchi TP (2001) Pareto-optimal solutions for multiobjective production scheduling problems. In: Zitzler E, Deb K, Thiele L, Coello Coello CA, Corne D (eds) First International Conference on Evolutionary Multi-Criterion Optimization. Springer, Lecture Notes in Computer Science No. 1993, pp 458-471 (Pubitemid 33241406)
-
(2001)
Lecture Notes in Computer Science
, Issue.1993
, pp. 458-471
-
-
Bagchi, T.P.1
-
56
-
-
0037063773
-
The development of gradual-priority weighting approach for the multiobjective flowshop scheduling problem
-
PC Chang JC Hsieh SG Lin 2002 The development of gradual-priority weighting approach for the multiobjective flowshop scheduling problem Int J Prod Econ 79 171 183
-
(2002)
Int J Prod Econ
, vol.79
, pp. 171-183
-
-
Chang, P.C.1
Hsieh, J.C.2
Lin, S.G.3
-
57
-
-
70350572217
-
New multi-objective method to solve reentrant hybrid flow shop scheduling problem
-
2556612 1176.90205
-
F Dugardin F Yalaoui L Amodeo 2010 New multi-objective method to solve reentrant hybrid flow shop scheduling problem Eur J Oper Res 203 22 31 2556612 1176.90205
-
(2010)
Eur J Oper Res
, vol.203
, pp. 22-31
-
-
Dugardin, F.1
Yalaoui, F.2
Amodeo, L.3
-
58
-
-
77549083772
-
Bi-objective group scheduling in hybrid flexible flowshop: A multi-phase approach
-
N Karimi M Zandieh HR Karamooz 2010 Bi-objective group scheduling in hybrid flexible flowshop: a multi-phase approach Expert Syst Appl 37 4024 4032
-
(2010)
Expert Syst Appl
, vol.37
, pp. 4024-4032
-
-
Karimi, N.1
Zandieh, M.2
Karamooz, H.R.3
-
59
-
-
0030192321
-
Scheduling in flowshop and cellular manufacturing systems with multiple objectives - A genetic algorithmic approach
-
J Sridhar C Rajendran 1996 Scheduling in flowshop and cellular manufacturing systems with multiple objectives: a genetic algorithmic approach Prod Plan Control 7 374 382 (Pubitemid 126625491)
-
(1996)
Production Planning and Control
, vol.7
, Issue.4
, pp. 374-382
-
-
Sridhar, J.1
Rajendran, C.2
-
60
-
-
0032131027
-
Hybrid genetic algorithms for a multiple-objective scheduling problem
-
S Cavalieri P Gaiardelli 1998 Hybrid genetic algorithms for a multiple-objective scheduling problem J Intell Manuf 9 361 367 (Pubitemid 128517783)
-
(1998)
Journal of Intelligent Manufacturing
, vol.9
, Issue.4
, pp. 361-367
-
-
Cavalieri, S.1
Gaiardelli, P.2
-
62
-
-
0038273913
-
Balance between genetic search and local search in memetic algorithms for multiobjective permutation flowshop scheduling
-
H Ishibuchi T Yoshida T Murata 2003 Balance between genetic search and local search in memetic algorithms for multiobjective permutation flowshop scheduling IEEE Trans Evol Comput 7 204 223
-
(2003)
IEEE Trans Evol Comput
, vol.7
, pp. 204-223
-
-
Ishibuchi, H.1
Yoshida, T.2
Murata, T.3
-
64
-
-
13544262325
-
Genetic local search for multi-objective flowshop scheduling problems
-
DOI 10.1016/j.ejor.2004.07.017, PII S0377221704004746, Multicriteria Scheduling
-
JEC Arroyo VA Armentano 2005 Genetic local search for multiobjective flowshop scheduling problems Eur J Oper Res 167 717 738 2157067 1077.90023 (Pubitemid 40220087)
-
(2005)
European Journal of Operational Research
, vol.167
, Issue.3
, pp. 717-738
-
-
Arroyo, J.E.C.1
Armentano, V.A.2
-
65
-
-
29344433807
-
A multi-objective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs
-
DOI 10.1007/s00170-004-2249-6
-
T Pasupathy C Rajendran RK Suresh 2006 A multiobjective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs Int J Adv Manuf Technol 27 804 815 (Pubitemid 43004635)
-
(2006)
International Journal of Advanced Manufacturing Technology
