-
1
-
-
0342497956
-
Hybrid flow shop problems, a decomposition based heuristic approach
-
Marrakech, FUCAM/IFIP/INRIA
-
Aghezzaf, E.H., Artiba, A., Moursli, O., Tahon, C., 1995. Hybrid flow shop problems, a decomposition based heuristic approach. Proceeding of International Conference on Industrial Engineering and Production Management (IEPM'95). Marrakech, FUCAM/IFIP/INRIA, pp. 43-56.
-
(1995)
Proceeding of International Conference on Industrial Engineering and Production Management (IEPM'95)
, pp. 43-56
-
-
Aghezzaf, E.H.1
Artiba, A.2
Moursli, O.3
Tahon, C.4
-
3
-
-
0000811707
-
Pathology of traveling salesman subtour elimination algorithms
-
M. Bellmore, and J.C. Malone Pathology of traveling salesman subtour elimination algorithms Operations Research 19 1971 278 307
-
(1971)
Operations Research
, vol.19
, pp. 278-307
-
-
Bellmore, M.1
Malone, J.C.2
-
4
-
-
0028462998
-
The impact of sequence dependent setup time on job shop scheduling performance
-
P.M. Bobrowski, and S.C. Kim The impact of sequence dependent setup time on job shop scheduling performance International Journal of Production Research 32 1994 1503 1520
-
(1994)
International Journal of Production Research
, vol.32
, pp. 1503-1520
-
-
Bobrowski, P.M.1
Kim, S.C.2
-
5
-
-
0031206538
-
Scheduling jobs with uncertain setup times and sequence dependency
-
P.M. Bobrowski, and S.C. Kim Scheduling jobs with uncertain setup times and sequence dependency International Journal of Management Science 25 4 1997 437 447
-
(1997)
International Journal of Management Science
, vol.25
, Issue.4
, pp. 437-447
-
-
Bobrowski, P.M.1
Kim, S.C.2
-
10
-
-
0345216198
-
Production planning in the glass industry
-
G. Chevalier, J. Barrier, and P. Richard Production planning in the glass industry Revue VERRE 2 5 1996 27 29
-
(1996)
Revue VERRE
, vol.2
, Issue.5
, pp. 27-29
-
-
Chevalier, G.1
Barrier, J.2
Richard, P.3
-
11
-
-
0023576978
-
The effects of setup time on output capacity in cellular manufacturing
-
BB. Flynn The effects of setup time on output capacity in cellular manufacturing International Journal of Production Research 25 1987 1761 1772
-
(1987)
International Journal of Production Research
, vol.25
, pp. 1761-1772
-
-
Flynn, B.B.1
-
12
-
-
0030385077
-
Using metaheuristics for solving a production scheduling problem in a chemical firm
-
P. Fortemps, C. Ost, M. Pirlot, J. Teghem, and D. Tuyttens Using metaheuristics for solving a production scheduling problem in a chemical firm International Journal of Production Economics 46-47 13 1996 13 26
-
(1996)
International Journal of Production Economics
, vol.46-47
, Issue.13
, pp. 13-26
-
-
Fortemps, P.1
Ost, C.2
Pirlot, M.3
Teghem, J.4
Tuyttens, D.5
-
14
-
-
0001068310
-
Sequencing a one state-variable machine: A solvable case of traveling salesman problem
-
P.C. Gilmore, and R.E. Gomory Sequencing a one state-variable machine A solvable case of traveling salesman problem Operations Research 12 1964 655 679
-
(1964)
Operations Research
, vol.12
, pp. 655-679
-
-
Gilmore, P.C.1
Gomory, R.E.2
-
15
-
-
0027625565
-
Scheduling sequencing-dependent jobs on identical parallel machines to minimize completion criteria
-
A. Guinet Scheduling sequencing-dependent jobs on identical parallel machines to minimize completion criteria International Journal of Production Research 31 1993 1579 1594
-
(1993)
International Journal of Production Research
, vol.31
, pp. 1579-1594
-
-
Guinet, A.1
-
16
-
-
0002687992
-
Impact of the setup variable on capacity and inventory decisions
-
C.K. Hahn, D.J. Bragg, and D.W. Shin Impact of the setup variable on capacity and inventory decisions Academic Management Review 13 1989 91 103
-
(1989)
Academic Management Review
, vol.13
, pp. 91-103
-
-
Hahn, C.K.1
Bragg, D.J.2
Shin, D.W.3
-
17
-
-
0001430010
-
Parallel sequencing and assembly line problems
-
T.C. Hu Parallel sequencing and assembly line problems Operations Research 9 1961 841 948
-
(1961)
Operations Research
, vol.9
, pp. 841-948
-
-
Hu, T.C.1
-
19
-
-
0003898180
-
-
Miller, R.E., Thatcher, J.W. (Eds.) Plenum Press, New York
-
Karp, R., 1972. In: Miller, R.E., Thatcher, J.W. (Eds.), Complexity of Computer Computations. Plenum Press, New York.