, vol.27
, Issue.7-8
, pp. 804-815
-
-
Pasupathy, T.1
Rajendran, C.2
Suresh, R.K.3
-
66
-
-
33750397101
-
Parallel cooperative meta-heuristics on the computational grid. A case study: The bi-objective Flow-Shop problem
-
DOI 10.1016/j.parco.2006.01.003, PII S0167819106000561
-
N Melab M Mezmaz EG Talbi 2006 Parallel cooperative meta-heuristics on the computational grid. A case study: the biobjective flow-shop problem Parallel Comput 32 643 659 2269535 (Pubitemid 44637307)
-
(2006)
Parallel Computing
, vol.32
, Issue.9
, pp. 643-659
-
-
Melab, N.1
Mezmaz, M.2
Talbi, E.-G.3
-
68
-
-
33847658312
-
Sub-population genetic algorithm with mining gene structures for multi-objective flow shop scheduling problems
-
PC Chang SH Chen CH Liu 2007 Sub-population genetic algorithm with mining gene structures for multi-objective flow shop scheduling problems Expert Syst Appl 33 762 771
-
(2007)
Expert Syst Appl
, vol.33
, pp. 762-771
-
-
Chang, P.C.1
Chen, S.H.2
Liu, C.H.3
-
69
-
-
0003401932
-
-
Dissertation, Dipartimento di Elettronica, Politecnico di Milano, Italy (in Italian)
-
Dorigo M (1992) Optimization, learning and natural algorithms. Dissertation, Dipartimento di Elettronica, Politecnico di Milano, Italy (in Italian)
-
(1992)
Optimization, Learning and Natural Algorithms
-
-
Dorigo, M.1
-
71
-
-
1642559633
-
Ant-colony algorithms for permutation flow shop scheduling to minimize makespan/total flow time of jobs
-
2054703 1045.90032
-
C Rajendran H Ziegler 2004 Ant-colony algorithms for permutation flow shop scheduling to minimize makespan/total flow time of jobs Eur J Oper Res 155 426 438 2054703 1045.90032
-
(2004)
Eur J Oper Res
, vol.155
, pp. 426-438
-
-
Rajendran, C.1
Ziegler, H.2
-
73
-
-
84958631637
-
An ant algorithm with a new pheromone evaluation rule for total tardiness problems
-
Springer, Berlin
-
Merkle D, Middendorf M (2000) An ant algorithm with a new pheromone evaluation rule for total tardiness problems. Proceedings of the EvoWorkshops. Lecture Notes in Computer Science, vol 1803). Springer, Berlin, pp 287-296
-
(2000)
Proceedings of the EvoWorkshops. Lecture Notes in Computer Science
, vol.1803
, pp. 287-296
-
-
Merkle, D.1
Middendorf, M.2
-
74
-
-
33751374104
-
Solving a bi-objective flowshop scheduling problem by pareto-ant colony optimization
-
Ant Colony Optimization and Swarm Intelligence - 5th International Workshop, ANTS 2006, Proceedings
-
Pasia JM, Hartl RF, Doerner KF (2006) Solving a bi-objective flowshop scheduling problem by Pareto-ant colony optimization. In: Dorigo M, Gambardella LM, Birattari M, Martinoli A, Poli R, Stützle T (eds) Lecture Notes in Computer Science, vol 4150. Ant Colony Optimization and Swarm Intelligence, pp 294-305 (Pubitemid 44811957)
-
(2006)
Lecture Notes in Computer Science (including subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics)
, vol.4150
, pp. 294-305
-
-
Pasia, J.M.1
Hartl, R.F.2
Doerner, K.F.3
-
75
-
-
38849110113
-
Ant colony optimization for multi-objective flow shop scheduling problem
-
DOI 10.1016/j.cie.2007.08.003, PII S0360835207001933
-
B Yagmahan MM Yenisey 2008 Ant colony optimization for multi-objective flow shop scheduling problem Comput Ind Eng 54 411 420 (Pubitemid 351199794)
-
(2008)
Computers and Industrial Engineering
, vol.54
, Issue.3
, pp. 411-420
-
-
Yagmahan, B.1
Yenisey, M.M.2
-
76
-
-
58149150064
-
Threshold accepting and ant-colony optimization algorithms for scheduling m-machine flow shops with lot streaming
-
S Marimuthu SG Ponnambalamb N Jawahar 2009 Threshold accepting and ant-colony optimization algorithms for scheduling m-machine flow shops with lot streaming J Mater Process Technol 209 1026 1041
-
(2009)
J Mater Process Technol
, vol.209
, pp. 1026-1041
-
-
Marimuthu, S.1
Ponnambalamb, S.G.2
Jawahar, N.3
-
77
-
-
67349089317
-
Solving a multi-objective overlapping flow-shop scheduling
-
2553442
-
RH Huang CL Yang 2009 Solving a multi-objective overlapping flow-shop scheduling Int J Adv Manuf Technol 42 955 962 2553442
-
(2009)
Int J Adv Manuf Technol
, vol.42
, pp. 955-962
-
-
Huang, R.H.1
Yang, C.L.2
-
78
-
-
71749114629
-
A multi-objective ant colony system algorithm for flow shop scheduling problem
-
B Yagmahan MM Yenisey 2010 A multi-objective ant colony system algorithm for flow shop scheduling problem Expert Syst Appl 37 1361 1368
-
(2010)
Expert Syst Appl
, vol.37
, pp. 1361-1368
-
-
Yagmahan, B.1
Yenisey, M.M.2
-
79
-
-
0029535737
-
Particle swarm optimization
-
IEEE Service Center, Piscataway, NJ
-
Kennedy J, Eberhart RC (1995) Particle swarm optimization. Proceedings of IEEE International Conference on Neural Networks, 4. IEEE Service Center, Piscataway, NJ, pp 1942-1948
-
(1995)
Proceedings of IEEE International Conference on Neural Networks
, vol.4
, pp. 1942-1948
-
-
Kennedy, J.1
Eberhart, R.C.2
-
82
-
-
33751090978
-
A multi-objective particle swarm for a flow shop scheduling problem
-
DOI 10.1007/s10878-006-9015-7
-
AR Rahimi-Vahed SM Mirghorbani 2007 A multiobjective particle swarm for a flow shop scheduling problem J Comb Optim 13 79 102 2273265 1112.90037 (Pubitemid 44771158)
-
(2007)
Journal of Combinatorial Optimization
, vol.13
, Issue.1
, pp. 79-102
-
-
Rahimi-Vahed, A.R.1
Mirghorbani, S.M.2
-
83
-
-
46649103641
-
An effective PSO-based hybrid algorithm for multiobjective permutation flow shop scheduling
-
BB Li L Wang B Liu 2008 An effective PSO-based hybrid algorithm for multiobjective permutation flow shop scheduling IEEE Trans Syst Man Cybern A38 4 818 831
-
(2008)
IEEE Trans Syst Man Cybern
, vol.38
, Issue.4
, pp. 818-831
-
-
Li, B.B.1
Wang, L.2
Liu, B.3
-
84
-
-
33847609606
-
A discrete version of particle swarm optimization for flowshop scheduling problems
-
DOI 10.1016/j.cor.2005.11.017, PII S0305054805003643
-
CJ Liao CT Tseng P Luarn 2007 A discrete version of particle swarm optimization for flowshop scheduling problems Comput Oper Res 34 3099 3111 1185.90083 (Pubitemid 46356739)
-
(2007)
Computers and Operations Research
, vol.34
, Issue.10
, pp. 3099-3111
-
-
Liao, C.-J.1
Chao-Tang Tseng2
Luarn, P.3
-
85
-
-
70449518389
-
A particle swarm optimization for multi-objective flowshop scheduling
-
DY Sha HH Lin 2009 A particle swarm optimization for multi-objective flowshop scheduling Int J Adv Manuf Technol 45 749 758
-
(2009)
Int J Adv Manuf Technol
, vol.45
, pp. 749-758
-
-
Sha, D.Y.1
Lin, H.H.2
-
86
-
-
0142000477
-
Differential Evolution - A Simple and Efficient Heuristic for Global Optimization over Continuous Spaces
-
R Storn K Price 1997 Differential evolution-a simple and efficient adaptive scheme for global optimization over continuous spaces J Glob Optim 11 341 59 1479553 0888.90135 (Pubitemid 127502202)
-
(1997)
Journal of Global Optimization
, vol.11
, Issue.4
, pp. 341-359
-
-
Storn, R.1
Price, K.2
-
87
-
-
62549140066
-
Mutli-objective no-wait flow-shop scheduling with a memetic algorithm based on differential evolution
-
B Qian L Wang DX Huang X Wang 2009 Mutli-objective no-wait flow-shop scheduling with a memetic algorithm based on differential evolution Soft Comput 13 847 869
-
(2009)
Soft Comput
, vol.13
, pp. 847-869
-
-
Qian, B.1
Wang, L.2
Huang, D.X.3