-
(1972)
Complexity of Computer Computations
-
-
Karp, R.1
-
21
-
-
0031248652
-
A hybrid two stage flow shop with part family, batch production, major and minor setups
-
S. Li A hybrid two stage flow shop with part family, batch production, major and minor setups European Journal of Operational Research 102 1997 142 156
-
(1997)
European Journal of Operational Research
, vol.102
, pp. 142-156
-
-
Li, S.1
-
23
-
-
0033355537
-
Cluster-based branching for the asymmetric traveling salesman problem
-
J. Lysgaard Cluster-based branching for the asymmetric traveling salesman problem European Journal of Operational Research 119 1999 314 325
-
(1999)
European Journal of Operational Research
, vol.119
, pp. 314-325
-
-
Lysgaard, J.1
-
24
-
-
0002643827
-
Scheduling with deadlines and loss functions
-
R. McNaughton Scheduling with deadlines and loss functions Management Science 6 1959 1 12
-
(1959)
Management Science
, vol.6
, pp. 1-12
-
-
McNaughton, R.1
-
25
-
-
27644526233
-
A new approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times based on linear programming
-
PORTO, Portugal
-
Nait, T.D., Chu, C., Yalaoui, F., Amodeo, L., 2003. A new approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times based on linear programming. International Conference on Industrial Engineering and Production Management, IEPM'03, vol. 3, PORTO, Portugal, pp. 266-274.
-
(2003)
International Conference on Industrial Engineering and Production Management, IEPM'03
, vol.3
, pp. 266-274
-
-
Nait, T.D.1
Chu, C.2
Yalaoui, F.3
Amodeo, L.4
-
26
-
-
84985846638
-
A comparison of sequencing rules for two stage hybrid flow shop
-
S.L. Narasimhan, and P.M. Mangiameli A comparison of sequencing rules for two stage hybrid flow shop Decision Sciences 18 1987 250 265
-
(1987)
Decision Sciences
, vol.18
, pp. 250-265
-
-
Narasimhan, S.L.1
Mangiameli, P.M.2
-
28
-
-
0018444331
-
A production scheduling problem in the glass container industry
-
R.J. Paul A production scheduling problem in the glass container industry Operation Research 27 2 1979 290 302
-
(1979)
Operation Research
, vol.27
, Issue.2
, pp. 290-302
-
-
Paul, R.J.1
-
29
-
-
0020709337
-
Analysis of a linear programming heuristic for scheduling unrelated parallel machines
-
C.N. Potts Analysis of a linear programming heuristic for scheduling unrelated parallel machines Discrete Applied Mathematics 10 2 1985 155 164
-
(1985)
Discrete Applied Mathematics
, vol.10
, Issue.2
, pp. 155-164
-
-
Potts, C.N.1
-
31
-
-
27644507590
-
Ordonnancement sur des machines parallèles identiques avec splitting et temps de préparation dépendants de la séquence
-
France, Troyes
-
Riotteau, G., Scaloni, O., Néron, E., 2001. Ordonnancement sur des machines parallèles identiques avec splitting et temps de préparation dépendants de la séquence. Proceedings of MOSIM'01, France, Troyes, pp. 69-74.
-
(2001)
Proceedings of MOSIM'01
, pp. 69-74
-
-
Riotteau, G.1
Scaloni, O.2
Néron, E.3
-
33
-
-
27644470336
-
-
Department of Computer Service State University of New York
-
S. Skierra The Stony Book Algorithm Repository 1998 Department of Computer Service State University of New York
-
(1998)
The Stony Book Algorithm Repository
-
-
Skierra, S.1
-
34
-
-
0013314082
-
Computational performance of three subtour elimination algorithms for the solving asymmetric traveling salesman problem
-
T.H.C. Smith, V. Srinivasan, and G.L. Thompson Computational performance of three subtour elimination algorithms for the solving asymmetric traveling salesman problem Annals of Discrete Mathematics 1 1977 495 506
-
(1977)
Annals of Discrete Mathematics
, vol.1
, pp. 495-506
-
-
Smith, T.H.C.1
Srinivasan, V.2
Thompson, G.L.3
-
36
-
-
0347934513
-
Parallel machine scheduling with splitting jobs
-
W. Xing, and J. Zhang Parallel machine scheduling with splitting jobs Discrete Applied Mathematics 103 2000 259 269
-
(2000)
Discrete Applied Mathematics
, vol.103
, pp. 259-269
-
-
Xing, W.1
Zhang, J.2
-
37
-
-
27644563253
-
Parallel machine scheduling with job splitting and setup times: A heuristic approach and performance analysis
-
Glasgow, UK
-
Yalaoui, F., Chu, C., 1999. Parallel machine scheduling with job splitting and setup times: A heuristic approach and performance analysis. Proceedings of the International Conference on Industrial Engineering and Production Management (IEPM'99), vol. 2, Glasgow, UK, pp. 297-306.
-
(1999)
Proceedings of the International Conference on Industrial Engineering and Production Management (IEPM'99)
, vol.2
, pp. 297-306
-
-
Yalaoui, F.1
Chu, C.2
-
38
-
-
0037321475
-
An efficient heuristic approach for parallel machine scheduling with job splitting and sequence-dependent setup times
-
F. Yalaoui, and C. Chu An efficient heuristic approach for parallel machine scheduling with job splitting and sequence-dependent setup times IIE Transactions 35 2 2003 183 190
-
(2003)
IIE Transactions
, vol.35
, Issue.2
, pp. 183-190
-
-
Yalaoui, F.1
Chu, C.2
|