Wang, X.4
-
88
-
-
44849083459
-
An effective hybrid DE-based algorithm for multi-objective flow shop scheduling with limited buffers
-
2577248 1163.90507
-
B Qian L Wang DX Huang WL Wang X Wang 2009 An effective hybrid DE-based algorithm for multi-objective flow shop scheduling with limited buffers Comput Oper Res 36 209 233 2577248 1163.90507
-
(2009)
Comput Oper Res
, vol.36
, pp. 209-233
-
-
Qian, B.1
Wang, L.2
Huang, D.X.3
Wang, W.L.4
Wang, X.5
-
89
-
-
58549115678
-
A novel differential evolution algorithm for bi-criteria no-wait flow shop scheduling problems
-
2586516 1157.90423
-
QK Pan L Wang B Qian 2009 A novel differential evolution algorithm for bi-criteria no-wait flow shop scheduling problems Comput Oper Res 36 2498 2511 2586516 1157.90423
-
(2009)
Comput Oper Res
, vol.36
, pp. 2498-2511
-
-
Pan, Q.K.1
Wang, L.2
Qian, B.3
-
90
-
-
77953618659
-
Solving flow shop scheduling problems by quantum differential evolutionary algorithm
-
TM Zheng M Yamashiro 2010 Solving flow shop scheduling problems by quantum differential evolutionary algorithm Int J Adv Manuf Technol 49 643 662
-
(2010)
Int J Adv Manuf Technol
, vol.49
, pp. 643-662
-
-
Zheng, T.M.1
Yamashiro, M.2
-
91
-
-
0001351468
-
Using genetic algorithms to explore pattern recognition in the immune system
-
S Forrest B Javornik R Smith AS Perelson 1993 Using genetic algorithms to explore pattern recognition in the immune system Evol Comput 1 3 191 211
-
(1993)
Evol Comput
, vol.1
, Issue.3
, pp. 191-211
-
-
Forrest, S.1
Javornik, B.2
Smith, R.3
Perelson, A.S.4
-
92
-
-
0036696728
-
An immune scheduling algorithm for solving multi-objective flow-shop problem
-
(in Chinese)
-
JG Yang HM Ding P Li 2002 An immune scheduling algorithm for solving multi-objective flow-shop problem Mach Des Res 18 4 28 31 (in Chinese)
-
(2002)
Mach des Res
, vol.18
, Issue.4
, pp. 28-31
-
-
Yang, J.G.1
Ding, H.M.2
Li, P.3
-
94
-
-
45949085601
-
Hyperheuristics: Recent developments
-
Cotta C, Sevaux M, and Sörensen K (eds) studies in computational intelligence Springer 2008
-
Chakhlevitch K, Cowling P (2006) Hyperheuristics: recent developments. In: Cotta C, Sevaux M, and Sörensen K (eds) Adaptive and multilevel metaheuristics, studies in computational intelligence, 136. Springer 2008, pp 3-29
-
(2006)
Adaptive and Multilevel Metaheuristics
, vol.136
, pp. 3-29
-
-
Chakhlevitch, K.1
Cowling, P.2
-
95
-
-
0029635352
-
Heuristics for scheduling in flowshop with multiple objectives
-
0905.90107
-
C Rajendran 1995 Heuristics for scheduling in flowshop with multiple objectives Eur J Oper Res 82 540 555 0905.90107
-
(1995)
Eur J Oper Res
, vol.82
, pp. 540-555
-
-
Rajendran, C.1
-
96
-
-
0026156181
-
A new heuristic for the n-job, M-machine flow-shop problem
-
0725.90045
-
JC Ho YL Chang 1991 A new heuristic for the n-job, M-machine flow-shop problem Eur J Oper Res 52 194 202 0725.90045
-
(1991)
Eur J Oper Res
, vol.52
, pp. 194-202
-
-
Ho, J.C.1
Chang, Y.L.2
-
97
-
-
0037120618
-
Efficient heuristics for flowshop sequencing with the objectives of makespan and flow time minimisation
-
1081.90555
-
JM Framinan R Leisten R Ruiz-Usano 2002 Efficient heuristics for flowshop sequencing with the objectives of makespan and flow time minimisation Eur J Oper Res 141 559 569 1081.90555
-
(2002)
Eur J Oper Res
, vol.141
, pp. 559-569
-
-
Framinan, J.M.1
Leisten, R.2
Ruiz-Usano, R.3
-
98
-
-
0037410252
-
The two- and m-machine flowshop scheduling problems with bi-criteria of makespan and mean flow time
-
1966164 1037.90020
-
A Allahverdi 2003 The two- and m-machine flowshop scheduling problems with bi-criteria of makespan and mean flow time Eur J Oper Res 147 373 396 1966164 1037.90020
-
(2003)
Eur J Oper Res
, vol.147
, pp. 373-396
-
-
Allahverdi, A.1
-
99
-
-
0346462895
-
A new heuristic for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness
-
DOI 10.1016/S0305-0548(02)00143-0, PII S0305054802001430
-
A Allahverdi 2004 A new heuristic for m-machine flowshop scheduling problem with bi-criteria of makespan and maximum tardiness Comput Oper Res 31 157 180 2025341 1087.90025 (Pubitemid 38092813)
-
(2004)
Computers and Operations Research
, vol.31
, Issue.2
, pp. 157-180
-
-
Allahverdi, A.1
-
100
-
-
4344592872
-
A partial enumeration heuristic for multiobjective flowshop scheduling problems
-
1097.90519
-
JEC Arroyo VA Armentano 2004 A partial enumeration heuristic for multiobjective flowshop scheduling problems J Oper Res Soc 55 1000 1007 1097.90519
-
(2004)
J Oper Res Soc
, vol.55
, pp. 1000-1007
-
-
Arroyo, J.E.C.1
Armentano, V.A.2
-
101
-
-
27644480893
-
A heuristic for scheduling a permutation flowshop with makespan objective subject to maximum tardiness
-
DOI 10.1016/j.ijpe.2004.12.004, PII S0925527304004499, Control and Management of Productive Systems
-
JM Framinan R Leisten 2006 A heuristic for scheduling a permutation flowshop with makespan objective subject to maximum tardiness Int J Prod Econ 99 28 40 (Pubitemid 41550208)
-
(2006)
International Journal of Production Economics
, vol.99
, Issue.1-2
, pp. 28-40
-
-
Framinan, J.M.1
Leisten, R.2
-
102
-
-
0036027960
-
Local search heuristics for two-stage flow shop problems with secondary criterion
-
DOI 10.1016/S0305-0548(00)00061-7, PII S0305054800000617
-
JND Gupta K Hennig F Werner 2002 Local search heuristics for two-stage flow shop problems with secondary criterion Comput Oper Res 29 123 149 1026.90103 (Pubitemid 32944292)
-
(2002)
Computers and Operations Research
, vol.29
, Issue.2
, pp. 123-149
-
-
Gupta, J.N.D.1
Hennig, K.2
Werner, F.3
-
103
-
-
33847245879
-
On operators and search space topology in multiobjective flow shop scheduling
-
2267436 1121.90057
-
MJ Geiger 2007 On operators and search space topology in multiobjective flow shop scheduling Eur J Oper Res 181 195 206 2267436 1121.90057
-
(2007)
Eur J Oper Res
, vol.181
, pp. 195-206
-
-
Geiger, M.J.1
-
104
-
-
33750007920
-
A bi-criterian flow shop scheduling using artificial neural network
-
AN Haq TR Ramanan 2006 A bi-criterian flow shop scheduling using artificial neural network Int J Adv Manuf Technol 30 1132 1138
-
(2006)
Int J Adv Manuf Technol
, vol.30
, pp. 1132-1138
-
-
Haq, A.N.1
Ramanan, T.R.2
-
105
-
-
77952597373
-
Escalating evolutionary algorithm with application to bi-objective flow shop scheduling problems
-
(in Chinese)
-
RF Shi H Zhou 2007 Escalating evolutionary algorithm with application to bi-objective flow shop scheduling problems J Manage Sci 10 5 11 20 (in Chinese)
-
(2007)
J Manage Sci
, vol.10
, Issue.5
, pp. 11-20
-
-
Shi, R.F.1
Zhou, H.2
-
106
-
-
79958818618
-
Bi-directional simulation approach for multi-objective scheduling problem of hybrid flow shop
-
(in Chinese)
-
CK Zhang XF Li HH Shao DX Ren 2002 Bi-directional simulation approach for multi-objective scheduling problem of hybrid flow shop J Shanghai Jiaotong Univ 36 4 547 550 (in Chinese)
-
(2002)
J Shanghai Jiaotong Univ
, vol.36
, Issue.4
, pp. 547-550
-
-
Zhang, C.K.1
Li, X.F.2
Shao, H.H.3
Ren, D.X.4
-
108
-
-
67349094635
-
A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic
-
J Behnamian SMT Fatemi Ghomi M Zandieh 2009 A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic Expert Syst Appl 36 11057 11069
-
(2009)
Expert Syst Appl
, vol.36
, pp. 11057-11069
-
-
Behnamian, J.1
Fatemi Ghomi, S.M.T.2
Zandieh, M.3
-
109
-
-
76949102251
-
A parallel multiple reference point approach for multi-objective optimization
-
2595241 1188.90237
-
JR Figueira A Liefooghe EG Talbi AP Wierzbicki 2010 A parallel multiple reference point approach for multi-objective optimization Eur J Oper Res 205 390 400 2595241 1188.90237
-
(2010)
Eur J Oper Res
, vol.205
, pp. 390-400
-
-
Figueira, J.R.1
Liefooghe, A.2
Talbi, E.G.3
Wierzbicki, A.P.4
-
110
-
-
33847024346
-
A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing
-
DOI 10.1016/j.ejor.2006.05.023, PII S0377221706003894
-
T Sawik 2007 A lexicographic approach to bi-objective scheduling of single- period orders in make-to-order manufacturing Eur J Oper Res 180 3 1060 1075 2314430 1121.90046 (Pubitemid 46275311)
-
(2007)
European Journal of Operational Research
, vol.180
, Issue.3
, pp. 1060-1075
-
-
Sawik, T.1
-
111
-
-
37849189535
-
Metaheuristic approaches to the hybrid flow shop scheduling problem with a cost-related criterion
-
DOI 10.1016/j.ijpe.2004.05.027, PII S0925527305002380, Scheduling in Batch-Processing Industries and Supply Shains
-
A Janiak E Kozan M Lichtenstein C Oguz 2007 Metaheuristic approaches to the hybrid flow shop scheduling problem with a cost-related criterion Int J Prod Econ 105 2 407 424 (Pubitemid 44827610)
-
(2007)
International Journal of Production Economics
, vol.105
, Issue.2
, pp. 407-424
-
-
Janiak, A.1
Kozan, E.2
Lichtenstein, M.3
Oguz, C.4
-
113
-
-
42449153783
-
Algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria
-
DOI 10.1007/s00170-007-0977-0
-
J Jungwattanakit M Reodecha P Chaovalitwongse F Werner 2006 Algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria Int J Adv Manuf Technol 37 3-4 354 370 (Pubitemid 351571819)
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.37
, Issue.3-4
, pp. 354-370
-
-
Jungwattanakit, J.1
Reodecha, M.2
Chaovalitwongse, P.3
Werner, F.4
-
114
-
-
41549086546
-
A multi-objective scatter search for a bi-criteria no-wait flow shop scheduling problem
-
DOI 10.1080/03052150701732509, PII 791047652
-
AR Rahimi-Vahed B Javadi M Rabbani R Tavakkoli-Moghaddam 2008 A multi-objective scatter search for a bi-criteria no-wait flow shop scheduling problem Eng Optim 40 4 331 346 2405873 (Pubitemid 351462592)
-
(2008)
Engineering Optimization
, vol.40
, Issue.4
, pp. 331-346
-
-
Rahimi-Vahed, A.R.1
Javadi, B.2
Rabbani, M.3
Tavakkoli-Moghaddam, R.4
-
115
-
-
63449087667
-
A novel hybrid multi-objective shuffled frog-leaping algorithm for a bi-criteria permutation flow shop scheduling problem
-
A Rahimi-Vahed M Dangchi H Rafiei E Salimi 2009 A novel hybrid multi-objective shuffled frog-leaping algorithm for a bi-criteria permutation flow shop scheduling problem Int J Adv Manuf Technol 41 1227 1239
-
(2009)
Int J Adv Manuf Technol
, vol.41
, pp. 1227-1239
-
-
Rahimi-Vahed, A.1
Dangchi, M.2
Rafiei, H.3
Salimi, E.4
-
116
-
-
78549269075
-
Hybrid flowshop scheduling with machine and resource-dependent processing times
-
2740853
-
J Behnamian SMT Fatemi Ghomi 2010 Hybrid flowshop scheduling with machine and resource-dependent processing times Appl Math Modell 35 1107 1123 2740853
-
(2010)
Appl Math Modell
, vol.35
, pp. 1107-1123
-
-
Behnamian, J.1
Fatemi Ghomi, S.M.T.2
-
117
-
-
75849165458
-
Electromagnetism-like mechanism and simulated annealing algorithms for flowshop scheduling problems minimizing the total weighted tardiness and makespan
-
B Naderi R Tavakkoli-Moghaddam M Khalili 2010 Electromagnetism-like mechanism and simulated annealing algorithms for flowshop scheduling problems minimizing the total weighted tardiness and makespan Knowl Based Syst 23 77 85
-
(2010)
Knowl Based Syst
, vol.23
, pp. 77-85
-
-
Naderi, B.1
Tavakkoli-Moghaddam, R.2
Khalili, M.3
-
118
-
-
0033672413
-
Handling preferences in evolutionary multiobjective optimization: A survey
-
IEEE Service Center, Piscataway, New Jersey
-
Coello Coello CA (2000) Handling preferences in evolutionary multiobjective optimization: a survey. 2000 Congress on Evolutionary Computation 1. IEEE Service Center, Piscataway, New Jersey, pp 30-37
-
(2000)
2000 Congress on Evolutionary Computation
, vol.1
, pp. 30-37
-
-
Coello Coello, C.A.1
-
119
-
-
0036464795
-
Preferences and their application in evolutionary multiobjective optimization
-
DOI 10.1109/4235.985691, PII S1089778X02022063
-
D Cvetković IC Parmee 2002 Preferences and their application in evolutionary multiobjective optimization IEEE Trans Evol Comput 6 1 42 57 (Pubitemid 34404563)
-
(2002)
IEEE Transactions on Evolutionary Computation
, vol.6
, Issue.1
, pp. 42-57
-
-
Cvetkovic, D.1
Parmee, I.C.2
-
120
-
-
3142667645
-
Preference-based search and multi-criteria
-
2076513 1156.90381
-
U Junker 2004 Preference-based search and multi-criteria Ann Oper Res 130 75 115 2076513 1156.90381
-
(2004)
Ann Oper Res
, vol.130
, pp. 75-115
-
-
Junker, U.1
-
121
-
-
33750235274
-
Incorporation of decision maker's preference into evolutionary multiobjective optimization algorithms
-
GECCO 2006 - Genetic and Evolutionary Computation Conference
-
Ishibuchi H, Nojima Y, Narukawa K, Doi T (2006) Incorporation of decision maker's preference into evolutionary multiobjective optimization algorithms. Proceedings of Genetic and Evolutionary Computation Conference-GECCO, New York, pp 741-742 (Pubitemid 44611396)
-
(2006)
GECCO 2006 - Genetic and Evolutionary Computation Conference
, vol.1
, pp. 741-742
-
-
Ishibuchi, H.1
Nojima, Y.2
Narukawa, K.3
Doi, T.4
-
123
-
-
46149114624
-
Incorporating preference information in interactive reference point methods for multiobjective optimization
-
M Luque K Miettinen P Eskelinen F Ruiz 2009 Incorporating preference information in interactive reference point methods for multiobjective optimization Omega-Int J Manage S 37 450 462
-
(2009)
Omega-Int J Manage S
, vol.37
, pp. 450-462
-
-
Luque, M.1
Miettinen, K.2
Eskelinen, P.3
Ruiz, F.4
-
124
-
-
70349620402
-
A preference-based evolutionary algorithm for multiobjective optimization
-
L Thiele K Miettinen PJ Korhonen J Molina 2009 A preference-based evolutionary algorithm for multiobjective optimization Evol Comput 17 3 411 436
-
(2009)
Evol Comput
, vol.17
, Issue.3
, pp. 411-436
-
-
Thiele, L.1
Miettinen, K.2
Korhonen, P.J.3
Molina, J.4
-
125
-
-
63149128570
-
Particle swarm optimization with preference order ranking for multi-objective optimization
-
Y Wang Y Yang 2009 Particle swarm optimization with preference order ranking for multi-objective optimization Inf Sci 179 1944 1959
-
(2009)
Inf Sci
, vol.179
, pp. 1944-1959
-
-
Wang, Y.1
Yang, Y.2
-
126
-
-
0034206108
-
An improved heuristic for two-machine owshop scheduling with an availability constraint
-
1784602 0982.90022
-
TCE Cheng G Wang 2000 An improved heuristic for two-machine owshop scheduling with an availability constraint Oper Res Lett 26 223 229 1784602 0982.90022
-
(2000)
Oper Res Lett
, vol.26
, pp. 223-229
-
-
Cheng, T.C.E.1
Wang, G.2
-
127
-
-
26444492122
-
Scheduling two-stage hybrid flow shop with availability constraints
-
DOI 10.1016/j.cor.2004.09.034, PII S0305054804002564
-
H Allaoui A Artiba 2006 Scheduling two-stage hybrid flow shop with availability constraints Comput Oper Res 33 1399 1419 2194791 1126.90017 (Pubitemid 41428298)
-
(2006)
Computers and Operations Research
, vol.33
, Issue.5
, pp. 1399-1419
-
-
Allaoui, H.1
Artiba, A.2
-
128
-
-
29144477260
-
A polynomial-time approximation scheme for the two-machine flow shop scheduling problem with an availability constraint
-
DOI 10.1016/j.cor.2005.01.004, PII S0305054805000043
-
J Breit 2006 A polynomial-time approximation scheme for the two-machine flow shop scheduling problem with an availability constraint Comput Oper Res 33 2143 2153 2201694 1086.90019 (Pubitemid 41802282)
-
(2006)
Computers and Operations Research
, vol.33
, Issue.8
, pp. 2143-2153
-
-
Breit, J.1
-
129
-
-
37849188714
-
Hybrid flow shop scheduling as a multi-mode multi-project scheduling problem with batching requirements: A real-world application
-
DOI 10.1016/j.ijpe.2004.05.029, PII S0925527305002409, Scheduling in Batch-Processing Industries and Supply Shains
-
S Voβ A Witt 2007 Hybrid flow shop scheduling as a multi-mode multi-project scheduling problem with batching requirements: a real-world application Int J Prod Econ 105 445 458 (Pubitemid 44827612)
-
(2007)
International Journal of Production Economics
, vol.105
, Issue.2
, pp. 445-458
-
-
Voss, S.1
Witt, A.2
-
130
-
-
33746267197
-
Heuristics for two-machine flowshop scheduling with setup times and an availability constraint
-
DOI 10.1016/j.cor.2005.05.003, PII S0305054805001516
-
X Wang TCE Cheng 2007 Heuristics for two-machine flowshop scheduling with setup times and an availability constraint Comput Oper Res 34 152 162 2335391 1109.90046 (Pubitemid 44093846)
-
(2007)
Computers and Operations Research
, vol.34
, Issue.1
, pp. 152-162
-
-
Wang, X.1
Edwin Cheng, T.C.2
-
131
-
-
34548625026
-
Modeling realistic hybrid flexible flowshop scheduling problems
-
R Ruiz F Sivrikaya-Serifoǧlu T Urlings 2006 Modeling realistic hybrid flexible flowshop scheduling problems Comput Oper Res 35 1151 1175
-
(2006)
Comput Oper Res
, vol.35
, pp. 1151-1175
-
-
Ruiz, R.1
Sivrikaya-Serifoǧlu, F.2
Urlings, T.3
-
132
-
-
34548462907
-
A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines
-
2566391
-
C Low CJ Hsu CT Su 2006 A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines Comput Oper Res 35 845 853 2566391
-
(2006)
Comput Oper Res
, vol.35
, pp. 845-853
-
-
Low, C.1
Hsu, C.J.2
Su, C.T.3
-
133
-
-
68949220786
-
Two-stage hybrid batching flowshop scheduling with blocking and machine availability constraints using genetic algorithm
-
H Luo GQ Huang YF Zhang QY Dai X Chen 2009 Two-stage hybrid batching flowshop scheduling with blocking and machine availability constraints using genetic algorithm Rob Com-Int Manuf 25 962 971
-
(2009)
Rob Com-Int Manuf
, vol.25
, pp. 962-971
-
-
Luo, H.1
Huang, G.Q.2
Zhang, Y.F.3
Dai, Q.Y.4
Chen, X.5
-
134
-
-
10444260511
-
Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints
-
H Allaoui A Artiba 2004 Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints Comput Ind Eng 47 431 450
-
(2004)
Comput Ind Eng
, vol.47
, pp. 431-450
-
-
Allaoui, H.1
Artiba, A.2
-
137
-
-
69649083513
-
Solving multi-objective SDST flexible flow shop using GRASP algorithm
-
Davoudpour H, Ashrafi M (2009) Solving multi-objective SDST flexible flow shop using GRASP algorithm. Int J Adv Manuf Technol 44:737-747
-
(2009)
Int J Adv Manuf Technol
, vol.44
, pp. 737-747
-
-
Davoudpour, H.1
Ashrafi, M.2
|